1182013-2_0002.pdf
PDF 6 MB Posted
- Attached to
- GLAC 307440 - Replace Headquarters Wastewater and Federal contract opportunity
- Solicitation number
- 140P2023R0072
About this file
This solicitation requests proposals to replace wastewater infrastructure and install backup power generation at Glacier National Park headquarters. The National Park Service seeks to upgrade its wastewater treatment plant and lift stations, replacing over 15,000 linear feet of sewer lines. Bidders should propose solutions for treatment plant upgrades, backup power generators, and sewer line replacement. Proposals are due by February 15, 2023, and the agency intends to award a fixed-price contract by April 30, 2023. The solicitation targets small businesses for this infrastructure project located in West Glacier, Montana.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0 Ft
78.4 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHG3-1] Water Level 0%
0.0 Ft
Deposits Attached Grease 08 to 04 o'clock 005% OM: 2 [S01] 7.5 Ft
Joint Offset Medium ST: 1 76.7 Ft
Tap Factory 4.000 12 o'clock 78.0 Ft
Deposits Attached Grease 08 to 04 o'clock 005% OM: 2 [F01] Cleanout House End of Survey
78.4 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/21
Setup 47 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 78.4 Ft Height 6 Width ins
Joint length
Up HQ-CO12 Rim to invert Ft Down HQ-MHG3-1 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO12 B NPSfor Certificate # U-1008-7698
Time 17:37 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 78.40
Northing Easting Elevation Coordinate System GPS Accuracy
Project Headquarters Work Order
R&R Visual Inc. Phone: 574-223-5426 Fax: 574-223-7953
Video Index Count 7.5 Ft Code Deposits Attached Grease
Remarks File Name 1044.jpg
Video Index Count 76.7 Ft Code Joint Offset Medium
Remarks File Name 1045.jpg
Video Index Count 78.0 Ft Code Tap Factory
Remarks File Name 1046.jpg
Video Index Count 78.4 Ft Code Cleanout House
Remarks File Name 1047.jpg
Video Index Count 78.4 Ft Code End of Survey
Remarks File Name 1048.jpg
CCTV Picture List of Work Order Setup 47 Video 11182013
HQ-CO12 B
Survey Date 2013/11/21 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\
VideoCount CD Code Fr To RemarksImRefIn1 % JntIn2
0.0 ST Start of Survey
0.0 AMH Manhole HQ-MHG3-1
0.0 MWL Water Level 0
7.5 S01 DAGS Deposits Attached Grease 08 045
76.7 JOM Joint Offset Medium
78.0 TF Tap Factory 4.000 12
78.4 F01 DAGS Deposits Attached Grease 08 045
78.4 ACOH Cleanout House
78.4 FH End of Survey
Total Length Surveyed78.4 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.4
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/21
Setup 47 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 78.4 Height 6 Width ins
Joint length
Up HQ-CO12 Rim to invert Ft Down HQ-MHG3-1 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO12 B NPSfor Certificate # U-1008-7698
Time 17:37 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 78.4
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
365 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHG1] Water Level 0%
0.0 Ft
Intruding Sealing Other 07 to 11 o'clock 015% OM: 3 5.8 Ft
Material change [VCP] 5.9 Ft
Obstacle Rocks 06 o'clock 015% OM: 3 11.8 Ft
Abandoned Survey [Camera stopped on rocks.] 12.8 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/22
Setup 56 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 365.0 Ft Height 6 Width ins
Joint length
Up HQ-CO36 Rim to invert Ft Down HQ-MHG1 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO36 A NPSfor Certificate # U-1008-7698
Time 16:09 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 12.80
Northing Easting Elevation Coordinate System GPS Accuracy
VCP
Video Index Count 5.8 Ft Code Intruding Sealing Other
Remarks File Name 1098.jpg
Video Index Count 5.9 Ft Code Material change
Remarks File Name 1099.jpg
Video Index Count 11.8 Ft Code Obstacle Rocks
Remarks File Name 1100.jpg
Video Index Count 12.8 Ft Code Abandoned Survey
Remarks Camera stopped on rocks.
