The document contains the results of closed circuit television inspections of wastewater pipes on the grounds of Glacier National Park. The inspections identified various issues in different sections of pipe including roots, offsets, fractures, infiltration, spalling, taps, and debris. The inspections were conducted by R&R Visual Inc. and involved over 20 separate pipe segments ranging in length from under 50 feet to over 100 feet. Pipes were made of various materials including polyvinyl chloride, vitrified clay, and ductile iron. The related federal contract opportunity is for replacing the Headquarters wastewater system and backup power generation at Glacier National Park.

View the file

Other files for this federal contract opportunity

Other files attached to GLAC 307440 - Replace Headquarters Wastewater and, newest first.
File Type Posted
Questions-Answers-07-10-23_Set_0003.pdf PDF
Sol_140P2023R0072_Amd_0003.pdf PDF
Questions-Answers-07-3-23_Set_0002.pdf PDF
11182013-4_0002.pdf PDF
1182013-1_0002.pdf PDF
GLAC_SSWR_ALL_0002.pdf PDF
Sol_140P2023R0072_Amd_0002.pdf PDF
Defects_by_Inspection_0002.pdf PDF
1182013-3_0002.pdf PDF
Headquarters_CCTV_Inspections_0002.pdf PDF
1182013-2_0002.pdf PDF
Sign_in_Sheet_0002.jpg JPG image
PACP_Quick_Rating_0002.pdf PDF
HQ_2017-2023_0001.xlsx XLSX spreadsheet
Bid_Bond_-_SF24_0001.pdf PDF
Housing_Winter_Occupantion_0001.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD(1)_0001.docx DOCX document
B08_Solit_PSP_Vol_I_Exp_REQD_0001.docx DOCX document
Sol_140P2023R0072_Amd_0001.pdf PDF
QandA06-23-23_0001.pdf PDF
MT_NP_GLAC_P_HQ(1)-70_PlanInHand_0001.pdf PDF
GLAC_307440_Final_CD_SubmittalList.pdf PDF
GLAC_307440_Final_CD_Permit_List.pdf PDF
GLAC307440_Final_CD_ProjectManual_Division_1.pdf PDF
B08_Solit_Clauses_Construction-1.pdf PDF
GLAC307440_Final_CD_Drawings.pdf PDF
Sol_140P2023R0072.pdf PDF
GLAC307440_Final_CD_ProjectManual_Division_2-43.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0 Ft

79.4 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-CO15] Water Level 0%

0.0 Ft

Start of Survey 1.6 Ft

Alignment Right 025% OM: 4 18.7 Ft

Deformed 010% ST: 4 60.0 Ft

End of Pipe End of Survey 79.4 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 133 Surveyor Heath Drainage

Street HQ Parking Lot

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 79.4 Ft Height 4 Width ins

Joint length

Up HQ-CO15 Rim to invert Ft Down HQ-MHG3 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO15 XX NPSfor Certificate # U-1008-7896

Time 18:07 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 79.40

Northing Easting Elevation Coordinate System GPS Accuracy

Project Headquaters Work Order

R&R Visual Inc. Phone: 574-223-5426 Fax: 574-223-7953

Video Index Count 18.7 Ft Code Alignment Right

Remarks File Name 3989.jpg

Video Index Count 60.0 Ft Code Deformed

Remarks File Name 3990.jpg

CCTV Picture List of Work Order Setup 133 Video 11182013

HQ-CO15 XX

Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\

VideoCount CD Code Fr To RemarksImRefIn1 % JntIn2

0.0 ST Start of Survey

0.0 AMH Manhole HQ-CO15

0.0 MWL Water Level 0

1.6 ST Start of Survey

18.7 LR Alignment Right 25

60.0 D Deformed 10

79.4 AEP End of Pipe

79.4 FH End of Survey

Total Length Surveyed79.4 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 133 Surveyor Heath Drainage

