1182013-1_0002.pdf

PDF 7 MB Posted

Attached to
GLAC 307440 - Replace Headquarters Wastewater and Federal contract opportunity
Solicitation number
140P2023R0072
Issued by
Department of the Interior National Park Service National Office

About this file

This document contains technical reports from closed circuit television (CCTV) inspections of wastewater pipes in Glacier National Park. The reports provide details on the condition of various pipes in the park including locations, materials, diameters, lengths, joints, deficiencies observed, and rehabilitation needs. Inspections identified issues such as grease deposits, water intrusion, cracked linings, protruding taps, and root intrusions. Pipes ranged in length from 22.6 to 318.3 feet and were made from materials including vitrified clay, polyvinyl chloride and polyethylene. Rehabilitation of these wastewater assets appears necessary to address deficiencies and ensure continued operations.

View the file

Other files for this federal contract opportunity

Other files attached to GLAC 307440 - Replace Headquarters Wastewater and, newest first.
File Type Posted
Questions-Answers-07-10-23_Set_0003.pdf PDF
Sol_140P2023R0072_Amd_0003.pdf PDF
Questions-Answers-07-3-23_Set_0002.pdf PDF
11182013-4_0002.pdf PDF
GLAC_SSWR_ALL_0002.pdf PDF
Sol_140P2023R0072_Amd_0002.pdf PDF
Defects_by_Inspection_0002.pdf PDF
11182013-5_0002.pdf PDF
1182013-3_0002.pdf PDF
Headquarters_CCTV_Inspections_0002.pdf PDF
1182013-2_0002.pdf PDF
Sign_in_Sheet_0002.jpg JPG image
PACP_Quick_Rating_0002.pdf PDF
HQ_2017-2023_0001.xlsx XLSX spreadsheet
Bid_Bond_-_SF24_0001.pdf PDF
Housing_Winter_Occupantion_0001.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD(1)_0001.docx DOCX document
B08_Solit_PSP_Vol_I_Exp_REQD_0001.docx DOCX document
Sol_140P2023R0072_Amd_0001.pdf PDF
QandA06-23-23_0001.pdf PDF
MT_NP_GLAC_P_HQ(1)-70_PlanInHand_0001.pdf PDF
GLAC_307440_Final_CD_SubmittalList.pdf PDF
GLAC_307440_Final_CD_Permit_List.pdf PDF
GLAC307440_Final_CD_ProjectManual_Division_1.pdf PDF
B08_Solit_Clauses_Construction-1.pdf PDF
GLAC307440_Final_CD_Drawings.pdf PDF
Sol_140P2023R0072.pdf PDF
GLAC307440_Final_CD_ProjectManual_Division_2-43.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0 Ft

17 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA12] Water Level 25%

0.0 Ft

Shape or Size Change 4.000 1.5 Ft

Abandoned Survey [Camera stopped on change in size.] 6.4 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 26 Surveyor Heath Drainage

Street Mathers Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 17.0 Ft Height 6 Width ins

Joint length

Up HQ-CO9 Rim to invert Ft Down HQ-MHA12 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO9 E NPSfor Certificate # U-1008-7698

Time 14:39 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 06.40

Northing Easting Elevation Coordinate System GPS Accuracy

Project Headquarters Work Order

R&R Visual Inc. Phone: 574-223-5426 Fax: 574-223-7953

Camera stopped on change in size.

Video Index Count 1.5 Ft Code Shape or Size Change

Remarks File Name 910.jpg

Video Index Count 6.4 Ft Code Abandoned Survey

Remarks File Name 911.jpg

CCTV Picture List of Work Order Setup 26 Video 11182013

HQ-CO9 E

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\

VideoCount CD Code Fr To RemarksImRefIn1 % JntIn2

0.0 ST Start of Survey

0.0 AMH Manhole HQ-MHA12

0.0 MWL Water Level 25

1.5 MSC Shape or Size Change 4.000

6.4 MSA Abandoned Survey Camera stopped on change in s...

Total Length Surveyed6.4 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 26 Surveyor Heath Drainage

Street Mathers Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 17.0 Height 6 Width ins

Joint length

Up HQ-CO9 Rim to invert Ft Down HQ-MHA12 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO9 E NPSfor Certificate # U-1008-7698

