1182013-1_0002.pdf
PDF 7 MB Posted
- Attached to
- GLAC 307440 - Replace Headquarters Wastewater and Federal contract opportunity
- Solicitation number
- 140P2023R0072
About this file
This document contains technical reports from closed circuit television (CCTV) inspections of wastewater pipes in Glacier National Park. The reports provide details on the condition of various pipes in the park including locations, materials, diameters, lengths, joints, deficiencies observed, and rehabilitation needs. Inspections identified issues such as grease deposits, water intrusion, cracked linings, protruding taps, and root intrusions. Pipes ranged in length from 22.6 to 318.3 feet and were made from materials including vitrified clay, polyvinyl chloride and polyethylene. Rehabilitation of these wastewater assets appears necessary to address deficiencies and ensure continued operations.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0 Ft
17 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA12] Water Level 25%
0.0 Ft
Shape or Size Change 4.000 1.5 Ft
Abandoned Survey [Camera stopped on change in size.] 6.4 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 26 Surveyor Heath Drainage
Street Mathers Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 17.0 Ft Height 6 Width ins
Joint length
Up HQ-CO9 Rim to invert Ft Down HQ-MHA12 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO9 E NPSfor Certificate # U-1008-7698
Time 14:39 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 06.40
Northing Easting Elevation Coordinate System GPS Accuracy
Project Headquarters Work Order
R&R Visual Inc. Phone: 574-223-5426 Fax: 574-223-7953
Camera stopped on change in size.
Video Index Count 1.5 Ft Code Shape or Size Change
Remarks File Name 910.jpg
Video Index Count 6.4 Ft Code Abandoned Survey
Remarks File Name 911.jpg
CCTV Picture List of Work Order Setup 26 Video 11182013
HQ-CO9 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\
VideoCount CD Code Fr To RemarksImRefIn1 % JntIn2
0.0 ST Start of Survey
0.0 AMH Manhole HQ-MHA12
0.0 MWL Water Level 25
1.5 MSC Shape or Size Change 4.000
6.4 MSA Abandoned Survey Camera stopped on change in s...
Total Length Surveyed6.4 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 26 Surveyor Heath Drainage
Street Mathers Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 17.0 Height 6 Width ins
Joint length
Up HQ-CO9 Rim to invert Ft Down HQ-MHA12 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO9 E NPSfor Certificate # U-1008-7698
Time 14:39 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 6.4
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
95.2 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHC4] Water Level 0%
0.0 Ft
Joint Offset Medium ST: 1 4.7 Ft
Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [S01] 61.5 Ft
Alignment Right 025% OM: 4 Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [F01] Cleanout House [HQ-CO77] End of Survey
95.2 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 18 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 95.2 Ft Height 4 Width ins
Joint length
Up HQ-CO77 Rim to invert Ft Down HQ-MHC4 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO77 B NPSfor Certificate # U-1008-7698
Time 11:09 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 95.20
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 4.7 Ft Code Joint Offset Medium
Remarks File Name 868.jpg
Video Index Count 61.5 Ft Code Deposits Attached Grease
Remarks File Name 869.jpg
Video Index Count 95.2 Ft Code Alignment Right
Remarks File Name 870.jpg
Video Index Count 95.2 Ft Code End of Survey
Remarks File Name 871.jpg
CCTV Picture List of Work Order Setup 18 Video 11182013
HQ-CO77 B
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHC4
0.0 MWL Water Level 0
4.7 JOM Joint Offset Medium
61.5 S01 DAGS Deposits Attached Grease 03 095
95.2 LR Alignment Right 25
95.2 F01 DAGS Deposits Attached Grease 03 095
95.2 ACOH Cleanout House HQ-CO77
95.2 FH End of Survey
Total Length Surveyed95.2 Ft
Scores Pipe Ratings Index Pipe Ratings Index
2.3
Peak Peak
Mean Pipe Mean Pipe
0.2
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 18 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 95.2 Height 4 Width ins
Joint length
Up HQ-CO77 Rim to invert Ft Down HQ-MHC4 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO77 B NPSfor Certificate # U-1008-7698