File Name 1101.jpg
CCTV Picture List of Work Order Setup 56 Video 11182013
HQ-CO36 A
Survey Date 2013/11/22 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHG1
0.0 MWL Water Level 0
5.8 ISZ Intruding Sealing Other 07 1115
5.9 MMC Material change VCP
11.8 OBR Obstacle Rocks 0615
12.8 MSA Abandoned Survey Camera stopped on rocks.
Total Length Surveyed12.8 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.5
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/22
Setup 56 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 365.0 Height 6 Width ins
Joint length
Up HQ-CO36 Rim to invert Ft Down HQ-MHG1 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO36 A NPSfor Certificate # U-1008-7698
Time 16:09 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 12.8
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
79 Ft
Pipe Flow
Survey Dir
Start of Survey Cleanout House [HQ-CO208] Water Level 0%
0.0 Ft
Tap Factory 4.000 12 o'clock 1.6 Ft
Tap Factory 4.000 03 o'clock General Observation [Leads to HQ-CO217] 6.8 Ft
Alignment Left Down 025% OM: 4 16.7 Ft
Tap Factory 4.000 03 o'clock 18.0 Ft
Joint Offset Large ST: 2 69.2 Ft
Joint Separated Medium ST: 1 76.4 Ft
Manhole [HQ-MHG2-3] End of Survey 79.0 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/21
Setup 46 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 79.0 Ft Height 4 Width ins
Joint length
Up HQ-CO208 Rim to invert Ft Down HQ-MHG2-3 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO208 B NPSfor Certificate # U-1008-7698
Time 17:14 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 79.00
Northing Easting Elevation Coordinate System GPS Accuracy
Leads to HQ-CO217
Video Index Count 1.6 Ft Code Tap Factory
Remarks File Name 1036.jpg
Video Index Count 6.8 Ft Code General Observation
Remarks File Name 1037.jpg
Video Index Count 16.7 Ft Code Alignment Left Down
Remarks File Name 1038.jpg
Video Index Count 18.0 Ft Code Tap Factory
Remarks File Name 1039.jpg
Video Index Count 69.2 Ft Code Joint Offset Large
Remarks File Name 1040.jpg
Video Index Count 76.4 Ft Code Joint Separated Medium
Remarks File Name 1041.jpg
Video Index Count 79.0 Ft Code End of Survey
Remarks File Name 1042.jpg
CCTV Picture List of Work Order Setup 46 Video 11182013
HQ-CO208 B
Survey Date 2013/11/21 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 ACOH Cleanout House HQ-CO208
0.0 MWL Water Level 0
1.6 TF Tap Factory 4.000 12
6.8 TF Tap Factory 4.000 03
6.8 MGO General Observation Leads to HQ-CO217
16.7 LLD Alignment Left Down 25
18.0 TF Tap Factory 4.000 03
69.2 JOL Joint Offset Large
76.4 JSM Joint Separated Medium
79.0 AMH Manhole HQ-MHG2-3
79.0 FH End of Survey
Total Length Surveyed79.0 Ft
Scores Pipe Ratings Index Pipe Ratings Index
1.5
Peak Peak
Mean Pipe Mean Pipe
0.1
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/21
Setup 46 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 79.0 Height 4 Width ins
Joint length
Up HQ-CO208 Rim to invert Ft Down HQ-MHG2-3 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO208 B NPSfor Certificate # U-1008-7698
Time 17:14 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 79.0
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
149 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-CO217] Water Level 0%
0.0 Ft
Tap Factory 4.000 12 o'clock 1.3 Ft
Alignment Right 025% OM: 4 13.7 Ft
Water Level Sag 010% ST: 2 32.8 Ft
Alignment Right 025% OM: 4 74.8 Ft
Tap Factory 4.000 09 o'clock 76.7 Ft
Alignment Left Down 025% OM: 4 85.9 Ft
Abandoned Survey [Maximum push capability] 112.5 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/21
Setup 45 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 149.0 Ft Height 4 Width ins
Joint length
Up HQ-CO217 Rim to invert Ft Down HQ-MHG2-3 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO217 B NPSfor Certificate # U-1008-7698
Time 16:50 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 112.50
