1182013-3_0002.pdf

PDF 4 MB Posted

Attached to
GLAC 307440 - Replace Headquarters Wastewater and Federal contract opportunity
Solicitation number
140P2023R0072
Issued by
Department of the Interior National Park Service National Office

About this file

This document contains multiple pipe inspection reports from closed circuit television (CCTV) surveys of wastewater pipelines located at Glacier National Park. The reports provide detailed findings from inspections of various vitrified clay, polyvinyl chloride, and ductile iron pipes ranging from 6 to 8 inches in diameter and up to 239.5 feet in length. Inspection details include start and end points, water levels, broken or offset joints, intruding roots, deposits, lining failures, taps and general condition observations. Locations include streets within West Glacier and manholes identified by unique reference codes. The surveys were conducted between July 2013 and July 2014 by R&R Visual Inc. for the National Park Service as part of pipeline maintenance, rehabilitation and planning efforts.

View the file

Other files for this federal contract opportunity

Other files attached to GLAC 307440 - Replace Headquarters Wastewater and, newest first.
File Type Posted
Questions-Answers-07-10-23_Set_0003.pdf PDF
Sol_140P2023R0072_Amd_0003.pdf PDF
Questions-Answers-07-3-23_Set_0002.pdf PDF
11182013-4_0002.pdf PDF
1182013-1_0002.pdf PDF
GLAC_SSWR_ALL_0002.pdf PDF
Sol_140P2023R0072_Amd_0002.pdf PDF
Defects_by_Inspection_0002.pdf PDF
11182013-5_0002.pdf PDF
Headquarters_CCTV_Inspections_0002.pdf PDF
1182013-2_0002.pdf PDF
Sign_in_Sheet_0002.jpg JPG image
PACP_Quick_Rating_0002.pdf PDF
HQ_2017-2023_0001.xlsx XLSX spreadsheet
Bid_Bond_-_SF24_0001.pdf PDF
Housing_Winter_Occupantion_0001.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD(1)_0001.docx DOCX document
B08_Solit_PSP_Vol_I_Exp_REQD_0001.docx DOCX document
Sol_140P2023R0072_Amd_0001.pdf PDF
QandA06-23-23_0001.pdf PDF
MT_NP_GLAC_P_HQ(1)-70_PlanInHand_0001.pdf PDF
GLAC_307440_Final_CD_SubmittalList.pdf PDF
GLAC_307440_Final_CD_Permit_List.pdf PDF
GLAC307440_Final_CD_ProjectManual_Division_1.pdf PDF
B08_Solit_Clauses_Construction-1.pdf PDF
GLAC307440_Final_CD_Drawings.pdf PDF
Sol_140P2023R0072.pdf PDF
GLAC307440_Final_CD_ProjectManual_Division_2-43.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0 Ft

23.2 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-CO18] Water Level 20% Broken Soil Visible 09 to 03 o'clock ST: 5 Tap Factory 4.000 12 o'clock

0.0 Ft

End of Pipe End of Survey 23.2 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 102 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 23.2 Ft Height 4 Width ins

Joint length

Up HQ-CO18 Rim to invert Ft Down HQ-MHA12-HQ-MHA1 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info Downstream MH ID is HQ-MHA12-HQ-MHA13

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO18 B NPSfor Certificate # U-1008-7698

Time 16:42 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 23.20

Northing Easting Elevation Coordinate System GPS Accuracy

Project Headquarters Work Order

R&R Visual Inc. Phone: 574-223-5426 Fax: 574-223-7953

Video Index Count 0.0 Ft Code Broken Soil Visible

Remarks File Name 3770.jpg

Video Index Count 0.0 Ft Code Tap Factory

Remarks File Name 3771.jpg

Video Index Count 23.2 Ft Code End of Pipe

Remarks File Name 3772.jpg

CCTV Picture List of Work Order Setup 102 Video 11182013

HQ-CO18 B

Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\

VideoCount CD Code Fr To RemarksImRefIn1 % JntIn2

0.0 ST Start of Survey

0.0 AMH Manhole HQ-CO18

0.0 MWL Water Level 20

0.0 BSV Broken Soil Visible 09 03

0.0 TF Tap Factory 4.000 12

23.2 AEP End of Pipe

23.2 FH End of Survey

Total Length Surveyed23.2 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.2

