This solicitation is for rehabilitation work on nine bridges located in the Great Smoky Mountains National Park. Certified small business concerns are invited to bid on the project, which includes asphalt wearing course removal, scour protection around existing abutments and wingwalls, installation of new concrete deck, replacement of nail-laminated timber decking, cleaning and repointing of masonry joints, repaving of bridge approaches, rail repairs, and other miscellaneous work. The project will be split into multiple work schedules and contract options, with a total cost expected to fall between $1,000,000 to $5,000,000. All work must be completed by March 26, 2022. Bids are due on a date specified in Block 13a of the solicitation. Interested vendors should register at www.beta.sam.gov to receive email notifications and download bid documents. Annual representations and certifications must be completed online. The Department of Transportation Federal Highway Administration is the agency issuing this solicitation for work to be performed in the Great Smoky Mountains National Park.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5460-013P
SINKS BRIDGE INSPECTION DATE: 6/21/18
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: ..
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUNDATION(S):
ABUTMENT / PIER MAT'L: ...
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
STEEL
STRINGER/MULTI-BEAM or GIRDER
CONCRETE CAST-IN-PLACE
BITUMINOUS
SPREAD FTG ON BEARING MAT'L
N/A
MASONRY
3B13, 3B15 / NONE
1 - PRINCIPAL PARK ROAD
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
65.6 FT (20.0 M)
65.6 FT (20.0 M)
26.0 FT (7.9 M)
24.0 FT (7.3 M)
23 °
NO
LOCATION
GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 6.82 (KM PT 10.98)
STATE: ................................. TENNESSEE LOCATION: 11.3 MILES WEST FROM NPS ROUTE 10
(NEWFOUND GAP ROAD). FACILITY CARRIED: ............ LITTLE RIVER ROAD
FEATURE INTERSECTED: .. LITTLE RIVER
STRUCTURE EVALUATION SUMMARY
This steel multi-beam bridge is in good to fair condition overall. The most serious problem is scour with up to 1.9' of undermining along the southwest wingwall and south abutment breastwall due to the stream alignment being directed at the wingwall during periods of high flow. Heavy flow directed toward the abutment has contributed to the deterioration of the mortar joints at the base of the south abutment. It should be noted water flows through the south abutment masonry mortar joints. Without repairs, this problem will likely continue to worsen and may eventually impact the integrity of the south abutment.
Other problems include transverse cracking of the approach pavement; vegetation growth on the wingwalls and at the west side of the south abutment bearing seat; a damaged rail post on the west side near the south abutment; and a fallen tree in the channel along the southwest wingwall.
Correct action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: M. BURNETT, C. BOSS (VOLKERT, INC.)
CONDITION ASSESSMENT:
MATT BURNETT, FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 11/8/18
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460-013P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
60.3,6 REMOVE VEGETATION AND TREES FROM WINGWALLS AND SOUTH ABUTMENT
BEARING SEAT.
1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
60.9 FILL UNDERMINED AREAS OF SOUTH ABUTMENT AND SOUTHWEST
WINGWALL WITH FLOWABLE FILL.
1 LS
60.1,6 REPOINT MASONRY MORTAR JOINTS AT SOUTH ABUTMENT AND
WINGWALLS.
1 LS
61.1,2 PLACE ENGINEERED RIPRAP TO DIRECT STREAM FLOW AWAY
FROM SOUTH ABUTMENT AND SOUTHWEST WINGWALL.
1 LS
222.4 SEAL TRANSVERSE CRACKING OF APPROACH PAVEMENT. 1 LS
58.6 REPLACE DAMAGED RAIL POST ON WEST SIDE NEAR SOUTH
ABUTMENT.
1 LS
61.4 REMOVE FALLEN TREE FROM CHANNEL ALONG SOUTHWEST
WINGWALL.
1 LS
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,
DESIGN, AND CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5460-013P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.
8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present
7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal 5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 7 ITEM REFERENCE AND REMARKS
G1. DECK SLAB
G2. EXPANSION JOINTS
G3. WEARING SURFACE
G4. RIDEABILITY
N5. CURBS, SIDEWALKS, AND MEDIAN
F6. PARAPETS AND/OR RAILINGS
G7. DRAINS AND DRAINAGE
N8. UTILITIES
G9. DEFLECTION AND/OR VIBRATION
N10. OTHER
59. SUPERSTRUCTURE 7
G1. BEARING DEVICES
G2. GIRDERS OR BEAMS
N3. ARCH(ES) OR SLAB(S)
N4. FLOOR BEAMS AND STRINGERS
N5. TRUSSES
G6. DIAPHRAGMS AND BRACING
G7. PAINT
N8. FASCIA(E)
G9. DEFLECTION AND/OR VIBRATION
G10. ALIGNMENT
N11. OTHER
60. SUBSTRUCTURE 5
58.2 POLYMER MODIFIED ASPHALT JOINT SYSTEM.
58.6 MINOR FULL HEIGHT VERTICAL CRACKING WITH EFFLORESCENCE
ON PARAPETS AT ISOLATED LOCATIONS. MINOR SPALLING ON TOP
OF WEST PARAPET NEAR MIDSPAN DUE TO FORM WORK LEFT IN
PLACE. MINOR VEHICLE SCRAPES ON WEST RAILING AT MIDSPAN.