Street HQ Parking Lot

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 79.4 Height 4 Width ins

Joint length

Up HQ-CO15 Rim to invert Ft Down HQ-MHG3 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO15 XX NPSfor Certificate # U-1008-7896

Time 18:07 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 79.4

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

117.1 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHB3-3] Water Level 0% Start of Survey

0.0 Ft

Surface Spalling 12 to 12 o'clock ST: 2 15.7 Ft

Roots Fine Joint 03 to 09 o'clock OM: 1 26.9 Ft

Joint Offset Large ST: 2 Material change [PVC] 31.1 Ft

Water Level Sag 025% ST: 2 73.1 Ft

Material change [ductile iron] 82.6 Ft

Surface Spalling 12 to 12 o'clock ST: 2 83.3 Ft

Alignment Left 025% OM: 4 84.6 Ft

Alignment Right 025% OM: 4 106.9 Ft

Alignment Left 025% OM: 4 116.4 Ft

End of Pipe End of Survey 117.1 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 126 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 117.1 Ft Height 4 Width ins

Joint length

Up HQ-CO49 Rim to invert Ft Down HQ-MHB3-3 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO49 XX NPSfor Certificate # U-1008-7896

Time 12:09 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 117.10

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 15.7 Ft Code Surface Spalling

Remarks File Name 3917.jpg

Video Index Count 26.9 Ft Code Roots Fine Joint

Remarks File Name 3918.jpg

Video Index Count 31.1 Ft Code Joint Offset Large

Remarks File Name 3919.jpg

Video Index Count 31.1 Ft Code Material change

Remarks PVC File Name 3920.jpg

Video Index Count 73.1 Ft Code Water Level Sag

Remarks File Name 3921.jpg

Video Index Count 82.6 Ft Code Material change

Remarks ductile iron File Name 3922.jpg

Video Index Count 83.3 Ft Code Surface Spalling

Remarks File Name 3923.jpg

Video Index Count 84.6 Ft Code Alignment Left

Remarks File Name 3924.jpg

CCTV Picture List of Work Order Setup 126 Video 11182013

HQ-CO49 XX

Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

CCTV Picture List of Work Order Setup 126 Video 11182013

HQ-CO49 XX

Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\

Video Index Count 106.9 Ft Code Alignment Right

Remarks File Name 3925.jpg

Video Index Count 116.4 Ft Code Alignment Left

Remarks File Name 3926.jpg

Video Index Count 117.1 Ft Code End of Survey

Remarks File Name 3927.jpg

0.0 AMH Manhole HQ-MHB3-3

0.0 MWL Water Level 0

0.0 ST Start of Survey

15.7 SSS Surface Spalling 12 12

26.9 RFJ Roots Fine Joint 03 09J

31.1 JOL Joint Offset Large

31.1 MMC Material change PVC

73.1 MWLS Water Level Sag 25

82.6 MMC Material change ductile iron

83.3 SSS Surface Spalling 12 12

84.6 LL Alignment Left 25

106.9 LR Alignment Right 25

116.4 LL Alignment Left 25

117.1 AEP End of Pipe

117.1 FH End of Survey

Total Length Surveyed117.1 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 126 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 117.1 Height 4 Width ins

Joint length

Up HQ-CO49 Rim to invert Ft Down HQ-MHB3-3 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO49 XX NPSfor Certificate # U-1008-7896

Time 12:09 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 117.1

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

84.3 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-CO64] Water Level 0% Start of Survey

0.0 Ft

Alignment Down 025% OM: 4 0.6 Ft

Surface Spalling 12 to 12 o'clock ST: 2 [S01] 5.2 Ft

Alignment Up 025% OM: 4 6.8 Ft

Roots Fine Joint 09 to 03 o'clock OM: 1 34.4 Ft

Material change [PVC] 35.1 Ft

Roots Fine Joint 09 to 03 o'clock OM: 1 38.7 Ft

Roots Fine Joint 09 to 03 o'clock OM: 1 55.7 Ft

Roots Fine Joint 09 to 03 o'clock OM: 1 [S02] 72.1 Ft

Tap Factory 4 12 o'clock 78.0 Ft

Shape or Size Change 6 79.4 Ft

Surface Spalling 12 to 12 o'clock ST: 2 [F01] Roots Fine Joint 09 to 03 o'clock OM: 1 [F02] End of Pipe [HQ-TPB6-1] End of Survey