Time 14:39 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 6.4

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

95.2 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHC4] Water Level 0%

0.0 Ft

Joint Offset Medium ST: 1 4.7 Ft

Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [S01] 61.5 Ft

Alignment Right 025% OM: 4 Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [F01] Cleanout House [HQ-CO77] End of Survey

95.2 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 18 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 95.2 Ft Height 4 Width ins

Joint length

Up HQ-CO77 Rim to invert Ft Down HQ-MHC4 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO77 B NPSfor Certificate # U-1008-7698

Time 11:09 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 95.20

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 4.7 Ft Code Joint Offset Medium

Remarks File Name 868.jpg

Video Index Count 61.5 Ft Code Deposits Attached Grease

Remarks File Name 869.jpg

Video Index Count 95.2 Ft Code Alignment Right

Remarks File Name 870.jpg

Video Index Count 95.2 Ft Code End of Survey

Remarks File Name 871.jpg

CCTV Picture List of Work Order Setup 18 Video 11182013

HQ-CO77 B

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHC4

0.0 MWL Water Level 0

4.7 JOM Joint Offset Medium

61.5 S01 DAGS Deposits Attached Grease 03 095

95.2 LR Alignment Right 25

95.2 F01 DAGS Deposits Attached Grease 03 095

95.2 ACOH Cleanout House HQ-CO77

95.2 FH End of Survey

Total Length Surveyed95.2 Ft

Scores Pipe Ratings Index Pipe Ratings Index

2.3

Peak Peak

Mean Pipe Mean Pipe

0.2

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 18 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 95.2 Height 4 Width ins

Joint length

Up HQ-CO77 Rim to invert Ft Down HQ-MHC4 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO77 B NPSfor Certificate # U-1008-7698

Time 11:09 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 95.2

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

140.1 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA8] Water Level 0% Deposits Attached Grease 08 to 04 o'clock 005% OM: 2

0.0 Ft

Deformed 010% ST: 4 [Eggshaped] 26.4 Ft

Deposits Settled Other 04 to 08 o'clock 010% OM: 2 [Debris] 56.7 Ft

Tap Break-in 4.000 10 o'clock 85.4 Ft

Water Level Sag 010% ST: 2 Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 104.5 Ft

Deposits Settled Gravel 04 to 08 o'clock 010% OM: 2 126.9 Ft

Manhole [HQ-MHA7] End of Survey 140.1 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 32 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 140.1 Ft Height 8 Width ins

Joint length

Up HQ-MHA8 Rim to invert Ft Down HQ-MHA7 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA8 E NPSfor Certificate # U-1008-7698

Time 16:34 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 140.10

Northing Easting Elevation Coordinate System GPS Accuracy

Eggshaped

Video Index Count 0.0 Ft Code Deposits Attached Grease

Remarks File Name 938.jpg

Video Index Count 26.4 Ft Code Deformed

Remarks File Name 939.jpg

Video Index Count 56.7 Ft Code Deposits Settled Other

Remarks Debris File Name 940.jpg

Video Index Count 85.4 Ft Code Tap Break-in

Remarks File Name 941.jpg

Video Index Count 104.5 Ft Code Water Level Sag

Remarks File Name 942.jpg

Video Index Count 104.5 Ft Code Deposits Settled Gravel

Remarks File Name 943.jpg

Video Index Count 126.9 Ft Code Deposits Settled Gravel

Remarks File Name 944.jpg

Video Index Count 140.1 Ft Code End of Survey

Remarks File Name 945.jpg

CCTV Picture List of Work Order Setup 32 Video 11182013

HQ-MHA8 E

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA8

0.0 MWL Water Level 0

0.0 DAGS Deposits Attached Grease 08 045

26.4 D Deformed Eggshaped10

56.7 DSZ Deposits Settled Other 04 08 Debris10

85.4 TB Tap Break-in 4.000 10

104.5 MWLS Water Level Sag 10

104.5 DSGV Deposits Settled Gravel 05 0710

126.9 DSGV Deposits Settled Gravel 04 0810

140.1 AMH Manhole HQ-MHA7

140.1 FH End of Survey

Total Length Surveyed140.1 Ft

Scores Pipe Ratings Index Pipe Ratings Index

1.6

Peak Peak

Mean Pipe Mean Pipe

0.1

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 32 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 140.1 Height 8 Width ins

