This document contains multiple pipe inspection reports from closed circuit television (CCTV) surveys of wastewater pipelines located at Glacier National Park. The reports provide detailed findings from inspections of various vitrified clay, polyvinyl chloride, and ductile iron pipes ranging from 6 to 8 inches in diameter and up to 239.5 feet in length. Inspection details include start and end points, water levels, broken or offset joints, intruding roots, deposits, lining failures, taps and general condition observations. Locations include streets within West Glacier and manholes identified by unique reference codes. The surveys were conducted between July 2013 and July 2014 by R&R Visual Inc. for the National Park Service as part of pipeline maintenance, rehabilitation and planning efforts.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0 Ft
23.2 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-CO18] Water Level 20% Broken Soil Visible 09 to 03 o'clock ST: 5 Tap Factory 4.000 12 o'clock
0.0 Ft
End of Pipe End of Survey 23.2 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 102 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 23.2 Ft Height 4 Width ins
Joint length
Up HQ-CO18 Rim to invert Ft Down HQ-MHA12-HQ-MHA1 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info Downstream MH ID is HQ-MHA12-HQ-MHA13
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO18 B NPSfor Certificate # U-1008-7698
Time 16:42 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 23.20
Northing Easting Elevation Coordinate System GPS Accuracy
Project Headquarters Work Order
R&R Visual Inc. Phone: 574-223-5426 Fax: 574-223-7953
Video Index Count 0.0 Ft Code Broken Soil Visible
Remarks File Name 3770.jpg
Video Index Count 0.0 Ft Code Tap Factory
Remarks File Name 3771.jpg
Video Index Count 23.2 Ft Code End of Pipe
Remarks File Name 3772.jpg
CCTV Picture List of Work Order Setup 102 Video 11182013
HQ-CO18 B
Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\
VideoCount CD Code Fr To RemarksImRefIn1 % JntIn2
0.0 ST Start of Survey
0.0 AMH Manhole HQ-CO18
0.0 MWL Water Level 20
0.0 BSV Broken Soil Visible 09 03
0.0 TF Tap Factory 4.000 12
23.2 AEP End of Pipe
23.2 FH End of Survey
Total Length Surveyed23.2 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.2
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 102 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 23.2 Height 4 Width ins
Joint length
Up HQ-CO18 Rim to invert Ft Down HQ-MHA12-HQ-MHA1 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info Downstream MH ID is HQ-MHA12-HQ-MHA13
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO18 B NPSfor Certificate # U-1008-7698
Time 16:42 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 23.2
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
16.4 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA14] Water Level 0%
0.0 Ft
Alignment Up 025% OM: 4 12.7 Ft
Cleanout House End of Survey 16.4 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 97 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 16.4 Ft Height 4 Width ins
Joint length
Up HQ-CO26 Rim to invert Ft Down HQ-MHA14 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO26 B NPSfor Certificate # U-1008-7698
Time 15:05 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 16.40
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 12.7 Ft Code Alignment Up
Remarks File Name 3747.jpg
Video Index Count 16.4 Ft Code End of Survey
Remarks File Name 3748.jpg
CCTV Picture List of Work Order Setup 97 Video 11182013
HQ-CO26 B
Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA14
0.0 MWL Water Level 0
12.7 LU Alignment Up 25
16.4 ACOH Cleanout House
16.4 FH End of Survey
Total Length Surveyed16.4 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.2
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 97 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 16.4 Height 4 Width ins
Joint length
Up HQ-CO26 Rim to invert Ft Down HQ-MHA14 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO26 B NPSfor Certificate # U-1008-7698
Time 15:05 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 16.4
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
42.9 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA14] Water Level 0%
0.0 Ft
Alignment Up 025% OM: 4 18.0 Ft
Alignment Down 025% OM: 4 21.6 Ft
Cleanout House End of Survey 42.9 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 98 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 42.9 Ft Height 4 Width ins
Joint length
Up HQ-CO27 Rim to invert Ft Down HQ-MHA14 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO27 B NPSfor Certificate # U-1008-7698
Time 15:11 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 42.90
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 18.0 Ft Code Alignment Up
Remarks File Name 3750.jpg
Video Index Count 21.6 Ft Code Alignment Down
Remarks File Name 3751.jpg
Video Index Count 42.9 Ft Code Cleanout House
Remarks File Name 3752.jpg
CCTV Picture List of Work Order Setup 98 Video 11182013
HQ-CO27 B
Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA14
0.0 MWL Water Level 0
18.0 LU Alignment Up 25
