This is a Fixed/T&M Price Narrative template for subcontractors responding to Request for Offer (RFO) N00421-26-R-1024 issued by the Naval Air Systems Command (NAWCAD). The document serves as Volume 3, Cost/Price Attachment C3 and requires subcontractors to provide administrative information including their RFO number, company name, address, Unique Entity Identifier (UEI), CAGE code, and point of contact details. Subcontractors must confirm response validity for a minimum of 180 calendar days and submit completed Section K provisions, current System for Award Management (SAM) representations and certifications, and an Organizational Conflict of Interest (OCI) assessment using the KTXT.209-9511 provision, along with any required OCI mitigation plans and letters of commitment for proposed contingent hires or key personnel.

The template requires an authorized representative signature and mandates disclosure of any deviations from the requested information in Attachment C3. This is associated with the NAWCAD WOLF EPF Draft RFO (Solicitation Number N0042126RFPREQTW000000807), which is currently in pre-solicitation status with contractor comments and questions due by 1400 hours on 11 July 2026. The document is marked as source selection information subject to FAR 2.101 and 3.104 restrictions.

View the file

Other files

File Type Posted
EPF_QASP.docx DOCX document
EPF_OCI List.docx DOCX document
Labor Mix and Allocation.pdf PDF
Cost Reimbursable Narrative.docx DOCX document
Government Labor Hours.xlsx XLSX spreadsheet
Solicitation - N0042126R1024.pdf PDF
N00421-26-R-1024_DD254_Signed.pdf PDF
Data Item Transmittal Form.docx DOCX document
SBPCD.docx DOCX document
Cost Workbook.xlsx XLSX spreadsheet
Section L - Instructions Conditions and Notices (EPF).docx DOCX document
EPF CDRL.pdf PDF
EPF_Award Fee Determination Plan (AFDP).docx DOCX document
EPF CSS PWS DRAFT SOW.pdf PDF
WD 2015-4279 Rev30.pdf PDF
TDL Admin Plan.docx DOCX document
Key Personnel.docx DOCX document
Section M - Evaluation Factors for Award (EPF).docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIXED/T&M PRICE NARRATIVE N00421-26-R-1024

Volume 3 – Cost/Price Attachment C3 (Section L, Part C, Paragraph 3.4) Page 1 of 2

I. ADMINISTRATIVE INFORMATION:

Subcontractors shall complete this attachment as instructed and within its entirety.

Subcontractors shall provide the following information:

· RFO Number:

· Subcontractor Name:

· Address:

· Unique Entity Identifier (UEI):

· CAGE Code:

· Point of Contact (POC) (Name, Title, Phone Number, and Email Address):

· Response Validity Date (Offer shall be valid for at least 180 calendar days):

Subcontractors shall include the following Enclosures as applicable:

· Completed Section K

· Completed OCI KTXT.209-9511 and OCI Mitigation Plan (if applicable)

· Letters of Commitment for each proposed Contingent Hire (only required if proposing Key Personnel) Subcontractors shall provide responses to the following items:

Section K Clause/Provision Fill-in or Responses:

The Subcontractor has completed the clauses and provisions contained in Section K of the RFO that require fill-in or response and included these items as an Enclosure. Choose an item.

Signed Representations, Certifications, and Acknowledgements and/or System for Award Management (SAM):

The Subcontractor’s representations and certifications are posted electronically on the System for Award Management (SAM) website and are current, accurate, complete, and applicable to this FOSR. Choose an item.

Table 1 – Organizational Conflict of Interest (OCI) KTXT.209-9511 Provision:

Table 1

Subcontractor Name
OCI Provision Completed and Submitted
Designate Conflict or No Conflict
Conflicts
Choose an item.
Choose an item.
Choose an item.
II.DEVIATIONS FROM THE INFORMATION REQUESTED IN ATTACHMENT C3:
Subcontractors shall provide a narrative to describe any deviation from the information requested within Attachment C3 as required by Section L, Part C, Paragraph 3.4.3. Otherwise, state N/A below:

III. AUTHORIZED SIGNATURE:

An authorized representative must sign below.

Type Name

Signature

Title

Date

SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104

File details come from the government source that posted it. Updated .