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 102 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 23.2 Height 4 Width ins

Joint length

Up HQ-CO18 Rim to invert Ft Down HQ-MHA12-HQ-MHA1 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info Downstream MH ID is HQ-MHA12-HQ-MHA13

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO18 B NPSfor Certificate # U-1008-7698

Time 16:42 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 23.2

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

16.4 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA14] Water Level 0%

0.0 Ft

Alignment Up 025% OM: 4 12.7 Ft

Cleanout House End of Survey 16.4 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 97 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 16.4 Ft Height 4 Width ins

Joint length

Up HQ-CO26 Rim to invert Ft Down HQ-MHA14 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO26 B NPSfor Certificate # U-1008-7698

Time 15:05 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 16.40

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 12.7 Ft Code Alignment Up

Remarks File Name 3747.jpg

Video Index Count 16.4 Ft Code End of Survey

Remarks File Name 3748.jpg

CCTV Picture List of Work Order Setup 97 Video 11182013

HQ-CO26 B

Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA14

0.0 MWL Water Level 0

12.7 LU Alignment Up 25

16.4 ACOH Cleanout House

16.4 FH End of Survey

Total Length Surveyed16.4 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.2

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 97 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 16.4 Height 4 Width ins

Joint length

Up HQ-CO26 Rim to invert Ft Down HQ-MHA14 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO26 B NPSfor Certificate # U-1008-7698

Time 15:05 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 16.4

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

42.9 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA14] Water Level 0%

0.0 Ft

Alignment Up 025% OM: 4 18.0 Ft

Alignment Down 025% OM: 4 21.6 Ft

Cleanout House End of Survey 42.9 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 98 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 42.9 Ft Height 4 Width ins

Joint length

Up HQ-CO27 Rim to invert Ft Down HQ-MHA14 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO27 B NPSfor Certificate # U-1008-7698

Time 15:11 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 42.90

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 18.0 Ft Code Alignment Up

Remarks File Name 3750.jpg

Video Index Count 21.6 Ft Code Alignment Down

Remarks File Name 3751.jpg

Video Index Count 42.9 Ft Code Cleanout House

Remarks File Name 3752.jpg

CCTV Picture List of Work Order Setup 98 Video 11182013

HQ-CO27 B

Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA14

0.0 MWL Water Level 0

18.0 LU Alignment Up 25

21.6 LD Alignment Down 25

42.9 ACOH Cleanout House

42.9 FH End of Survey

Total Length Surveyed42.9 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.2

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 98 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 42.9 Height 4 Width ins

Joint length

Up HQ-CO27 Rim to invert Ft Down HQ-MHA14 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO27 B NPSfor Certificate # U-1008-7698

Time 15:11 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 42.9

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

43.3 Ft

Pip e F low

Survey Dir

Start of Survey Cleanout Propertyline [HQ-CO29] Water Level 20%

0.0 Ft

Cleanout Propertyline End of Survey 43.3 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 96 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 43.3 Ft Height 4 Width ins

Joint length

Up HQ-CO28 Rim to invert Ft Down HQ-CO29 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO28 B NPSfor Certificate # U-1008-7698

Time 14:49 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 43.30

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 43.3 Ft Code End of Survey

Remarks File Name 3745.jpg

CCTV Picture List of Work Order Setup 96 Video 11182013

HQ-CO28 B

Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 ACOP Cleanout Propertyline HQ-CO29

0.0 MWL Water Level 20

43.3 ACOP Cleanout Propertyline

43.3 FH End of Survey

Total Length Surveyed43.3 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 96 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 43.3 Height 4 Width ins

Joint length

Up HQ-CO28 Rim to invert Ft Down HQ-CO29 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO28 B NPSfor Certificate # U-1008-7698

Time 14:49 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 43.3

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

34.4 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA15] Water Level 0%

0.0 Ft

Cleanout Propertyline End of Survey 34.4 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 95 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 34.4 Ft Height 4 Width ins