MODERATE COLLISION DAMAGE TO THIRD RAIL POST FROM SOUTH
ABUTMENT ON WEST SIDE.
58.7 MINOR GRAVEL ACCUMULATION ALONG PARAPETS WITH MINOR
VEGETATION GROWTH.
59.1 MINOR BULGING OF ELASTOMERIC BEARING PADS.
59.2,6,7 MINOR PEELING OF PAINT AND SPOT RUSTING OF BEAMS, COVER
PLATES, AND DIAPHRAGMS.
60.1 SEVERE DETERIORATION OF SOUTH ABUTMENT BREASTWALL
MASONRY MORTAR JOINTS AT WATERLINE; GAPS PROBED UP TO
17" DEEP. MINOR DETERIORATION OF NORTH ABUTMENT
BREASTWALL MASONRY MORTAR JOINTS.
60.3 MINOR TO MODERATE VEGETATION GROWTH AT ENDS OF BEARING
SEATS. MINOR FLOOD DEBRIS ON SOUTH ABUTMENT BEARING
SEAT ON EAST SIDE OF BEAM #4. TREE (2" DIAMETER) GROWING
ON SOUTH ABUTMENT BEARING SEAT AT WEST END.
60.6 MODERATE TO SEVERE DETERIORATION OF MASONRY WINGWALL
MORTAR JOINTS; MINOR TO MODERATE VEGETATION GROWTH.
ABUTMENTS
1. BREASTWALLS OR COLUMNS F
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS G
4. BACKWALLS AND/OR BULKHEADS G
5. FOUNDATIONS N
6. WINGWALLS G
7. WEEP HOLES N
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR P
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER N
PIER(S)
13. WALLS AND/OR COLUMNS N
14. PILE BENTS N
15. CAPS AND/OR BEARING SEATS N
16. FOUNDATIONS N
17. EROSION AND/OR SCOUR N
18. SETTLEMENT OR DEFLECTION N
19. OTHER N
FIELD INSPECTION REPORT STRUCTURE NO. 5460-013P
ITEM REFERENCE AND REMARKS
61. CHANNEL 4
1. ALIGNMENT P
2. EROSION AND/OR SCOUR G
3. CHANNEL PROTECTION G
4. WATERWAY OBSTRUCTIONS F
5. OTHER N
6. ADEQUACY OF OPENING INSUFF
7. NORMAL VELOCITY HIGH
8. AVERAGE CLEAR OPENING 15 FT.
9. STREAM BED COMPOSITION :
ROCK, SAND, STONES
222. APPROACHES 7
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
N N G G G G N G N
223. RETAINING WALL 7
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
G N N G G N
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
60.9, 61.1 FLOW DIRECTED TOWARD SOUTH ABUTMENT AND SOUTHWEST
WINGWALL DURING PERIODS OF HIGH FLOW. MODERATE TO
SEVERE SCOUR WITH UNDERMINING UP TO 1.9' ALONG
SOUTHWEST WINGWALL AND UP TO 1.7' ALONG SOUTH ABUTMENT
BREASTWALL. WATER FLOWS THROUGH SOUTH ABUTMENT
BREASTWALL MASONRY MORTAR JOINTS; HOWEVER, ABUTMENT IS
FOUNDED ON ROCK.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
61.2,3 GROUTED BOULDERS ON NORTH BANK, UPSTREAM FROM
STRUCTURE; NATURAL ROCK OUTCROPPINGS SERVE AS BANKS
ELSEWHERE. NO EROSION OR SCOUR NOTED ALONG CHANNEL
BANKS.
61.4 LARGE TREE FALLEN ADJACENT TO SOUTHWEST WINGWALL AND IN
FRONT OF SOUTH ABUTMENT.
61.7 VERY RAPID CURRENT WITH WATERFALLS APPROXIMATELY 50'
UPSTREAM AND DOWNSTREAM OF STRUCTURE.
222.3 MINOR VEHICLE SCRAPES ON APPROACH RAILINGS.
222.4 MODERATE TRANSVERSE CRACKING OF APPROACH PAVEMENT AT
APPROACH SLAB ENDS.
222.5 MINOR EROSION OF SIDE SLOPE AT EAST SIDE OF NORTH
APPROACH.
223 STONE MASONRY RETAINING WALL ADJACENT TO SOUTHEAST
WINGWALL; RETAINING WALL IN GOOD CONDITION.