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 1.3 Ft Code Tap Factory
Remarks File Name 1030.jpg
Video Index Count 13.7 Ft Code Alignment Right
Remarks File Name 1031.jpg
Video Index Count 32.8 Ft Code Water Level Sag
Remarks File Name 1032.jpg
Video Index Count 74.8 Ft Code Alignment Right
Remarks File Name 1033.jpg
Video Index Count 112.5 Ft Code Abandoned Survey
Remarks Maximum push capability File Name 1034.jpg
CCTV Picture List of Work Order Setup 45 Video 11182013
HQ-CO217 B
Survey Date 2013/11/21 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-CO217
0.0 MWL Water Level 0
1.3 TF Tap Factory 4.000 12
13.7 LR Alignment Right 25
32.8 MWLS Water Level Sag 10
74.8 LR Alignment Right 25
76.7 TF Tap Factory 4.000 09
85.9 LLD Alignment Left Down 25
112.5 MSA Abandoned Survey Maximum push capability
Total Length Surveyed112.5 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.1
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/21
Setup 45 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 149.0 Height 4 Width ins
Joint length
Up HQ-CO217 Rim to invert Ft Down HQ-MHG2-3 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO217 B NPSfor Certificate # U-1008-7698
Time 16:50 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 112.5
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
327.6 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA2] Water Level 0%
0.0 Ft
Deposits Attached Grease 12 to 12 o'clock 005% OM: 2 [S01] 28.8 Ft
Water Level Sag 015% ST: 2 131.0 Ft
Water Level Sag 015% ST: 2 169.9 Ft
Water Level Sag 020% ST: 2 250.0 Ft
Water Level Sag 020% ST: 2 278.6 Ft
Water Level Sag 020% ST: 2 317.2 Ft
Deposits Attached Grease 12 to 12 o'clock 005% OM: 2 [F01] Manhole [HQ-MHA3] End of Survey
327.6 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/23
Setup 65 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 327.6 Ft Height 8 Width ins
Joint length
Up HQ-MHA3 Rim to invert Ft Down HQ-MHA2 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA3 A NPSfor Certificate # U-1008-7698
Time 15:39 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 327.60
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 28.8 Ft
Remarks File Name 1144.jpg
Video Index Count 131.0 Ft Code Water Level Sag
Remarks File Name 1145.jpg
Video Index Count 169.9 Ft Code Water Level Sag
Remarks File Name 1146.jpg
Video Index Count 250.0 Ft Code Water Level Sag
Remarks File Name 1147.jpg
Video Index Count 278.6 Ft Code Water Level Sag
Remarks File Name 1148.jpg
Video Index Count 278.6 Ft Code Water Level Sag
Remarks File Name 1149.jpg
Video Index Count 317.2 Ft Code Water Level Sag
Remarks File Name 1150.jpg
Video Index Count 327.6 Ft Code End of Survey
Remarks File Name 1151.jpg
CCTV Picture List of Work Order Setup 65 Video 11182013
HQ-MHA3 A
Survey Date 2013/11/23 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA2
0.0 MWL Water Level 0
28.8 S01 DAGS Deposits Attached Grease 12 125
131.0 MWLS Water Level Sag 15
169.9 MWLS Water Level Sag 15
250.0 MWLS Water Level Sag 20
278.6 MWLS Water Level Sag 20
317.2 MWLS Water Level Sag 20
327.6 F01 DAGS Deposits Attached Grease 12 125
327.6 AMH Manhole HQ-MHA3
327.6 FH End of Survey
Total Length Surveyed327.6 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.4
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/23
Setup 65 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 327.6 Height 8 Width ins
Joint length
Up HQ-MHA3 Rim to invert Ft Down HQ-MHA2 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA3 A NPSfor Certificate # U-1008-7698
Time 15:39 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 327.6
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
312.1 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA4] Water Level 10%
0.0 Ft
General Photo 97.2 Ft
Buckling Dimpling 12 o'clock 105.5 Ft
Deposits Settled Gravel 05 to 07 o'clock 015% OM: 3 123.1 Ft