21.6 LD Alignment Down 25
42.9 ACOH Cleanout House
42.9 FH End of Survey
Total Length Surveyed42.9 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.2
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 98 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 42.9 Height 4 Width ins
Joint length
Up HQ-CO27 Rim to invert Ft Down HQ-MHA14 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO27 B NPSfor Certificate # U-1008-7698
Time 15:11 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 42.9
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
43.3 Ft
Pip e F low
Survey Dir
Start of Survey Cleanout Propertyline [HQ-CO29] Water Level 20%
0.0 Ft
Cleanout Propertyline End of Survey 43.3 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 96 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 43.3 Ft Height 4 Width ins
Joint length
Up HQ-CO28 Rim to invert Ft Down HQ-CO29 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO28 B NPSfor Certificate # U-1008-7698
Time 14:49 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 43.30
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 43.3 Ft Code End of Survey
Remarks File Name 3745.jpg
CCTV Picture List of Work Order Setup 96 Video 11182013
HQ-CO28 B
Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 ACOP Cleanout Propertyline HQ-CO29
0.0 MWL Water Level 20
43.3 ACOP Cleanout Propertyline
43.3 FH End of Survey
Total Length Surveyed43.3 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 96 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 43.3 Height 4 Width ins
Joint length
Up HQ-CO28 Rim to invert Ft Down HQ-CO29 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO28 B NPSfor Certificate # U-1008-7698
Time 14:49 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 43.3
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
34.4 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA15] Water Level 0%
0.0 Ft
Cleanout Propertyline End of Survey 34.4 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 95 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 34.4 Ft Height 4 Width ins
Joint length
Up HQ-CO29 Rim to invert Ft Down HQ-MHA15 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO29 B NPSfor Certificate # U-1008-7698
Time 14:42 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 34.40
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 34.4 Ft Code End of Survey
Remarks File Name 3743.jpg
CCTV Picture List of Work Order Setup 95 Video 11182013
HQ-CO29 B
Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA15
0.0 MWL Water Level 0
34.4 ACOP Cleanout Propertyline
34.4 FH End of Survey
Total Length Surveyed34.4 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 95 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 34.4 Height 4 Width ins
Joint length
Up HQ-CO29 Rim to invert Ft Down HQ-MHA15 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO29 B NPSfor Certificate # U-1008-7698
Time 14:42 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 34.4
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
87.6 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHC4] Water Level 0%
0.0 Ft
Alignment Right 025% OM: 4 2.9 Ft
Cleanout House End of Survey 87.6 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 103 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 87.6 Ft Height 4 Width ins
Joint length
Up HQ-CO41 Rim to invert Ft Down HQ-MHC4 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO41 B NPSfor Certificate # U-1008-7698
Time 7:34 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 87.60
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 2.9 Ft Code Alignment Right
Remarks File Name 3775.jpg
Video Index Count 87.6 Ft Code Cleanout House
Remarks File Name 3776.jpg
Video Index Count 87.6 Ft Code End of Survey
Remarks File Name 3777.jpg
CCTV Picture List of Work Order Setup 103 Video 11182013
HQ-CO41 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHC4
0.0 MWL Water Level 0
2.9 LR Alignment Right 25
87.6 ACOH Cleanout House
87.6 FH End of Survey
Total Length Surveyed87.6 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 103 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 87.6 Height 4 Width ins
Joint length
Up HQ-CO41 Rim to invert Ft Down HQ-MHC4 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO41 B NPSfor Certificate # U-1008-7698
Time 7:34 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 87.6
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
42.3 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHC5] Water Level 10%
0.0 Ft
Tap Factory 4.000 12 o'clock 41.6 Ft
Cleanout House End of Survey 42.3 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 100 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 42.3 Ft Height 4 Width ins
Joint length
Up HQ-CO73 Rim to invert Ft Down HQ-MHC5 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO73 B NPSfor Certificate # U-1008-7698
Time 15:51 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 42.30
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 41.6 Ft Code Tap Factory
Remarks File Name 3759.jpg
Video Index Count 42.3 Ft Code Cleanout House
Remarks File Name 3760.jpg
