Government Labor Hours.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- NAWCAD WOLF EPF DRAFT RFO
- Solicitation number
- N0042126RFPREQTW000000807
About this file
This is a Government Labor Hours spreadsheet for contract N00421-26-R-1024, detailing the authorized labor categories and hours required across a five-year period at the Naval Air Warfare Center Aircraft Division (NAWCAD) facility in St. Inigoes, Maryland. The spreadsheet is organized into four distinct sections: Total Non-Performance & FFP EPF hours (643,200 total hours), CPAF Non-Performance Based hours (403,200 total hours), FFP LOE hours (240,000 total hours), and On-Site/Off-Site hour breakdowns. Labor categories span production, inspection, maintenance, and administrative functions, including First-Line Supervisors, Machinists, Sheet-Metal Workers, Welders, Electricians, Automobile Body Repairers (Fiberglass), and Woodworkers. The majority of labor is performed on-site at the government facility (624,000 hours), with minimal off-site contractor work (19,200 hours) limited to senior and journeyman-level inspectors only. All hours are distributed equally across the five contract years, with most labor categories requiring 1,920 to 23,040 hours annually.
The spreadsheet serves as an attachment to Section L, Part B, Paragraph 3.5.1 of the solicitation, establishing the funded labor requirements for performance-based and fixed-price contract types. Government personnel will occupy supervisory, inspection, and quality assurance roles, while contractor support is restricted to specific inspection functions at the contractor's facility. This structure indicates a government-led manufacturing or maintenance operation with contractor supplemental support, consistent with Naval Air Systems Command acquisition strategy for equipment production or overhaul services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EPF CDRL.pdf | ||
| EPF_Award Fee Determination Plan (AFDP).docx | DOCX document | |
| EPF_QASP.docx | DOCX document | |
| EPF_OCI List.docx | DOCX document | |
| Labor Mix and Allocation.pdf | ||
| Cost Reimbursable Narrative.docx | DOCX document | |
| Solicitation - N0042126R1024.pdf | ||
| N00421-26-R-1024_DD254_Signed.pdf | ||
| Data Item Transmittal Form.docx | DOCX document | |
| SBPCD.docx | DOCX document | |
| Cost Workbook.xlsx | XLSX spreadsheet | |
| Section L - Instructions Conditions and Notices (EPF).docx | DOCX document | |
| EPF CSS PWS DRAFT SOW.pdf | ||
| WD 2015-4279 Rev30.pdf | ||
| TDL Admin Plan.docx | DOCX document | |
| Fixed T and M Price Narrative.docx | DOCX document | |
| Key Personnel.docx | DOCX document | |
| Section M - Evaluation Factors for Award (EPF).docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Non-Performance & FFP
| EPF Government Labor Hours - N00421-26-R-1024 | |
| Section L, Part B, Paragraph 3.5.1 | Attachment C4 |
| Note: The location is either St. Inigoes, MD (Govt) (On-Site) or Contractor (KTR) (Off-Site) |
| Labor Category | Location | Year I | Year II | Year III | Year IV | Year V | Total | |
| First-Line Supervisors of Production and Operating Workers (Project Manager), Senior, 51-1011 | Govt Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | ||
| General and Operations Managers (Key), Senior, 11-1021 | Govt Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | ||
| Inspectors, Testers, Sorters, Samplers, and Weighers, Senior, 51-9061 | Govt Site | 5,760 | 5,760 | 5,760 | 5,760 | 5,760 | ||
| Inspectors, Testers, Sorters, Samplers, and Weighers, Journeyman, 51-9061 | Govt Site | 3,840 | 3,840 | 3,840 | 3,840 | 3,840 | ||
| Project Management Specialists, Journeyman, 13-1082 | Govt Site | 7,680 | 7,680 | 7,680 | 7,680 | 7,680 | ||
| Automobile Body Repairer, Fiberglass, 05005 | Govt Site | 15,360 | 15,360 | 15,360 | 15,360 | 15,360 | ||
| Electrician, Maintenance , 23160 | Govt Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | ||
| Electrostatic Spray Painter, 09010 | Govt Site | 9,600 | 9,600 | 9,600 | 9,600 | 9,600 | ||
| General Maintenance Worker, 23370 | Govt Site | 9,600 | 9,600 | 9,600 | 9,600 | 9,600 | ||
| Heating, Ventilation and Air-Conditioning Mechanic , 23410 | Govt Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | ||
| Machinist, Maintenance , 23550 | Govt Site | 23,040 | 23,040 | 23,040 | 23,040 | 23,040 | ||
| Sheet-Metal Worker, Maintenance , 23890 | Govt Site | 23,040 | 23,040 | 23,040 | 23,040 | 23,040 | ||
| Shipping/Receiving Clerk, 21130 | Govt Site | 9,600 | 9,600 | 9,600 | 9,600 | 9,600 | 17 | |
| Welder, Combination, Maintenance, 23960 | Govt Site | 5,760 | 5,760 | 5,760 | 5,760 | 5,760 | 18 | |
| Woodworker, 23980 | Govt Site | 3,840 | 3,840 | 3,840 | 3,840 | 3,840 | ||
| Total CPAF Non-performance based & FFP Hours | 124,800 | 124,800 | 124,800 | 124,800 | 124,800 | 643,200 |
CPAF Non-performance Hours
| EPF CPAF Non-Performance Based Government Labor Hours - N00421-26-R-1024 | |
| Section L, Part B, Paragraph 3.5.1 | Attachment C4 |
| Note: The location is either St. Inigoes, MD (Govt) (On-Site) or Contractor (KTR) (Off-Site) |
| Labor Category | Location | Year I | Year II | Year III | Year IV | Year V | Total |
| Automobile Body Repairer, Fiberglass, 05005 | Govt Site | 15,360 | 15,360 | 15,360 | 15,360 | 15,360 | |
| Electrostatic Spray Painter, 09010 | Govt Site | 9,600 | 9,600 | 9,600 | 9,600 | 9,600 | |
| Machinist, Maintenance , 23550 | Govt Site | 23,040 | 23,040 | 23,040 | 23,040 | 23,040 | |
| Sheet-Metal Worker, Maintenance , 23890 | Govt Site | 23,040 | 23,040 | 23,040 | 23,040 | 23,040 | |
| Welder, Combination, Maintenance, 23960 | Govt Site | 5,760 | 5,760 | 5,760 | 5,760 | 5,760 | |
| Woodworker, 23980 | Govt Site | 3,840 | 3,840 | 3,840 | 3,840 | 3,840 | |
| Total CPAF Non-performance based Hours | 80,640 | 80,640 | 80,640 | 80,640 | 80,640 | 403,200 |
FFP Hours
| EPF Government Labor Hours - N00421-26-R-1024 | |
| Section L, Part B, Paragraph 3.5.1 | Attachment C4 |
| Note: The location is either St. Inigoes, MD (Govt) (On-Site) or Contractor (KTR) (Off-Site) |
| Labor Category | Location | Year I | Year II | Year III | Year IV | Year V | Total |
| First-Line Supervisors of Production and Operating Workers (Project Manager), Senior, 51-1011 | Govt Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | |
| General and Operations Managers (Key), Senior, 11-1021 | Govt Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | |
| Inspectors, Testers, Sorters, Samplers, and Weighers, Senior, 51-9061 | Govt Site | 5,760 | 5,760 | 5,760 | 5,760 | 5,760 | |
| Inspectors, Testers, Sorters, Samplers, and Weighers, Journeyman, 51-9061 | Govt Site | 3,840 | 3,840 | 3,840 | 3,840 | 3,840 | |
| Inspectors, Testers, Sorters, Samplers, and Weighers, Senior, 51-9061 | KTR Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | |
| Inspectors, Testers, Sorters, Samplers, and Weighers, Journeyman, 51-9061 | KTR Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | |
| Project Management Specialists, Journeyman, 13-1082 | Govt Site | 7,680 | 7,680 | 7,680 | 7,680 | 7,680 | |
| Electrician, Maintenance , 23160 | Govt Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | |
| General Maintenance Worker, 23370 | Govt Site | 9,600 | 9,600 | 9,600 | 9,600 | 9,600 | |
| Heating, Ventilation and Air-Conditioning Mechanic , 23410 | Govt Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | |
| Shipping/Receiving Clerk, 21130 | Govt Site | 9,600 | 9,600 | 9,600 | 9,600 | 9,600 | |
| Total FFP LOE Hours | 48,000 | 48,000 | 48,000 | 48,000 | 48,000 | 240,000 |
On Site Hours
| EPF Government Labor Hours - N00421-26-R-1024 | |
| Section L, Part B, Paragraph 3.5.1 | Attachment C4 |
| Note: The location is St. Inigoes, MD (Govt) (On-Site) |
| Labor Category | Location | Year I | Year II | Year III | Year IV | Year V | Total |
| First-Line Supervisors of Production and Operating Workers (Project Manager), Senior, 51-1011 | Govt Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | |
| General and Operations Managers (Key), Senior, 11-1021 | Govt Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | |
| Inspectors, Testers, Sorters, Samplers, and Weighers, Senior, 51-9061 | Govt Site | 5,760 | 5,760 | 5,760 | 5,760 | 5,760 | |
| Inspectors, Testers, Sorters, Samplers, and Weighers, Journeyman, 51-9061 | Govt Site | 3,840 | 3,840 | 3,840 | 3,840 | 3,840 | |
| Project Management Specialists, Journeyman, 13-1082 | Govt Site | 7,680 | 7,680 | 7,680 | 7,680 | 7,680 | |
| Automobile Body Repairer, Fiberglass, 05005 | Govt Site | 15,360 | 15,360 | 15,360 | 15,360 | 15,360 | |
| Electrician, Maintenance , 23160 | Govt Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | |
| Electrostatic Spray Painter, 09010 | Govt Site | 9,600 | 9,600 | 9,600 | 9,600 | 9,600 | |
| General Maintenance Worker, 23370 | Govt Site | 9,600 | 9,600 | 9,600 | 9,600 | 9,600 | |
| Heating, Ventilation and Air-Conditioning Mechanic , 23410 | Govt Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | |
| Machinist, Maintenance , 23550 | Govt Site | 23,040 | 23,040 | 23,040 | 23,040 | 23,040 | |
| Sheet-Metal Worker, Maintenance , 23890 | Govt Site | 23,040 | 23,040 | 23,040 | 23,040 | 23,040 | |
| Shipping/Receiving Clerk, 21130 | Govt Site | 9,600 | 9,600 | 9,600 | 9,600 | 9,600 | |
| Welder, Combination, Maintenance, 23960 | Govt Site | 5,760 | 5,760 | 5,760 | 5,760 | 5,760 | |
| Woodworker, 23980 | Govt Site | 3,840 | 3,840 | 3,840 | 3,840 | 3,840 | |
| TOTAL | 124,800 | 124,800 | 124,800 | 124,800 | 124,800 | 624,000 |
Off Site Hours
| EPF Government Labor Hours - N00421-26-R-1024 | |
| Section L, Part B, Paragraph 3.5.1 | Attachment C4 |
| Note: The location is Contractor (KTR) (Off-Site) |
| Labor Category | Location | Year I | Year II | Year III | Year IV | Year V | Total |
| Inspectors, Testers, Sorters, Samplers, and Weighers, Senior, 51-9061 | KTR Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | |
| Inspectors, Testers, Sorters, Samplers, and Weighers, Journeyman, 51-9061 | KTR Site | 1,920 | 1,920 | 1,920 | 1,920 | 1,920 | |
| Automobile Body Repairer, Fiberglass, 05005 | KTR Site | N/A | N/A | N/A | N/A | N/A | |
| Electrostatic Spray Painter, 09010 | KTR Site | N/A | N/A | N/A | N/A | N/A | |
| Machinist, Maintenance , 23550 | KTR Site | N/A | N/A | N/A | N/A | N/A | |
| Sheet-Metal Worker, Maintenance , 23890 | KTR Site | N/A | N/A | N/A | N/A | N/A | |
| Welder, Combination, Maintenance, 23960 | KTR Site | N/A | N/A | N/A | N/A | N/A | |
| TOTAL | 3,840 | 3,840 | 3,840 | 3,840 | 3,840 | 19,200 |
File details come from the government source that posted it. Updated .