General Photo 202.0 Ft
Water Level Sag 020% ST: 2 255.1 Ft
Water Level Sag 015% ST: 2 288.4 Ft
Manhole [HQ-MHA3] End of Survey 312.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/22
Setup 60 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 312.1 Ft Height 8 Width ins
Joint length
Up HQ-MHA4 Rim to invert Ft Down HQ-MHA3 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA4 A NPSfor Certificate # U-1008-7698
Time 18:07 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 312.10
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 97.2 Ft Code General Photo
Remarks File Name 1114.jpg
Video Index Count 105.5 Ft Code Buckling Dimpling
Remarks File Name 1115.jpg
Video Index Count 123.1 Ft Code Deposits Settled Gravel
Remarks File Name 1116.jpg
Video Index Count 202.0 Ft Code General Photo
Remarks File Name 1117.jpg
Video Index Count 255.1 Ft Code Water Level Sag
Remarks File Name 1118.jpg
Video Index Count 288.4 Ft Code Water Level Sag
Remarks File Name 1119.jpg
Video Index Count 312.1 Ft Code End of Survey
Remarks File Name 1120.jpg
CCTV Picture List of Work Order Setup 60 Video 11182013
HQ-MHA4 A
Survey Date 2013/11/22 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA4
0.0 MWL Water Level 10
97.2 MGP General Photo
105.5 KD Buckling Dimpling 12
123.1 DSGV Deposits Settled Gravel 05 0715
202.0 MGP General Photo
255.1 MWLS Water Level Sag 20
288.4 MWLS Water Level Sag 15
312.1 AMH Manhole HQ-MHA3
312.1 FH End of Survey
Total Length Surveyed312.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
1.3
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/22
Setup 60 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 312.1 Height 8 Width ins
Joint length
Up HQ-MHA4 Rim to invert Ft Down HQ-MHA3 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA4 A NPSfor Certificate # U-1008-7698
Time 18:07 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 312.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
96.3 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA5] Water Level 70%
0.0 Ft
Abandoned Survey [Camera stopped on debris.] 10.7 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/22
Setup 59 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 96.3 Ft Height 8 Width ins
Joint length
Up HQ-MHA5 Rim to invert Ft Down HQ-MHA4 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA5 A NPSfor Certificate # U-1008-7698
Time 17:47 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 10.70
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 10.7 Ft Code Abandoned Survey
Remarks Camera stopped on debris.
File Name 1112.jpg
CCTV Picture List of Work Order Setup 59 Video 11182013
HQ-MHA5 A
Survey Date 2013/11/22 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA5
0.0 MWL Water Level 70
10.7 MSA Abandoned Survey Camera stopped on debris.
Total Length Surveyed10.7 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/22
Setup 59 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 96.3 Height 8 Width ins
Joint length
Up HQ-MHA5 Rim to invert Ft Down HQ-MHA4 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA5 A NPSfor Certificate # U-1008-7698
Time 17:47 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 10.7
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
150.8 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA6] Water Level 30%
0.0 Ft
Camera Underwater 4.3 Ft
Abandoned Survey [Camera stopped on debris.] 12.2 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/22
Setup 58 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 150.8 Ft Height 8 Width ins
Joint length
Up HQ-MHA6 Rim to invert Ft Down HQ-MHA5 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA6 A NPSfor Certificate # U-1008-7698
Time 17:18 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 12.20
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 12.2 Ft Code Abandoned Survey
Remarks Camera stopped on debris.