84.3 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 127 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 84.3 Ft Height 4 Width ins

Joint length

Up HQ-CO64 Rim to invert Ft Down HQ-TPB6-1 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO64 XX NPSfor Certificate # U-1008-7896

Time 12:45 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 84.30

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 0.6 Ft Code Alignment Down

Remarks File Name 3932.jpg

Video Index Count 5.2 Ft Code Surface Spalling

Remarks File Name 3933.jpg

Video Index Count 6.8 Ft Code Alignment Up

Remarks File Name 3934.jpg

Video Index Count 6.8 Ft Code Alignment Up

Remarks File Name 3935.jpg

Video Index Count 34.4 Ft Code Roots Fine Joint

Remarks File Name 3936.jpg

Video Index Count 35.1 Ft Code Material change

Remarks PVC File Name 3937.jpg

Video Index Count 38.7 Ft Code Roots Fine Joint

Remarks File Name 3938.jpg

Video Index Count 55.7 Ft Code Roots Fine Joint

Remarks File Name 3939.jpg

CCTV Picture List of Work Order Setup 127 Video 11182013

HQ-CO64 XX

Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

CCTV Picture List of Work Order Setup 127 Video 11182013

HQ-CO64 XX

Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\

Video Index Count 72.1 Ft Code Roots Fine Joint

Remarks File Name 3940.jpg

Video Index Count 78.0 Ft Code Tap Factory

Remarks File Name 3941.jpg

Video Index Count 79.4 Ft Code Shape or Size Change

Remarks File Name 3942.jpg

0.0 AMH Manhole HQ-CO64

0.0 MWL Water Level 0

0.0 ST Start of Survey

0.6 LD Alignment Down 25

5.2 S01 SSS Surface Spalling 12 12

6.8 LU Alignment Up 25

34.4 RFJ Roots Fine Joint 09 03J

35.1 MMC Material change PVC

38.7 RFJ Roots Fine Joint 09 03J

55.7 RFJ Roots Fine Joint 09 03J

72.1 S02 RFJ Roots Fine Joint 09 03J

78.0 TF Tap Factory 4 12

79.4 MSC Shape or Size Change 6

84.3 F01 SSS Surface Spalling 12 12

84.3 F02 RFJ Roots Fine Joint 09 03J

84.3 AEP End of Pipe HQ-TPB6-1

84.3 FH End of Survey

Total Length Surveyed84.3 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 127 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 84.3 Height 4 Width ins

Joint length

Up HQ-CO64 Rim to invert Ft Down HQ-TPB6-1 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO64 XX NPSfor Certificate # U-1008-7896

Time 12:45 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 84.3

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

45.9 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-CO94D] Water Level 0%

0.0 Ft

Roots Fine Joint 09 to 03 o'clock OM: 1 3.9 Ft

Tap Factory 4 09 o'clock Fracture Circumferential 12 to 12 o'clock ST: 2 5.2 Ft

Shape or Size Change 6 22.6 Ft

Tap Factory 4 09 o'clock 29.5 Ft

Intruding Sealing Ring 11 to 04 o'clock 005% OM: 2 43.6 Ft

Abandoned Survey [camera stopped on debris] 45.9 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 131 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length Ft Height 4 Width ins

Joint length

Up HQ-CO94D Rim to invert Ft Down HQ-MHB3-1 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO94D XX NPSfor Certificate # U-1008-7896