Joint length

Up HQ-CO29 Rim to invert Ft Down HQ-MHA15 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO29 B NPSfor Certificate # U-1008-7698

Time 14:42 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 34.40

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 34.4 Ft Code End of Survey

Remarks File Name 3743.jpg

CCTV Picture List of Work Order Setup 95 Video 11182013

HQ-CO29 B

Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA15

0.0 MWL Water Level 0

34.4 ACOP Cleanout Propertyline

34.4 FH End of Survey

Total Length Surveyed34.4 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 95 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 34.4 Height 4 Width ins

Joint length

Up HQ-CO29 Rim to invert Ft Down HQ-MHA15 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO29 B NPSfor Certificate # U-1008-7698

Time 14:42 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 34.4

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

87.6 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHC4] Water Level 0%

0.0 Ft

Alignment Right 025% OM: 4 2.9 Ft

Cleanout House End of Survey 87.6 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 103 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 87.6 Ft Height 4 Width ins

Joint length

Up HQ-CO41 Rim to invert Ft Down HQ-MHC4 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO41 B NPSfor Certificate # U-1008-7698

Time 7:34 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 87.60

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 2.9 Ft Code Alignment Right

Remarks File Name 3775.jpg

Video Index Count 87.6 Ft Code Cleanout House

Remarks File Name 3776.jpg

Video Index Count 87.6 Ft Code End of Survey

Remarks File Name 3777.jpg

CCTV Picture List of Work Order Setup 103 Video 11182013

HQ-CO41 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHC4

0.0 MWL Water Level 0

2.9 LR Alignment Right 25

87.6 ACOH Cleanout House

87.6 FH End of Survey

Total Length Surveyed87.6 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 103 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 87.6 Height 4 Width ins

Joint length

Up HQ-CO41 Rim to invert Ft Down HQ-MHC4 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO41 B NPSfor Certificate # U-1008-7698

Time 7:34 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 87.6

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

42.3 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHC5] Water Level 10%

0.0 Ft

Tap Factory 4.000 12 o'clock 41.6 Ft

Cleanout House End of Survey 42.3 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 100 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 42.3 Ft Height 4 Width ins

Joint length

Up HQ-CO73 Rim to invert Ft Down HQ-MHC5 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO73 B NPSfor Certificate # U-1008-7698

Time 15:51 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 42.30

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 41.6 Ft Code Tap Factory

Remarks File Name 3759.jpg

Video Index Count 42.3 Ft Code Cleanout House

Remarks File Name 3760.jpg

Video Index Count 42.3 Ft Code End of Survey

Remarks File Name 3761.jpg

CCTV Picture List of Work Order Setup 100 Video 11182013

HQ-CO73 B

Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHC5

0.0 MWL Water Level 10

41.6 TF Tap Factory 4.000 12

42.3 ACOH Cleanout House

42.3 FH End of Survey

Total Length Surveyed42.3 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 100 Surveyor Heath Drainage

Street Sperry Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 42.3 Height 4 Width ins

Joint length

Up HQ-CO73 Rim to invert Ft Down HQ-MHC5 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO73 B NPSfor Certificate # U-1008-7698

Time 15:51 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 42.3

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

155.1 Ft

Pipe Flow

Survey Dir

Start of Survey Cleanout House [HQ-CO80] Water Level 20%

0.0 Ft

Alignment Right 025% OM: 4 23.9 Ft

Alignment Right 025% OM: 4 45.6 Ft

Alignment Right 025% OM: 4 Abandoned Survey [Maximum push capability.] 155.1 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 104 Surveyor Heath Drainage

Street Mather Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length Ft Height 4 Width ins

Joint length

Up HQ-CO80 Rim to invert Ft Down HQ-MHC1-HQ-MHC4 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO80 B NPSfor Certificate # U-1008-7698

Time 7:59 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 155.10

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 23.9 Ft Code Alignment Right

Remarks File Name 3779.jpg

Video Index Count 45.6 Ft Code Alignment Right

Remarks File Name 3780.jpg

Video Index Count 155.1 Ft Code Alignment Right

Remarks File Name 3781.jpg

Video Index Count 155.1 Ft Code Abandoned Survey

Remarks Maximum push capability.