Video Index Count 42.3 Ft Code End of Survey
Remarks File Name 3761.jpg
CCTV Picture List of Work Order Setup 100 Video 11182013
HQ-CO73 B
Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHC5
0.0 MWL Water Level 10
41.6 TF Tap Factory 4.000 12
42.3 ACOH Cleanout House
42.3 FH End of Survey
Total Length Surveyed42.3 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 100 Surveyor Heath Drainage
Street Sperry Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 42.3 Height 4 Width ins
Joint length
Up HQ-CO73 Rim to invert Ft Down HQ-MHC5 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO73 B NPSfor Certificate # U-1008-7698
Time 15:51 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 42.3
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
155.1 Ft
Pipe Flow
Survey Dir
Start of Survey Cleanout House [HQ-CO80] Water Level 20%
0.0 Ft
Alignment Right 025% OM: 4 23.9 Ft
Alignment Right 025% OM: 4 45.6 Ft
Alignment Right 025% OM: 4 Abandoned Survey [Maximum push capability.] 155.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 104 Surveyor Heath Drainage
Street Mather Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length Ft Height 4 Width ins
Joint length
Up HQ-CO80 Rim to invert Ft Down HQ-MHC1-HQ-MHC4 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO80 B NPSfor Certificate # U-1008-7698
Time 7:59 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 155.10
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 23.9 Ft Code Alignment Right
Remarks File Name 3779.jpg
Video Index Count 45.6 Ft Code Alignment Right
Remarks File Name 3780.jpg
Video Index Count 155.1 Ft Code Alignment Right
Remarks File Name 3781.jpg
Video Index Count 155.1 Ft Code Abandoned Survey
Remarks Maximum push capability.
File Name 3782.jpg
CCTV Picture List of Work Order Setup 104 Video 11182013
HQ-CO80 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 ACOH Cleanout House HQ-CO80
0.0 MWL Water Level 20
23.9 LR Alignment Right 25
45.6 LR Alignment Right 25
155.1 LR Alignment Right 25
155.1 MSA Abandoned Survey Maximum push capability.
Total Length Surveyed155.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.1
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 104 Surveyor Heath Drainage
Street Mather Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length Height 4 Width ins
Joint length
Up HQ-CO80 Rim to invert Ft Down HQ-MHC1-HQ-MHC4 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO80 B NPSfor Certificate # U-1008-7698
Time 7:59 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 155.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
57.7 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA2] Water Level 0% Deposits Attached Grease 12 to 12 o'clock 005% OM: 2
0.0 Ft
Water Level Sag 015% ST: 2 51.1 Ft
Manhole [HQ-MHA1] End of Survey 57.7 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2013/11/23
Setup 66 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 57.7 Ft Height 8 Width ins
Joint length
Up HQ-MHA2 Rim to invert Ft Down HQ-MHA1 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA2 A NPSfor Certificate # U-1008-7698
Time 16:09 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 57.70
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 51.1 Ft Code Water Level Sag
Remarks File Name 1153.jpg
Video Index Count 57.7 Ft Code End of Survey
Remarks File Name 1154.jpg
CCTV Picture List of Work Order Setup 66 Video 11182013
HQ-MHA2 A
Survey Date 2013/11/23 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA2
0.0 MWL Water Level 0
0.0 DAGS Deposits Attached Grease 12 125
51.1 MWLS Water Level Sag 15
57.7 AMH Manhole HQ-MHA1
57.7 FH End of Survey
Total Length Surveyed57.7 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2013/11/23
Setup 66 Surveyor Heath Drainage
Street Community Bldg.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 57.7 Height 8 Width ins
Joint length
Up HQ-MHA2 Rim to invert Ft Down HQ-MHA1 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA2 A NPSfor Certificate # U-1008-7698
Time 16:09 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 57.7
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
96.3 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA4] Water Level 10%
0.0 Ft
Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 [S01] 2.2 Ft
Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 [F01] 18.9 Ft
Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 [S02] 31.6 Ft
Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 [F02] Abandoned Survey [Camera stopped on debris.] 54.7 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/26
Setup 82 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 96.3 Ft Height 8 Width ins
Joint length
Up HQ-MHA5 Rim to invert Ft Down HQ-MHA4 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA5 A NPSfor Certificate # U-1008-7698
Time 9:22 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 54.70
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 2.2 Ft Code Deposits Settled Gravel
Remarks File Name 3680.jpg
Video Index Count 31.6 Ft Code Deposits Settled Gravel
Remarks File Name 3681.jpg
Video Index Count 54.7 Ft Code Abandoned Survey
Remarks Camera stopped on debris.