STRUCTURE LOAD RATING STRUCTURE NO. 5460-013P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 22 20 36 33
HS 26 24 44 40
TYPE 3 25 23 42 38
TYPE 3S2 33 30 55 50
TYPE 3-3 40 36 67 61
DESIGN LOADING: H20 (M18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 6/15
LOAD RATING CONTROLLED BY: EXTERIOR GIRDER
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-013P
STRUCTURE IDENTIFICATION
(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK (1) STATE: ....................................... 474 - TENNESSEE (TN)
(202) STRUCTURE NAME: .......... SINKS BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 155 - SEVIER
(204) STRUCTURE NUMBER: ..... 5460-013P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 14 (6) FEATURES INTERSECTED:....... LITTLE RIVER
(207) ROAD SECTION NO: ..........013P (7) FACILITY CARRIED: .................. LITTLE RIVER ROAD
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5460013P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 11.3 MILES WEST FROM NPS
(210) OPERATING UNIT: ............. N. DIST. (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................3B13, 3B15 (11) MILE POINT: .............................6.82 (KM PT 10.98)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 3 - POSSIBLY ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
3 - STEEL
02 - STRINGER/MULTI-BEAM or GIRDER
65.6 FT (20.0 M)
65.6 FT (20.0 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
6 - N/A
6 - N/A
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 4 - H20 (M18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 26.0 TONS (23.6 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 44.0 TONS (39.9 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/18 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-013P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°40'09.80"
(17) LONGITUDE: ......................... 83°39'45.00"
(19) DETOUR LENGTH: ............... 55 MI (89 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
24.0 FT (7.3 M)
26.0 FT (7.9 M)
22.0 FT (6.7 M)
20.0 FT (6.1 M)
1.0 FT (0.3 M)
1.0 FT (0.3 M)
0 - NO MEDIAN
23 °
NO
24.0 FT (7.3 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
2 - MOUNTED ON PARAPET
6 - ALUMINUM
1 - CONTINUOUS RAIL
2.46 FT (0.75 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL:
(36) TRAFFIC SAFETY FEAT: ... 1111
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
5 - Stable; scour within limits of
2 - REHAB/RECONSTRUCTION
C - MODERATE
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
https://83�39'45.00 https://35�40'09.80
APPENDIX STRUCTURE NO. 5460-013P
PHOTOGRAPHS STRUCTURE NO. 5460-013P
PHOTO #1 - LOOKING SOUTH TOWARD CADES COVE
FLOW
PHOTO #2 - EAST (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING NORTH
PHOTO #4 - GENERAL UNDERSIDE VIEW LOOKING SOUTH
PHOTO #5 - GENERAL VIEW OF JOINT OVER NORTH ABUTMENT
PHOTO #6 - VEHICULAR SCRAPES ON NORTHWEST APPROACH
RAILING
PHOTO #7 - SCOUR WITH UNDERMINING ALONG SOUTH ABUTMENT
BREASTWALL AT UPSTREAM END; NOTE DETERIORATED MASONRY
MORTAR JOINTS
PHOTO #8 - SPALLING ON TOP OF WEST PARAPET NEAR MIDSPAN DUE
TO FORM WORK LEFT IN PLACE
PHOTO #9 - COLLISION DAMAGE TO WEST RAIL POST, THIRD POST
FROM SOUTH END
PHOTO #10 - TYPICAL GRAVEL ACCUMULATION ALONG PARAPETS
PHOTO #11 - TYPICAL TRANSVERSE CRACKING OF APPROACH
PAVEMENT AT END OF APPROACH SLABS, SOUTH APPROACH SHOWN
PHOTO #12 - TYPICAL CONDITION OF ELASTOMERIC BEARING PADS,
NORTH BEARING FOR BEAM #4 SHOWN
PHOTO #13 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #14 - TYPICAL PEELING OF PAINT AND SPOT RUSTING OF
BEAMS, BEAM #1 SHOWN
PHOTO #15 - GENERAL VIEW OF SOUTH ABUTMENT; NOTE FALLEN
TREE
PHOTO #16 - FLOW BENEATH SOUTH ABUTMENT MASONRY NEAR
WEST END
PHOTO #17 - FALLEN TREE ALONG SOUTHWEST WINGWALL; NOTE
CHANNEL FLOW INTO SOUTHWEST WINGWALL
PHOTO #18 - SCOUR AND UNDERMINING ALONG SOUTHWEST
WINGWALL
PHOTO #19 - TYPICAL DETERIORATION OF WINGWALL MASONRY
MORTAR JOINTS, SOUTHWEST WINGWALL SHOWN; NOTE
VEGETATION GROWTH
PHOTO #20 - VEGETATION GROWTH FROM WEST SIDE OF SOUTH
BEARING SEAT
PHOTO #21 - LOOKING UPSTREAM FROM DECK
PHOTO #22 - LOOKING DOWNSTREAM FROM DECK