Time 16:02 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 45.90

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 5.2 Ft Code Tap Factory

Remarks File Name 3974.jpg

Video Index Count 5.2 Ft Code Fracture Circumferential

Remarks File Name 3975.jpg

Video Index Count 22.6 Ft Code Shape or Size Change

Remarks File Name 3976.jpg

Video Index Count 29.5 Ft Code Tap Factory

Remarks File Name 3977.jpg

CCTV Picture List of Work Order Setup 131 Video 11182013

HQ-CO94D XX

Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-CO94D

0.0 MWL Water Level 0

3.9 RFJ Roots Fine Joint 09 03J

5.2 TF Tap Factory 4 09

5.2 FC Fracture Circumferential 12 12

22.6 MSC Shape or Size Change 6

29.5 TF Tap Factory 4 09

43.6 ISSR Intruding Sealing Ring 11 045

45.9 MSA Abandoned Survey camera stopped on debris

Total Length Surveyed45.9 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 131 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length Height 4 Width ins

Joint length

Up HQ-CO94D Rim to invert Ft Down HQ-MHB3-1 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO94D XX NPSfor Certificate # U-1008-7896

Time 16:02 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 45.9

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

42.3 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-CO203] Water Level 0% Start of Survey

0.0 Ft

Tap Factory 4 03 o'clock 2.6 Ft

Alignment Right 050% OM: 4 6.2 Ft

Water Level Sag 040% ST: 3 38.0 Ft

Manhole [HQ-MHG2] End of Survey 42.3 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 134 Surveyor Heath Drainage

Street Ruhle Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 42.3 Ft Height 4 Width ins

Joint length

Up HQ-CO203 Rim to invert Ft Down HQ-MHG2 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO203 XX NPSfor Certificate # U-1008-7896

Time 18:33 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 42.30

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 2.6 Ft Code Tap Factory

Remarks File Name 3995.jpg

Video Index Count 6.2 Ft Code Alignment Right

Remarks File Name 3996.jpg

Video Index Count 38.0 Ft Code Water Level Sag

Remarks File Name 3997.jpg

Video Index Count 42.3 Ft Code End of Survey

Remarks File Name 3998.jpg

CCTV Picture List of Work Order Setup 134 Video 11182013

HQ-CO203 XX

Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-CO203

0.0 MWL Water Level 0

0.0 ST Start of Survey

2.6 TF Tap Factory 4 03

6.2 LR Alignment Right 50

38.0 MWLS Water Level Sag 40

42.3 AMH Manhole HQ-MHG2

42.3 FH End of Survey

Total Length Surveyed42.3 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 134 Surveyor Heath Drainage

Street Ruhle Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 42.3 Height 4 Width ins

Joint length

Up HQ-CO203 Rim to invert Ft Down HQ-MHG2 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO203 XX NPSfor Certificate # U-1008-7896

Time 18:33 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 42.3

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

72.1 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHG4] Water Level 0% Start of Survey

0.0 Ft

Roots Fine Joint 10 to 02 o'clock OM: 1 4.9 Ft

Roots Fine Joint 09 to 03 o'clock OM: 1 [S01] 10.8 Ft

Joint Offset Medium ST: 1 53.1 Ft

Joint Offset Medium ST: 1 62.9 Ft

Roots Fine Joint 09 to 03 o'clock OM: 1 [F01] Manhole [HQ-TP10] End of Survey

72.1 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/09

Setup 135 Surveyor Heath Drainage

Street Ruhle Dr.

Weather Dry

City West Glacier

Flow control

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 72.1 Ft Height 4 Width ins

Joint length

Up HQ-TP10 Rim to invert Ft Down HQ-MHG4 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP10 XX NPSfor Certificate # U-1008-7896

Time 9:19 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 72.10

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 4.9 Ft Code Roots Fine Joint