Time 11:09 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 95.2
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
140.1 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA8] Water Level 0% Deposits Attached Grease 08 to 04 o'clock 005% OM: 2
0.0 Ft
Deformed 010% ST: 4 [Eggshaped] 26.4 Ft
Deposits Settled Other 04 to 08 o'clock 010% OM: 2 [Debris] 56.7 Ft
Tap Break-in 4.000 10 o'clock 85.4 Ft
Water Level Sag 010% ST: 2 Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 104.5 Ft
Deposits Settled Gravel 04 to 08 o'clock 010% OM: 2 126.9 Ft
Manhole [HQ-MHA7] End of Survey 140.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 32 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 140.1 Ft Height 8 Width ins
Joint length
Up HQ-MHA8 Rim to invert Ft Down HQ-MHA7 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA8 E NPSfor Certificate # U-1008-7698
Time 16:34 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 140.10
Northing Easting Elevation Coordinate System GPS Accuracy
Eggshaped
Video Index Count 0.0 Ft Code Deposits Attached Grease
Remarks File Name 938.jpg
Video Index Count 26.4 Ft Code Deformed
Remarks File Name 939.jpg
Video Index Count 56.7 Ft Code Deposits Settled Other
Remarks Debris File Name 940.jpg
Video Index Count 85.4 Ft Code Tap Break-in
Remarks File Name 941.jpg
Video Index Count 104.5 Ft Code Water Level Sag
Remarks File Name 942.jpg
Video Index Count 104.5 Ft Code Deposits Settled Gravel
Remarks File Name 943.jpg
Video Index Count 126.9 Ft Code Deposits Settled Gravel
Remarks File Name 944.jpg
Video Index Count 140.1 Ft Code End of Survey
Remarks File Name 945.jpg
CCTV Picture List of Work Order Setup 32 Video 11182013
HQ-MHA8 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA8
0.0 MWL Water Level 0
0.0 DAGS Deposits Attached Grease 08 045
26.4 D Deformed Eggshaped10
56.7 DSZ Deposits Settled Other 04 08 Debris10
85.4 TB Tap Break-in 4.000 10
104.5 MWLS Water Level Sag 10
104.5 DSGV Deposits Settled Gravel 05 0710
126.9 DSGV Deposits Settled Gravel 04 0810
140.1 AMH Manhole HQ-MHA7
140.1 FH End of Survey
Total Length Surveyed140.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
1.6
Peak Peak
Mean Pipe Mean Pipe
0.1
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 32 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 140.1 Height 8 Width ins
Joint length
Up HQ-MHA8 Rim to invert Ft Down HQ-MHA7 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA8 E NPSfor Certificate # U-1008-7698
Time 16:34 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 140.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
92.9 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA9] Water Level 0%
0.0 Ft
Deposits Attached Grease 08 to 04 o'clock 005% OM: 2 [S01] 2.1 Ft
Deposits Attached Grease 08 to 04 o'clock 005% OM: 2 [F01] Manhole [HQ-MHA8] End of Survey
92.9 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 31 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 92.9 Ft Height 8 Width ins
Joint length
Up HQ-MHA9 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA9 E NPSfor Certificate # U-1008-7698
Time 16:26 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 92.90
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 2.1 Ft Code Deposits Attached Grease
Remarks File Name 935.jpg
Video Index Count 92.9 Ft Code End of Survey
Remarks File Name 936.jpg
CCTV Picture List of Work Order Setup 31 Video 11182013
HQ-MHA9 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA9
0.0 MWL Water Level 0
2.1 S01 DAGS Deposits Attached Grease 08 045
92.9 F01 DAGS Deposits Attached Grease 08 045
92.9 AMH Manhole HQ-MHA8
92.9 FH End of Survey
Total Length Surveyed92.9 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.4
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 31 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 92.9 Height 8 Width ins
Joint length
Up HQ-MHA9 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA9 E NPSfor Certificate # U-1008-7698
Time 16:26 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 92.9
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
171.6 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA10] Water Level 5%
0.0 Ft
Crack Longitudinal 08 o'clock ST: 2 1.1 Ft
Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [S01] 7.2 Ft
Water Level Sag 010% ST: 2 15.2 Ft
Deformed 015% ST: 5 [Eggshaped] 48.6 Ft