File Name 3682.jpg
CCTV Picture List of Work Order Setup 82 Video 11182013
HQ-MHA5 A
Survey Date 2014/07/26 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA4
0.0 MWL Water Level 10
2.2 S01 DSGV Deposits Settled Gravel 05 0710
18.9 F01 DSGV Deposits Settled Gravel 05 0710
31.6 S02 DSGV Deposits Settled Gravel 05 0710
54.7 F02 DSGV Deposits Settled Gravel 05 0710
54.7 MSA Abandoned Survey Camera stopped on debris.
Total Length Surveyed54.7 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.3
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/26
Setup 82 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 96.3 Height 8 Width ins
Joint length
Up HQ-MHA5 Rim to invert Ft Down HQ-MHA4 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA5 A NPSfor Certificate # U-1008-7698
Time 9:22 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 54.7
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
96.3 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA5] Water Level 10%
0.0 Ft
Buckling Dimpling 12 o'clock 56.1 Ft
Water Level Sag 015% ST: 2 [S01] 82.0 Ft
Buckling Dimpling 01 to 02 o'clock 89.0 Ft
Water Level Sag 015% ST: 2 [F01] Manhole [HQ-MHA4] End of Survey
96.3 Ft
Direction 2014/07/26Date Cleaned
P/O #
Media No 11182013
Date 2014/07/26
Setup 84 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 96.3 Ft Height 8 Width ins
Joint length
Up HQ-MHA5 Rim to invert Ft Down HQ-MHA4 Rim to invert Ft
Downstream Preclean H
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA5 A NPSfor Certificate # U-1008-7698
Time 10:34 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 96.30
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 56.1 Ft Code Buckling Dimpling
Remarks File Name 3688.jpg
Video Index Count 82.0 Ft Code Water Level Sag
Remarks File Name 3689.jpg
Video Index Count 89.0 Ft Code Buckling Dimpling
Remarks File Name 3690.jpg
Video Index Count 96.3 Ft Code End of Survey
Remarks File Name 3691.jpg
CCTV Picture List of Work Order Setup 84 Video 11182013
HQ-MHA5 A
Survey Date 2014/07/26 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA5
0.0 MWL Water Level 10
56.1 KD Buckling Dimpling 12
82.0 S01 MWLS Water Level Sag 15
89.0 KD Buckling Dimpling 01 02
96.3 F01 MWLS Water Level Sag 15
96.3 AMH Manhole HQ-MHA4
96.3 FH End of Survey
Total Length Surveyed96.3 Ft
Scores Pipe Ratings Index Pipe Ratings Index
1.2
Peak Peak
Mean Pipe Mean Pipe
0.1
Pipe Rating Pipe Rating
Structural:
O&M:
2014/07/26Date Cleaned
P/O #
Media No 11182013
Date 2014/07/26
Setup 84 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 96.3 Height 8 Width ins
Joint length
Up HQ-MHA5 Rim to invert Ft Down HQ-MHA4 Rim to invert Ft
Direction Down Preclean H
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA5 A NPSfor Certificate # U-1008-7698
Time 10:34 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 96.3
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
150.8 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA5] Water Level 15%
0.0 Ft
Deposits Attached Grease 08 to 04 o'clock 005% OM: 2 [S01] 36.6 Ft
Buckling Dimpling 12 o'clock 108.6 Ft
Deposits Attached Grease 08 to 04 o'clock 005% OM: 2 [F01] Abandoned Survey [Camera stopped on grease.] 118.5 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/26
Setup 83 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 150.8 Ft Height 8 Width ins
Joint length
Up HQ-MHA6 Rim to invert Ft Down HQ-MHA5 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA6 A NPSfor Certificate # U-1008-7698
Time 10:19 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 118.50
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 36.6 Ft Code Deposits Attached Grease
Remarks File Name 3684.jpg
Video Index Count 108.6 Ft Code Buckling Dimpling
Remarks File Name 3685.jpg
Video Index Count 118.5 Ft Code Abandoned Survey
Remarks Camera stopped on grease.