File Name 1110.jpg
CCTV Picture List of Work Order Setup 58 Video 11182013
HQ-MHA6 A
Survey Date 2013/11/22 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA6
0.0 MWL Water Level 30
4.3 MCU Camera Underwater
12.2 MSA Abandoned Survey Camera stopped on debris.
Total Length Surveyed12.2 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.3
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/22
Setup 58 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 150.8 Height 8 Width ins
Joint length
Up HQ-MHA6 Rim to invert Ft Down HQ-MHA5 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA6 A NPSfor Certificate # U-1008-7698
Time 17:18 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 12.2
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
337.6 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA7] Water Level 20%
0.0 Ft
Deposits Settled Gravel 05 to 07 o'clock 015% OM: 3 [S01] 18.0 Ft
Deposits Settled Gravel 05 to 07 o'clock 015% OM: 3 [F01] 24.6 Ft
Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 [S02] 77.7 Ft
Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 [F02] 89.0 Ft
Tap Factory 4.000 10 o'clock 95.8 Ft
Water Level Sag 015% ST: 2 161.9 Ft
Deposits Settled Gravel 05 to 07 o'clock 015% OM: 3 175.6 Ft
Buckling Dimpling 11 o'clock 205.1 Ft
Manhole [HQ-MHA6] End of Survey 337.6 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/22
Setup 57 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 337.6 Ft Height 8 Width ins
Joint length
Up HQ-MHA7 Rim to invert Ft Down HQ-MHA6 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA7 A NPSfor Certificate # U-1008-7698
Time 16:42 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 337.60
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 18.0 Ft Code Deposits Settled Gravel
Remarks File Name 1103.jpg
Video Index Count 95.8 Ft Code Tap Factory
Remarks File Name 1104.jpg
Video Index Count 161.9 Ft Code Water Level Sag
Remarks File Name 1105.jpg
Video Index Count 175.6 Ft Code Deposits Settled Gravel
Remarks File Name 1106.jpg
Video Index Count 205.1 Ft Code Buckling Dimpling
Remarks File Name 1107.jpg
Video Index Count 337.6 Ft Code End of Survey
Remarks File Name 1108.jpg
CCTV Picture List of Work Order Setup 57 Video 11182013
HQ-MHA7 A
Survey Date 2013/11/22 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA7
0.0 MWL Water Level 20
18.0 S01 DSGV Deposits Settled Gravel 05 0715
24.6 F01 DSGV Deposits Settled Gravel 05 0715
77.7 S02 DSGV Deposits Settled Gravel 05 0710
89.0 F02 DSGV Deposits Settled Gravel 05 0710
95.8 TF Tap Factory 4.000 10
161.9 MWLS Water Level Sag 15
175.6 DSGV Deposits Settled Gravel 05 0715
205.1 KD Buckling Dimpling 11
337.6 AMH Manhole HQ-MHA6
337.6 FH End of Survey
Total Length Surveyed337.6 Ft
Scores Pipe Ratings Index Pipe Ratings Index
2.5
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/22
Setup 57 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 337.6 Height 8 Width ins
Joint length
Up HQ-MHA7 Rim to invert Ft Down HQ-MHA6 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA7 A NPSfor Certificate # U-1008-7698
Time 16:42 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 337.6
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
179 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA8-1] Water Level 0%
0.0 Ft
Roots Fine Joint 07 to 05 o'clock OM: 1 2.9 Ft
Roots Medium Joint 12 to 06 o'clock 030% OM: 3 [S01] 14.5 Ft
Camera Underwater 26.5 Ft
Roots Medium Joint 12 to 06 o'clock 030% OM: 3 [F01] Abandoned Survey [Camera stopped on roots.] 31.8 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 36 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 179.0 Ft Height 6 Width ins
Joint length
Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA8-1 E NPSfor Certificate # U-1008-7698
Time 18:15 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 31.80
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 2.9 Ft Code Roots Fine Joint
Remarks File Name 957.jpg
Video Index Count 14.5 Ft Code Roots Medium Joint
Remarks File Name 958.jpg
Video Index Count 14.5 Ft Code Roots Medium Joint
Remarks File Name 959.jpg
Video Index Count 26.5 Ft Code Camera Underwater
Remarks File Name 960.jpg
Video Index Count 31.8 Ft Code Abandoned Survey
Remarks Camera stopped on roots.