Tap Break-in 4.000 12 o'clock 49.0 Ft
Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [F01] Manhole [HQ-MHA9] End of Survey
171.6 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 30 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 171.6 Ft Height 8 Width ins
Joint length
Up HQ-MHA10 Rim to invert Ft Down HQ-MHA9 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA10 E NPSfor Certificate # U-1008-7698
Time 16:07 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 171.60
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 7.2 Ft
Remarks File Name 929.jpg
Video Index Count 15.2 Ft Code Water Level Sag
Remarks File Name 930.jpg
Video Index Count 48.6 Ft Code Deformed
Remarks Eggshaped File Name 931.jpg
Video Index Count 49.0 Ft Code Tap Break-in
Remarks File Name 932.jpg
Video Index Count 171.6 Ft Code End of Survey
Remarks File Name 933.jpg
CCTV Picture List of Work Order Setup 30 Video 11182013
HQ-MHA10 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA10
0.0 MWL Water Level 5
1.1 CL Crack Longitudinal 08
7.2 S01 DAGS Deposits Attached Grease 03 095
15.2 MWLS Water Level Sag 10
48.6 D Deformed Eggshaped15
49.0 TB Tap Break-in 4.000 12
171.6 F01 DAGS Deposits Attached Grease 03 095
171.6 AMH Manhole HQ-MHA9
171.6 FH End of Survey
Total Length Surveyed171.6 Ft
Scores Pipe Ratings Index Pipe Ratings Index
1.9
Peak Peak
Mean Pipe Mean Pipe
0.1 0.4
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 30 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 171.6 Height 8 Width ins
Joint length
Up HQ-MHA10 Rim to invert Ft Down HQ-MHA9 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA10 E NPSfor Certificate # U-1008-7698
Time 16:07 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 171.6
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
250.8 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA10-1] Water Level 5%
0.0 Ft
Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [S01] 7.6 Ft
Tap Break-in 4.000 10 o'clock 57.1 Ft
Water Level Sag 015% ST: 2 69.7 Ft
Tap Break-in 4.000 12 o'clock 131.1 Ft
Water Level Sag 010% ST: 2 217.1 Ft
Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [F01] Manhole [HQ-MHA10] End of Survey
250.8 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 28 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 250.8 Ft Height 8 Width ins
Joint length
Up HQ-MHA10-1 Rim to invert Ft Down HQ-MHA10 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA10-1 E NPSfor Certificate # U-1008-7698
Time 15:06 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 250.80
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 7.6 Ft
Remarks File Name 916.jpg
Video Index Count 57.1 Ft Code Tap Break-in
Remarks File Name 917.jpg
Video Index Count 69.7 Ft Code Water Level Sag
Remarks File Name 918.jpg
Video Index Count 131.1 Ft Code Tap Break-in
Remarks File Name 919.jpg
Video Index Count 217.1 Ft Code Water Level Sag
Remarks File Name 920.jpg
Video Index Count 250.8 Ft Code End of Survey
Remarks File Name 921.jpg
CCTV Picture List of Work Order Setup 28 Video 11182013
HQ-MHA10-1 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA10-1
0.0 MWL Water Level 5
7.6 S01 DAGS Deposits Attached Grease 03 095
57.1 TB Tap Break-in 4.000 10
69.7 MWLS Water Level Sag 15
131.1 TB Tap Break-in 4.000 12
217.1 MWLS Water Level Sag 10
250.8 F01 DAGS Deposits Attached Grease 03 095
250.8 AMH Manhole HQ-MHA10
250.8 FH End of Survey
Total Length Surveyed250.8 Ft
Scores Pipe Ratings Index Pipe Ratings Index
1.9
Peak Peak
Mean Pipe Mean Pipe
0.4
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 28 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 250.8 Height 8 Width ins
Joint length
Up HQ-MHA10-1 Rim to invert Ft Down HQ-MHA10 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA10-1 E NPSfor Certificate # U-1008-7698
Time 15:06 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 250.8
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
22.6 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA10-1] Water Level 0%
0.0 Ft
Buckling Dimpling 05 to 08 o'clock 12.4 Ft
Manhole [HQ-MHA10-2] End of Survey 22.6 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 27 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 22.6 Ft Height 8 Width ins
Joint length
Up HQ-MHA10-2 Rim to invert Ft Down HQ-MHA10-1 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info Line is abandoned.