File Name 3686.jpg
CCTV Picture List of Work Order Setup 83 Video 11182013
HQ-MHA6 A
Survey Date 2014/07/26 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA5
0.0 MWL Water Level 15
36.6 S01 DAGS Deposits Attached Grease 08 045
108.6 KD Buckling Dimpling 12
118.5 F01 DAGS Deposits Attached Grease 08 045
118.5 MSA Abandoned Survey Camera stopped on grease.
Total Length Surveyed118.5 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.3
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/26
Setup 83 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 150.8 Height 8 Width ins
Joint length
Up HQ-MHA6 Rim to invert Ft Down HQ-MHA5 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA6 A NPSfor Certificate # U-1008-7698
Time 10:19 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 118.5
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
150.8 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA6] Water Level 40%
0.0 Ft
Buckling Dimpling 12 o'clock 18.3 Ft
Buckling Dimpling 12 o'clock 38.4 Ft
General Photo 95.2 Ft
Manhole [HQ-MHA5] End of Survey 150.8 Ft
Direction 2014/07/26Date Cleaned
P/O #
Media No 11182013
Date 2014/07/26
Setup 85 Surveyor Heath Drainage
Street Community Center
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 150.8 Ft Height 8 Width ins
Joint length
Up HQ-MHA6 Rim to invert Ft Down HQ-MHA5 Rim to invert Ft
Downstream Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA6 X NPSfor Certificate # U-1008-7698
Time 11:34 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 150.80
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 18.3 Ft Code Buckling Dimpling
Remarks File Name 3693.jpg
Video Index Count 38.4 Ft Code Buckling Dimpling
Remarks File Name 3694.jpg
Video Index Count 95.2 Ft Code General Photo
Remarks File Name 3695.jpg
Video Index Count 150.8 Ft Code End of Survey
Remarks File Name 3696.jpg
CCTV Picture List of Work Order Setup 85 Video 11182013
HQ-MHA6 X
Survey Date 2014/07/26 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA6
0.0 MWL Water Level 40
18.3 KD Buckling Dimpling 12
38.4 KD Buckling Dimpling 12
95.2 MGP General Photo
150.8 AMH Manhole HQ-MHA5
150.8 FH End of Survey
Total Length Surveyed150.8 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
2014/07/26Date Cleaned
P/O #
Media No 11182013
Date 2014/07/26
Setup 85 Surveyor Heath Drainage
Street Community Center
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 150.8 Height 8 Width ins
Joint length
Up HQ-MHA6 Rim to invert Ft Down HQ-MHA5 Rim to invert Ft
Direction Down Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA6 X NPSfor Certificate # U-1008-7698
Time 11:34 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 150.8
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
179 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA8] Water Level 10%
0.0 Ft
Material change [VCP] Roots Fine Joint 12 to 12 o'clock OM: 1 3.1 Ft
Roots Medium Joint 07 to 05 o'clock 025% OM: 3 Abandoned Survey [Camera stopped on roots.] 3.9 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/25
Setup 75 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 179.0 Ft Height 6 Width ins
Joint length
Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA8-1 A NPSfor Certificate # U-1008-7698
Time 14:27 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 03.90
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 3.1 Ft Code Material change
Remarks VCP File Name 3630.jpg
Video Index Count 3.1 Ft Code Roots Fine Joint
Remarks File Name 3631.jpg
Video Index Count 3.9 Ft Code Roots Medium Joint
Remarks File Name 3632.jpg
Video Index Count 3.9 Ft Code Abandoned Survey
Remarks Camera stopped on roots.
