This solicitation is for rehabilitation work on nine bridges located in the Great Smoky Mountains National Park in Tennessee. The project involves asphalt removal, scour protection, new concrete decks, replacing nail-laminated timber decking, masonry repointing, repaving approaches, and rail repairs. The work will be split into multiple schedules with a total expected cost between $1 million to $5 million. All construction must be completed by March 26, 2022. Certified small businesses can submit sealed bids by the date specified in the solicitation to be issued on or around June 17, 2020. The solicitation is being conducted by the Department of Transportation Federal Highway Administration for the Great Smoky Mountains National Park project.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R01
-M a y -2
1:
P
M M
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
GENERAL NOTES AND INDEX
A C
T U
A L F I L E R
G R
S M
G N .D
G N
GENERAL NOTES:
SPECIFICATIONS:
Design:
Field verify all dimensions.
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
Construction:
DESIGN LOADING:
Dead Load:
MATERIALS:
WELDING:
TIMBER:
SCOPE OF WORK
No scale 1
Live Loads:
H-20 Truck
STRUCTURAL STEEL:
CONCRETE:
REINFORCING STEEL:
- inch unless noted otherwise. 4 3Chamfer exposed edges of all concrete
Furnish Class D(AE) concrete for approach slab with f'c = 5.0 ksi at 28 days.
AASHTO Standard Specifications for Highway Bridges, 17th Edition, 2002;Errata 2003 and 2005.
Timber: 50 pcf
Verify all dimensions and locations in the field prior to ordering materials.
Structure No. 5460-060P
RAMSEY CASCADES ROAD BRIDGE #1
Schedule C
Provide 2-inch cover for reinforcing steel, unless noted otherwise.
Furnish reinforcing steel conforming to AASHTO M 31, Grade 60 deformed.
Galvanize angles according to ASTM A123.
Galvanize all bolts, nuts, and washers according to ASTM A153 unless noted otherwise.
to ASTM A325 (Type 1) unless noted otherwise.
" diameter fasteners conforming 8 7All field connections are slip critical, friction type (Class A) made with
The contractor is responsible for the stability of the structure during all phases of construction.
match AMS-STD 595 20059 (brown). Touch up paint on site as specified by manufacturer.
the manufacturing plant using paint system 2, according to Section 563. Furnish the top coat with gloss finish to
Furnish high-strength low alloy structural steel conforming to AASHTO M270, Grade 50. Paint all structural steel at
Field welding of any kind is not permitted on beams unless noted otherwise.
Magnetic particle testing (MT.) - 10% min.
Fillet welds - Visual - 100%
Perform non-destructive testing of welds as follows:
classified E7028.
Perform welding process Shielded Metal Arc Welding (SMAW) using low hydrogen electrodes
Perform all welding in accordance with the current AASHTO/AWS D1.5 Bridge Welding Code.
long for the nail laminated deck.
Furnish ASTM F1667 stainless steel, type 316, annular ring shank nails, 20d (4 inches)
Galvanize all bolts, nuts, and washers according to ASTM A153 unless noted otherwise.
Use pressure treated Southern Pine No. 1 timber that is surfaced on all four sides (S4S).
arsenic and/or chromium compounds. Obtain all timber from a single approved source.
Use waterborne copper-based suspension containing micronized or dispersed copper not containing
Pressure treat all timber in accordance with the latest AWPA U1. Provide use category UC4B timber.
west approach to match final grade.
Place concrete approach slab at east approach and regrade 7.
6. Repoint stone masonry on pier and west abutment.
5. Place riprap around pier.
4. Repair undermining.
Place deck, curb, and rail.3.
Set new beams.2.
Remove existing curb, deck, and beams.1.
INDEX OF BRIDGE PLAN SHEETS
Scour Repair Details
Approach Slab
Deck Boards Layout
Miscellaneous Details-2
Miscellaneous Details-1
Girder Connection Details: Span-2
Girder Connection Details: Span-1
Camber Diagram
Girder Layout
Typical Section
Plan and Elevation
General Notes and Index
SHEET NO. SHEET TITLE
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128512
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
REHABILITATION OF NINE BRIDGES (TN SIDE)
May 2020
R02
M
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
A C
T U
A L F I L E R
G R
S M
P
E .D
G N
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-M a y -2
1:
P
M
93'-7"
20°
End Bridge
Elev. 1677.81
Sta. 101+13.58
Elev. 1677.13
Sta. 100+20.00
Begin Bridge
Traffic
CL Structure
P o rt e rs C re e k
N
100+20 100+40 100+60 100+80 101+00 101+20
(Ty p.)
"4 163'-11
+0.582%
CIP concrete
Existing
Fix.
Fix.Exp.
Exp.1675 masonry wall
Existing
CL Bearing
PLAN AND ELEVATION
sheet for details
See "MISCELLANEOUS DETAILS"
'' = 1'-0''16
No scale
A A
2'-0"
Face of Pier
Approach slab
"4 329'-7
Bridge length = 93'-7"
2'- 0"
CL Bearing
West Abutment
East Abutment
(Typ.)
T y p of footing
Tie into top
PLAN
ELEVATION
SECTION A-A
Notes:
'-0
See Note 5.
Repair undermining/Scour
(Method A)
Riprap Class 3
(Method A)
Riprap Class 3
CL
(Approximate)
Pier
Face of curb
Face of curb
" (North)8 5" = 88'-62
117 Post spaces @ 5'-1
6"
(Typ.)
(Typ.)
masonry joint
Repoint masonry joints
Repoint concrete
Existing CIP
" = 92'-3" (South)2 118 Post spaces @ 5'-1 grade
Finished wall
Existing masonry concrete
Existing CIP
Finish grade
CLground line at constr.
Approximate existing
Ramsey Pong Rd.
Constr. CL approved by the CO.
6. Repoint stone masonry on pier and west abutment, as
5. See "SCOUR REPAIR DETAILS" sheet for undermining repair.
Place structural concrete approach slab at east approach.
4. Furnish structural concrete class D (AE) for approach slab.
3. See "DECK BOARDS LAYOUT" sheet for additional information.
limestone as riprap.
area in texture and size, as approved by the CO. Do not use
CO. Furnish field stone that matches existing field stone in the color to blend in with natural surroundings, as approved by the
2. Furnish rock and field stone for riprap that is brown or gray in materials.
1. Verify all dimensions and locations in the field prior to ordering
2'-4"
Structure No. 5460-060P
RAMSEY CASCADES ROAD BRIDGE #1
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128512
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R03
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-M a y -2
1:
P
M
Notes:
TYPICAL SECTION
3No scale
A C
T U
A L F I L E R
G R
S M
T Y P
X S S
P A
N .D
G N
3'-8"3'-8"
3'-8"3'-8"
4" x 8"
Continuous
4" x 8"
Continuous
(Typ.)
Flange clip
(Typ.)