File Name 3782.jpg

CCTV Picture List of Work Order Setup 104 Video 11182013

HQ-CO80 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 ACOH Cleanout House HQ-CO80

0.0 MWL Water Level 20

23.9 LR Alignment Right 25

45.6 LR Alignment Right 25

155.1 LR Alignment Right 25

155.1 MSA Abandoned Survey Maximum push capability.

Total Length Surveyed155.1 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.1

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 104 Surveyor Heath Drainage

Street Mather Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length Height 4 Width ins

Joint length

Up HQ-CO80 Rim to invert Ft Down HQ-MHC1-HQ-MHC4 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO80 B NPSfor Certificate # U-1008-7698

Time 7:59 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 155.1

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

57.7 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA2] Water Level 0% Deposits Attached Grease 12 to 12 o'clock 005% OM: 2

0.0 Ft

Water Level Sag 015% ST: 2 51.1 Ft

Manhole [HQ-MHA1] End of Survey 57.7 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2013/11/23

Setup 66 Surveyor Heath Drainage

Street Community Bldg.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 57.7 Ft Height 8 Width ins

Joint length

Up HQ-MHA2 Rim to invert Ft Down HQ-MHA1 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA2 A NPSfor Certificate # U-1008-7698

Time 16:09 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 57.70

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 51.1 Ft Code Water Level Sag

Remarks File Name 1153.jpg

Video Index Count 57.7 Ft Code End of Survey

Remarks File Name 1154.jpg

CCTV Picture List of Work Order Setup 66 Video 11182013

HQ-MHA2 A

Survey Date 2013/11/23 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA2

0.0 MWL Water Level 0

0.0 DAGS Deposits Attached Grease 12 125

51.1 MWLS Water Level Sag 15

57.7 AMH Manhole HQ-MHA1

57.7 FH End of Survey

Total Length Surveyed57.7 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2013/11/23

Setup 66 Surveyor Heath Drainage

Street Community Bldg.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 57.7 Height 8 Width ins

Joint length

Up HQ-MHA2 Rim to invert Ft Down HQ-MHA1 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA2 A NPSfor Certificate # U-1008-7698

Time 16:09 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 57.7

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

96.3 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA4] Water Level 10%

0.0 Ft

Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 [S01] 2.2 Ft

Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 [F01] 18.9 Ft

Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 [S02] 31.6 Ft

Deposits Settled Gravel 05 to 07 o'clock 010% OM: 2 [F02] Abandoned Survey [Camera stopped on debris.] 54.7 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/26

Setup 82 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 96.3 Ft Height 8 Width ins

Joint length

Up HQ-MHA5 Rim to invert Ft Down HQ-MHA4 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA5 A NPSfor Certificate # U-1008-7698

Time 9:22 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 54.70

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 2.2 Ft Code Deposits Settled Gravel

Remarks File Name 3680.jpg

Video Index Count 31.6 Ft Code Deposits Settled Gravel

Remarks File Name 3681.jpg

Video Index Count 54.7 Ft Code Abandoned Survey

Remarks Camera stopped on debris.

File Name 3682.jpg

CCTV Picture List of Work Order Setup 82 Video 11182013

HQ-MHA5 A

Survey Date 2014/07/26 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA4

0.0 MWL Water Level 10

2.2 S01 DSGV Deposits Settled Gravel 05 0710

18.9 F01 DSGV Deposits Settled Gravel 05 0710

31.6 S02 DSGV Deposits Settled Gravel 05 0710

54.7 F02 DSGV Deposits Settled Gravel 05 0710

54.7 MSA Abandoned Survey Camera stopped on debris.

Total Length Surveyed54.7 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.3

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/26

Setup 82 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 96.3 Height 8 Width ins

Joint length

Up HQ-MHA5 Rim to invert Ft Down HQ-MHA4 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA5 A NPSfor Certificate # U-1008-7698