Joint length

Up HQ-MHA8 Rim to invert Ft Down HQ-MHA7 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA8 E NPSfor Certificate # U-1008-7698

Time 16:34 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 140.1

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

92.9 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA9] Water Level 0%

0.0 Ft

Deposits Attached Grease 08 to 04 o'clock 005% OM: 2 [S01] 2.1 Ft

Deposits Attached Grease 08 to 04 o'clock 005% OM: 2 [F01] Manhole [HQ-MHA8] End of Survey

92.9 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 31 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 92.9 Ft Height 8 Width ins

Joint length

Up HQ-MHA9 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA9 E NPSfor Certificate # U-1008-7698

Time 16:26 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 92.90

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 2.1 Ft Code Deposits Attached Grease

Remarks File Name 935.jpg

Video Index Count 92.9 Ft Code End of Survey

Remarks File Name 936.jpg

CCTV Picture List of Work Order Setup 31 Video 11182013

HQ-MHA9 E

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA9

0.0 MWL Water Level 0

2.1 S01 DAGS Deposits Attached Grease 08 045

92.9 F01 DAGS Deposits Attached Grease 08 045

92.9 AMH Manhole HQ-MHA8

92.9 FH End of Survey

Total Length Surveyed92.9 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.4

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 31 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 92.9 Height 8 Width ins

Joint length

Up HQ-MHA9 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA9 E NPSfor Certificate # U-1008-7698

Time 16:26 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 92.9

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

171.6 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA10] Water Level 5%

0.0 Ft

Crack Longitudinal 08 o'clock ST: 2 1.1 Ft

Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [S01] 7.2 Ft

Water Level Sag 010% ST: 2 15.2 Ft

Deformed 015% ST: 5 [Eggshaped] 48.6 Ft

Tap Break-in 4.000 12 o'clock 49.0 Ft

Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [F01] Manhole [HQ-MHA9] End of Survey

171.6 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 30 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 171.6 Ft Height 8 Width ins

Joint length

Up HQ-MHA10 Rim to invert Ft Down HQ-MHA9 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA10 E NPSfor Certificate # U-1008-7698

Time 16:07 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 171.60

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 7.2 Ft

Remarks File Name 929.jpg

Video Index Count 15.2 Ft Code Water Level Sag

Remarks File Name 930.jpg

Video Index Count 48.6 Ft Code Deformed

Remarks Eggshaped File Name 931.jpg

Video Index Count 49.0 Ft Code Tap Break-in

Remarks File Name 932.jpg

Video Index Count 171.6 Ft Code End of Survey

Remarks File Name 933.jpg

CCTV Picture List of Work Order Setup 30 Video 11182013

HQ-MHA10 E

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA10

0.0 MWL Water Level 5

1.1 CL Crack Longitudinal 08

7.2 S01 DAGS Deposits Attached Grease 03 095

15.2 MWLS Water Level Sag 10

48.6 D Deformed Eggshaped15

49.0 TB Tap Break-in 4.000 12

171.6 F01 DAGS Deposits Attached Grease 03 095

171.6 AMH Manhole HQ-MHA9

171.6 FH End of Survey

Total Length Surveyed171.6 Ft

Scores Pipe Ratings Index Pipe Ratings Index

1.9

Peak Peak

Mean Pipe Mean Pipe

0.1 0.4

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 30 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 171.6 Height 8 Width ins

Joint length

Up HQ-MHA10 Rim to invert Ft Down HQ-MHA9 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA10 E NPSfor Certificate # U-1008-7698

Time 16:07 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 171.6

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

250.8 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA10-1] Water Level 5%

0.0 Ft

Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [S01] 7.6 Ft

Tap Break-in 4.000 10 o'clock 57.1 Ft

Water Level Sag 015% ST: 2 69.7 Ft

Tap Break-in 4.000 12 o'clock 131.1 Ft

Water Level Sag 010% ST: 2 217.1 Ft

Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [F01] Manhole [HQ-MHA10] End of Survey

250.8 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 28 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 250.8 Ft Height 8 Width ins

Joint length

Up HQ-MHA10-1 Rim to invert Ft Down HQ-MHA10 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA10-1 E NPSfor Certificate # U-1008-7698