File Name 3633.jpg
CCTV Picture List of Work Order Setup 75 Video 11182013
HQ-MHA8-1 A
Survey Date 2014/07/25 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA8
0.0 MWL Water Level 10
3.1 MMC Material change VCP
3.1 RFJ Roots Fine Joint 12 12J
3.9 RMJ Roots Medium Joint 07 05J25
3.9 MSA Abandoned Survey Camera stopped on roots.
Total Length Surveyed3.9 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/25
Setup 75 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 179.0 Height 6 Width ins
Joint length
Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA8-1 A NPSfor Certificate # U-1008-7698
Time 14:27 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 3.9
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA8] Water Level 0%
0.0 Ft
Material change [VCP] Fracture Circumferential 07 to 11 o'clock ST: 2 3.0 Ft
Roots Medium Joint 09 to 03 o'clock 015% OM: 3 4.4 Ft
Roots Fine Joint 09 to 10 o'clock OM: 1 10.1 Ft
Roots Medium Joint 02 to 06 o'clock 015% OM: 3 20.9 Ft
Roots Medium Joint 09 to 12 o'clock 045% OM: 3 24.2 Ft
Roots Medium Joint 08 to 04 o'clock 045% OM: 3 42.3 Ft
Tap Factory 4.000 02 o'clock 100.9 Ft
Joint Offset Large ST: 2 125.3 Ft
Abandoned Survey [Camera stopped on offset joint.] 126.7 Ft
Direction 2014/07/25Date Cleaned
P/O #
Media No 11182013
Date 2014/07/25
Setup 77 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 179.0 Ft Height 6 Width ins
Joint length
Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft
Upstream Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA8-1 A NPSfor Certificate # U-1008-7698
Time 16:29 Survey Customer vGlacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 126.70
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 3.0 Ft
Remarks VCP File Name 3649.jpg
Video Index Count 3.0 Ft Code Fracture Circumferential
Remarks File Name 3650.jpg
Video Index Count 4.4 Ft Code Roots Medium Joint
Remarks File Name 3651.jpg
Video Index Count 10.1 Ft Code Roots Fine Joint
Remarks File Name 3652.jpg
Video Index Count 20.9 Ft Code Roots Medium Joint
Remarks File Name 3653.jpg
Video Index Count 24.2 Ft Code Roots Medium Joint
Remarks File Name 3654.jpg
Video Index Count 42.3 Ft Code Roots Medium Joint
Remarks File Name 3655.jpg
Video Index Count 100.9 Ft Code Tap Factory
Remarks File Name 3656.jpg
CCTV Picture List of Work Order Setup 77 Video 11182013
HQ-MHA8-1 A
Survey Date 2014/07/25 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
CCTV Picture List of Work Order Setup 77 Video 11182013
HQ-MHA8-1 A
Survey Date 2014/07/25 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\
Camera stopped on offset joint.
Video Index Count 125.3 Ft Code Joint Offset Large
Remarks File Name 3657.jpg
Video Index Count 126.7 Ft Code Abandoned Survey
Remarks File Name 3658.jpg
0.0 AMH Manhole HQ-MHA8
0.0 MWL Water Level 0
3.0 MMC Material change VCP
3.0 FC Fracture Circumferential 07 11
4.4 RMJ Roots Medium Joint 09 03J15
10.1 RFJ Roots Fine Joint 09 10J
20.9 RMJ Roots Medium Joint 02 06J15
24.2 RMJ Roots Medium Joint 09 12J45
42.3 RMJ Roots Medium Joint 08 04J45
100.9 TF Tap Factory 4.000 02
125.3 JOL Joint Offset Large
126.7 MSA Abandoned Survey Camera stopped on offset join...
Total Length Surveyed126.7 Ft
Scores Pipe Ratings Index Pipe Ratings Index
2.6
Peak Peak
Mean Pipe Mean Pipe
0.1
Pipe Rating Pipe Rating
Structural:
O&M:
2014/07/25Date Cleaned
P/O #
Media No 11182013
Date 2014/07/25
Setup 77 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 179.0 Height 6 Width ins
Joint length
Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft
Direction Up Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA8-1 A NPSfor Certificate # U-1008-7698
Time 16:29 Survey Customer vGlacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 126.7
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA8-1] Water Level 0%
0.0 Ft
Roots Fine Joint 12 o'clock OM: 1 29.6 Ft
Broken Void Visible 06 to 08 o'clock ST: 5 Joint Offset Large ST: 2 41.3 Ft
Abandoned Survey [Line segment complete.] 42.7 Ft
Direction 2014/07/25Date Cleaned
P/O #
Media No 11182013
Date 2014/07/25
Setup 78 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 179.0 Ft Height 6 Width ins
Joint length
Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft
Downstream Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA8-1 A NPSfor Certificate # U-1008-7698
Time 16:58 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 42.70
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 29.6 Ft Code Roots Fine Joint
Remarks File Name 3660.jpg
Video Index Count 41.3 Ft Code Broken Void Visible
Remarks File Name 3661.jpg
Video Index Count 41.3 Ft Code Joint Offset Large
Remarks File Name 3662.jpg
Video Index Count 42.7 Ft Code Abandoned Survey
Remarks Line segment complete.