Remarks File Name 4003.jpg

Video Index Count 10.8 Ft Code Roots Fine Joint

Remarks File Name 4004.jpg

Video Index Count 53.1 Ft Code Joint Offset Medium

Remarks File Name 4005.jpg

Video Index Count 62.9 Ft Code Joint Offset Medium

Remarks File Name 4006.jpg

CCTV Picture List of Work Order Setup 135 Video 11182013

HQ-TP10 XX

Survey Date 2013/11/09 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHG4

0.0 MWL Water Level 0

0.0 ST Start of Survey

4.9 RFJ Roots Fine Joint 10 02J

10.8 S01 RFJ Roots Fine Joint 09 03J

53.1 JOM Joint Offset Medium

62.9 JOM Joint Offset Medium

72.1 F01 RFJ Roots Fine Joint 09 03J

72.1 AMH Manhole HQ-TP10

72.1 FH End of Survey

Total Length Surveyed72.1 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/09

Setup 135 Surveyor Heath Drainage

Street Ruhle Dr.

Weather Dry

City West Glacier

Flow control

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 72.1 Height 4 Width ins

Joint length

Up HQ-TP10 Rim to invert Ft Down HQ-MHG4 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP10 XX NPSfor Certificate # U-1008-7896

Time 9:19 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 72.1

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

112.2 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHB5] Water Level 0%

0.0 Ft

Abandoned Survey [Camera stopped on debris.] 112.2 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 128 Surveyor Heath Drainage

Street Grinnel Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length Ft Height 4 Width ins

Joint length

Up HQ-TP83 Rim to invert Ft Down HQ-MHB5 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP83 XX NPSfor Certificate # U-1008-7896

Time 13:46 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 112.20

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 112.2 Ft Code Abandoned Survey

Remarks Camera stopped on debris.

File Name 3952.jpg

CCTV Picture List of Work Order Setup 128 Video 11182013

HQ-TP83 XX

Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHB5

0.0 MWL Water Level 0

112.2 MSA Abandoned Survey Camera stopped on debris.

Total Length Surveyed112.2 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 128 Surveyor Heath Drainage

Street Grinnel Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length Height 4 Width ins

Joint length

Up HQ-TP83 Rim to invert Ft Down HQ-MHB5 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP83 XX NPSfor Certificate # U-1008-7896

Time 13:46 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 112.2

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

73.1 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHB5] Water Level 0%

0.0 Ft

Roots Fine Joint 09 to 03 o'clock OM: 1 Material change [Ductile iron] 0.9 Ft

Camera Underwater 9.8 Ft

Obstacle Pipe Material 04 to 08 o'clock 005% OM: 2 51.8 Ft

Alignment Left 025% OM: 4 71.5 Ft

End of Pipe End of Survey 73.1 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 129 Surveyor Heath Drainage

Street Grinnel Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 73.1 Ft Height 4 Width ins

Joint length

Up HQ-TP86 Rim to invert Ft Down HQ-MHB5 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP86 XX NPSfor Certificate # U-1008-7896

Time 14:45 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 73.10

Northing Easting Elevation Coordinate System GPS Accuracy

Ductile iron

Video Index Count 0.9 Ft Code Roots Fine Joint

Remarks File Name 3957.jpg

Video Index Count 0.9 Ft Code Material change

Remarks File Name 3958.jpg

Video Index Count 9.8 Ft Code Camera Underwater

Remarks File Name 3959.jpg

Video Index Count 51.8 Ft Code Obstacle Pipe Material

Remarks File Name 3960.jpg

Video Index Count 71.5 Ft Code Alignment Left

Remarks File Name 3961.jpg

Video Index Count 71.5 Ft Code Alignment Left

Remarks File Name 3962.jpg

Video Index Count 73.1 Ft Code End of Survey

Remarks File Name 3963.jpg

CCTV Picture List of Work Order Setup 129 Video 11182013

HQ-TP86 XX

Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHB5

0.0 MWL Water Level 0

0.9 RFJ Roots Fine Joint 09 03J

0.9 MMC Material change Ductile iron

9.8 MCU Camera Underwater

51.8 OBM Obstacle Pipe Material 04 085

71.5 LL Alignment Left 25

73.1 AEP End of Pipe

73.1 FH End of Survey

Total Length Surveyed73.1 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 129 Surveyor Heath Drainage