Time 9:22 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 54.7

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

96.3 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA5] Water Level 10%

0.0 Ft

Buckling Dimpling 12 o'clock 56.1 Ft

Water Level Sag 015% ST: 2 [S01] 82.0 Ft

Buckling Dimpling 01 to 02 o'clock 89.0 Ft

Water Level Sag 015% ST: 2 [F01] Manhole [HQ-MHA4] End of Survey

96.3 Ft

Direction 2014/07/26Date Cleaned

P/O #

Media No 11182013

Date 2014/07/26

Setup 84 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 96.3 Ft Height 8 Width ins

Joint length

Up HQ-MHA5 Rim to invert Ft Down HQ-MHA4 Rim to invert Ft

Downstream Preclean H

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA5 A NPSfor Certificate # U-1008-7698

Time 10:34 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 96.30

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 56.1 Ft Code Buckling Dimpling

Remarks File Name 3688.jpg

Video Index Count 82.0 Ft Code Water Level Sag

Remarks File Name 3689.jpg

Video Index Count 89.0 Ft Code Buckling Dimpling

Remarks File Name 3690.jpg

Video Index Count 96.3 Ft Code End of Survey

Remarks File Name 3691.jpg

CCTV Picture List of Work Order Setup 84 Video 11182013

HQ-MHA5 A

Survey Date 2014/07/26 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA5

0.0 MWL Water Level 10

56.1 KD Buckling Dimpling 12

82.0 S01 MWLS Water Level Sag 15

89.0 KD Buckling Dimpling 01 02

96.3 F01 MWLS Water Level Sag 15

96.3 AMH Manhole HQ-MHA4

96.3 FH End of Survey

Total Length Surveyed96.3 Ft

Scores Pipe Ratings Index Pipe Ratings Index

1.2

Peak Peak

Mean Pipe Mean Pipe

0.1

Pipe Rating Pipe Rating

Structural:

O&M:

2014/07/26Date Cleaned

P/O #

Media No 11182013

Date 2014/07/26

Setup 84 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 96.3 Height 8 Width ins

Joint length

Up HQ-MHA5 Rim to invert Ft Down HQ-MHA4 Rim to invert Ft

Direction Down Preclean H

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA5 A NPSfor Certificate # U-1008-7698

Time 10:34 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 96.3

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

150.8 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA5] Water Level 15%

0.0 Ft

Deposits Attached Grease 08 to 04 o'clock 005% OM: 2 [S01] 36.6 Ft

Buckling Dimpling 12 o'clock 108.6 Ft

Deposits Attached Grease 08 to 04 o'clock 005% OM: 2 [F01] Abandoned Survey [Camera stopped on grease.] 118.5 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/26

Setup 83 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 150.8 Ft Height 8 Width ins

Joint length

Up HQ-MHA6 Rim to invert Ft Down HQ-MHA5 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA6 A NPSfor Certificate # U-1008-7698

Time 10:19 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 118.50

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 36.6 Ft Code Deposits Attached Grease

Remarks File Name 3684.jpg

Video Index Count 108.6 Ft Code Buckling Dimpling

Remarks File Name 3685.jpg

Video Index Count 118.5 Ft Code Abandoned Survey

Remarks Camera stopped on grease.

File Name 3686.jpg

CCTV Picture List of Work Order Setup 83 Video 11182013

HQ-MHA6 A

Survey Date 2014/07/26 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA5

0.0 MWL Water Level 15

36.6 S01 DAGS Deposits Attached Grease 08 045

108.6 KD Buckling Dimpling 12

118.5 F01 DAGS Deposits Attached Grease 08 045

118.5 MSA Abandoned Survey Camera stopped on grease.

Total Length Surveyed118.5 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.3

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/26

Setup 83 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 150.8 Height 8 Width ins

Joint length

Up HQ-MHA6 Rim to invert Ft Down HQ-MHA5 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA6 A NPSfor Certificate # U-1008-7698

Time 10:19 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 118.5

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

150.8 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA6] Water Level 40%

0.0 Ft

Buckling Dimpling 12 o'clock 18.3 Ft

Buckling Dimpling 12 o'clock 38.4 Ft

General Photo 95.2 Ft

Manhole [HQ-MHA5] End of Survey 150.8 Ft

Direction 2014/07/26Date Cleaned

P/O #

Media No 11182013

Date 2014/07/26

Setup 85 Surveyor Heath Drainage

Street Community Center

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 150.8 Ft Height 8 Width ins

