This document contains a PACP Quick Rating survey of 133 sewer lines at the Glacier National Park headquarters. The survey details each sewer line segment's identification code, length, pipe material and size, and connecting manholes.
The related federal contract opportunity is for GLAC 307440 to replace the wastewater collection system and generate backup power at Glacier National Park headquarters. The solicitation was issued by the National Park Service National Office within the Department of the Interior. The opportunity involves replacing aged sewer lines and installing backup power generation to ensure continued wastewater service.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 HQ-MHB3-3 X HQ-MHB3-2 HQ-MHB3-3 117.5 6 VCP 2100 0000 2100
2 HQ-MHB3-2 X HQ-MHB3-2 HQ-MHB3-1 324.2 6 VCP 3221 2100 3222
3 HQ-MHB3-1 X HQ-MHB3 HQ-MHB3-1 318.3 6 VCP 3121 4100 4131
4 HQ-STUBMHB7 XX HQ-MHB7 HQ-STUBMHB7 0.6 6 VCP
5 HQ-MHC1 X HQ-MHB3 HQ-MHC1 157.7 6 PVC 2100 2D00 2D00
6 HQ-MHC4 X HQ-MHC1 HQ-MHC4 100.9 6 PVC 0000 2C00 2C00
7 HQ-TPB6-1 X HQ-MHB6 HQ-TPB6-1 256.2 6 DIP 1100 0000 1100
8 HQ-MHB7 X HQ-MHB6 HQ-MHB7 204.1 6 VCP 0000 1100 1100
9 HQ-MHB6 X HQ-MHB6 HQ-MHB5 82.5 6 VCP 0000 0000 0000
10 HQ-MHB6 A HQ-MHB5 HQ-MHB6 141.6 6 VCP 3223 5100 5132
11 HQ-MHB5 A HQ-MHB5 HQ-MHB4 178.1 6 VCP 3300 0000 3300
12 HQ-MHB4 B HQ-MHB4 HQ-MHB3 246.5 8 VCP 5121 0000 5121
13 HQ-MHB3 B HQ-MHB2 HQ-MHB3 128.6 8 VCP 3100 2100 3121
14 HQ-MHB2 B HQ-MHB2 HQ-MHB1 148.6 8 VCP 2211 0000 2211
15 HQ-MHB1 B HQ-MHB1 HQ-MHA1 182.8 8 VCP 0000 0000 0000
16 HQ-MHC4 B HQ-MHC4 HQ-MHC1 145.7 6 PVC 2100 2D00 2D00
17 HQ-MHC5 B HQ-MHC4 HQ-MHC5 122.7 6 PVC 3100 3211 3311
18 HQ-CO77 B HQ-MHC4 HQ-CO77 95.2 4 PVC 1100 4127 4127
19 HQ-MHA15 B HQ-MHA14 HQ-MHA15 141.2 6 PVC 2100 0000 2100
Client Project Project Start Location UOM Database Printed On
Contract
Survey Count 133
PACP Quick Rating
Setup PSR Length Size MatFrom MH To MH Struct O & M
Project # 11/18/2013
Jan-07-2015 Ft
NPS
Headquarters Glacier National Park
X:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\DATA\GLAC.MDB
Overall
R&R Visual Inc.Phone:574-223-5426Fax:574-223-7953
19 HQ-MHA15 B HQ-MHA14 HQ-MHA15 141.2 6 PVC 2100 0000 2100
20 HQ-MHA14 B HQ-MHA14 HQ-MHA13 156.1 6 PVC 0000 0000 0000
22 HQ-MHA13 C HQ-MHA13 HQ-MHA12 151.0 8 PE 2300 412E 412E
23 HQ-MHA13 E HQ-MHA12 HQ-MHA13 122.8 8 PE 3121 4100 4131
24 HQ-MHA12 E HQ-MHA12 HQ-MHA11 190.8 8 PVC 0000 4900 4900
25 HQ-MHA11 E HQ-MHA11 HQ-MHA10 80.6 8 PVC 2100 2100 2200
26 HQ-CO9 E HQ-MHA12 HQ-CO9 6.4 6 PVC 0000 0000 0000
27 HQ-MHA10-2 E HQ-MHA10-1 HQ-MHA10-2 22.6 8 PVC 0000 0000 0000
28 HQ-MHA10-1 E HQ-MHA10-1 HQ-MHA10 250.8 8 PVC 2200 2H00 2I00
29 HQ-TP16 E HQ-MHA10-2 HQ-TP16 95.8 6 VCP 4100 1100 4111
30 HQ-MHA10 E HQ-MHA10 HQ-MHA9 171.6 8 PVC 5122 2E00 512F
31 HQ-MHA9 E HQ-MHA9 HQ-MHA8 92.9 8 PVC 0000 2B00 2B00
32 HQ-MHA8 E HQ-MHA8 HQ-MHA7 140.1 8 PVC 4121 2400 4125
33 HQ-MHA11-3 E HQ-MHA11-3 HQ-MHA11-2 110.4 6 PVC 0000 0000 0000
34 HQ-MHA11-2 E HQ-MHA11-1 HQ-MHA11-2 127.0 6 PVC 0000 0000 0000
35 HQ-MHA11-1 E HQ-MHA11-1 HQ-MHA11 110.8 6 PVC 3100 0000 3100
36 HQ-MHA8-1 E HQ-MHA8-1 HQ-MHA8 31.8 6 VCP 0000 4134 4134
37 HQ-MHA9-1 E HQ-MHA9-1 HQ-MHA9 15.1 8 DIP 0000 5100 5100
38 HQ-MHA9-2 E HQ-MHA9-1 HQ-MHA9-2 141.2 6 DIP 0000 0000 0000
Client Project Project Start Location UOM Database Printed On
Contract
Survey Count 133
PACP Quick Rating
Setup PSR Length Size MatFrom MH To MH Struct O & M
Project # 11/18/2013
Jan-07-2015 Ft
NPS
Headquarters Glacier National Park
X:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\DATA\GLAC.MDB
39 HQ-MHE2 E HQ-MHE1 HQ-MHE2 285.7 6 VCP 0000 1J00 1J00
40 HQ-MHE1 E HQ-MHE1 HQ-MHA2 251.4 8 PVC 2100 2H00 2I00
41 HQ-MHE2 B HQ-MHE2 HQ-MHE1 68.1 6 VCP 0000 1A00 1A00
42 HQ-MHG4 B HQ-MHG3 HQ-MHG4 102.2 6 PVC 0000 2100 2100
43 HQ-MHG5 B HQ-MHG4 HQ-MHG5 55.5 6 PVC 0000 2100 2100
44 HQ-MHG3-1 B HQ-MHG3-1 HQ-MHG3 162.4 6 PVC 2400 432C 432D
45 HQ-CO217 B HQ-CO217 HQ-MHG2-3 112.5 4 PVC 2100 4300 4321
46 HQ-CO208 B HQ-CO208 HQ-MHG2-3 79.0 4 PVC 2111 4100 4121
47 HQ-CO12 B HQ-MHG3-1 HQ-CO12 78.4 6 PVC 1100 2B00 2B11
48 HQ-TP205 B HQ-MHG3-1 HQ-TP205 38.7 6 PVC 0000 0000 0000
49 HQ-TP209 B HQ-MHG2-1 HQ-TP209 43.9 6 PVC 5121 4100 5141
50 HQ-MHG3 E HQ-MHG2 HQ-MHG3 72.3 8 PVC 0000 2B00 2B00
51 HQ-MHG2 E HQ-MHG2 HQ-MHG1 201.0 8 PVC 2200 312G 312G
52 HQ-MHG1 E HQ-MHG1 HQ-MHA7 129.5 8 PVC 0000 2100 2100
53 HQ-MHG2-2 E HQ-MHG2-2 HQ-MHG2 95.2 6 PVC 3100 0000 3100
54 HQ-MHG2-3 A HQ-MHG2-3 HQ-MHG2-2 220.1 6 PVC 0000 0000 0000
55 HQ-MHG2-1 A HQ-MHG2-1 HQ-MHG2 110.3 6 PVC 2111 2B00 2B11
56 HQ-CO36 A HQ-MHG1 HQ-CO36 12.8 6 PVC 0000 3200 3200
57 HQ-MHA7 A HQ-MHA7 HQ-MHA6 337.6 8 PVC 2100 3323 3324
Client Project Project Start Location UOM Database Printed On
Contract
Survey Count 133
PACP Quick Rating
Setup PSR Length Size MatFrom MH To MH Struct O & M
Project # 11/18/2013
Jan-07-2015 Ft
NPS
Headquarters Glacier National Park
X:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\DATA\GLAC.MDB
58 HQ-MHA6 A HQ-MHA6 HQ-MHA5 12.2 8 PVC 0000 4100 4100
59 HQ-MHA5 A HQ-MHA5 HQ-MHA4 10.7 8 PVC 0000 0000 0000
60 HQ-MHA4 A HQ-MHA4 HQ-MHA3 312.1 8 PVC 2200 3100 3122
61 HQ-MHD4 A HQ-MHD3 HQ-MHD4 186.0 8 VCP 2100 2F11 2F11
62 HQ-MHD3 A HQ-MHD3 HQ-MHD2 194.1 8 VCP 0000 2F11 2F11
63 HQ-MHD2 A HQ-MHD1 HQ-MHD2 165.1 8 VCP 0000 312E 312E
64 HQ-MHD1 A HQ-MHD1 HQ-MHA2 54.8 8 VCP 0000 322A 322A
65 HQ-MHA3 A HQ-MHA2 HQ-MHA3 327.6 8 VCP 2500 2K00 2L00
66 HQ-MHA2 A HQ-MHA2 HQ-MHA1 57.7 8 PVC 2100 2100 2200
67 HQ-MHF2 A HQ-MHF1 HQ-MHF2 239.6 6 PVC 2200 2100 2300
68 HQ-MHF1 A HQ-MHF1 HQ-MHF1-1 208.3 6 PVC 3100 4100 4131
69 HQ-MHF1-1 A HQ-MHF1-1 HQ-MFA5 93.2 6 PVC 5131 4100 5141
70 HQ-MHD4 A HQ-MHD4 HQ-MHD3 8.0 8 VCP 0000 4131 4131
71 HQ-MHD2 A HQ-MHD2 HQ-MHD1 140.5 8 VCP 2300 4234 4234
72 HQ-MHD4 A HQ-MHD3 HQ-MHD4 271.2 8 VCP 0000 0000 0000
73 HQ-MHD4 A HQ-MHD4 HQ-MHD3 254.0 8 VCP 0000 0000 0000
74 HQ-MHA9-1 A HQ-MHA9-1 HQ-MHA9 182.6 8 DIP 0000 0000 0000
75 HQ-MHA8-1 A HQ-MHA8 HQ-MHA8-1 3.9 6 PVC 0000 3111 3111
76 HQ-MHD2 A HQ-MHD1 HQ-MHD2 341.9 8 VCP 0000 2317 2317
Client Project Project Start Location UOM Database Printed On
Contract
Survey Count 133
PACP Quick Rating
Setup PSR Length Size MatFrom MH To MH Struct O & M
Project # 11/18/2013
Jan-07-2015 Ft
NPS
Headquarters Glacier National Park
X:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\DATA\GLAC.MDB
76 HQ-MHD2 A HQ-MHD1 HQ-MHD2 341.9 8 VCP 0000 2317 2317
77 HQ-MHA8-1 A HQ-MHA8 HQ-MHA8-1 126.7 6 PVC 2200 3411 3422
78 HQ-MHA8-1 A HQ-MHA8-1 HQ-MHA8 42.7 6 PVC 5121 1100 5121
80 HQ-MHD1 A HQ-MHA2 HQ-MHD1 64.1 8 PVC 0000 4131 4131
81 HQ-MHD1 A HQ-MHA2 HQ-MHD1 147.0 8 PVC 0000 0000 0000
82 HQ-MHA5 A HQ-MHA4 HQ-MHA5 54.7 8 PVC 0000 2900 2900
83 HQ-MHA6 A HQ-MHA5 HQ-MHA6 118.5 8 PVC 0000 2B00 2B00
84 HQ-MHA5 A HQ-MHA5 HQ-MHA4 96.3 8 PVC 2300 0000 2300
85 HQ-MHA6 X HQ-MHA6 HQ-MHA5 150.8 8 PVC 0000 0000 0000
86 HQ-MHG5 B HQ-MHG5 HQ-MHG4 0.9 6 PVC 0000 0000 0000
87 HQ-MHG5 B HQ-MHG5 HQ-MHG4 125.6 6 PVC 2500 0000 2500
88 HQ-TP201 B HQ-MHG5 HQ-TP201 0.2 6 VCP 0000 5100 5100
89 HQ-MHB3 B HQ-MHB3 HQ-MHB2 27.5 8 VCP 0000 2500 2500
90 HQ-MHB3 B HQ-MHB3 HQ-MHB2 184.4 8 VCP 2800 0000 2800
91 HQ-MHC5 B HQ-MHC5 HQ-MHC4 53.9 6 VCP 4132 3129 4133
92 HQ-MHB6 B HQ-MHB5 HQ-MHB6 239.5 6 VCP 3121 2100 3122
93 HQ-MHB5 B HQ-MHB5 HQ-MHB4 175.8 6 VCP 3200 0000 3200
94 HQ-TP40 B HQ-MHA15 HQ-TP40 92.5 4 PVC 0000 4200 4200
95 HQ-CO29 B HQ-MHA15 HQ-CO29 34.4 4 PVC 0000 0000 0000
Client Project Project Start Location UOM Database Printed On
Contract
Survey Count 133
PACP Quick Rating
Setup PSR Length Size MatFrom MH To MH Struct O & M
Project # 11/18/2013
Jan-07-2015 Ft
NPS
Headquarters Glacier National Park
X:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\DATA\GLAC.MDB
96 HQ-CO28 B HQ-CO29 HQ-CO28 43.3 4 PVC 0000 0000 0000
97 HQ-CO26 B HQ-MHA14 HQ-CO26 16.4 4 PVC 0000 4100 4100
98 HQ-CO27 B HQ-MHA14 HQ-CO27 42.9 4 PVC 0000 4200 4200
99 HQ-TP20 B HQ-MHA13 HQ-TP20 67.5 6 PVC 0000 2100 2100
100 HQ-CO73 B HQ-MHC5 HQ-CO73 42.3 4 PVC 0000 0000 0000
101 HQ-MHC5 B HQ-MHC5 HQ-MHC4 213.1 6 VCP 5131 1100 5131
102 HQ-CO18 B HQ-CO18 HQ-MHA12-HQ-MHA1 23.2 4 PVC 5100 0000 5100
103 HQ-CO41 B HQ-MHC4 HQ-CO41 87.6 4 PVC 0000 4100 4100
104 HQ-CO80 B HQ-CO80 HQ-MHC1-HQ-MHC4 155.1 4 PVC 0000 4300 4300
105 HQ-UNKNOWN995 B HQ-MHE2 HQ-UNKNOWN995 146.6 4 PVC 2100 4100 4121
106 HQ-TP995 B HQ-MHE2 HQ-TP995 2.1 6 VCP 0000 5100 5100
107 HQ-TP66 B HQ-MHA8-1 HQ-TP66 57.0 6 VCP 3A00 4100 413A
108 HQ-TP8 B HQ-MHA9-2 HQ-TP8 14.4 4 PVC 2200 0000 2200
109 HQ-UNKNOWN14 B HQ-MHG4 HQ-UNKNOWN14 0.3 4 VCP 5100 0000 5100
110 HQ-CO14 B HQ-MHG4 HQ-CO14 56.4 4 VCP 0000 4100 4100
111 HQ-CO11 B HQ-CO11 HQ-MHG3 76.1 4 PVC 0000 4100 4100
112 HQ-C0213 B HQ-CO213 HQ-CO36-HQ-MHG1 162.0 4 PVC 2C00 4231 4231
113 HQ-CO35 B HQ-CO35 HQ-CO36-HQ-MHG1 32.4 4 PVC 2100 4100 4121
114 HQ-CO2 B HQ-CO2 HQ-MHA10-HQ-MHA1 35.4 4 PVC 0000 5142 5142
Client Project Project Start Location UOM Database Printed On
Contract
Survey Count 133
PACP Quick Rating
Setup PSR Length Size MatFrom MH To MH Struct O & M
Project # 11/18/2013
Jan-07-2015 Ft
NPS
Headquarters Glacier National Park
X:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\DATA\GLAC.MDB
115 HQ-TP25 B HQ-MHA11-3 HQ-TP25 126.3 4 PVC 0000 0000 0000
116 HQ-TP24 B HQ-MHA11-3 HQ-TP24 18.0 4 VCP 0000 5100 5100
117 HQ-CO22 B HQ-MHA11-1 HQ-CO22 96.1 4 PVC 0000 4100 4100
118 HQ-CO21 B HQ-MHA11-1 HQ-CO21 126.9 4 PVC 0000 4100 4100
119 HQ-TP87 E HQ-MHB4 HQ-TP87 61.6 6 DIP 0000 0000 0000
120 HQ-TP168 E HQ-MHB4 HQ-TP168 55.7 4 VCP 0000 4221 4221
121 HQ-TPE1 E HQ-MHE1 HQ-TPE1 71.8 4 DIP 0000 4200 4200
122 HQ-CO49 X HQ-MHB3-3 HQ-CO49 84.6 4 DIP 0000 4200 4200
123 HQ-TP168 X HQ-MHB4 HQ-TP168 66.2 4 VCP 2100 4100 4121
124 HQ-TP995 X HQ-MHE2 HQ-TP995 89.5 6 VCP 0000 4231 4231
125 HQ-TP96 XX HQ-MHB3-2 HQ-TP96 52.4 6 VCP
126 HQ-CO49 XX HQ-MHB3-3 HQ-CO49 117.1 4 DIP
127 HQ-CO64 XX HQ-CO64 HQ-TPB6-1 84.3 4 DIP
128 HQ-TP83 XX HQ-MHB5 HQ-TP83 112.2 4 PVC 0000 0000 0000
129 HQ-TP86 XX HQ-MHB5 HQ-TP86 73.1 4 VCP
130 HQ-TP169 XX HQ-MHB5 HQ-TP169 52.4 4 VCP
131 HQ-CO94D XX HQ-CO94D HQ-MHB3-1 45.9 4 VCP
132 HQ-TP295 XX HQ-MHD3 HQ-TP295A 71.1 4 DIP
133 HQ-CO15 XX HQ-CO15 HQ-MHG3 79.4 4 PVC
Client Project Project Start Location UOM Database Printed On
Contract
Survey Count 133
PACP Quick Rating
Setup PSR Length Size MatFrom MH To MH Struct O & M
Project # 11/18/2013
Jan-07-2015 Ft
NPS
Headquarters Glacier National Park
X:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\DATA\GLAC.MDB
133 HQ-CO15 XX HQ-CO15 HQ-MHG3 79.4 4 PVC
134 HQ-CO203 XX HQ-CO203 HQ-MHG2 42.3 4 PVC
135 HQ-TP10 XX HQ-MHG4 HQ-TP10 72.1 4 VCP
Client Project Project Start Location UOM Database Printed On
Contract
Survey Count 133
PACP Quick Rating
Setup PSR Length Size MatFrom MH To MH Struct O & M
Project # 11/18/2013
Jan-07-2015 M
NPS
Headquarters Glacier National Park
X:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\DATA\GLAC.MDB