Street Grinnel Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 73.1 Height 4 Width ins

Joint length

Up HQ-TP86 Rim to invert Ft Down HQ-MHB5 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP86 XX NPSfor Certificate # U-1008-7896

Time 14:45 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 73.1

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

52.4 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHB3-2] Water Level 0% Start of Survey

0.0 Ft

Alignment Left 050% OM: 4 4.9 Ft

Hole Soil Visible 04 to 09 o'clock ST: 5 Material change [ductile iron] 39.3 Ft

Surface Spalling 12 to 12 o'clock ST: 2 40.0 Ft

End of Pipe End of Survey 52.4 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 125 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 52.4 Ft Height 6 Width ins

Joint length

Up HQ-TP96 Rim to invert Ft Down HQ-MHB3-2 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP96 XX NPSfor Certificate # U-1008-7896

Time 11:48 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 52.40

Northing Easting Elevation Coordinate System GPS Accuracy ductile iron

Video Index Count 39.3 Ft Code Hole Soil Visible

Remarks File Name 3909.jpg

Video Index Count 39.3 Ft Code Material change

Remarks File Name 3910.jpg

Video Index Count 40.0 Ft Code Surface Spalling

Remarks File Name 3911.jpg

Video Index Count 52.4 Ft Code End of Survey

Remarks File Name 3912.jpg

CCTV Picture List of Work Order Setup 125 Video 11182013

HQ-TP96 XX

Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHB3-2

0.0 MWL Water Level 0

0.0 ST Start of Survey

4.9 LL Alignment Left 50

39.3 HSV Hole Soil Visible 04 09

39.3 MMC Material change ductile iron

40.0 SSS Surface Spalling 12 12

52.4 AEP End of Pipe

52.4 FH End of Survey

Total Length Surveyed52.4 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 125 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 52.4 Height 6 Width ins

Joint length

Up HQ-TP96 Rim to invert Ft Down HQ-MHB3-2 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP96 XX NPSfor Certificate # U-1008-7896

Time 11:48 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 52.4

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

52.4 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHB5] Water Level 0%

0.0 Ft

Material change [ductile iron] 44.2 Ft

End of Pipe End of Survey 52.4 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 130 Surveyor Heath Drainage

Street Grinnel Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 52.4 Ft Height 4 Width ins

Joint length

Up HQ-TP169 Rim to invert Ft Down HQ-MHB5 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP169 XX NPSfor Certificate # U-1008-7896

Time 15:03 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 52.40

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 44.2 Ft Code Material change

Remarks ductile iron File Name 3968.jpg

Video Index Count 52.4 Ft Code End of Survey

Remarks File Name 3969.jpg

CCTV Picture List of Work Order Setup 130 Video 11182013

HQ-TP169 XX

Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHB5

0.0 MWL Water Level 0

44.2 MMC Material change ductile iron

52.4 AEP End of Pipe

52.4 FH End of Survey

Total Length Surveyed52.4 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 130 Surveyor Heath Drainage

Street Grinnel Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 52.4 Height 4 Width ins

Joint length

Up HQ-TP169 Rim to invert Ft Down HQ-MHB5 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP169 XX NPSfor Certificate # U-1008-7896

Time 15:03 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 52.4

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

71.1 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHD3] Water Level 0%

0.0 Ft

Water Level Sag 050% ST: 3 Camera Underwater 2.6 Ft

Camera Underwater 20.0 Ft

Tap Factory 4 09 o'clock 49.2 Ft

Manhole [HQ-TP295] End of Survey 71.1 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 132 Surveyor Heath Drainage

Street HQ Parking Lot

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 71.1 Ft Height 4 Width ins

Joint length

Up HQ-TP295 Rim to invert Ft Down HQ-MHD3 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP295 XX NPSfor Certificate # U-1008-7896

Time 17:18 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 71.10

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 20.0 Ft Code Camera Underwater