Joint length

Up HQ-MHA6 Rim to invert Ft Down HQ-MHA5 Rim to invert Ft

Downstream Preclean J

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA6 X NPSfor Certificate # U-1008-7698

Time 11:34 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 150.80

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 18.3 Ft Code Buckling Dimpling

Remarks File Name 3693.jpg

Video Index Count 38.4 Ft Code Buckling Dimpling

Remarks File Name 3694.jpg

Video Index Count 95.2 Ft Code General Photo

Remarks File Name 3695.jpg

Video Index Count 150.8 Ft Code End of Survey

Remarks File Name 3696.jpg

CCTV Picture List of Work Order Setup 85 Video 11182013

HQ-MHA6 X

Survey Date 2014/07/26 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA6

0.0 MWL Water Level 40

18.3 KD Buckling Dimpling 12

38.4 KD Buckling Dimpling 12

95.2 MGP General Photo

150.8 AMH Manhole HQ-MHA5

150.8 FH End of Survey

Total Length Surveyed150.8 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

2014/07/26Date Cleaned

P/O #

Media No 11182013

Date 2014/07/26

Setup 85 Surveyor Heath Drainage

Street Community Center

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 150.8 Height 8 Width ins

Joint length

Up HQ-MHA6 Rim to invert Ft Down HQ-MHA5 Rim to invert Ft

Direction Down Preclean J

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA6 X NPSfor Certificate # U-1008-7698

Time 11:34 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 150.8

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

179 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA8] Water Level 10%

0.0 Ft

Material change [VCP] Roots Fine Joint 12 to 12 o'clock OM: 1 3.1 Ft

Roots Medium Joint 07 to 05 o'clock 025% OM: 3 Abandoned Survey [Camera stopped on roots.] 3.9 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/25

Setup 75 Surveyor Heath Drainage

Street Ruhle Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 179.0 Ft Height 6 Width ins

Joint length

Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA8-1 A NPSfor Certificate # U-1008-7698

Time 14:27 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 03.90

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 3.1 Ft Code Material change

Remarks VCP File Name 3630.jpg

Video Index Count 3.1 Ft Code Roots Fine Joint

Remarks File Name 3631.jpg

Video Index Count 3.9 Ft Code Roots Medium Joint

Remarks File Name 3632.jpg

Video Index Count 3.9 Ft Code Abandoned Survey

Remarks Camera stopped on roots.

File Name 3633.jpg

CCTV Picture List of Work Order Setup 75 Video 11182013

HQ-MHA8-1 A

Survey Date 2014/07/25 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA8

0.0 MWL Water Level 10

3.1 MMC Material change VCP

3.1 RFJ Roots Fine Joint 12 12J

3.9 RMJ Roots Medium Joint 07 05J25

3.9 MSA Abandoned Survey Camera stopped on roots.

Total Length Surveyed3.9 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/25

Setup 75 Surveyor Heath Drainage

Street Ruhle Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 179.0 Height 6 Width ins

Joint length

Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA8-1 A NPSfor Certificate # U-1008-7698

Time 14:27 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 3.9

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA8] Water Level 0%

0.0 Ft

Material change [VCP] Fracture Circumferential 07 to 11 o'clock ST: 2 3.0 Ft

Roots Medium Joint 09 to 03 o'clock 015% OM: 3 4.4 Ft

Roots Fine Joint 09 to 10 o'clock OM: 1 10.1 Ft

Roots Medium Joint 02 to 06 o'clock 015% OM: 3 20.9 Ft

Roots Medium Joint 09 to 12 o'clock 045% OM: 3 24.2 Ft

Roots Medium Joint 08 to 04 o'clock 045% OM: 3 42.3 Ft

Tap Factory 4.000 02 o'clock 100.9 Ft

Joint Offset Large ST: 2 125.3 Ft

Abandoned Survey [Camera stopped on offset joint.] 126.7 Ft

Direction 2014/07/25Date Cleaned

P/O #

Media No 11182013

Date 2014/07/25

Setup 77 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 179.0 Ft Height 6 Width ins

Joint length

Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft

Upstream Preclean J

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA8-1 A NPSfor Certificate # U-1008-7698