File Name 3663.jpg
CCTV Picture List of Work Order Setup 78 Video 11182013
HQ-MHA8-1 A
Survey Date 2014/07/25 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA8-1
0.0 MWL Water Level 0
29.6 RFJ Roots Fine Joint 12J
41.3 BVV Broken Void Visible 06 08
41.3 JOL Joint Offset Large
42.7 MSA Abandoned Survey Line segment complete.
Total Length Surveyed42.7 Ft
Scores Pipe Ratings Index Pipe Ratings Index
3.5
Peak Peak
Mean Pipe Mean Pipe
0.2
Pipe Rating Pipe Rating
Structural:
O&M:
2014/07/25Date Cleaned
P/O #
Media No 11182013
Date 2014/07/25
Setup 78 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 179.0 Height 6 Width ins
Joint length
Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft
Direction Down Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA8-1 A NPSfor Certificate # U-1008-7698
Time 16:58 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 42.7
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
182.6 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHA9-1] Water Level 0%
0.0 Ft
Material change [PVC] 31.4 Ft
General Photo 90.6 Ft
Manhole [HQ-MHA9] End of Survey 182.6 Ft
Direction 2014/07/25Date Cleaned
P/O #
Media No 11182013
Date 2014/07/25
Setup 74 Surveyor Heath Drainage
Street Mather Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 182.6 Ft Height 8 Width ins
Joint length
Up HQ-MHA9-1 Rim to invert Ft Down HQ-MHA9 Rim to invert Ft
Downstream Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHA9-1 A NPSfor Certificate # U-1008-7698
Time 13:40 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 182.60
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 31.4 Ft
Remarks PVC File Name 3627.jpg
Video Index Count 182.6 Ft Code End of Survey
Remarks File Name 3628.jpg
CCTV Picture List of Work Order Setup 74 Video 11182013
HQ-MHA9-1 A
Survey Date 2014/07/25 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA9-1
0.0 MWL Water Level 0
31.4 MMC Material change PVC
90.6 MGP General Photo
182.6 AMH Manhole HQ-MHA9
182.6 FH End of Survey
Total Length Surveyed182.6 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
2014/07/25Date Cleaned
P/O #
Media No 11182013
Date 2014/07/25
Setup 74 Surveyor Heath Drainage
Street Mather Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 182.6 Height 8 Width ins
Joint length
Up HQ-MHA9-1 Rim to invert Ft Down HQ-MHA9 Rim to invert Ft
Direction Down Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHA9-1 A NPSfor Certificate # U-1008-7698
Time 13:40 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 182.6
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
184.4 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHB3] Water Level 10%
0.0 Ft
Deposits Attached Grease 04 to 08 o'clock 005% OM: 2 [S01] 4.8 Ft
Deposits Attached Grease 04 to 08 o'clock 005% OM: 2 [F01] Abandoned Survey [Camera stopped on grease.] 27.5 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 89 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place
Total length 184.4 Ft Height 8 Width ins
Joint length
Up HQ-MHB3 Rim to invert Ft Down HQ-MHB2 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-MHB3 B NPSfor Certificate # U-1008-7698
Time 7:36 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 27.50
Northing Easting Elevation Coordinate System GPS Accuracy
Camera stopped on grease.
Video Index Count 4.8 Ft Code Deposits Attached Grease
Remarks File Name 3707.jpg
Video Index Count 27.5 Ft Code Abandoned Survey
Remarks File Name 3708.jpg
CCTV Picture List of Work Order Setup 89 Video 11182013
HQ-MHB3 B
Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHB3
0.0 MWL Water Level 10
4.8 S01 DAGS Deposits Attached Grease 04 085
27.5 F01 DAGS Deposits Attached Grease 04 085
27.5 MSA Abandoned Survey Camera stopped on grease.
Total Length Surveyed27.5 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.4
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/28
Setup 89 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat See SRM (or client will provide)Purpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place
Total length 184.4 Height 8 Width ins
Joint length
Up HQ-MHB3 Rim to invert Ft Down HQ-MHB2 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-MHB3 B NPSfor Certificate # U-1008-7698
Time 7:36 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 27.5
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
184.4 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-MHB3] Water Level 0%
0.0 Ft
Water Level Sag 015% ST: 2 [S01] 26.4 Ft
Water Level Sag 015% ST: 2 [F01] 66.0 Ft
Tap Break-in 4.000 03 o'clock 77.7 Ft
Tap Break-in 4.000 10 o'clock 87.3 Ft
Genera…
This is the start of the file's text. The full file is on GovTribe.