Flange clip
Profile grade
Profile grade
13'-0"
11'-8"
CLStructure
W 27 x 161
W18 x 97 splice detail.
'' radii. See rail 8 5of all rails with bolts and washers. Round top corners
" carriage4 3maximum. Connect with
Rail length 12'-0'' minimum and 16'-0"
4'' x 8'' Rail, continuous each side.
splice detail.
'' radii. See rail 8 5of all rails with bolts and washers. Round top corners
" carriage4 3maximum. Connect with
Rail length 12'-0'' minimum and 16'-0"
4'' x 8'' Rail, continuous each side.
each side.
continuous
8" x 8" Curbs, 2'-10" 2'-10"
2'-10"2'-10"
11'-8"
13'-0"
TYPICAL SECTION SPAN 1
TYPICAL SECTION SPAN 2
(Typ.)
8" x 8" Post
(Typ.)
8" x 8" Post
"4 m in
Sealer plank length at bridge ends.
8'-0" Min. plank length with odd
3'-0"
Stagger end joints Traffic direction
RUNNING PLANKS LAYOUT
lag screw (Typ.)
" Dia. galvanized 8
Bridge end
2"
2'-0"
" 4" 4"
LAG SCREW PATTERN
lag screw
" Dia. galvanized 8
(Typ.)
See Note 3
See Note 3 See Note 3
See Note 3
See Detail A
DETAIL A
ELEVATION
PLAN
Laminated deck
Plank
2" x 12" Running deck
Laminated indicates nails in first lamination indicates nails in second lamination indicates nails in third lamination
"2 14 "2
14 9" 9""2
T y p
NAIL LAMINATION DETAIL
(Typ.)
(Typ.)
2" x 8" Nail laminated timber deck nailed with
20d nails @ 18", staggered as shown. Deck connected to beams with galvanized flange clips @ 12" spacing on all beams.
2" x 8" Nail laminated timber deck nailed with
20d nails @ 18", staggered as shown. Deck connected to beams with galvanized flange clips @ 12" spacing on all beams.
B1 B2 B3
B1 B2 B3
Scupper blocks, 51 2" x 8" x 24" with 2'-0" max. space between blocks. End block to be flush with ends of deck.
each side continuous
8" x 8" Curbs, Top surface
Cut washer
(Typ.)
B1
B1 - indicates beam number
- indicates beam number
See Note 9 (Typ.)
Waterproofing membrane.
See Note 9 (Typ.).
Waterproofing membrane planks (Typ.)
2" x 12" Running planks (Typ.)
2" x 12" Running plank
2" x 12" Running plank
2" x 12" Running bolts and washers.
1" Dia. galvanized carriage
(Typ.)
bolts and washers.
1" Dia. galvanized carriage
2" x 8" x 24" Scupper blocks, with
2'-0" max. space between blocks.
End block to be flush with ends of deck.
Structure No. 5460-060P
RAMSEY CASCADES ROAD BRIDGE #1
considered incidental to Section 555.
to manufacturer's recommendations. Cost of waterproofing is
702.07 or 702.08 over the top flange of each beam according
9. Install waterproofing membrane conforming to Subsection
8. See "PLAN AND ELEVATION" sheet for post spacing.
information.
7. See "MISCELLANEOUS DETAILS 1 and 2" sheets for more
6. Treat holes with wood preservatives before placing lag screws.
" less than shank diameter.64 9threaded lead holes
" larger than shank diameter; 16
15. Prebore shank lead holes
4. Clean deck and install timber runners on deck.
3. Cut to fit timber running boards on bridge deck.
2. Railing dimensions are actual size.
conforming to ASTM A153, unless noted otherwise.
Furnish hardware conforming to ASTM A307 and galvanize 1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128512
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R04
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-M a y -2
1:
P
M
A C
T U
A L F I L E R
G R
S M
F
R A
M E .D
G N
CL
" Plate (Typ.)2
W27x161
W18x97
W27x161
(Typ.)
(T y p
Notes:
GIRDER LAYOUT
C
C
A
A
B
B D
D
2''x1" Bearing stiffener (Typ.)
"7
9"
"2 163'-9
"2 129'-765'-3"
"2 128'-3
"2 1" = 61'-116
115 Spaces @ 12'-2 "2 1" = 25'-74
32 Spaces @ 12'-9
95'-0"
65'-3" "2 129'-7
9" 7"8"
"2
94'-11"
2'' x 1" Bearing stiffener (Typ.)
GIRDER ELEVATION
FRAMING PLAN
CL Bearings
Constr.
" = 1'-0"4
(Beam 3 shown)
Connection plate (Typ.)
CL Bearings
SPAN 2 SPAN 1
C15 x 33.9 plate (Typ.)
" Connection 2 1" x 2
3.
2.
1.
plate (Typ.)
Connection
C12x20.7
(Typ.)
(Typ.)
" End plate 2
" Gap2
Measured along of beamsCL
Structure No. 5460-060P
RAMSEY CASCADES ROAD BRIDGE #1
steel.
Submit survey data to the CO prior to ordering the structural materials.
Verify all dimensions and locations in the field prior to ordering information.
See "GIRDER CONNECTION DETAILS" sheet for additional
B1
B2
B3
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128512
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R05
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-M a y -2
1:
P
M
0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L
CLPier
Span L Span L
Reference line
Total camber Total camberDL Deflection DL Deflection
No scale
Notes:
0.1 L 0.2 L 0.3 L 0.4 L 0.5 L 0.7 L 0.8 L 0.9 L0.6 L
I STEEL D.L. (in.)
III SUPERIMPOSED D.L. (in.)
CL
0II TIMBER DECK D.L. (in.)
"4
A C
T U
A L F I L E R
G R
S M
C A
M B
E R .D
G N
TOTAL = I+II+III (in.)
0.1 L 0.2 L 0.3 L 0.4 L 0.5 L 0.7 L 0.8 L 0.9 L0.6 L of Bearings
I STEEL D.L. (in.)
III SUPERIMPOSED D.L. (in.)
CL
0II TIMBER DECK D.L. (in.)
''16 5 ''16
7 ''2
''8 1 "4
1 "8
TOTAL = I+II+III (in.)
I STEEL D.L. (in.)
III SUPERIMPOSED D.L. (in.)
0II TIMBER DECK D.L. (in.)
"8 3 "2
TOTAL = I+II+III (in.)
I STEEL D.L. (in.)
III SUPERIMPOSED D.L. (in.)
0II TIMBER DECK D.L. (in.)
"4 1 "8
3 "2
TOTAL = I+II+III (in.)