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA10-2 E NPSfor Certificate # U-1008-7698
Time 14:54 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 22.60
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 12.4 Ft Code Buckling Dimpling
Remarks File Name 913.jpg
Video Index Count 22.6 Ft Code End of Survey
Remarks File Name 914.jpg
CCTV Picture List of Work Order Setup 27 Video 11182013
HQ-MHA10-2 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA10-1
0.0 MWL Water Level 0
12.4 KD Buckling Dimpling 05 08
22.6 AMH Manhole HQ-MHA10-2
22.6 FH End of Survey
Total Length Surveyed22.6 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 27 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 22.6 Height 8 Width ins
Joint length
Up HQ-MHA10-2 Rim to invert Ft Down HQ-MHA10-1 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info Line is abandoned.
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA10-2 E NPSfor Certificate # U-1008-7698
Time 14:54 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 22.6
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
80.6 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA11] Water Level 5%
0.0 Ft
Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 1.1 Ft
Water Level Sag 015% ST: 2 47.0 Ft
Manhole [HQ-KHA10] End of Survey 80.6 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 25 Surveyor Heath Drainage
Street Mathers Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 80.6 Ft Height 8 Width ins
Joint length
Up HQ-MHA11 Rim to invert Ft Down HQ-MHA10 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA11 E NPSfor Certificate # U-1008-7698
Time 14:07 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 80.60
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 1.1 Ft
Remarks File Name 906.jpg
Video Index Count 47.0 Ft Code Water Level Sag
Remarks File Name 907.jpg
Video Index Count 80.6 Ft Code End of Survey
Remarks File Name 908.jpg
CCTV Picture List of Work Order Setup 25 Video 11182013
HQ-MHA11 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA11
0.0 MWL Water Level 5
1.1 DAGS Deposits Attached Grease 03 095
47.0 MWLS Water Level Sag 15
80.6 AMH Manhole HQ-KHA10
80.6 FH End of Survey
Total Length Surveyed80.6 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 25 Surveyor Heath Drainage
Street Mathers Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 80.6 Height 8 Width ins
Joint length
Up HQ-MHA11 Rim to invert Ft Down HQ-MHA10 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA11 E NPSfor Certificate # U-1008-7698
Time 14:07 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 80.6
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
190.8 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA12] Water Level 60%
0.0 Ft
Camera Underwater [S01] 1.0 Ft
Camera Underwater [F01] 44.6 Ft
General Photo 150.7 Ft
Tap Factory 8.000 03 o'clock 158.9 Ft
Manhole [HQ-MHA11] End of Survey 190.8 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 24 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 190.8 Ft Height 8 Width ins
Joint length
Up HQ-MHA12 Rim to invert Ft Down HQ-MHA11 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA12 E NPSfor Certificate # U-1008-7698
Time 13:53 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 190.80
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 1.0 Ft Code Camera Underwater
Remarks File Name 900.jpg
Video Index Count 44.6 Ft Code Camera Underwater
Remarks File Name 901.jpg
Video Index Count 150.7 Ft Code General Photo
Remarks File Name 902.jpg
Video Index Count 158.9 Ft Code Tap Factory
Remarks File Name 903.jpg
Video Index Count 190.8 Ft Code End of Survey
Remarks File Name 904.jpg
CCTV Picture List of Work Order Setup 24 Video 11182013
HQ-MHA12 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA12
0.0 MWL Water Level 60
1.0 S01 MCU Camera Underwater
44.6 F01 MCU Camera Underwater
150.7 MGP General Photo
158.9 TF Tap Factory 8.000 03
190.8 AMH Manhole HQ-MHA11
190.8 FH End of Survey
Total Length Surveyed190.8 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.2
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 24 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 190.8 Height 8 Width ins
Joint length
Up HQ-MHA12 Rim to invert Ft Down HQ-MHA11 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA12 E NPSfor Certificate # U-1008-7698
Time 13:53 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 190.8
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
260 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA13] Water Level 5%
0.0 Ft
Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [S01] 0.9 Ft
Water Level Sag 020% ST: 2 7.6 Ft
Water Level Sag 020% ST: 2 40.9 Ft
Tap Break-in 4.000 03 o'clock 64.1 Ft
Water Level Sag 015% ST: 2 72.4 Ft
Tap Break-in Intruding 4.000 03 o'clock 2.000 OM: 4 Deposits Attached Grease 03 to 09 o'clock 005% OM: 2 [F01] Abandoned Survey [Camera stopped on intruding tap.]
