GLAC_307440_Final_CD_Permit_List.pdf

PDF 60 KB Posted

Attached to
GLAC 307440 - Replace Headquarters Wastewater and Federal contract opportunity
Solicitation number
140P2023R0072
Issued by
Department of the Interior National Park Service National Office

About this file

This document contains a permit list for the GLAC 307440 Headquarters Wastewater System project. The list identifies permits required by March 16, 2023 for the project, which includes replacing the headquarters wastewater system and backup power generation at Glacier National Park. The permits include an incidental take concurrence letter from the U.S. Fish and Wildlife Service, which will be provided by the government, and a construction stormwater general permit from the Montana Department of Environmental Quality, which must be obtained by the contractor. The document notes an update removing a wastewater permit from the list following discussion with the state agency and that consultation with the wildlife service may result in a concurrence letter rather than an incidental take permit.

View the file

Other files for this federal contract opportunity

Other files attached to GLAC 307440 - Replace Headquarters Wastewater and, newest first.
File Type Posted
Questions-Answers-07-10-23_Set_0003.pdf PDF
Sol_140P2023R0072_Amd_0003.pdf PDF
Questions-Answers-07-3-23_Set_0002.pdf PDF
11182013-4_0002.pdf PDF
1182013-1_0002.pdf PDF
GLAC_SSWR_ALL_0002.pdf PDF
Sol_140P2023R0072_Amd_0002.pdf PDF
Defects_by_Inspection_0002.pdf PDF
11182013-5_0002.pdf PDF
1182013-3_0002.pdf PDF
Headquarters_CCTV_Inspections_0002.pdf PDF
1182013-2_0002.pdf PDF
Sign_in_Sheet_0002.jpg JPG image
PACP_Quick_Rating_0002.pdf PDF
HQ_2017-2023_0001.xlsx XLSX spreadsheet
Bid_Bond_-_SF24_0001.pdf PDF
Housing_Winter_Occupantion_0001.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD(1)_0001.docx DOCX document
B08_Solit_PSP_Vol_I_Exp_REQD_0001.docx DOCX document
Sol_140P2023R0072_Amd_0001.pdf PDF
QandA06-23-23_0001.pdf PDF
MT_NP_GLAC_P_HQ(1)-70_PlanInHand_0001.pdf PDF
GLAC_307440_Final_CD_SubmittalList.pdf PDF
GLAC307440_Final_CD_ProjectManual_Division_1.pdf PDF
B08_Solit_Clauses_Construction-1.pdf PDF
GLAC307440_Final_CD_Drawings.pdf PDF
Sol_140P2023R0072.pdf PDF
GLAC307440_Final_CD_ProjectManual_Division_2-43.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Permit List:

GLAC 307440, Headquarters Wastewater System

PROJECT TITLE: HQ Wastewater System & Backup Power System PMIS #: 307440 PEPC#

PARK: GLAC REGION: IntermountainPROGRAM: Design/Const

PARK CONTACT: Jim Foster A\E: HDR

Dates of Assessment:

updated

1/20/2023 A\E CONTACT: Rickey Schultz, PE

Permits to Contracting no later than:

Permit Agency

Government Furnished

(GF) or Contractor

Provided (CP) USF&WS Incidental Take/ Concurrence Letter U.S. Fish & Wildlife Service GF

Construction Stormwater General Permit Montana Department of Environmental Quality CP

Project Meta Data

Notes: Update 1/20/23: Schedule 1.A. wastewater permit removed from list following discussion with MDEQ on 1/18/23.

Permit listed was upated on 11/09/22 to reflect all permits identified as part of the project in the PAF that do not fall within 'Construction Topics

(Based on Means and Methods) are Government Furnished (GF). The Permit Plan will be subsequently updated to reflect this change, as well as permit aquisition services.

USF&WS permit was updated to note that a concurrence letter may be the outcome of the consultation process rather than an incidental take permit.

DSC PM: Matt Jagunic

DSC PS:

Permit Lead:

Permit List 3/16/2023 | page 1 of 1