File Name 961.jpg
CCTV Picture List of Work Order Setup 36 Video 11182013
HQ-MHA8-1 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA8-1
0.0 MWL Water Level 0
2.9 RFJ Roots Fine Joint 07 05J
14.5 S01 RMJ Roots Medium Joint 12 06J30
26.5 MCU Camera Underwater
31.8 F01 RMJ Roots Medium Joint 12 06J30
31.8 MSA Abandoned Survey Camera stopped on roots.
Total Length Surveyed31.8 Ft
Scores Pipe Ratings Index Pipe Ratings Index
2.8
Peak Peak
Mean Pipe Mean Pipe
0.5
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 36 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 179.0 Height 6 Width ins
Joint length
Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA8-1 E NPSfor Certificate # U-1008-7698
Time 18:15 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 31.8
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
182.6 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA9-1] Water Level 30%
0.0 Ft
Deposits Ingressed Other 02 to 09 o'clock 075% OM: 5 [Debris] 14.0 Ft
Abandoned Survey [Camera stopped on debris.] 15.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/20
Setup 37 Surveyor Heath Drainage
Street Mathers Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 182.6 Ft Height 8 Width ins
Joint length
Up HQ-MHA9-1 Rim to invert Ft Down HQ-MHA9 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA9-1 E NPSfor Certificate # U-1008-7698
Time 9:28 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 15.10
Northing Easting Elevation Coordinate System GPS Accuracy
Camera stopped on debris.
Video Index Count 14.0 Ft Code Deposits Ingressed Other
Remarks Debris File Name 963.jpg
Video Index Count 15.1 Ft Code Abandoned Survey
Remarks File Name 964.jpg
CCTV Picture List of Work Order Setup 37 Video 11182013
HQ-MHA9-1 E
Survey Date 2013/11/20 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA9-1
0.0 MWL Water Level 30
14.0 DNZ Deposits Ingressed Other 02 09 Debris75
15.1 MSA Abandoned Survey Camera stopped on debris.
Total Length Surveyed15.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.3
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/20
Setup 37 Surveyor Heath Drainage
Street Mathers Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 182.6 Height 8 Width ins
Joint length
Up HQ-MHA9-1 Rim to invert Ft Down HQ-MHA9 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA9-1 E NPSfor Certificate # U-1008-7698
Time 9:28 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 15.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
141.2 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA9-1] Water Level 0%
0.0 Ft
Material change [PVC] 17.6 Ft
General Photo 85.0 Ft
Manhole [HQ-MHA9-2] End of Survey 141.2 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/20
Setup 38 Surveyor Heath Drainage
Street Mathers Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 141.2 Ft Height 6 Width ins
Joint length
Up HQ-MHA9-2 Rim to invert Ft Down HQ-MHA9-1 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA9-2 E NPSfor Certificate # U-1008-7698
Time 10:47 Survey Customer Glacier National ParkGlacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 141.20
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 17.6 Ft Code Material change
Remarks PVC File Name 966.jpg
Video Index Count 85.0 Ft Code General Photo
Remarks File Name 967.jpg
Video Index Count 141.2 Ft Code End of Survey
Remarks File Name 968.jpg
CCTV Picture List of Work Order Setup 38 Video 11182013
HQ-MHA9-2 E
Survey Date 2013/11/20 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA9-1
0.0 MWL Water Level 0
17.6 MMC Material change PVC
85.0 MGP General Photo
141.2 AMH Manhole HQ-MHA9-2
141.2 FH End of Survey
Total Length Surveyed141.2 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/20
Setup 38 Surveyor Heath Drainage
Street Mathers Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 141.2 Height 6 Width ins
Joint length
Up HQ-MHA9-2 Rim to invert Ft Down HQ-MHA9-1 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA9-2 E NPSfor Certificate # U-1008-7698
Time 10:47 Survey Customer Glacier National ParkGlacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 141.2
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
110.8 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA11-1] Water Level 0%
0.0 Ft
Water Level Sag 040% ST: 3 14.0 Ft
Manhole [HQ-MHA11] End of Survey 110.8 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 35 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 110.8 Ft Height 6 Width ins
Joint length
Up HQ-MHA11-1 Rim to invert Ft Down HQ-MHA11 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA11-1 E NPSfor Certificate # U-1008-7698
Time 17:38 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 110.80
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 14.0 Ft Code Water Level Sag
Remarks File Name 953.jpg
Video Index Count 110.8 Ft Code End of Survey
Remarks File Name 954.jpg
CCTV Picture List of Work Order Setup 35 Video 11182013
HQ-MHA11-1 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA11-1
0.0 MWL Water Level 0
14.0 MWLS Water Level Sag 40
110.8 AMH Manhole HQ-MHA11
110.8 FH End of Survey
Total Length Surveyed110.8 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 35 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 110.8 Height 6 Width ins
Joint length
Up HQ-MHA11-1 Rim to invert Ft Down HQ-MHA11 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA11-1 E NPSfor Certificate # U-1008-7698
Time 17:38 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 110.8
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
127 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA11-1] Water Level 0%
0.0 Ft
General Photo 65.9 Ft
Manhole [HQ-MHA11-2] End of Survey 127.0 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 34 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 127.0 Ft Height 6 Width ins
Joint length
Up HQ-MHA11-2 Rim to invert Ft Down HQ-MHA11-1 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA11-2 E NPSfor Certificate # U-1008-7698
Time 17:27 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 127.00
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 65.9 Ft
Remarks File Name 950.jpg
Video Index Count 127.0 Ft Code End of Survey
Remarks File Name 951.jpg
CCTV Picture List of Work Order Setup 34 Video 11182013
HQ-MHA11-2 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA11-1
0.0 MWL Water Level 0
65.9 MGP General Photo
127.0 AMH Manhole HQ-MHA11-2
127.0 FH End of Survey
Total Length Surveyed127.0 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 34 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 127.0 Height 6 Width ins
Joint length
Up HQ-MHA11-2 Rim to invert Ft Down HQ-MHA11-1 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA11-2 E NPSfor Certificate # U-1008-7698
Time 17:27 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 127.0
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
110.4 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA11-3] Water Level 0%
0.0 Ft
General Photo 56.0 Ft
Manhole [HQ-MHA11-2] End of Survey 110.4 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 33 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 110.4 Ft Height 6 Width ins
Joint length
Up HQ-MHA11-3 Rim to invert Ft Down HQ-MHA11-2 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA11-3 E NPSfor Certificate # U-1008-7698
Time 17:06 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 110.40
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 56.0 Ft
Remarks File Name 947.jpg
Video Index Count 110.4 Ft Code End of Survey
Remarks File Name 948.jpg
CCTV Picture List of Work Order Setup 33 Video 11182013
HQ-MHA11-3 E
Survey Date 2013/11/19 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA11-3
0.0 MWL Water Level 0
56.0 MGP General Photo
110.4 AMH Manhole HQ-MHA11-2
110.4 FH End of Survey
Total Length Surveyed110.4 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/19
Setup 33 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 110.4 Height 6 Width ins
Joint length
Up HQ-MHA11-3 Rim to invert Ft Down HQ-MHA11-2 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA11-3 E NPSfor Certificate # U-1008-7698
Time 17:06 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 110.4
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
147 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHD1] Water Level 0%
0.0 Ft
Intruding Sealing Ring 12 to 12 o'clock 005% OM: 2 [S01] 1.8 Ft
Roots Medium Joint 07 to 11 o'clock 015% OM: 3 5.2 Ft
Roots Medium Joint 07 to 05 o'clock 020% OM: 3 13.1 Ft
Intruding Sealing Ring 12 to 12 o'clock 005% OM: 2 [F01] Abandoned Survey [Camera stopped on roots.] 54.8 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/23
Setup 64 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 147.0 Ft Height 8 Width ins
Joint length
Up HQ-MHD1 Rim to invert Ft Down HQ-MHA2 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHD1 A NPSfor Certificate # U-1008-7698
Time 15:20 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 54.80
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 1.8 Ft Code Intruding Sealing Ring
Remarks File Name 1139.jpg
Video Index Count 5.2 Ft Code Roots Medium Joint
Remarks File Name 1140.jpg
Video Index Count 13.1 Ft Code Roots Medium Joint
Remarks File Name 1141.jpg
Video Index Count 54.8 Ft Code Abandoned Survey
Remarks Camera stopped on roots.