Remarks File Name 3982.jpg

Video Index Count 49.2 Ft Code Tap Factory

Remarks File Name 3983.jpg

Video Index Count 71.1 Ft Code End of Survey

Remarks File Name 3984.jpg

CCTV Picture List of Work Order Setup 132 Video 11182013

HQ-TP295 XX

Survey Date 2013/11/08 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHD3

0.0 MWL Water Level 0

2.6 MWLS Water Level Sag 50

2.6 MCU Camera Underwater

20.0 MCU Camera Underwater

49.2 TF Tap Factory 4 09

71.1 AMH Manhole HQ-TP295

71.1 FH End of Survey

Total Length Surveyed71.1 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/08

Setup 132 Surveyor Heath Drainage

Street HQ Parking Lot

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 71.1 Height 4 Width ins

Joint length

Up HQ-TP295 Rim to invert Ft Down HQ-MHD3 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP295 XX NPSfor Certificate # U-1008-7896

Time 17:18 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 71.1

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

HQ-CO15_1338_1
HQ-CO15_1338_2
HQ-CO15_1338_PG
HQ-CO15_1338_PL
HQ-CO15_1338_TAB
HQ-CO49_1261_1
HQ-CO49_1261_2
HQ-CO49_1261_3
HQ-CO49_1261_4
HQ-CO49_1261_5
HQ-CO49_1261_6
HQ-CO49_1261_7
HQ-CO49_1261_8
HQ-CO49_1261_9
HQ-CO49_1261_10
HQ-CO49_1261_11
HQ-CO49_1261_PG
HQ-CO49_1261_PL
HQ-CO49_1261_TAB
HQ-CO64_1272_1
HQ-CO64_1272_2
HQ-CO64_1272_3
HQ-CO64_1272_4
HQ-CO64_1272_5
HQ-CO64_1272_6
HQ-CO64_1272_7
HQ-CO64_1272_8
HQ-CO64_1272_9
HQ-CO64_1272_10
HQ-CO64_1272_11
HQ-CO64_1272_PG
HQ-CO64_1272_PL
HQ-CO64_1272_TAB
HQ-CO94D_1316_1
HQ-CO94D_1316_2
HQ-CO94D_1316_3
HQ-CO94D_1316_4
HQ-CO94D_1316_PG
HQ-CO94D_1316_PL
HQ-CO94D_1316_TAB
HQ-CO203_1349_1
HQ-CO203_1349_2
HQ-CO203_1349_3
HQ-CO203_1349_4
HQ-CO203_1349_PG
HQ-CO203_1349_PL
HQ-CO203_1349_TAB
HQ-TP10_13510_1
HQ-TP10_13510_2
HQ-TP10_13510_3
HQ-TP10_13510_4
HQ-TP10_13510_PG
HQ-TP10_13510_PL
HQ-TP10_13510_TAB
HQ-TP83_1283_1
HQ-TP83_1283_PG
HQ-TP83_1283_PL
HQ-TP83_1283_TAB
HQ-TP86_1294_1
HQ-TP86_1294_2
HQ-TP86_1294_3
HQ-TP86_1294_4
HQ-TP86_1294_5
HQ-TP86_1294_6
HQ-TP86_1294_7
HQ-TP86_1294_PG
HQ-TP86_1294_PL
HQ-TP86_1294_TAB
HQ-TP96_1250_1
HQ-TP96_1250_2
HQ-TP96_1250_3
HQ-TP96_1250_4
HQ-TP96_1250_PG
HQ-TP96_1250_PL
HQ-TP96_1250_TAB
HQ-TP169_1305_1
HQ-TP169_1305_2
HQ-TP169_1305_PG
HQ-TP169_1305_PL
HQ-TP169_1305_TAB
HQ-TP295_1327_1
HQ-TP295_1327_2
HQ-TP295_1327_3
HQ-TP295_1327_PG
HQ-TP295_1327_PL
HQ-TP295_1327_TAB

File details come from the government source that posted it. Updated .