Time 15:06 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 250.80

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 7.6 Ft

Remarks File Name 916.jpg

Video Index Count 57.1 Ft Code Tap Break-in

Remarks File Name 917.jpg

Video Index Count 69.7 Ft Code Water Level Sag

Remarks File Name 918.jpg

Video Index Count 131.1 Ft Code Tap Break-in

Remarks File Name 919.jpg

Video Index Count 217.1 Ft Code Water Level Sag

Remarks File Name 920.jpg

Video Index Count 250.8 Ft Code End of Survey

Remarks File Name 921.jpg

CCTV Picture List of Work Order Setup 28 Video 11182013

HQ-MHA10-1 E

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA10-1

0.0 MWL Water Level 5

7.6 S01 DAGS Deposits Attached Grease 03 095

57.1 TB Tap Break-in 4.000 10

69.7 MWLS Water Level Sag 15

131.1 TB Tap Break-in 4.000 12

217.1 MWLS Water Level Sag 10

250.8 F01 DAGS Deposits Attached Grease 03 095

250.8 AMH Manhole HQ-MHA10

250.8 FH End of Survey

Total Length Surveyed250.8 Ft

Scores Pipe Ratings Index Pipe Ratings Index

1.9

Peak Peak

Mean Pipe Mean Pipe

0.4

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 28 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 250.8 Height 8 Width ins

Joint length

Up HQ-MHA10-1 Rim to invert Ft Down HQ-MHA10 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA10-1 E NPSfor Certificate # U-1008-7698

Time 15:06 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 250.8

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

22.6 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA10-1] Water Level 0%

0.0 Ft

Buckling Dimpling 05 to 08 o'clock 12.4 Ft

Manhole [HQ-MHA10-2] End of Survey 22.6 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 27 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 22.6 Ft Height 8 Width ins

Joint length

Up HQ-MHA10-2 Rim to invert Ft Down HQ-MHA10-1 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info Line is abandoned.

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA10-2 E NPSfor Certificate # U-1008-7698

Time 14:54 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 22.60

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 12.4 Ft Code Buckling Dimpling

Remarks File Name 913.jpg

Video Index Count 22.6 Ft Code End of Survey

Remarks File Name 914.jpg

CCTV Picture List of Work Order Setup 27 Video 11182013

HQ-MHA10-2 E

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA10-1

0.0 MWL Water Level 0

12.4 KD Buckling Dimpling 05 08

22.6 AMH Manhole HQ-MHA10-2

22.6 FH End of Survey

Total Length Surveyed22.6 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 27 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 22.6 Height 8 Width ins

Joint length

Up HQ-MHA10-2 Rim to invert Ft Down HQ-MHA10-1 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info Line is abandoned.

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA10-2 E NPSfor Certificate # U-1008-7698

Time 14:54 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 22.6

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

80.6 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA11] Water Level 5%

0.0 Ft

Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 1.1 Ft

Water Level Sag 015% ST: 2 47.0 Ft

Manhole [HQ-KHA10] End of Survey 80.6 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 25 Surveyor Heath Drainage

Street Mathers Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 80.6 Ft Height 8 Width ins

Joint length

Up HQ-MHA11 Rim to invert Ft Down HQ-MHA10 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA11 E NPSfor Certificate # U-1008-7698

Time 14:07 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 80.60

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 1.1 Ft

Remarks File Name 906.jpg

Video Index Count 47.0 Ft Code Water Level Sag

Remarks File Name 907.jpg

Video Index Count 80.6 Ft Code End of Survey

Remarks File Name 908.jpg

CCTV Picture List of Work Order Setup 25 Video 11182013

HQ-MHA11 E

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA11

0.0 MWL Water Level 5

1.1 DAGS Deposits Attached Grease 03 095

47.0 MWLS Water Level Sag 15

80.6 AMH Manhole HQ-KHA10

80.6 FH End of Survey

Total Length Surveyed80.6 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 25 Surveyor Heath Drainage

Street Mathers Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 80.6 Height 8 Width ins

Joint length

Up HQ-MHA11 Rim to invert Ft Down HQ-MHA10 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA11 E NPSfor Certificate # U-1008-7698