151.0 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 22 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyethylene Lining
Total length 260.0 Ft Height 8 Width ins
Joint length
Up HQ-MHA13 Rim to invert Ft Down HQ-MHA12 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA13 C NPSfor Certificate # U-1008-7698
Time 13:04 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 151.00
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 0.9 Ft
Remarks File Name 886.jpg
Video Index Count 7.6 Ft Code Water Level Sag
Remarks File Name 887.jpg
Video Index Count 40.9 Ft Code Water Level Sag
Remarks File Name 888.jpg
Video Index Count 64.1 Ft Code Tap Break-in
Remarks File Name 889.jpg
Video Index Count 72.4 Ft Code Water Level Sag
Remarks File Name 890.jpg
Video Index Count 151.0 Ft Code Tap Break-in Intruding
Remarks File Name 891.jpg
Video Index Count 151.0 Ft Code Tap Break-in Intruding
Remarks File Name 892.jpg
Video Index Count 151.0 Ft Code Abandoned Survey
Remarks Camera stopped on intruding tap.
File Name 893.jpg
CCTV Picture List of Work Order Setup 22 Video 11182013
HQ-MHA13 C
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA13
0.0 MWL Water Level 5
0.9 S01 DAGS Deposits Attached Grease 03 095
7.6 MWLS Water Level Sag 20
40.9 MWLS Water Level Sag 20
64.1 TB Tap Break-in 4.000 03
72.4 MWLS Water Level Sag 15
151.0 TBI Tap Break-in Intruding 4.000 032.000
151.0 F01 DAGS Deposits Attached Grease 03 095
151.0 MSA Abandoned Survey Camera stopped on intruding t...
Total Length Surveyed151.0 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.4
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 22 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyethylene Lining
Total length 260.0 Height 8 Width ins
Joint length
Up HQ-MHA13 Rim to invert Ft Down HQ-MHA12 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA13 C NPSfor Certificate # U-1008-7698
Time 13:04 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 151.0
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
260 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA12] Water Level 50%
0.0 Ft
Water Level Sag 050% ST: 3 14.7 Ft
Water Level Sag 030% ST: 2 93.3 Ft
Tap Break-in Intruding 4.000 09 o'clock 2.000 OM: 4 Manhole [HQ-MHA13] End of Survey [Line segment complete.]
122.8 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 23 Surveyor Heath Drainage
Street Sperry Dr.
Weather Heavy Rain
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyethylene Lining
Total length 260.0 Ft Height 8 Width ins
Joint length
Up HQ-MHA13 Rim to invert Ft Down HQ-MHA12 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA13 E NPSfor Certificate # U-1008-7698
Time 13:31 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 122.80
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 14.7 Ft Code Water Level Sag
Remarks File Name 895.jpg
Video Index Count 93.3 Ft Code Water Level Sag
Remarks File Name 896.jpg
Video Index Count 122.8 Ft Code Tap Break-in Intruding
Remarks File Name 897.jpg
Video Index Count 122.8 Ft Code End of Survey
Remarks Line segment complete.
File Name 898.jpg
CCTV Picture List of Work Order Setup 23 Video 11182013
HQ-MHA13 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA12
0.0 MWL Water Level 50
14.7 MWLS Water Level Sag 50
93.3 MWLS Water Level Sag 30
122.8 TBI Tap Break-in Intruding 4.000 092.000
122.8 AMH Manhole HQ-MHA13
122.8 FH End of Survey Line segment complete.
Total Length Surveyed122.8 Ft
Scores Pipe Ratings Index Pipe Ratings Index
2.5
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 23 Surveyor Heath Drainage
Street Sperry Dr.
Weather Heavy Rain
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyethylene Lining
Total length 260.0 Height 8 Width ins
Joint length
Up HQ-MHA13 Rim to invert Ft Down HQ-MHA12 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA13 E NPSfor Certificate # U-1008-7698
Time 13:31 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 122.8
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
156.1 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA14] Water Level 0%
0.0 Ft
General Photo 85.8 Ft
Manhole [HQ-MHA13] End of Survey 156.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 20 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 156.1 Ft Height 6 Width ins
Joint length
Up HQ-MHA14 Rim to invert Ft Down HQ-MHA13 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA14 B NPSfor Certificate # U-1008-7698
Time 12:11 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 156.10
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 85.8 Ft Code General Photo
Remarks File Name 876.jpg
Video Index Count 156.1 Ft Code End of Survey
Remarks File Name 877.jpg
CCTV Picture List of Work Order Setup 20 Video 11182013
HQ-MHA14 B
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA14
0.0 MWL Water Level 0
85.8 MGP General Photo
156.1 AMH Manhole HQ-MHA13
156.1 FH End of Survey
Total Length Surveyed156.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 20 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 156.1 Height 6 Width ins
Joint length
Up HQ-MHA14 Rim to invert Ft Down HQ-MHA13 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA14 B NPSfor Certificate # U-1008-7698
Time 12:11 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 156.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
141.2 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA14] Water Level 5%
0.0 Ft
Water Level Sag 015% ST: 2 9.0 Ft
Manhole [HQ-MHA15] End of Survey 141.2 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 19 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 141.2 Ft Height 6 Width ins
Joint length
Up HQ-MHA15 Rim to invert Ft Down HQ-MHA14 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA15 B NPSfor Certificate # U-1008-7698
Time 11:53 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 141.20
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 9.0 Ft
Remarks File Name 873.jpg
Video Index Count 141.2 Ft Code End of Survey
Remarks File Name 874.jpg
CCTV Picture List of Work Order Setup 19 Video 11182013
HQ-MHA15 B
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA14
0.0 MWL Water Level 5
9.0 MWLS Water Level Sag 15
141.2 AMH Manhole HQ-MHA15
141.2 FH End of Survey
Total Length Surveyed141.2 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 19 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 141.2 Height 6 Width ins
Joint length
Up HQ-MHA15 Rim to invert Ft Down HQ-MHA14 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA15 B NPSfor Certificate # U-1008-7698
Time 11:53 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 141.2
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
182.8 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHB1] Water Level 0%
0.0 Ft
General Photo 94.5 Ft
Manhole [HQ-MHA1] End of Survey 182.8 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/18
Setup 15 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place
Total length 182.8 Ft Height 8 Width ins
Joint length
Up HQ-MHB1 Rim to invert Ft Down HQ-MHA1 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHB1 B NPSfor Certificate # U-1008-7698
Time 17:41 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 182.80
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 94.5 Ft
Remarks File Name 841.jpg
Video Index Count 182.8 Ft Code End of Survey
Remarks File Name 842.jpg
CCTV Picture List of Work Order Setup 15 Video 11182013
HQ-MHB1 B
Survey Date 2013/11/18 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHB1
0.0 MWL Water Level 0
94.5 MGP General Photo
182.8 AMH Manhole HQ-MHA1
182.8 FH End of Survey
Total Length Surveyed182.8 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/18
Setup 15 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place
Total length 182.8 Height 8 Width ins
Joint length
Up HQ-MHB1 Rim to invert Ft Down HQ-MHA1 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHB1 B NPSfor Certificate # U-1008-7698
Time 17:41 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 182.8
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
148.6 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHB2] Water Level 10%
0.0 Ft
Joint Offset Medium ST: 1 23.1 Ft
Material change [PVC] 23.4 Ft
Joint Offset Large ST: 2 Material change [VCP] 27.6 Ft
Water Level Sag 015% ST: 2 131.2 Ft
Manhole [HQ-MHB1] End of Survey 148.6 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/18
Setup 14 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place
Total length 148.6 Ft Height 8 Width ins
Joint length
Up HQ-MHB2 Rim to invert Ft Down HQ-MHB1 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHB2 B NPSfor Certificate # U-1008-7698
Time 17:26 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 148.60
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 23.1 Ft Code Joint Offset Medium
Remarks File Name 832.jpg
Video Index Count 23.1 Ft Code Joint Offset Medium
Remarks File Name 833.jpg
Video Index Count 23.4 Ft Code Material change
Remarks PVC File Name 834.jpg
Video Index Count 27.6 Ft Code Joint Offset Large
Remarks File Name 835.jpg
Video Index Count 27.6 Ft Code Joint Offset Large
Remarks File Name 836.jpg
Video Index Count 27.6 Ft Code Material change
Remarks VCP File Name 837.jpg
Video Index Count 131.2 Ft Code Water Level Sag
Remarks File Name 838.jpg
Video Index Count 148.6 Ft Code End of Survey
Remarks File Name 839.jpg
CCTV Picture List of Work Order Setup 14 Video 11182013
HQ-MHB2 B
Survey Date 2013/11/18 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHB2
0.0 MWL Water Level 10
23.1 JOM Joint Offset Medium
23.4 MMC Material change PVC
27.6 JOL Joint Offset Large
27.6 MMC Material change VCP
131.2 MWLS Water Level Sag 15
148.6 AMH Manhole HQ-MHB1
148.6 FH End of Survey
Total Length Surveyed148.6 Ft
Scores Pipe Ratings Index Pipe Ratings Index
1.7
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/18
Setup 14 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place
Total length 148.6 Height 8 Width ins
Joint length
Up HQ-MHB2 Rim to invert Ft Down HQ-MHB1 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHB2 B NPSfor Certificate # U-1008-7698
Time 17:26 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 148.6
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
184.4 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHB2] Water Level 0%
0.0 Ft
General Photo 91.8 Ft
Tap Break-in 4.000 02 o'clock 95.3 Ft
Tap Break-in 4.000 10 o'clock 104.7 Ft
Lining Failure Wrinkled 04 to 05 o'clock ST: 3 108.9 Ft
Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 128.5 Ft
Abandoned Survey [Camera stopped on debris.] 128.6 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/18
Setup 13 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place
Total length 184.4 Ft Height 8 Width ins
Joint length
Up HQ-MHB3 Rim to invert Ft Down HQ-MHB2 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHB3 B NPSfor Certificate # U-1008-7698
Time 17:02 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 128.60
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 91.8 Ft
Remarks File Name 825.jpg
Video Index Count 95.3 Ft Code Tap Break-in
Remarks File Name 826.jpg
Video Index Count 104.7 Ft Code Tap Break-in
Remarks File Name 827.jpg
Video Index Count 108.9 Ft Code Lining Failure Wrinkled
Remarks File Name 828.jpg
Video Index Count 128.5 Ft Code Deposits Settled Gravel
Remarks File Name 829.jpg
Video Index Count 128.6 Ft Code Abandoned Survey
Remarks Camera stopped on debris.