File Name 1142.jpg
CCTV Picture List of Work Order Setup 64 Video 11182013
HQ-MHD1 A
Survey Date 2013/11/23 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHD1
0.0 MWL Water Level 0
1.8 S01 ISSR Intruding Sealing Ring 12 125
5.2 RMJ Roots Medium Joint 07 11J15
13.1 RMJ Roots Medium Joint 07 05J20
54.8 F01 ISSR Intruding Sealing Ring 12 125
54.8 MSA Abandoned Survey Camera stopped on roots.
Total Length Surveyed54.8 Ft
Scores Pipe Ratings Index Pipe Ratings Index
2.2
Peak Peak
Mean Pipe Mean Pipe
0.5
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/23
Setup 64 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 147.0 Height 8 Width ins
Joint length
Up HQ-MHD1 Rim to invert Ft Down HQ-MHA2 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHD1 A NPSfor Certificate # U-1008-7698
Time 15:20 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 54.8
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
341.9 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHD1] Water Level 5% Deposits Attached Grease 04 to 08 o'clock 005% OM: 2 [S01]
0.0 Ft
Roots Medium Joint 07 to 05 o'clock 030% OM: 3 10.5 Ft
Roots Fine Joint 07 to 05 o'clock OM: 1 20.1 Ft
Roots Fine Joint 07 to 05 o'clock OM: 1 [S02] 42.6 Ft
Tap Break-in 4.000 10 o'clock 138.0 Ft
Deposits Attached Grease 04 to 08 o'clock 005% OM: 2 [F01] Roots Fine Joint 07 to 05 o'clock OM: 1 [F02] Abandoned Survey [Camera stopped on roots.]
165.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/23
Setup 63 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 341.9 Ft Height 8 Width ins
Joint length
Up HQ-MHD2 Rim to invert Ft Down HQ-MHD1 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHD2 A NPSfor Certificate # U-1008-7698
Time 14:54 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 165.10
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 0.0 Ft
Remarks File Name 1133.jpg
Video Index Count 20.1 Ft Code Roots Fine Joint
Remarks File Name 1134.jpg
Video Index Count 42.6 Ft Code Roots Fine Joint
Remarks File Name 1135.jpg
Video Index Count 138.0 Ft Code Tap Break-in
Remarks File Name 1136.jpg
Video Index Count 165.1 Ft Code Abandoned Survey
Remarks Camera stopped on roots.
File Name 1137.jpg
CCTV Picture List of Work Order Setup 63 Video 11182013
HQ-MHD2 A
Survey Date 2013/11/23 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHD1
0.0 MWL Water Level 5
0.0 S01 DAGS Deposits Attached Grease 04 085
10.5 RMJ Roots Medium Joint 07 05J30
20.1 RFJ Roots Fine Joint 07 05J
42.6 S02 RFJ Roots Fine Joint 07 05J
138.0 TB Tap Break-in 4.000 10
165.1 F01 DAGS Deposits Attached Grease 04 085
165.1 F02 RFJ Roots Fine Joint 07 05J
165.1 MSA Abandoned Survey Camera stopped on roots.
Total Length Surveyed165.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
1.6
Peak Peak
Mean Pipe Mean Pipe
0.6
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/23
Setup 63 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 341.9 Height 8 Width ins
Joint length
Up HQ-MHD2 Rim to invert Ft Down HQ-MHD1 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHD2 A NPSfor Certificate # U-1008-7698
Time 14:54 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 165.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
194.1 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHD3] Water Level 0%
0.0 Ft
Intruding Sealing Ring 12 to 12 o'clock 005% OM: 2 [S01] 3.0 Ft
General Photo 124.2 Ft
Roots Fine Joint 03 to 04 o'clock OM: 1 176.1 Ft
Intruding Sealing Ring 12 to 12 o'clock 005% OM: 2 [F01] Manhole [HQ-MHD2] End of Survey
194.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/23
Setup 62 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 194.1 Ft Height 8 Width ins
Joint length
Up HQ-MHD3 Rim to invert Ft Down HQ-MHD2 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHD3 A NPSfor Certificate #…
This is the start of the file's text. The full file is on GovTribe.