This document contains a permit list for the GLAC 307440 Headquarters Wastewater System project. The list identifies permits required by March 16, 2023 for the project, which includes replacing the headquarters wastewater system and backup power generation at Glacier National Park. The permits include an incidental take concurrence letter from the U.S. Fish and Wildlife Service, which will be provided by the government, and a construction stormwater general permit from the Montana Department of Environmental Quality, which must be obtained by the contractor. The document notes an update removing a wastewater permit from the list following discussion with the state agency and that consultation with the wildlife service may result in a concurrence letter rather than an incidental take permit.

View the file

Other files

Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Permit List:

GLAC 307440, Headquarters Wastewater System

PROJECT TITLE: HQ Wastewater System & Backup Power System PMIS #: 307440 PEPC#

PARK: GLAC REGION: IntermountainPROGRAM: Design/Const

PARK CONTACT: Jim Foster A\E: HDR

Dates of Assessment:

updated

1/20/2023 A\E CONTACT: Rickey Schultz, PE

Permits to Contracting no later than:

Permit Agency

Government Furnished

(GF) or Contractor

Provided (CP) USF&WS Incidental Take/ Concurrence Letter U.S. Fish & Wildlife Service GF

Construction Stormwater General Permit Montana Department of Environmental Quality CP

Project Meta Data

Notes: Update 1/20/23: Schedule 1.A. wastewater permit removed from list following discussion with MDEQ on 1/18/23.

Permit listed was upated on 11/09/22 to reflect all permits identified as part of the project in the PAF that do not fall within 'Construction Topics

(Based on Means and Methods) are Government Furnished (GF). The Permit Plan will be subsequently updated to reflect this change, as well as permit aquisition services.

USF&WS permit was updated to note that a concurrence letter may be the outcome of the consultation process rather than an incidental take permit.

DSC PM: Matt Jagunic

DSC PS:

Permit Lead:

Permit List 3/16/2023 | page 1 of 1