Time 16:29 Survey Customer vGlacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 126.70

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 3.0 Ft

Remarks VCP File Name 3649.jpg

Video Index Count 3.0 Ft Code Fracture Circumferential

Remarks File Name 3650.jpg

Video Index Count 4.4 Ft Code Roots Medium Joint

Remarks File Name 3651.jpg

Video Index Count 10.1 Ft Code Roots Fine Joint

Remarks File Name 3652.jpg

Video Index Count 20.9 Ft Code Roots Medium Joint

Remarks File Name 3653.jpg

Video Index Count 24.2 Ft Code Roots Medium Joint

Remarks File Name 3654.jpg

Video Index Count 42.3 Ft Code Roots Medium Joint

Remarks File Name 3655.jpg

Video Index Count 100.9 Ft Code Tap Factory

Remarks File Name 3656.jpg

CCTV Picture List of Work Order Setup 77 Video 11182013

HQ-MHA8-1 A

Survey Date 2014/07/25 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

CCTV Picture List of Work Order Setup 77 Video 11182013

HQ-MHA8-1 A

Survey Date 2014/07/25 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\

Camera stopped on offset joint.

Video Index Count 125.3 Ft Code Joint Offset Large

Remarks File Name 3657.jpg

Video Index Count 126.7 Ft Code Abandoned Survey

Remarks File Name 3658.jpg

0.0 AMH Manhole HQ-MHA8

0.0 MWL Water Level 0

3.0 MMC Material change VCP

3.0 FC Fracture Circumferential 07 11

4.4 RMJ Roots Medium Joint 09 03J15

10.1 RFJ Roots Fine Joint 09 10J

20.9 RMJ Roots Medium Joint 02 06J15

24.2 RMJ Roots Medium Joint 09 12J45

42.3 RMJ Roots Medium Joint 08 04J45

100.9 TF Tap Factory 4.000 02

125.3 JOL Joint Offset Large

126.7 MSA Abandoned Survey Camera stopped on offset join...

Total Length Surveyed126.7 Ft

Scores Pipe Ratings Index Pipe Ratings Index

2.6

Peak Peak

Mean Pipe Mean Pipe

0.1

Pipe Rating Pipe Rating

Structural:

O&M:

2014/07/25Date Cleaned

P/O #

Media No 11182013

Date 2014/07/25

Setup 77 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 179.0 Height 6 Width ins

Joint length

Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft

Direction Up Preclean J

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA8-1 A NPSfor Certificate # U-1008-7698

Time 16:29 Survey Customer vGlacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 126.7

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA8-1] Water Level 0%

0.0 Ft

Roots Fine Joint 12 o'clock OM: 1 29.6 Ft

Broken Void Visible 06 to 08 o'clock ST: 5 Joint Offset Large ST: 2 41.3 Ft

Abandoned Survey [Line segment complete.] 42.7 Ft

Direction 2014/07/25Date Cleaned

P/O #

Media No 11182013

Date 2014/07/25

Setup 78 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 179.0 Ft Height 6 Width ins

Joint length

Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft

Downstream Preclean J

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA8-1 A NPSfor Certificate # U-1008-7698

Time 16:58 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 42.70

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 29.6 Ft Code Roots Fine Joint

Remarks File Name 3660.jpg

Video Index Count 41.3 Ft Code Broken Void Visible

Remarks File Name 3661.jpg

Video Index Count 41.3 Ft Code Joint Offset Large

Remarks File Name 3662.jpg

Video Index Count 42.7 Ft Code Abandoned Survey

Remarks Line segment complete.