Time 14:07 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 80.6

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

190.8 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA12] Water Level 60%

0.0 Ft

Camera Underwater [S01] 1.0 Ft

Camera Underwater [F01] 44.6 Ft

General Photo 150.7 Ft

Tap Factory 8.000 03 o'clock 158.9 Ft

Manhole [HQ-MHA11] End of Survey 190.8 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 24 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 190.8 Ft Height 8 Width ins

Joint length

Up HQ-MHA12 Rim to invert Ft Down HQ-MHA11 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA12 E NPSfor Certificate # U-1008-7698

Time 13:53 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 190.80

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 1.0 Ft Code Camera Underwater

Remarks File Name 900.jpg

Video Index Count 44.6 Ft Code Camera Underwater

Remarks File Name 901.jpg

Video Index Count 150.7 Ft Code General Photo

Remarks File Name 902.jpg

Video Index Count 158.9 Ft Code Tap Factory

Remarks File Name 903.jpg

Video Index Count 190.8 Ft Code End of Survey

Remarks File Name 904.jpg

CCTV Picture List of Work Order Setup 24 Video 11182013

HQ-MHA12 E

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA12

0.0 MWL Water Level 60

1.0 S01 MCU Camera Underwater

44.6 F01 MCU Camera Underwater

150.7 MGP General Photo

158.9 TF Tap Factory 8.000 03

190.8 AMH Manhole HQ-MHA11

190.8 FH End of Survey

Total Length Surveyed190.8 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.2

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 24 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 190.8 Height 8 Width ins

Joint length

Up HQ-MHA12 Rim to invert Ft Down HQ-MHA11 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA12 E NPSfor Certificate # U-1008-7698

Time 13:53 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 190.8

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

260 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA13] Water Level 5%

0.0 Ft

Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [S01] 0.9 Ft

Water Level Sag 020% ST: 2 7.6 Ft

Water Level Sag 020% ST: 2 40.9 Ft

Tap Break-in 4.000 03 o'clock 64.1 Ft

Water Level Sag 015% ST: 2 72.4 Ft

Tap Break-in Intruding 4.000 03 o'clock 2.000 OM: 4 Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [F01] Abandoned Survey [Camera stopped on intruding tap.]

151.0 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 22 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyethylene Lining

Total length 260.0 Ft Height 8 Width ins

Joint length

Up HQ-MHA13 Rim to invert Ft Down HQ-MHA12 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA13 C NPSfor Certificate # U-1008-7698

Time 13:04 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 151.00

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 0.9 Ft

Remarks File Name 886.jpg

Video Index Count 7.6 Ft Code Water Level Sag

Remarks File Name 887.jpg

Video Index Count 40.9 Ft Code Water Level Sag

Remarks File Name 888.jpg

Video Index Count 64.1 Ft Code Tap Break-in

Remarks File Name 889.jpg

Video Index Count 72.4 Ft Code Water Level Sag

Remarks File Name 890.jpg

Video Index Count 151.0 Ft Code Tap Break-in Intruding

Remarks File Name 891.jpg

Video Index Count 151.0 Ft Code Tap Break-in Intruding

Remarks File Name 892.jpg

Video Index Count 151.0 Ft Code Abandoned Survey

Remarks Camera stopped on intruding tap.

File Name 893.jpg

CCTV Picture List of Work Order Setup 22 Video 11182013

HQ-MHA13 C

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA13

0.0 MWL Water Level 5

0.9 S01 DAGS Deposits Attached Grease 03 095

7.6 MWLS Water Level Sag 20

40.9 MWLS Water Level Sag 20

64.1 TB Tap Break-in 4.000 03

72.4 MWLS Water Level Sag 15

151.0 TBI Tap Break-in Intruding 4.000 032.000

151.0 F01 DAGS Deposits Attached Grease 03 095

151.0 MSA Abandoned Survey Camera stopped on intruding t...

Total Length Surveyed151.0 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.4

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 22 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyethylene Lining

Total length 260.0 Height 8 Width ins

Joint length

Up HQ-MHA13 Rim to invert Ft Down HQ-MHA12 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA13 C NPSfor Certificate # U-1008-7698

Time 13:04 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 151.0

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

260 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA12] Water Level 50%

0.0 Ft

Water Level Sag 050% ST: 3 14.7 Ft

Water Level Sag 030% ST: 2 93.3 Ft

Tap Break-in Intruding 4.000 09 o'clock 2.000 OM: 4 Manhole [HQ-MHA13] End of Survey [Line segment complete.]

122.8 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 23 Surveyor Heath Drainage

Street Sperry Dr.

Weather Heavy Rain

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyethylene Lining

Total length 260.0 Ft Height 8 Width ins

Joint length

Up HQ-MHA13 Rim to invert Ft Down HQ-MHA12 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA13 E NPSfor Certificate # U-1008-7698

Time 13:31 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 122.80

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 14.7 Ft Code Water Level Sag

Remarks File Name 895.jpg

Video Index Count 93.3 Ft Code Water Level Sag

Remarks File Name 896.jpg

Video Index Count 122.8 Ft Code Tap Break-in Intruding

Remarks File Name 897.jpg

Video Index Count 122.8 Ft Code End of Survey

Remarks Line segment complete.

File Name 898.jpg

CCTV Picture List of Work Order Setup 23 Video 11182013

HQ-MHA13 E

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA12

0.0 MWL Water Level 50

14.7 MWLS Water Level Sag 50

93.3 MWLS Water Level Sag 30

122.8 TBI Tap Break-in Intruding 4.000 092.000

122.8 AMH Manhole HQ-MHA13

122.8 FH End of Survey Line segment complete.

Total Length Surveyed122.8 Ft

Scores Pipe Ratings Index Pipe Ratings Index

2.5

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 23 Surveyor Heath Drainage

Street Sperry Dr.

Weather Heavy Rain

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyethylene Lining

Total length 260.0 Height 8 Width ins

Joint length

Up HQ-MHA13 Rim to invert Ft Down HQ-MHA12 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA13 E NPSfor Certificate # U-1008-7698

Time 13:31 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 122.8

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

156.1 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA14] Water Level 0%

0.0 Ft

General Photo 85.8 Ft

Manhole [HQ-MHA13] End of Survey 156.1 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 20 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 156.1 Ft Height 6 Width ins

Joint length

Up HQ-MHA14 Rim to invert Ft Down HQ-MHA13 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA14 B NPSfor Certificate # U-1008-7698

Time 12:11 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 156.10

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 85.8 Ft Code General Photo

Remarks File Name 876.jpg

Video Index Count 156.1 Ft Code End of Survey

Remarks File Name 877.jpg

CCTV Picture List of Work Order Setup 20 Video 11182013

HQ-MHA14 B

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA14

0.0 MWL Water Level 0

85.8 MGP General Photo

156.1 AMH Manhole HQ-MHA13

156.1 FH End of Survey

Total Length Surveyed156.1 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 20 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 156.1 Height 6 Width ins

Joint length

Up HQ-MHA14 Rim to invert Ft Down HQ-MHA13 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA14 B NPSfor Certificate # U-1008-7698

Time 12:11 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 156.1

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

141.2 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA14] Water Level 5%

0.0 Ft

Water Level Sag 015% ST: 2 9.0 Ft

Manhole [HQ-MHA15] End of Survey 141.2 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 19 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 141.2 Ft Height 6 Width ins

Joint length

Up HQ-MHA15 Rim to invert Ft Down HQ-MHA14 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA15 B NPSfor Certificate # U-1008-7698

Time 11:53 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 141.20

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 9.0 Ft

Remarks File Name 873.jpg

Video Index Count 141.2 Ft Code End of Survey

Remarks File Name 874.jpg

CCTV Picture List of Work Order Setup 19 Video 11182013

HQ-MHA15 B

Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA14

0.0 MWL Water Level 5

9.0 MWLS Water Level Sag 15

141.2 AMH Manhole HQ-MHA15

141.2 FH End of Survey

Total Length Surveyed141.2 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/19

Setup 19 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 141.2 Height 6 Width ins

Joint length

Up HQ-MHA15 Rim to invert Ft Down HQ-MHA14 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA15 B NPSfor Certificate # U-1008-7698

Time 11:53 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 141.2

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

182.8 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHB1] Water Level 0%

0.0 Ft

General Photo 94.5 Ft

Manhole [HQ-MHA1] End of Survey 182.8 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/18

Setup 15 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place

Total length 182.8 Ft Height 8 Width ins

Joint length

Up HQ-MHB1 Rim to invert Ft Down HQ-MHA1 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHB1 B NPSfor Certificate # U-1008-7698

Time 17:41 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 182.80

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 94.5 Ft

Remarks File Name 841.jpg

Video Index Count 182.8 Ft Code End of Survey

Remarks File Name 842.jpg

CCTV Picture List of Work Order Setup 15 Video 11182013

HQ-MHB1 B

Survey Date 2013/11/18 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHB1

0.0 MWL Water Level 0

94.5 MGP General Photo

182.8 AMH Manhole HQ-MHA1

182.8 FH End of Survey

Total Length Surveyed182.8 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/18

Setup 15 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place

Total length 182.8 Height 8 Width ins

Joint length

Up HQ-MHB1 Rim to invert Ft Down HQ-MHA1 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHB1 B NPSfor Certificate # U-1008-7698

Time 17:41 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 182.8

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

148.6 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHB2] Water Level 10%

0.0 Ft

Joint Offset Medium ST: 1 23.1 Ft

Material change [PVC] 23.4 Ft

Joint Offset Large ST: 2 Material change [VCP] 27.6 Ft

Water Level Sag 015% ST: 2 131.2 Ft

Manhole [HQ-MHB1] End of Survey 148.6 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/18

Setup 14 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place

Total length 148.6 Ft Height 8 Width ins

Joint length

Up HQ-MHB2 Rim to invert Ft Down HQ-MHB1 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHB2 B NPSfor Certificate # U-1008-7698

Time 17:26 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 148.60

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 23.1 Ft Code Joint Offset Medium

Remarks File Name 832.jpg

Video Index Count 23.1 Ft Code Joint Offset Medium

Remarks File Name 833.jpg

Video Index Count 23.4 Ft Code Material change

Remarks PVC File Name 834.jpg

Video Index Count 27.6 Ft Code Joint Offset Large

Remarks File Name 835.jpg

Video Index Count 27.6 Ft Code Joint Offset Large

Remarks File Name 836.jpg

Video Index Count 27.6 Ft Code Material change

Remarks VCP File Name 837.jpg

Video Index Count 131.2 Ft Code Water Level Sag

Remarks File Name 838.jpg

Video Index Count 148.6 Ft Code End of Survey

Remarks File Name 839.jpg

CCTV Picture List of Work Order Setup 14 Video 11182013

HQ-MHB2 B

Survey Date 2013/11/18 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHB2

0.0 MWL Water Level 10

23.1 JOM Joint Offset Medium

23.4 MMC Material change PVC

27.6 JOL Joint Offset Large

27.6 MMC Material change VCP

131.2 MWLS Water Level Sag 15

148.6 AMH Manhole HQ-MHB1

148.6 FH End of Survey

Total Length Surveyed148.6 Ft

Scores Pipe Ratings Index Pipe Ratings Index

1.7

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/18

Setup 14 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place

Total length 148.6 Height 8 Width ins

Joint length

Up HQ-MHB2 Rim to invert Ft Down HQ-MHB1 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHB2 B NPSfor Certificate # U-1008-7698

Time 17:26 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 148.6

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

184.4 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHB2] Water Level 0%

0.0 Ft

General Photo 91.8 Ft

Tap Break-in 4.000 02 o'clock 95.3 Ft

Tap Break-in 4.000 10 o'clock 104.7 Ft

Lining Failure Wrinkled 04 to 05 o'clock ST: 3 108.9 Ft

Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 128.5 Ft

Abandoned Survey [Camera stopped on debris.] 128.6 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/18

Setup 13 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place

Total length 184.4 Ft Height 8 Width ins

Joint length

Up HQ-MHB3 Rim to invert Ft Down HQ-MHB2 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHB3 B NPSfor Certificate # U-1008-7698

Time 17:02 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 128.60

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 91.8 Ft

Remarks File Name 825.jpg

Video Index Count 95.3 Ft Code Tap Break-in

Remarks File Name 826.jpg

Video Index Count 104.7 Ft Code Tap Break-in

Remarks File Name 827.jpg

Video Index Count 108.9 Ft Code Lining Failure Wrinkled

Remarks File Name 828.jpg

Video Index Count 128.5 Ft Code Deposits Settled Gravel

Remarks File Name 829.jpg

Video Index Count 128.6 Ft Code Abandoned Survey

Remarks Camera stopped on debris.

File Name 830.jpg

CCTV Picture List of Work Order Setup 13 Video 11182013

HQ-MHB3 B

Survey Date 2013/11/18 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHB2

0.0 MWL Water Level 0

91.8 MGP General Photo

95.3 TB Tap Break-in 4.000 02

104.7 TB Tap Break-in 4.000 10

108.9 LFW Lining Failure Wrinkled 04 05

128.5 DSGV Deposits Settled Gravel 05 0710

128.6 MSA Abandoned Survey Camera stopped on debris.

Total Length Surveyed128.6 Ft

Scores Pipe Ratings Index Pipe Ratings Index

0.7

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/18

Setup 13 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place

Total length 184.4 Height 8 Width ins

Joint length

Up HQ-MHB3 Rim to invert Ft Down HQ-MHB2 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHB3 B NPSfor Certificate # U-1008-7698

Time 17:02 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 128.6

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

318.3 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHB3] Water Level 0%

0.0 Ft

Lining Failure Buckled 07 o'clock ST: 3 22.5 Ft

Roots Ball Lateral 06 to 12 o'clock 055% OM: 4 59.4 Ft

Tap Break-in 4.000 09 o'clock 60.0 Ft

Lining Failure Other 02 o'clock [Seam failure] 79.3 Ft

Water Level Sag 010% ST: 2 102.6 Ft

General Photo 195.9 Ft

Tap Break-in 6.000 09 o'clock 231.9 Ft

Manhole [HQ-MHB3-1] End of Survey 318.3 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/18

Setup 3 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place

Total length 318.3 Ft Height 6 Width ins

Joint length

Up HQ-MHB3-1 Rim to invert Ft Down HQ-MHB3 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHB3-1 X NPSfor Certificate # U-1008-7698

Time 11:14 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 318.30

Northing Easting Elevation Coordinate System GPS Accuracy

Code Water Level

Remarks File Name 756.jpg

Video Index Count 22.5 Ft Code Lining Failure Buckled

Remarks File Name 757.jpg

Video Index Count 59.4 Ft Code Roots Ball Lateral

Remarks File Name 758.jpg

Video Index Count 60.0 Ft Code Tap Break-in

Remarks File Name 759.jpg

Video Index Count 79.3 Ft Code Lining Failure Other

Remarks Seam failure File Name 760.jpg

Video Index Count 102.6 Ft Code Water Level Sag

Remarks File Name 761.jpg

Video Index Count 195.9 Ft Code General Photo

Remarks File Name 762.jpg

Video Index Count 231.9 Ft Code Tap Break-in

Remarks File Name 763.jpg

CCTV Picture List of Work Order Setup 3 Video 11182013

HQ-MHB3-1 X

Survey Date 2013/11/18 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

CCTV Picture List of Work Order Setup 3 Video 11182013

HQ-MHB3-1 X

Survey Date 2013/11/18 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\

Video Index Count 318.3 Ft Code End of Survey

Remarks File Name 764.jpg

0.0 AMH Manhole HQ-MHB3

0.0 MWL Water Level 0

22.5 LFBK Lining Failure Buckled 07

59.4 RBL Roots Ball Lateral 06 1255

60.0 TB Tap Break-in 4.000 09

79.3 LFZ Lining Failure Other 02 Seam failure

102.6 MWLS Water Level Sag 10

195.9 MGP General Photo

231.9 TB Tap Break-in 6.000 09

318.3 AMH Manhole HQ-MHB3-1

318.3 FH End of Survey

Total Length Surveyed318.3 Ft

Scores Pipe Ratings Index Pipe Ratings Index

1.7 1.3

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/18

Setup 3 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place

Total length 318.3 Height 6 Width ins

Joint length

Up HQ-MHB3-1 Rim to invert Ft Down HQ-MHB3 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHB3-1 X NPSfor Certificate # U-1008-7698

Time 11:14 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 318.3

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

324.2 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHB3-2] Water Level 0% Lining Failure Buckled 05 to 06 o'clock ST: 3

0.0 Ft

Lining Failure Other 03 o'clock…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .