The document contains the results of closed circuit television inspections of wastewater pipes on the grounds of Glacier National Park. The inspections identified various issues in different sections of pipe including roots, offsets, fractures, infiltration, spalling, taps, and debris. The inspections were conducted by R&R Visual Inc. and involved over 20 separate pipe segments ranging in length from under 50 feet to over 100 feet. Pipes were made of various materials including polyvinyl chloride, vitrified clay, and ductile iron. The related federal contract opportunity is for replacing the Headquarters wastewater system and backup power generation at Glacier National Park.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0 Ft
79.4 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-CO15] Water Level 0%
0.0 Ft
Start of Survey 1.6 Ft
Alignment Right 025% OM: 4 18.7 Ft
Deformed 010% ST: 4 60.0 Ft
End of Pipe End of Survey 79.4 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 133 Surveyor Heath Drainage
Street HQ Parking Lot
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 79.4 Ft Height 4 Width ins
Joint length
Up HQ-CO15 Rim to invert Ft Down HQ-MHG3 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO15 XX NPSfor Certificate # U-1008-7896
Time 18:07 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 79.40
Northing Easting Elevation Coordinate System GPS Accuracy
Project Headquaters Work Order
R&R Visual Inc. Phone: 574-223-5426 Fax: 574-223-7953
Video Index Count 18.7 Ft Code Alignment Right
Remarks File Name 3989.jpg
Video Index Count 60.0 Ft Code Deformed
Remarks File Name 3990.jpg
CCTV Picture List of Work Order Setup 133 Video 11182013
HQ-CO15 XX
Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\
VideoCount CD Code Fr To RemarksImRefIn1 % JntIn2
0.0 ST Start of Survey
0.0 AMH Manhole HQ-CO15
0.0 MWL Water Level 0
1.6 ST Start of Survey
18.7 LR Alignment Right 25
60.0 D Deformed 10
79.4 AEP End of Pipe
79.4 FH End of Survey
Total Length Surveyed79.4 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 133 Surveyor Heath Drainage
Street HQ Parking Lot
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 79.4 Height 4 Width ins
Joint length
Up HQ-CO15 Rim to invert Ft Down HQ-MHG3 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO15 XX NPSfor Certificate # U-1008-7896
Time 18:07 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 79.4
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
117.1 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHB3-3] Water Level 0% Start of Survey
0.0 Ft
Surface Spalling 12 to 12 o'clock ST: 2 15.7 Ft
Roots Fine Joint 03 to 09 o'clock OM: 1 26.9 Ft
Joint Offset Large ST: 2 Material change [PVC] 31.1 Ft
Water Level Sag 025% ST: 2 73.1 Ft
Material change [ductile iron] 82.6 Ft
Surface Spalling 12 to 12 o'clock ST: 2 83.3 Ft
Alignment Left 025% OM: 4 84.6 Ft
Alignment Right 025% OM: 4 106.9 Ft
Alignment Left 025% OM: 4 116.4 Ft
End of Pipe End of Survey 117.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 126 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 117.1 Ft Height 4 Width ins
Joint length
Up HQ-CO49 Rim to invert Ft Down HQ-MHB3-3 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO49 XX NPSfor Certificate # U-1008-7896
Time 12:09 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 117.10
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 15.7 Ft Code Surface Spalling
Remarks File Name 3917.jpg
Video Index Count 26.9 Ft Code Roots Fine Joint
Remarks File Name 3918.jpg
Video Index Count 31.1 Ft Code Joint Offset Large
Remarks File Name 3919.jpg
Video Index Count 31.1 Ft Code Material change
Remarks PVC File Name 3920.jpg
Video Index Count 73.1 Ft Code Water Level Sag
Remarks File Name 3921.jpg
Video Index Count 82.6 Ft Code Material change
Remarks ductile iron File Name 3922.jpg
Video Index Count 83.3 Ft Code Surface Spalling
Remarks File Name 3923.jpg
Video Index Count 84.6 Ft Code Alignment Left
Remarks File Name 3924.jpg
CCTV Picture List of Work Order Setup 126 Video 11182013
HQ-CO49 XX
Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
CCTV Picture List of Work Order Setup 126 Video 11182013
HQ-CO49 XX
Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\
Video Index Count 106.9 Ft Code Alignment Right
Remarks File Name 3925.jpg
Video Index Count 116.4 Ft Code Alignment Left
Remarks File Name 3926.jpg
Video Index Count 117.1 Ft Code End of Survey
Remarks File Name 3927.jpg
0.0 AMH Manhole HQ-MHB3-3
0.0 MWL Water Level 0
0.0 ST Start of Survey
15.7 SSS Surface Spalling 12 12
26.9 RFJ Roots Fine Joint 03 09J
31.1 JOL Joint Offset Large
31.1 MMC Material change PVC
73.1 MWLS Water Level Sag 25
82.6 MMC Material change ductile iron
83.3 SSS Surface Spalling 12 12
84.6 LL Alignment Left 25
106.9 LR Alignment Right 25
116.4 LL Alignment Left 25
117.1 AEP End of Pipe
117.1 FH End of Survey
Total Length Surveyed117.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 126 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 117.1 Height 4 Width ins
Joint length
Up HQ-CO49 Rim to invert Ft Down HQ-MHB3-3 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO49 XX NPSfor Certificate # U-1008-7896
Time 12:09 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 117.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
84.3 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-CO64] Water Level 0% Start of Survey
0.0 Ft
Alignment Down 025% OM: 4 0.6 Ft
Surface Spalling 12 to 12 o'clock ST: 2 [S01] 5.2 Ft
Alignment Up 025% OM: 4 6.8 Ft
Roots Fine Joint 09 to 03 o'clock OM: 1 34.4 Ft
Material change [PVC] 35.1 Ft
Roots Fine Joint 09 to 03 o'clock OM: 1 38.7 Ft
Roots Fine Joint 09 to 03 o'clock OM: 1 55.7 Ft
Roots Fine Joint 09 to 03 o'clock OM: 1 [S02] 72.1 Ft
Tap Factory 4 12 o'clock 78.0 Ft
Shape or Size Change 6 79.4 Ft
Surface Spalling 12 to 12 o'clock ST: 2 [F01] Roots Fine Joint 09 to 03 o'clock OM: 1 [F02] End of Pipe [HQ-TPB6-1] End of Survey
84.3 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 127 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 84.3 Ft Height 4 Width ins
Joint length
Up HQ-CO64 Rim to invert Ft Down HQ-TPB6-1 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO64 XX NPSfor Certificate # U-1008-7896
Time 12:45 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 84.30
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 0.6 Ft Code Alignment Down
Remarks File Name 3932.jpg
Video Index Count 5.2 Ft Code Surface Spalling
Remarks File Name 3933.jpg
Video Index Count 6.8 Ft Code Alignment Up
Remarks File Name 3934.jpg
Video Index Count 6.8 Ft Code Alignment Up
Remarks File Name 3935.jpg
Video Index Count 34.4 Ft Code Roots Fine Joint
Remarks File Name 3936.jpg
Video Index Count 35.1 Ft Code Material change
Remarks PVC File Name 3937.jpg
Video Index Count 38.7 Ft Code Roots Fine Joint
Remarks File Name 3938.jpg
Video Index Count 55.7 Ft Code Roots Fine Joint
Remarks File Name 3939.jpg
CCTV Picture List of Work Order Setup 127 Video 11182013
HQ-CO64 XX
Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
CCTV Picture List of Work Order Setup 127 Video 11182013
HQ-CO64 XX
Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\
Video Index Count 72.1 Ft Code Roots Fine Joint
Remarks File Name 3940.jpg
Video Index Count 78.0 Ft Code Tap Factory
Remarks File Name 3941.jpg
Video Index Count 79.4 Ft Code Shape or Size Change
Remarks File Name 3942.jpg
0.0 AMH Manhole HQ-CO64
0.0 MWL Water Level 0
0.0 ST Start of Survey
0.6 LD Alignment Down 25
5.2 S01 SSS Surface Spalling 12 12
6.8 LU Alignment Up 25
34.4 RFJ Roots Fine Joint 09 03J
35.1 MMC Material change PVC
38.7 RFJ Roots Fine Joint 09 03J
55.7 RFJ Roots Fine Joint 09 03J
72.1 S02 RFJ Roots Fine Joint 09 03J
78.0 TF Tap Factory 4 12
79.4 MSC Shape or Size Change 6
84.3 F01 SSS Surface Spalling 12 12
84.3 F02 RFJ Roots Fine Joint 09 03J
84.3 AEP End of Pipe HQ-TPB6-1
84.3 FH End of Survey
Total Length Surveyed84.3 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 127 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 84.3 Height 4 Width ins
Joint length
Up HQ-CO64 Rim to invert Ft Down HQ-TPB6-1 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO64 XX NPSfor Certificate # U-1008-7896
Time 12:45 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 84.3
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
45.9 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-CO94D] Water Level 0%
0.0 Ft
Roots Fine Joint 09 to 03 o'clock OM: 1 3.9 Ft
Tap Factory 4 09 o'clock Fracture Circumferential 12 to 12 o'clock ST: 2 5.2 Ft
Shape or Size Change 6 22.6 Ft
Tap Factory 4 09 o'clock 29.5 Ft
Intruding Sealing Ring 11 to 04 o'clock 005% OM: 2 43.6 Ft
Abandoned Survey [camera stopped on debris] 45.9 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 131 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length Ft Height 4 Width ins
Joint length
Up HQ-CO94D Rim to invert Ft Down HQ-MHB3-1 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO94D XX NPSfor Certificate # U-1008-7896
Time 16:02 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 45.90
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 5.2 Ft Code Tap Factory
Remarks File Name 3974.jpg
Video Index Count 5.2 Ft Code Fracture Circumferential
Remarks File Name 3975.jpg
Video Index Count 22.6 Ft Code Shape or Size Change
Remarks File Name 3976.jpg
Video Index Count 29.5 Ft Code Tap Factory
Remarks File Name 3977.jpg
CCTV Picture List of Work Order Setup 131 Video 11182013
HQ-CO94D XX
Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-CO94D
0.0 MWL Water Level 0
3.9 RFJ Roots Fine Joint 09 03J
5.2 TF Tap Factory 4 09
5.2 FC Fracture Circumferential 12 12
22.6 MSC Shape or Size Change 6
29.5 TF Tap Factory 4 09
43.6 ISSR Intruding Sealing Ring 11 045
45.9 MSA Abandoned Survey camera stopped on debris
Total Length Surveyed45.9 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 131 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length Height 4 Width ins
Joint length
Up HQ-CO94D Rim to invert Ft Down HQ-MHB3-1 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO94D XX NPSfor Certificate # U-1008-7896
Time 16:02 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 45.9
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
42.3 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-CO203] Water Level 0% Start of Survey
0.0 Ft
Tap Factory 4 03 o'clock 2.6 Ft
Alignment Right 050% OM: 4 6.2 Ft
Water Level Sag 040% ST: 3 38.0 Ft
Manhole [HQ-MHG2] End of Survey 42.3 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 134 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 42.3 Ft Height 4 Width ins
Joint length
Up HQ-CO203 Rim to invert Ft Down HQ-MHG2 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO203 XX NPSfor Certificate # U-1008-7896
Time 18:33 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 42.30
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 2.6 Ft Code Tap Factory
Remarks File Name 3995.jpg
Video Index Count 6.2 Ft Code Alignment Right
Remarks File Name 3996.jpg
Video Index Count 38.0 Ft Code Water Level Sag
Remarks File Name 3997.jpg
Video Index Count 42.3 Ft Code End of Survey
Remarks File Name 3998.jpg
CCTV Picture List of Work Order Setup 134 Video 11182013
HQ-CO203 XX
Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-CO203
0.0 MWL Water Level 0
0.0 ST Start of Survey
2.6 TF Tap Factory 4 03
6.2 LR Alignment Right 50
38.0 MWLS Water Level Sag 40
42.3 AMH Manhole HQ-MHG2
42.3 FH End of Survey
Total Length Surveyed42.3 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 134 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 42.3 Height 4 Width ins
Joint length
Up HQ-CO203 Rim to invert Ft Down HQ-MHG2 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO203 XX NPSfor Certificate # U-1008-7896
Time 18:33 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 42.3
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
72.1 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHG4] Water Level 0% Start of Survey
0.0 Ft
Roots Fine Joint 10 to 02 o'clock OM: 1 4.9 Ft
Roots Fine Joint 09 to 03 o'clock OM: 1 [S01] 10.8 Ft
Joint Offset Medium ST: 1 53.1 Ft
Joint Offset Medium ST: 1 62.9 Ft
Roots Fine Joint 09 to 03 o'clock OM: 1 [F01] Manhole [HQ-TP10] End of Survey
72.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/09
Setup 135 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 72.1 Ft Height 4 Width ins
Joint length
Up HQ-TP10 Rim to invert Ft Down HQ-MHG4 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP10 XX NPSfor Certificate # U-1008-7896
Time 9:19 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 72.10
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 4.9 Ft Code Roots Fine Joint
Remarks File Name 4003.jpg
Video Index Count 10.8 Ft Code Roots Fine Joint
Remarks File Name 4004.jpg
Video Index Count 53.1 Ft Code Joint Offset Medium
Remarks File Name 4005.jpg
Video Index Count 62.9 Ft Code Joint Offset Medium
Remarks File Name 4006.jpg
CCTV Picture List of Work Order Setup 135 Video 11182013
HQ-TP10 XX
Survey Date 2013/11/09 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHG4
0.0 MWL Water Level 0
0.0 ST Start of Survey
4.9 RFJ Roots Fine Joint 10 02J
10.8 S01 RFJ Roots Fine Joint 09 03J
53.1 JOM Joint Offset Medium
62.9 JOM Joint Offset Medium
72.1 F01 RFJ Roots Fine Joint 09 03J
72.1 AMH Manhole HQ-TP10
72.1 FH End of Survey
Total Length Surveyed72.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/09
Setup 135 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 72.1 Height 4 Width ins
Joint length
Up HQ-TP10 Rim to invert Ft Down HQ-MHG4 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP10 XX NPSfor Certificate # U-1008-7896
Time 9:19 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 72.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
112.2 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHB5] Water Level 0%
0.0 Ft
Abandoned Survey [Camera stopped on debris.] 112.2 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 128 Surveyor Heath Drainage
Street Grinnel Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length Ft Height 4 Width ins
Joint length
Up HQ-TP83 Rim to invert Ft Down HQ-MHB5 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP83 XX NPSfor Certificate # U-1008-7896
Time 13:46 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 112.20
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 112.2 Ft Code Abandoned Survey
Remarks Camera stopped on debris.
File Name 3952.jpg
CCTV Picture List of Work Order Setup 128 Video 11182013
HQ-TP83 XX
Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHB5
0.0 MWL Water Level 0
112.2 MSA Abandoned Survey Camera stopped on debris.
Total Length Surveyed112.2 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 128 Surveyor Heath Drainage
Street Grinnel Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length Height 4 Width ins
Joint length
Up HQ-TP83 Rim to invert Ft Down HQ-MHB5 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP83 XX NPSfor Certificate # U-1008-7896
Time 13:46 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 112.2
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
73.1 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHB5] Water Level 0%
0.0 Ft
Roots Fine Joint 09 to 03 o'clock OM: 1 Material change [Ductile iron] 0.9 Ft
Camera Underwater 9.8 Ft
Obstacle Pipe Material 04 to 08 o'clock 005% OM: 2 51.8 Ft
Alignment Left 025% OM: 4 71.5 Ft
End of Pipe End of Survey 73.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 129 Surveyor Heath Drainage
Street Grinnel Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 73.1 Ft Height 4 Width ins
Joint length
Up HQ-TP86 Rim to invert Ft Down HQ-MHB5 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP86 XX NPSfor Certificate # U-1008-7896
Time 14:45 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 73.10
Northing Easting Elevation Coordinate System GPS Accuracy
Ductile iron
Video Index Count 0.9 Ft Code Roots Fine Joint
Remarks File Name 3957.jpg
Video Index Count 0.9 Ft Code Material change
Remarks File Name 3958.jpg
Video Index Count 9.8 Ft Code Camera Underwater
Remarks File Name 3959.jpg
Video Index Count 51.8 Ft Code Obstacle Pipe Material
Remarks File Name 3960.jpg
Video Index Count 71.5 Ft Code Alignment Left
Remarks File Name 3961.jpg
Video Index Count 71.5 Ft Code Alignment Left
Remarks File Name 3962.jpg
Video Index Count 73.1 Ft Code End of Survey
Remarks File Name 3963.jpg
CCTV Picture List of Work Order Setup 129 Video 11182013
HQ-TP86 XX
Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHB5
0.0 MWL Water Level 0
0.9 RFJ Roots Fine Joint 09 03J
0.9 MMC Material change Ductile iron
9.8 MCU Camera Underwater
51.8 OBM Obstacle Pipe Material 04 085
71.5 LL Alignment Left 25
73.1 AEP End of Pipe
73.1 FH End of Survey
Total Length Surveyed73.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 129 Surveyor Heath Drainage
Street Grinnel Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 73.1 Height 4 Width ins
Joint length
Up HQ-TP86 Rim to invert Ft Down HQ-MHB5 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP86 XX NPSfor Certificate # U-1008-7896
Time 14:45 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 73.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
52.4 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHB3-2] Water Level 0% Start of Survey
0.0 Ft
Alignment Left 050% OM: 4 4.9 Ft
Hole Soil Visible 04 to 09 o'clock ST: 5 Material change [ductile iron] 39.3 Ft
Surface Spalling 12 to 12 o'clock ST: 2 40.0 Ft
End of Pipe End of Survey 52.4 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 125 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 52.4 Ft Height 6 Width ins
Joint length
Up HQ-TP96 Rim to invert Ft Down HQ-MHB3-2 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP96 XX NPSfor Certificate # U-1008-7896
Time 11:48 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 52.40
Northing Easting Elevation Coordinate System GPS Accuracy ductile iron
Video Index Count 39.3 Ft Code Hole Soil Visible
Remarks File Name 3909.jpg
Video Index Count 39.3 Ft Code Material change
Remarks File Name 3910.jpg
Video Index Count 40.0 Ft Code Surface Spalling
Remarks File Name 3911.jpg
Video Index Count 52.4 Ft Code End of Survey
Remarks File Name 3912.jpg
CCTV Picture List of Work Order Setup 125 Video 11182013
HQ-TP96 XX
Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHB3-2
0.0 MWL Water Level 0
0.0 ST Start of Survey
4.9 LL Alignment Left 50
39.3 HSV Hole Soil Visible 04 09
39.3 MMC Material change ductile iron
40.0 SSS Surface Spalling 12 12
52.4 AEP End of Pipe
52.4 FH End of Survey
Total Length Surveyed52.4 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 125 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 52.4 Height 6 Width ins
Joint length
Up HQ-TP96 Rim to invert Ft Down HQ-MHB3-2 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP96 XX NPSfor Certificate # U-1008-7896
Time 11:48 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 52.4
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
52.4 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHB5] Water Level 0%
0.0 Ft
Material change [ductile iron] 44.2 Ft
End of Pipe End of Survey 52.4 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 130 Surveyor Heath Drainage
Street Grinnel Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 52.4 Ft Height 4 Width ins
Joint length
Up HQ-TP169 Rim to invert Ft Down HQ-MHB5 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP169 XX NPSfor Certificate # U-1008-7896
Time 15:03 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 52.40
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 44.2 Ft Code Material change
Remarks ductile iron File Name 3968.jpg
Video Index Count 52.4 Ft Code End of Survey
Remarks File Name 3969.jpg
CCTV Picture List of Work Order Setup 130 Video 11182013
HQ-TP169 XX
Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHB5
0.0 MWL Water Level 0
44.2 MMC Material change ductile iron
52.4 AEP End of Pipe
52.4 FH End of Survey
Total Length Surveyed52.4 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 130 Surveyor Heath Drainage
Street Grinnel Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 52.4 Height 4 Width ins
Joint length
Up HQ-TP169 Rim to invert Ft Down HQ-MHB5 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP169 XX NPSfor Certificate # U-1008-7896
Time 15:03 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 52.4
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
71.1 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHD3] Water Level 0%
0.0 Ft
Water Level Sag 050% ST: 3 Camera Underwater 2.6 Ft
Camera Underwater 20.0 Ft
Tap Factory 4 09 o'clock 49.2 Ft
Manhole [HQ-TP295] End of Survey 71.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 132 Surveyor Heath Drainage
Street HQ Parking Lot
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 71.1 Ft Height 4 Width ins
Joint length
Up HQ-TP295 Rim to invert Ft Down HQ-MHD3 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP295 XX NPSfor Certificate # U-1008-7896
Time 17:18 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 71.10
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 20.0 Ft Code Camera Underwater
Remarks File Name 3982.jpg
Video Index Count 49.2 Ft Code Tap Factory
Remarks File Name 3983.jpg
Video Index Count 71.1 Ft Code End of Survey
Remarks File Name 3984.jpg
CCTV Picture List of Work Order Setup 132 Video 11182013
HQ-TP295 XX
Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHD3
0.0 MWL Water Level 0
2.6 MWLS Water Level Sag 50
2.6 MCU Camera Underwater
20.0 MCU Camera Underwater
49.2 TF Tap Factory 4 09
71.1 AMH Manhole HQ-TP295
71.1 FH End of Survey
Total Length Surveyed71.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/08
Setup 132 Surveyor Heath Drainage
Street HQ Parking Lot
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 71.1 Height 4 Width ins
Joint length
Up HQ-TP295 Rim to invert Ft Down HQ-MHD3 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP295 XX NPSfor Certificate # U-1008-7896
Time 17:18 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 71.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
| HQ-CO15_1338_1 |
| HQ-CO15_1338_2 |
| HQ-CO15_1338_PG |
| HQ-CO15_1338_PL |
| HQ-CO15_1338_TAB |
| HQ-CO49_1261_1 |
| HQ-CO49_1261_2 |
| HQ-CO49_1261_3 |
| HQ-CO49_1261_4 |
| HQ-CO49_1261_5 |
| HQ-CO49_1261_6 |
| HQ-CO49_1261_7 |
| HQ-CO49_1261_8 |
| HQ-CO49_1261_9 |
| HQ-CO49_1261_10 |
| HQ-CO49_1261_11 |
| HQ-CO49_1261_PG |
| HQ-CO49_1261_PL |
| HQ-CO49_1261_TAB |
| HQ-CO64_1272_1 |
| HQ-CO64_1272_2 |
| HQ-CO64_1272_3 |
| HQ-CO64_1272_4 |
| HQ-CO64_1272_5 |
| HQ-CO64_1272_6 |
| HQ-CO64_1272_7 |
| HQ-CO64_1272_8 |
| HQ-CO64_1272_9 |
| HQ-CO64_1272_10 |
| HQ-CO64_1272_11 |
| HQ-CO64_1272_PG |
| HQ-CO64_1272_PL |
| HQ-CO64_1272_TAB |
| HQ-CO94D_1316_1 |
| HQ-CO94D_1316_2 |
| HQ-CO94D_1316_3 |
| HQ-CO94D_1316_4 |
| HQ-CO94D_1316_PG |
| HQ-CO94D_1316_PL |
| HQ-CO94D_1316_TAB |
| HQ-CO203_1349_1 |
| HQ-CO203_1349_2 |
| HQ-CO203_1349_3 |
| HQ-CO203_1349_4 |
| HQ-CO203_1349_PG |
| HQ-CO203_1349_PL |
| HQ-CO203_1349_TAB |
| HQ-TP10_13510_1 |
| HQ-TP10_13510_2 |
| HQ-TP10_13510_3 |
| HQ-TP10_13510_4 |
| HQ-TP10_13510_PG |
| HQ-TP10_13510_PL |
| HQ-TP10_13510_TAB |
| HQ-TP83_1283_1 |
| HQ-TP83_1283_PG |
| HQ-TP83_1283_PL |
| HQ-TP83_1283_TAB |
| HQ-TP86_1294_1 |
| HQ-TP86_1294_2 |
| HQ-TP86_1294_3 |
| HQ-TP86_1294_4 |
| HQ-TP86_1294_5 |
| HQ-TP86_1294_6 |
| HQ-TP86_1294_7 |
| HQ-TP86_1294_PG |
| HQ-TP86_1294_PL |
| HQ-TP86_1294_TAB |
| HQ-TP96_1250_1 |
| HQ-TP96_1250_2 |
| HQ-TP96_1250_3 |
| HQ-TP96_1250_4 |
| HQ-TP96_1250_PG |
| HQ-TP96_1250_PL |
| HQ-TP96_1250_TAB |
| HQ-TP169_1305_1 |
| HQ-TP169_1305_2 |
| HQ-TP169_1305_PG |
| HQ-TP169_1305_PL |
| HQ-TP169_1305_TAB |
| HQ-TP295_1327_1 |
| HQ-TP295_1327_2 |
| HQ-TP295_1327_3 |
| HQ-TP295_1327_PG |
| HQ-TP295_1327_PL |
| HQ-TP295_1327_TAB |
File details come from the government source that posted it. Updated .