File Name 830.jpg
CCTV Picture List of Work Order Setup 13 Video 11182013
HQ-MHB3 B
Survey Date 2013/11/18 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHB2
0.0 MWL Water Level 0
91.8 MGP General Photo
95.3 TB Tap Break-in 4.000 02
104.7 TB Tap Break-in 4.000 10
108.9 LFW Lining Failure Wrinkled 04 05
128.5 DSGV Deposits Settled Gravel 05 0710
128.6 MSA Abandoned Survey Camera stopped on debris.
Total Length Surveyed128.6 Ft
Scores Pipe Ratings Index Pipe Ratings Index
0.7
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/18
Setup 13 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place
Total length 184.4 Height 8 Width ins
Joint length
Up HQ-MHB3 Rim to invert Ft Down HQ-MHB2 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHB3 B NPSfor Certificate # U-1008-7698
Time 17:02 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 128.6
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
318.3 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHB3] Water Level 0%
0.0 Ft
Lining Failure Buckled 07 o'clock ST: 3 22.5 Ft
Roots Ball Lateral 06 to 12 o'clock 055% OM: 4 59.4 Ft
Tap Break-in 4.000 09 o'clock 60.0 Ft
Lining Failure Other 02 o'clock [Seam failure] 79.3 Ft
Water Level Sag 010% ST: 2 102.6 Ft
General Photo 195.9 Ft
Tap Break-in 6.000 09 o'clock 231.9 Ft
Manhole [HQ-MHB3-1] End of Survey 318.3 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/18
Setup 3 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place
Total length 318.3 Ft Height 6 Width ins
Joint length
Up HQ-MHB3-1 Rim to invert Ft Down HQ-MHB3 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHB3-1 X NPSfor Certificate # U-1008-7698
Time 11:14 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 318.30
Northing Easting Elevation Coordinate System GPS Accuracy
Code Water Level
Remarks File Name 756.jpg
Video Index Count 22.5 Ft Code Lining Failure Buckled
Remarks File Name 757.jpg
Video Index Count 59.4 Ft Code Roots Ball Lateral
Remarks File Name 758.jpg
Video Index Count 60.0 Ft Code Tap Break-in
Remarks File Name 759.jpg
Video Index Count 79.3 Ft Code Lining Failure Other
Remarks Seam failure File Name 760.jpg
Video Index Count 102.6 Ft Code Water Level Sag
Remarks File Name 761.jpg
Video Index Count 195.9 Ft Code General Photo
Remarks File Name 762.jpg
Video Index Count 231.9 Ft Code Tap Break-in
Remarks File Name 763.jpg
CCTV Picture List of Work Order Setup 3 Video 11182013
HQ-MHB3-1 X
Survey Date 2013/11/18 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
CCTV Picture List of Work Order Setup 3 Video 11182013
HQ-MHB3-1 X
Survey Date 2013/11/18 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\
Video Index Count 318.3 Ft Code End of Survey
Remarks File Name 764.jpg
0.0 AMH Manhole HQ-MHB3
0.0 MWL Water Level 0
22.5 LFBK Lining Failure Buckled 07
59.4 RBL Roots Ball Lateral 06 1255
60.0 TB Tap Break-in 4.000 09
79.3 LFZ Lining Failure Other 02 Seam failure
102.6 MWLS Water Level Sag 10
195.9 MGP General Photo
231.9 TB Tap Break-in 6.000 09
318.3 AMH Manhole HQ-MHB3-1
318.3 FH End of Survey
Total Length Surveyed318.3 Ft
Scores Pipe Ratings Index Pipe Ratings Index
1.7 1.3
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/18
Setup 3 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place
Total length 318.3 Height 6 Width ins
Joint length
Up HQ-MHB3-1 Rim to invert Ft Down HQ-MHB3 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHB3-1 X NPSfor Certificate # U-1008-7698
Time 11:14 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 318.3
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
324.2 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHB3-2] Water Level 0% Lining Failure Buckled 05 to 06 o'clock ST: 3
0.0 Ft
Lining Failure Other 03 o'clock…
This is the start of the file's text. The full file is on GovTribe.