''16
''2 1 ''2
1 ''16 7 ''16
5 ''16
''8 1"4
1"8 3 "8
3 "8 3 "8
"32 1 ''16
1 "32 1''16
1 ''16 1 ''8
1 ''16 1 ''16
1 ''16
0 ''16 5 ''16
10 ''16 13 ''16
15 1" ''16 15 ''16
13 ''16 10 ''16
"8 1 "4
1 "2 1 "2
1 "4 1 "8
"8 1 "4
1 "4 1 "8
3 "8 3 "8
1"4 1"8
3 "8 3 "8
0 "32 1 ''16
1 ''16 1 ''16
1 ''16 1 ''16
1 ''16 1"8
1 "32
''16 5 "16
9 "16 13 "16
15 1" "16 15 "16
13 "16 9 ''16
"8 1 "2
1 "2 1 "8
3 "4
"8
"8 1 "8
1"4 1 "4
1"8 3 "8
3 "8 3 "8
3 "8
0 "32 1 ''16
1 ''16 1 ''16
1 ''8 1 ''16
1 ''16 1 ''16
1 "32
''16
"16 9 "16
13 "16 15 1" "16
15 "16 13 "16
9 ''16
"8
"8 1 "4
1 "4 1 "8
3 "4 1 "4
1 "4 1 "8
"8
"4 1 "8
3 "2 1 "2
1 "2
"8 3 "4
1 "8
0 "16 1 "8
1 "8 1 "8
"16
1 "16 1 "16
1 "16 1 "16
"16
0 "16 10"16
15 "16 131""16
15"16 13"16
10"16
CAMBER DIAGRAM
5No scale additional information.
See "GIRDER CONNECTION DETAILS" sheet for1.
CAMBER DIAGRAM - SPAN 2 CAMBER DIAGRAM - SPAN 1
No scale
B E
A M I
B E
A M I I
B E
A M I I I
Bearings of
Structure No. 5460-060P
RAMSEY CASCADES ROAD BRIDGE #1
CL BearingsCL Bearings
B E
A M I I I I I I
CAMBER TABLE SPAN-2 CAMBER TABLE SPAN-1
cambered beam
Top of web fully deflected beam
Top of web fully cambered beam
Top of web fully deflected beam
Top of web fully
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128512
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R06
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
-M a y -2
1:
P
M
(Typ.)
C12x20.7
(Typ.)
1" Min. chamfer
(Typ.)
" Dia. bolt8
(Typ.)
" Dia. bolt8
CL
(Typ.)
W18x97
(Typ.)
W18x97CL
3" "2
"2
"4
(Typ.)
T y p
W18x97LC stiffener
Bearing
A C
T U
A L F I L E R
G R
S M
G I R
D E
R
D E
T A I L S S
P A
N .D
G N
"8
(Typ.)
W18x97CL
" End plate2
(Typ.)
"Dia. bolts4
"2
Shop weld bearing pad
Laminated elastomeric plate
" End 2 width holes @ 2'-0" spaces for full bridge
" dia.16 13" x 16" Lag bolts with4 deck
Nail laminated
See joint detail
1'-0"
Min against backwall
4" x 6", Loose
LCW18x97
2" x 12" Timber runner
Approach slab base
6" aggregate
SECTION C-C
SECTION D-D
" Impact angle 2 18" x 4" x
GIRDER CONNECTION DETAILS: SPAN-1
plate (Typ.)
" Connection 2 1" x 2 plate (Typ.)
" Connection 2 1" x 2
BEARING STIFFENER DETAIL
stiffener (Typ.)
" x 1" Bearing 2
END PLATE DETAIL
(Typ.)
C12x20.7 plate (Typ.)
" Connection 2 1" x 2
VIEW AT BEARING
"4 11 "4 stiffener (Typ.)
" x 1" Bearing 2
C.P.G.W steel bolts
" Dia. stainless 4
Typ.
Typ.
Typ.
Typ.
Typ.
Typ.
Typ.
Typ.
backwall
4" Timber backfill
Structural stainless steel hardware and fasteners for work below grade.
3. Furnish ASTM F593, ASTM F594, or ASTM F1667, type 316
C.P.G.W = Complete penetration groove weld.2.
See "GIRDER LAYOUT" sheet for location of Sections.1.
Structure No. 5460-060P
RAMSEY CASCADES ROAD BRIDGE #1
No scale
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128512
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R07
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
-M a y -2
1:
P
M
(Typ.)
C15x33.9 16
(Typ.)
1" Min. chamfer
(Typ.)
C15x33.9
(Typ.)
" Dia. bolt8
(Typ.)
" Dia. bolt8
CL
T y p
LC
stiffener
Bearing
A C
T U
A L F I L E R
G R
S M
G I R
D E
R
D E
T A I L S S
P A
N .D
G N
3" "2
"2
"8
(Typ.)
W27x161
(Typ.)
W27x161
1'-2"
W27x161LC
" End plate2
(Typ.)
" Dia. bolts4
" End plate 2 bearing pad
Laminated elastomeric
Shop weld
9" deck
Nail laminated match deck road surface to
Regrade existing
1'-0"
Min
W27x161
(Typ.)
W27x161CL
" Impact angle2 18' x 4" x againts backwall
4" x 6" Timber, Loose
SECTION A-A
SECTION B-B
stiffener (Typ.)
" x 1" Bearing 2
VIEW AT BEARING
END PLATE DETAIL
"4 11 "4 plate (Typ.)
" Connection 2 1" x 2 plate (Typ.)
" Connection 2 1" x 2
(Typ.)
C15x33.9
BEARING STIFFENER DETAIL
plate (Typ.)
" Connection 2 1" x 2 stiffener
" x 1" Bearing 2 steel bolts
" Dia. stainless 4 limit
Excavation plank (Typ.)
2" x 12" Running spaces for full bridge width.
" dia.holes @ 2'-0" 16
" x 16" Lag bolts with4
C.P.G.W
Typ.
Typ.
Typ.
Typ.
Typ.
Typ.
Typ.
Structure No. 5460-060P
RAMSEY CASCADES ROAD BRIDGE #1
backwall
4'' Timber backfill
Structural stainless steel hardware and fasteners for work below grade.
3. Furnish ASTM F593, ASTM F594, or ASTM F1667, type 316
C.P.G.W = Complete penetration groove weld. 2.
See "GIRDER LAYOUT" sheet for location of Sections.1.
No scale
GIRDER CONNECTION DETAILS: SPAN-2
reconditioning
Aggregate surface base
Aggregate
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128512
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R08
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-M a y -2
1:
P
M
13'-0"
Limits of timber backwall
Timber backwall
W27 x 161
2" x 8" Laminated deck
CLStructure beam to steel connector plates of
Connect new timber backwall
Impact angle
'-1
0"
CLStructure
Impact angle
Lim its of tim be r b ack wall
Timber backwall beam to steel connector plates of
Connect new timber backwall
M in
" thick, uncompressed)8 1(1
AASHTO M153, Type 1
Performed joint filler
1" Dia. backer rod
"4
1" for nails
" Dia. holes 32
7CL
1"
4"
8"
"2 12"2
CL
16" Dia. holes @ 24"
Notes:
6"
3"
" Dia. holes16 13C L
2" x 8" Laminated deck
4" x 8" Rails
8No scale
(ASTM D5893, SL)
Silicone sealant
M in
W18 x 97
A C
T U
A L F I L E R
G R
S M
M I S
C .D
G N
IMPACT ANGLE
FLANGE CLIP
JOINT DETAIL
EAST ABUTMENT
PLAN VIEW
WEST ABUTMENT
PLAN VIEW
RAIL SPLICE DETAIL
RAIL SPLICE CONECTOR
Structure No. 5460-060P
RAMSEY CASCADES ROAD BRIDGE #1
No scale
No scale
No scale
No scale No scale
1"
Post connector
Rail splice
" machine bolt and washers at each splice.4 3bolts and one
" carriage 4 3" dia. holes centered in each leg) with two 16
13two
" x 5" long with 4
18. For rail splice, use two steel angles (6" x 6" x deck.
and joint material is considered incidental to nail laminated
7. All cost associated with furnishing and installing impact angle
" x 16" lag bolts.4 3dia. holes drilled @ 24" spacing to accept
" 16 13width between curbs. Long leg of each impact to have
6. For impact angle, use one continuous angle to fit full clear deck and leave smooth finish.
5. Cut ends of laminated deck planks to incorporate the skew conforming to ASTM A153, unless noted otherwise.
4. Furnish hardware conforming to ASTM A307 and galvanize
Space flange clips on every beam at 12" spacing.
Stagger clip spacing 12'' on opposite sides of beam flanges.
Place flange clips at 2'-0" spacing along each of each beam. 3.
clip.
annular ring shank nails, 20d (4.0'') long to attach each flange flanges. Furnish ASTM F1667 stainless steel, type 316,
2. Place flange clips snugly against bottom and edges of beam
A446, Grade C or D, conforming to ASTM A653, Coating G-90.
Furnish 12 gage galvanized sheet or strip steel flange clips, 1.
(Typ.)
(Typ.)
MISCELLANEOUS DETAILS-1
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128512
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R09
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-M a y -2
1:
P
M
B B
A A
Sole plate
C
(each side for fixed bearings)
" Dia. Hole16 13L 1 bearing pad
Laminated elastomeric
Clr.
(Typ.)
all sides
4" 4"
8" b e a r in g
E x p a n s io n b e a r in g
F ix e d
CL Girder
C bearing)
(each side for expansion
" Slotted hole4 3" x 316
9L 1
CL
CL
Anchor bolts &
Bearing pad 10"
5" 5"
CL Girder
(Typ.)
bolt with washer and double nut
5 kip minimum pull out anchor
" dia.2 1Fully swedged 1CL
Top of bearing seat
"8
Scale: 3" = 1'-0" No Scale
8" x 8'' Curb
2'-0"
4" x 8" Continuous
Scupper block
CL
(Typ.)
with washer
1" Dia. bolt
No Scale
8" x 8" Timber curb steel armor plate
" Thick weathering2
1 CL
(Typ.)
lag bolt with washer
" Dia. x 4" galvanized8
1'-6"
CL
3" 5" 5"
9" 6" 9"
4" x 8" Scupper block snug to plate
Tighten nut
Notes:
Galvanize anchor bolts, hex nuts, and washers in accordance with ASTM A153.
CLGirder bearing
Laminated elastomeric
" = 1'-0"2 1Scale: 1
M in
" = 1'-0"2 1Scale: 1
5 bearing only
Clear at expansion"4
9As shown steel armor plate
Timber curb &
No Scale
Countersink bolt heads into face of curb and rail.
6"
A C
T U
A L F I L E R
G R
S M
M I S
C .D
G N
S. side shown (N. side opposite)
GIRDER BEARING PLAN LAMINATED ELASTOMERIC BEARING PAD DETAIL
SCUPPER DETAIL
CURB END DETAIL
AT WEST ABUTMENT
FOR EXTERIOR GIRDERS
SECTION A-A
SECTION A-A
bearing only
Clear at expansion"4
Structure No. 5460-060P
RAMSEY CASCADES ROAD BRIDGE #1
" Interior layers8
PLAN
SECTION B-B
" Exterior layers4 molded securely to pad
" Steel shims8 15 -
PLAN
ELEVATION
deck
Nail laminated
" 2
Sole plate
5.
4.
3.
2.
1.
pads conforming to AASHTO M 251.
Furnish Grade 2, 50 durometer hardness, steel laminated elastomeric bearing
Furnish sole plate conforming to AASHTO M 270.
shall conform to ASTM A563, Grade DH or DH3.
Furnish swedged anchor bolts conforming to ASTM F1554 Grade 36. Hex nuts of timber curb armor plate with face
Flush weathering steel
" 8
" 8
MISCELLANEOUS DETAILS-2
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128512
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R10
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
-M a y -2
1:
P
M
DECK BOARDS LAYOUT
Group No.
Group 1
"16 513'- 8
"8 71'-3"4
31'-3"2 11'-3"8
31'-3"8 31'-3"4
11'-3"8 11'-3"8
11'-31'-3"1'-3"1'-3"
Group 1Group 2Group 3Group 4Group 5Group 6Group 7Group 8Group 9Group 10Group 11
"8 314'-
Edge of Deck
Group 2
"4 313'- 6
Group 3
"8 313'- 5
Group 4
113'-4
113'-3Group 5
Group 6
313'-2
Group 7
"2 113'-1
Group 8
1513'-0
Group 9
"2 113'-0
Group 10
"4 113'-0
Group 11
13'-0" 90.0
Timber board board
Angle of timber timber board (Deg.)
Angle of
Timber post
Timber curb
LC of structure
Length of timber board*
*Center timber boards with C of structureL
A C
T U
A L F I L E R
G R
S M
D E
C K
B O
A R
D L
A Y
O U
T .D
G N
No scale
PLAN
108.3
106.4
104.6
102.8
101.1
99.3
97.5
95.6
93.8
91.9
West Abutment
1"
BOARDS
ANGLE OF TIMBER
DETAIL
TIMBER BOARDS
"2
See Note 2.
Structure No. 5460-060P
RAMSEY CASCADES ROAD BRIDGE #1
the CO for review and approval.
2. Altenative method to timber deck fanning is allowed. Submit to materials.
1. Verify all dimensions and locations in the field prior to ordering
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128512
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R11
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-M a y -2
1:
P
M
A C
T U
A L F I L E R
G R
S M
A P P S
L A
B .D
G N
16'-0"
6"
PLAN
SECTION A-A
6"
#7AP4 (varies) (Bottom)
#5AP3 (varies) (Top), #7AP2 (Bottom)
#5AP1 (Top)
#7AP6 (Bottom)
#5AP5 (Top)
#7AP2 (Bottom)
#5AP1 (Top)
#7AP4 (varies) (Bottom)
#5AP3 (varies) (Top), 5 Spa. @ 1'-0"= 5'-0"
#7AP6 (Bottom)
#5AP5 (Top)
A P
T o p a n d B o tt o m
A P
T o p a n d B o tt o m
#7AP6
#5AP5
APPROACH SLAB
A A
= 4'-0" 4 Spa.@ 1'-0"
CL(along the of approach slab)
"2 1" = 4'-102
19 Spa. @ 6
ONE APPROACH SLAB
ESTIMATED QUANTITIES
(CUYD)
Concrete
(Lbs.)
Reinforced Steel
4.0 1400.00
" = 1'-0"4
C L C o n s t.
3" 3"
= 4'-0"
4 Spa. @ 1'-0" 6" 5 Spa. @ 1'-0" = 5'-0"
Note:
"2 1 = 4'-10
" 2 19 Spa. @ 6
"2
S p a
S p a
20°
Structure No. 5460-060P
RAMSEY CASCADES ROAD BRIDGE #1
See Note 3.
Joint
" 2 1 3-
4. Provide 2-inch cover for reinforcing steel, unless noted otherwise.
roller setting only (vibratory or oscillatory compaction is prohibited).
3. Compact aggregate base material over approach slab in a static otherwise.
- inch, unless noted 4
32. Chamfer exposed edges of all concrete
1. All dimensions are along centerline of structure.
6'-0"9 Spa. @ grading C or D
Aggregate base, grading C or D
6" aggregate base, NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128512
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R12
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-M a y -2
1:
P
M
12No scale
A C
T U
A L F I L E R
G R
S M
S
C O
U R
R E P
A I R .D
G N
Roadway surface
Existing rock wall
Sandbags A
A
Wall foundation voids
Plywood form
Direction of stream flow
Existing rock wall
Pumping tube
Plywood form character to existing rock wall Install rock facing similar in
1'-0" _+
1'-0" _+ with lean concrete backfill Completely fill existing void
Notes:
6.
5.
4.
3.
2.
1.
SECTION A-A
EXISTING ROCK WALL PROFILE
Existing concrete apron
Structure No. 5460-060P
RAMSEY CASCADES ROAD BRIDGE #1
SCOUR REPAIR DETAILS
review and approval.
Submit alternative methods of filling voids to the CO for backfill has reached desired strength.
Remove plywood and sandbags once lean concrete
Use lean concrete backfill color matching AMS-STD-595.
approval from the CO.
Determine limits of repair locations and obtain or larger.
Do not disturb existing boulders 1 foot by 1 foot
Remove existing concrete apron.
Sandbag (typ.)
Waterproof membrane waterproof membrane
Additional sandbag to hold
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128512
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R13
-M a y -2
1:
P
M M
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
GENERAL NOTES AND INDEX
SCOPE OF WORK
A C
T U
A L F I L E R
G R
S M
G N .D
G N
No scale 1
GENERAL NOTES:
SPECIFICATIONS:
Design:
Field verify all dimensions.
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
Construction:
DESIGN LOADING:
Dead Load:
Live Loads:
H-20 Truck
AASHTO Standard Specifications for Highway Bridges, 17th Edition, 2002;Errata 2003 and 2005.
Timber: 50 pcf
MATERIALS:
WELDING:
STRUCTURAL STEEL:
TIMBER:
Verify all dimensions and locations in the field prior to ordering materials.
INDEX OF BRIDGE PLAN SHEETS
Scour Repair Details
Miscellaneous Details
Typical Section
Girder Connection Details
Girder Layout
Plan and Elevation
General Notes and Index
SHEET NO. SHEET TITLE
Structure No. 5460-078P
HORSE STABLE BRIDGE
7. Regrade approach profile to match final grade.
line support. Maintain water line during construction.
6. Replace water line insulation in-kind and install water
5. Repoint stone masonry at abutments.
4. Repair undermining at east corner of north abutment.
Place deck, curb, and rail.3.
Set new beams.2.
Remove existing curb, rail, deck, and beams.1.
Galvanize angles according to ASTM A123.
Galvanize all bolts, nuts, and washers according to ASTM A153, unless noted otherwise.
to ASTM A325 (Type 1) unless noted otherwise.
" diameter fasteners conforming 8 7All field connections are slip critical, friction type (Class A) made with
The contractor is responsible for the stability of the structure during all phases of construction.
match AMS-STD 595 20059 (brown). Touch up paint on site as specified by manufacturer.
the manufacturing plant using paint system 2 according to Section 563. Furnish the top coat with gloss finish to
Furnish high-strength low alloy structural steel conforming to AASHTO M270, Grade 50. Paint all structural steel at
Field welding of any kind is not permitted on beams, unless noted otherwise.
Magnetic particle testing (MT.) - 10% min.
Fillet welds - Visual - 100%
Perform non-destructive testing of welds as follows:
classified E7028.
Perform welding process Shielded Metal Arc Welding (SMAW) using low hydrogen electrodes
Perform all welding in accordance with the current AASHTO/AWS D1.5 Bridge Welding Code.
long for the nail laminated deck.
Furnish ASTM F1667 stainless steel, type 316, annular ring shank nails, 20d (4 inches)
Galvanize all bolts, nuts, and washers according to ASTM A153, unless noted otherwise.
Use pressure treated Southern Pine No. 1 timber that is surfaced on all four sides (S4S).
arsenic and/or chromium compounds. Obtain all timber from a single approvd source.
Use waterborne copper-based suspension containing micronized or dispersed copper not containing
Pressure treat all timber in accordance with the latest AWPA U1. Provide use category UC4B timber.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12857
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R14
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
-M a y -2
1:
P
M
A C
T U
A L F I L E R
G R
S M
P
E .D
G N
"2 128'-6
CLPost
(Typ.)
ground line
Approximate existing masonry wall
Existing masonry wall
Existing
CL
PLAN AND ELEVATION
100+40 100+60 100+80
Elev. 1545.73
Sta. 100+39.03
Begin Bridge
Elev. 1544.72
Sta. 100+67.56
End Bridge
Traffic
Traffic
BearingCL
BearingCL
CIP concrete
Existing
CIP concrete
Existing
N
D u d le y C r e e k
- 3.552% sheet for details
See" MISCELLANEOUS DETAILS"
1length = 28'-6Bridge
'' = 1'-0''4
PLAN
ELEVATION
Structure No. 5460-078P
HORSE STABLE BRIDGE
(See Note 2) water line
Existing
North Abutment
South Abutment
Face of curb
Face of curb creck Rd.
Const. Dudley
10°
Structure CL
"2 1" = 25'-108
15 Post spaces @ 5'-2
Exp.
Fix
6"
2'-4"
(Typ.)
(Typ.)
East AbutmentWest Abutment
5. Repair undermining at east corner of north abutment.
4. Repoint stone masonry at abutments.
approval prior to removal of existing steel beams.
3. Submit temporary support system for water line to the CO for times during construction.
2. Maintain and support water line attached to beam #5 at all materials.
1. Verify all dimensions and locations in the field prior to ordering joints
Repoint masonry joints
Repoint masonry
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12857
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R15
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
-M a y -2
1:
P
M
A C
T U
A L F I L E R
G R
S M
F
R A
M E .D
G N
" Plate (Typ.)2
CL CL
CL
CL
W18x97
CL
Span L
0.1L 0.9L0.8L0.7L0.6L0.5L0.4L0.3L0.2L
No Scale
Reference line
Total camber
A
A
B
B
10°
"2 128'-7
"2 128'-6
"2 127'-2
Bearing plate
(Typ.)
W18x97
GIRDER LAYOUT
0.1 L 0.2 L 0.3 L 0.4 L 0.5 L 0.7 L 0.8 L 0.9 L0.6 LCAMBER TABLE
I STEEL D.L. (in.)
III SUPERIMPOSED D.L. (in.)
CL
0II TIMBER DECK D.L. (in.)
"4
TOTAL = I+II+III (in.)
"8 1 "4
1 "4 1 "8
3 "4 1 "4
1 "4 1 "8
"8
"4 1 "8
3 "2 1 "2
1 "2
"8 3 "4
1 "8
0 "16 1 "8
1 "8 1 "8
"16
1 "16 1 "16
1 "16 1 "16
"16
0 "16 10"16
15 "16 131""16
15"16 13"16
10"16
3No scale
"8 35'-11
(Typ.) Water line support (Typ.)CL
N
GIRDER ELEVATION
FRAMING PLAN
CAMBER DIAGRAM
Structure No. 5460-078P
HORSE STABLE BRIDGE
Bearings Bearings
(Typ.)
" End plate2
Water line
(Typ.)
C12 x 20.7
Const.
B4
B5
B3
B2
B1
(Typ.)
Connection plate
Bearings
Bearings " 8 5" = 23'-94
32 Spaces @ 11'-10 3'-5"
2 2" x 1 " Connection plate (Typ.)
8" 8" information.
1. See "GIRDER CONNECTION DETAILS" sheet for additional
BearingsCL CLBearings
DL Deflection
Bearings of
B E
A M
S cambered beam
Top of web fully deflected beam
Top of web fully
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12857
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R16
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
-M a y -2
1:
P
M
A C
T U
A L F I L E R
G R
S M
G I R
D E
R
D E
T A I L S .D
G N
(Typ.)
C12x20.7
(Typ.)
1" Min. chamfer
(Typ.)
C12x20.7
(Typ.)
" Dia. bolt8
(Typ.)
" Dia. bolt8
CL
(Typ.)
W18x97
(Typ.)
W18x97CL
3" "2
"2
"4
T y p
W18x97LC stiffener
Bearing
W18x97LC
GIRDER CONNECTION DETAILS
(Bearing pad not shown)
"8
" End plate2 plate
" End 2
8" bearing pad
Laminated elastomeric
(Typ.)
W18x97CL
(Typ.)
W18x97CL
CL
(Typ.)
" Dia. bolt2 water line
Existing
Water line support 2'-0"
Pipe support water line
Existing
Insulation
2'-0"
Insulation
C.P.G.W
2'-0"
Pipe support
(Typ.)
"Dia. stainless steel bolts 4
SECTION A-A
SECTION B-B
SECTION C-C
Structure No. 5460-078P
HORSE STABLE BRIDGE
WATER LINE SUPPORT
plate (Typ.)
" Connection2 1" x 2
BEARING STIFFENER DETAIL
END PLATE DETAIL
SECTION VIEW AT BEARING
stiffener (Typ.)
" x 1" Bearing 2
'' Stiffener 2 1" x 2
C stiffener (Typ.)
" x 1" Bearing 2
3" 3""2
C
"4 11"4
11 "8 34"8
8"
2"4"2"
3"3""2 12 "2
" Steel plate4 pipe
Utility water CL
Typ.
Typ.
Typ.
Typ.
Typ.
Typ.
Typ.
Typ.
Typ.
Typ.
C.P.G.W water line stainless steel hardware and fasteners for work below grade.
7. Furnish ASTM F593, ASTM F594, or ASTM F1667, type 316 structural steel (waterline support).
supporting water line during construction is paid under support, pipe support, pipe insulation and maintain and
5. All cost associated with furnishing and installing the water line conforming to ASTM A153, unless noted otherwise.
4. Furnish hardware conforming to ASTM A307 and galvanize
20059.
3. Paint water line support to match AMS-STD-595 color No.
C.P.G.W = Complete penetration groove weld. 2.
See "GIRDER LAYOUT" sheet for location of sections. 1.
No scale as required
Place steel shims
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12857
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R17
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-M a y -2
1:
P
M
A C
T U
A L F I L E R
G R
S M
T Y P S
E C
T .D
G N
TYPICAL SECTION
"2 124'-9
Limit of timber backwall
CLStructure
W18 x 97 laminated deck
2" x 8" Skewed
A
A
Notes:
1"
1"
1"
4"
'' Dia. holes for nails32
7CL
Notes:
1'-0"
Nail laminated deck
W18 x 97
Min.
4" x 6", Loose against backwall
Regrade existing road surface to match deck
5" x 3" x1 4" Impact angle
5"
"4 33 "4
Note:
"4
1" Dia. backer rod
Performed joint filler
AASHTO M153, Type 1
(11 8" thick, uncompressed)
(Expansion end only)
Profile grade
(TYP.)
Flange clip
(Typ.)
W18 x 97
StructureCL
(Typ.)
8" x 8" Post
" 1
Continuous
4" x 8"
23'-1"
24'-5"
No scale 5 line
Existing water
Silicone sealant
(ASTM D5893, SL)
width holes @ 2'-0" spaces for full bridge
" dia.16 13" x 16" Lag bolts with 4
4'-7"
(Typ.)
"2 13'- 4'-7" backwall
Timber angle
Impact
TYPICAL SECTION
IMPACT ANGLE
FLANGE CLIP
ABUTMENT PLAN
SECTION A-A
JOINT DETAIL
(Typ.)
Structure No. 5460-078P
HORSE STABLE BRIDGE
clips @ 12'' spacing on all beams.
connected to beams with galvanized flange
20d nails @ 18'', staggered as shown. Deck
2'' x 8'' Nail laminated timber deck nailed with
Waterproofing membrane.
indicates nails in first lamination indicates nails in second lamination indicates nails in third lamination
NAIL LAMINATION DETAIL
"2 14 "2
14 9" 9""2
(Typ.)
as required
Place steel shims
B1 B2 B3 B4 B5
B1 - Indicates beam number
(Typ.)
bolts and washers.
1" Dia. galvanized carriage with ends of deck.
blocks. End block to be flush with 2'-0" max. space between
4" x 8" x 24" Scupper blocks, splice detail.
" radii. See rail 8 5of all rails with bolts and washers. Round top corners
" carriage4 3maximum. Connect with
Rail length 12-0" minimum and 16'-0"
4" x 8" Rail, continuous each side.
curb only at centers of scupper blocks.
Curb length 12'-0'' minimum. Splice
8'' x 8'' Curb, continuous each side.
block
4" Timber
See Joint Detail
(expansion end only) steel bolts
" Dia. stainless 4 limit
Excavation to end plate
Connect new timber backwall sheet for details
See "GIRDER CONNECTION DETAILS"
M in
M in noted otherwise.
galvanized conforming to ASTM A153, unless
5. Furnish hardware conforming to ASTM A307 and the proposed support and water pipe (not the insulation)
4. Support water line in a way to provide contact between beam at 12" spacing.
sides of beam flanges. Space flange clips on every of each beam. Stagger clip spacing 12" on opposite
3. Place flange clips at 2'-0'' spacing along each side each flange clip.
type 316, annular shank nails, 20d (4.0'') long to attach of beam flanges. Furnish ASTM F1667 stainless steel,
2. Place flange clips snugly against bottoms and edges to ASTM A653, Coating G-90.
flange clips, A446, Grade C or D, conforming
1. Furnish 12 gage galvanized sheet or strip steel
Structural backfill
Aggregate base
RAIL SPLICE DETAIL
4" x 8" Rails connector
Rail splice Post
'' x 16'' lag bolts.4 holes drilled @ 24'' spacing to accept
'' dia. 16 13 each impact angle to have deck width between curbs. Long leg of
1. Use one continuous angle to fit full clear at each splice.
" machine bolt and washers4 3 and one
" carriage bolts4 3 in each leg) with two
" dia. holes centered16 13 long with two
" x 5''4
11. Use two steel angles (6" x 6'' x 1
Note:
reconditioning
Aggregate surface waterproofing is considered incidental to Section 555.
beams according to manufacturer's recommendations. Cost of
702.07 or 702.08 between the deck and the top of flange
4. Install waterproofing membrane conforming to Subsection stainless steel hardware and fasteners for work below grade.
3. Furnish ASTM F593, ASTM F594, or ASTM F1667, type 316 deck.
and joint material is considered incidental to nail laminated
2. All cost associated with furnishing and installing impact angle leave a smooth finish.
1. Cut ends of laminated deck planks to incorporate the skew and
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12857
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R18
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
-M a y -2
1:
P
M
B B
A A
Sole plate
C
(each side for fixed bearings)
" Dia. Hole16 13L 1 bearing pad
Laminated elastomeric
Clr.
(Typ.)
all sides
4" 4"
8" b e a r in g
E x p a n s io b e a r in g
F ix e d
CL Girder
C bearing)
(each side for expansion
" Slotted hole4 3" x 316
9L 1
CL
CL
Anchor bolts &
Bearing pad
10"
5" 5"
CL Girder
(Typ.)
bolt with washer and double nut
5 kip minimum pull out anchor
" dia.2 1Fully swedged 1CL bearing only
Clear at expansion
"8
Scale: 3" = 1'-0"
Scale: 3" = 1'-0"
No Scale
8" x 8'' Curb
2'-0"
4" x 8" Continuous
Scupper block
CL
No Scale
8" x 8" Timber curb steel armor plate
" Thick weathering2
1 CL
(Typ.)
lag bolt with washer
" Dia. x 4" galvanized8
1'-6"
CL
3" 5" 5"
9" 6" 9"
4" x 8" Scupper block snug to plate
Tighten nut
A C
T U
A L F I L E R
G R
S M
M I S
C .D
G N
MISCELLANEOUS DETAILS
6As shown steel armor plate
Timber curb &
6"
GIRDER BEARING PLAN
LAMINATED ELASTOMERIC BEARING PAD DETAILS
SCUPPER DETAIL
CURB END DETAIL
SECTION A-A
Structure No. 5460-078P
HORSE STABLE BRIDGE
PLAN
ELEVATION
deck
Nail laminated
SECTION B-B
PLAN
" Interior layers8 molded securely to pad
" Steel shims8 15 -
" Exterior layers4
Sole plate bearing
Laminated elastomeric
M in
Top of bearing pad
5. Countersink bolt heads into face of curb and rail.
elastomeric bearing pads conforming to AASHTO M 251.
4. Furnish Grade 2, 50 durometer hardness, steel laminated
Furnish sole plate conforming to AASHTO M 270.3.
with ASTM A153.
Galvanize anchor bolts, hex nuts, and washers in accordance 2.
DH3.
Grade 36. Hex nuts shall conform to ASTM A563, Grade DH or
Furnish swedged anchor bolts conforming to ASTM F1554 1.
(Typ.)
1" Dia. bolt with washer of timber curb armor plate with face
Flush weathering steel
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12857
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R19
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-M a y -2
1:
P
M
7No scale
Roadway surface
Existing rock wall
Sandbags A
A
Wall foundation voids
Plywood form
Direction of stream flow
Existing rock wall
Pumping tube
Plywood form character to existing rock wall Install rock facing similar in
1'-0" _+
1'-0" _+ with lean concrete backfill Completely fill existing void
Notes:
6.
5.
4.
3.
2.
1.
A
C T
U A
L F I L E R
G R
S M
S
C O
U R
R E P
A I R .D
G N
EXISTING ROCK WALL PROFILE
SECTION A-A
Existing concrete apron
Structure No. 5460-078P
HORSE STABLE BRIDGE
SCOUR REPAIR DETAILS
Submit alternative methods of filling voids to the CO for
Remove plywood and sandbags once lean concrete
Use lean concrete backfill color matching AMS-STD-595.
Determine limits of repair locations and obtain or larger.
Do not disturb existing boulders 1 foot by 1 foot
Remove existing concrete apron.
Sandbag (typ.)
Waterproof membrane waterproof membrane
Additional sandbag to hold
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165284
157528 TN
112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
HS HS LE
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12857
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Schedule C
R20
-M a y -2
1:
P
M M
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Field verify all dimensions.
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
Construction:
A C
T U
A L F I L E R
G R
S M
,1
G N .D
G N
No scale
GENERAL NOTES AND INDEX
Structure No. 5460-013P, 5460-041P, 5460-042P
Provide 2-inch cover for reinforcing steel unless otherwise noted.
Furnish reinforcing steel conforming to AASHTO M 31, Grade 60 deformed.
Reinforcing Steel:
GENERAL NOTES:
Design:
Edition 2017 th
AASHTO LRFD Bridge Design Specifications, 8
SPECIFICATIONS:
Dead Load:
Concrete: 150 pcf
DESIGN LOADS:
Galvanize structural steel according to ASTM A123.
Furnish structural steel conforming to ASTM A709, Grade 36.
Structural Steel:
Concrete:
- inch unless otherwise noted.4 3Chamfer exposed edges of all concrete
Furnish Nonshrink grout with f'c = 5.0 ksi at 3 days.
Furnish PPC concrete for deck overlay (color gray).
Furnish Class S (Seal) concrete with f'c = 3.0 ksi at 28 days, for underpinning.
Furnish Class HES (High Early Strength) concrete with f'c = 3.0 ksi at 24 hours.
MATERIALS:
INDEX OF BRIDGE PLAN SHEETS
Scour Repair Details-2
Scour Repair Details-1
Concrete Repair Details
Joint Details
Structure 5460-050P
Structure 5460-048P
Structure 5460-047P
Structure 5460-162P
Structure 5460-042P
Structure 5460-013P & 5460-041P
Summary of Quantities
Scope of Work
General Notes and Index
PLAN SHEET NO. SHEET TITLE
5460-162P, 5460-047P, 5460-048P, 5460-050P
Furnish asphaltic plug joint conforming to Subsection 712.01(i).
Furnish pre-compressed foam-supported silicone seal conforming to Subsection 712.01(h).
Furnish silicone joint sealant conforming to Subsection 712.01(d) and 712.01(e).
Joint Sealant:
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
157528 TN165284 112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
MR MR HS
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128513
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
R21
-M a y -2
1:
P
M M
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
SCOPE OF WORK
No scale
SCOPE OF WORK
A C
T U
A L F I L E R
G R
S M
,1
S
C O
P E O
F W
O R
K .d g n
Structure Number 5460-042P - Gatlinburg Bypass Bridge #3
Structure Number 5460-047P - Elkmont Road Bridge at Little River
Structure Number 5460-048P - Elkmont Campground Bridge
Structure Number 5460-050P - Headquarters Residence Bridge
Schedule B
Structure Number 5460-013P - Sinks Bridge
Structure Number 5460-162P - Camp Two Bridge
Schedule A Schedule C
Repair scour and undermining around bridge abutments and pier.-
Install steel armor plating along upstream side of pier.-
Repoint masonry joints on abutments and wingwalls.-
Seal cracks at abutments and wingwalls.-
Structure No. 5460-013P, 5460-041P, 5460-042P
Repair scour around bridge abutments and piers.-
Reset loose capstones on upstream side of pier footings.-
Repoint masonry joints. -
Clean and epoxy coat corrugated steel plate.-and abutments.
Clean and epoxy coat exposed rebar at underside of girder -
Repoint masonry joints on wingwalls and parapets.-
Repair concrete at abutment breastwalls.-
Replace curb and sidewalk joints.-
Replace deck expansion joints.-
Remove and replace concrete backwall.-
Repair deck deterioration, and place PPC overlay.-
.Repair deck joints - use pourable joints-
Seal vertical cracks on concrete beams in center span.-
Repoint masonry joints on parapets.-place PPC overlay.
Remove asphalt wearing surface, repair deck deterioration, and -
Structure Number 5460-041P - Gatlinburg bypass bridge #2
(total 35 feet of two rail system).
Remove and replace damaged rail sections of west Railing -
5460-162P, 5460-047P, 5460-048P, 5460-050P
Clean and epoxy coat exposed rebar on precast channel beams.-
Repair undermining of west pier footing.-
Seal cracks on abutments and piers.-
Replace joints at deck, curb, and sidewalk.-
Repair concrete backwall.-
Replace deck drains (total 4)-asphalt overlay.
Repair concrete slabs. Place waterproofing membrane and
Remove existing asphalt wearing surface including membrane. -
Replace north asphaltic expansion joint.-
Repoint stone masonry as needed.-
Replace damaged bridge rail post and mounting hardware.-
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
157528 TN165284 112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
MR MR HS
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128513
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
R22
-M a y -2
1:
P
M M
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
SUMMARY OF QUANTITIES
A C
T U
A L F I L E R
G R
S M
,1
S
U M Q
T Y .d g n
ESTIMATED QUANTITIES - SCHEDULE A
ESTIMATED QUANTITIES - SCHEDULE B
ESTIMATED QUANTITIES - SCHEDULE C
Structure No. 5460-013P, 5460-041P, 5460-042P
5460-162P, 5460-047P, 5460-048P, 5460-050P
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
157528 TN165284 112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
MR MR HS
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128513
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
R23
-M a y -2
1:
P
M M
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Notes:
CL Post
B
B
RAIL POST REPLACEMENT
CC
RAIL POST ELEVATION VIEW B-B SECTION C-C
"4
Rail post
(See Note 3) replace post
Remove and 4
1""2 11"4
"4
"16
1"
SOUTH ABUTMENT SOUTHWEST WINGWALL
4No scale masonry wall motar joints.
Repoint deteriorated
"4
(See Note 5)
" Neoprene pad 8
A C
T U
A L F I L E R
G R
S M
,1
S
T R
.D
G N
Schedule A
Base plate
"8 wall motar joints.
Repoint deteriorated masonry
Structure 5460-013P Structure 5460-013P
Structure 5460-013P
STRUCTURE 5460-013P & 5460-041P
RAIL DETAILS
Structure 5460-041P
RAIL SECTION DETAIL
Structure 5460-013P Structure 5460-013P
Structure 5460-041PStructure 5460-041P RAIL REPLACEMENT
SINKS BRIDGE & GATLINBURG BYPASS BRIDGE #2
washer and nut conforming to ASTM A194, grade 8.
steel bolts conforming to ASTM F593, type 4. Furnish inch diameter stainless4 3Connect base plate to post with 6.
aluminum post and concrete surface.
inch neoprene pad at the interface of8 1Provide 5.
6351-T5. ASTM B221, alloy 6061-T6 or alloy
Furnish aluminum post and base plate conforming to4.
from south end of structure 5460-013P.
Remove and replace west rail post, third post 3.
process.
bridge railing section during the removal and installation
Provide a TL-3 temporary barrier along any removed west railing in the north span of structure 5460-041P.
Remove and replace four damaged rail sections of the 2.
Match mortar color and texture to existing joints.1.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
157528 TN165284 112(1),ETC.
NP-GRSM 14(3),
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
MR MR HS
DRAWN BY
George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-128513
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
R24
P R
O J E
C T
S g r s m (3
(1
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
-M a y -2
1:
P
M
A C
T U
A L F I L E R
G R
S M
,1
S
T R
.D
G N road
L Campbell lead C deck
Concrete
21'-9"
(TYP.)(TYP.)
T
Y P
29'-5"
" 2 12'-8 "2
12'-812'-0" 12'-0"
8" 6'-6"
3'-10" 3'-10"
Concrete box girder
TYPICAL SECTION
STRUCTURE 5460-042P
PLAN VIEW
99'-0"
Expansion joint seal (Typ.)
(See Note 1)
Expansion joint seal (Typ.)
(See Note 1)
33°
SOUTH ABUTMENT - WEST END
REPAIR CONCRETE
NORTH ABUTMENT
REPAIR CONCRETE…