File Name 3663.jpg

CCTV Picture List of Work Order Setup 78 Video 11182013

HQ-MHA8-1 A

Survey Date 2014/07/25 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA8-1

0.0 MWL Water Level 0

29.6 RFJ Roots Fine Joint 12J

41.3 BVV Broken Void Visible 06 08

41.3 JOL Joint Offset Large

42.7 MSA Abandoned Survey Line segment complete.

Total Length Surveyed42.7 Ft

Scores Pipe Ratings Index Pipe Ratings Index

3.5

Peak Peak

Mean Pipe Mean Pipe

0.2

Pipe Rating Pipe Rating

Structural:

O&M:

2014/07/25Date Cleaned

P/O #

Media No 11182013

Date 2014/07/25

Setup 78 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 179.0 Height 6 Width ins

Joint length

Up HQ-MHA8-1 Rim to invert Ft Down HQ-MHA8 Rim to invert Ft

Direction Down Preclean J

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA8-1 A NPSfor Certificate # U-1008-7698

Time 16:58 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 42.7

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

182.6 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHA9-1] Water Level 0%

0.0 Ft

Material change [PVC] 31.4 Ft

General Photo 90.6 Ft

Manhole [HQ-MHA9] End of Survey 182.6 Ft

Direction 2014/07/25Date Cleaned

P/O #

Media No 11182013

Date 2014/07/25

Setup 74 Surveyor Heath Drainage

Street Mather Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 182.6 Ft Height 8 Width ins

Joint length

Up HQ-MHA9-1 Rim to invert Ft Down HQ-MHA9 Rim to invert Ft

Downstream Preclean J

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHA9-1 A NPSfor Certificate # U-1008-7698

Time 13:40 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 182.60

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 31.4 Ft

Remarks PVC File Name 3627.jpg

Video Index Count 182.6 Ft Code End of Survey

Remarks File Name 3628.jpg

CCTV Picture List of Work Order Setup 74 Video 11182013

HQ-MHA9-1 A

Survey Date 2014/07/25 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA9-1

0.0 MWL Water Level 0

31.4 MMC Material change PVC

90.6 MGP General Photo

182.6 AMH Manhole HQ-MHA9

182.6 FH End of Survey

Total Length Surveyed182.6 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

2014/07/25Date Cleaned

P/O #

Media No 11182013

Date 2014/07/25

Setup 74 Surveyor Heath Drainage

Street Mather Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 182.6 Height 8 Width ins

Joint length

Up HQ-MHA9-1 Rim to invert Ft Down HQ-MHA9 Rim to invert Ft

Direction Down Preclean J

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHA9-1 A NPSfor Certificate # U-1008-7698

Time 13:40 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 182.6

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

184.4 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHB3] Water Level 10%

0.0 Ft

Deposits Attached Grease 04 to 08 o'clock 005% OM: 2 [S01] 4.8 Ft

Deposits Attached Grease 04 to 08 o'clock 005% OM: 2 [F01] Abandoned Survey [Camera stopped on grease.] 27.5 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 89 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place

Total length 184.4 Ft Height 8 Width ins

Joint length

Up HQ-MHB3 Rim to invert Ft Down HQ-MHB2 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-MHB3 B NPSfor Certificate # U-1008-7698

Time 7:36 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 27.50

Northing Easting Elevation Coordinate System GPS Accuracy

Camera stopped on grease.

Video Index Count 4.8 Ft Code Deposits Attached Grease

Remarks File Name 3707.jpg

Video Index Count 27.5 Ft Code Abandoned Survey

Remarks File Name 3708.jpg

CCTV Picture List of Work Order Setup 89 Video 11182013

HQ-MHB3 B

Survey Date 2014/07/28 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHB3

0.0 MWL Water Level 10

4.8 S01 DAGS Deposits Attached Grease 04 085

27.5 F01 DAGS Deposits Attached Grease 04 085

27.5 MSA Abandoned Survey Camera stopped on grease.

Total Length Surveyed27.5 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.4

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/28

Setup 89 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat See SRM (or client will provide)Purpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining Cured in Place

Total length 184.4 Height 8 Width ins

Joint length

Up HQ-MHB3 Rim to invert Ft Down HQ-MHB2 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-MHB3 B NPSfor Certificate # U-1008-7698

Time 7:36 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 27.5

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

184.4 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-MHB3] Water Level 0%

0.0 Ft

Water Level Sag 015% ST: 2 [S01] 26.4 Ft

Water Level Sag 015% ST: 2 [F01] 66.0 Ft

Tap Break-in 4.000 03 o'clock 77.7 Ft

Tap Break-in 4.000 10 o'clock 87.3 Ft

Genera…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .