About this file

This document contains CCTV inspection records for wastewater pipes in Glacier National Park. The inspections were conducted on various dates in July 2014 and document pipe locations, materials, dimensions, conditions observed and video still images. Pipes surveyed include HQ-CO2, HQ-CO11, HQ-CO14, HQ-CO21, HQ-CO22, HQ-CO35, HQ-CO49, HQ-CO213, HQ-TP8, HQ-TP24, HQ-TP25, HQ-TP66, HQ-TP87, HQ-TP168, HQ-TP995 and HQ-TPE1. Observed conditions noted include deposits, roots, fractures, offsets, water levels and collapsed sections. Video records and still images were captured to document findings. Pipe material included PVC, DIP, VCP and other vitrified clay. Dimensions ranged from 14.4 to 162 feet in length with heights from 4 to 6 inches. The related federal contract opportunity is for replacement of wastewater and backup power systems at Glacier National Park headquarters.

View the file

Other files for this federal contract opportunity

Other files attached to GLAC 307440 - Replace Headquarters Wastewater and, newest first.
File Type Posted
Questions-Answers-07-10-23_Set_0003.pdf PDF
Sol_140P2023R0072_Amd_0003.pdf PDF
Questions-Answers-07-3-23_Set_0002.pdf PDF
1182013-1_0002.pdf PDF
GLAC_SSWR_ALL_0002.pdf PDF
Sol_140P2023R0072_Amd_0002.pdf PDF
Defects_by_Inspection_0002.pdf PDF
11182013-5_0002.pdf PDF
1182013-3_0002.pdf PDF
Headquarters_CCTV_Inspections_0002.pdf PDF
1182013-2_0002.pdf PDF
Sign_in_Sheet_0002.jpg JPG image
PACP_Quick_Rating_0002.pdf PDF
HQ_2017-2023_0001.xlsx XLSX spreadsheet
Bid_Bond_-_SF24_0001.pdf PDF
Housing_Winter_Occupantion_0001.pdf PDF
B08_Solit_PSP_Vol_I_PastPerf_REQD(1)_0001.docx DOCX document
B08_Solit_PSP_Vol_I_Exp_REQD_0001.docx DOCX document
Sol_140P2023R0072_Amd_0001.pdf PDF
QandA06-23-23_0001.pdf PDF
MT_NP_GLAC_P_HQ(1)-70_PlanInHand_0001.pdf PDF
GLAC_307440_Final_CD_SubmittalList.pdf PDF
GLAC_307440_Final_CD_Permit_List.pdf PDF
GLAC307440_Final_CD_ProjectManual_Division_1.pdf PDF
B08_Solit_Clauses_Construction-1.pdf PDF
GLAC307440_Final_CD_Drawings.pdf PDF
Sol_140P2023R0072.pdf PDF
GLAC307440_Final_CD_ProjectManual_Division_2-43.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0 Ft

35.4 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-CO2] Water Level 0%

0.0 Ft

Deposits Settled Fine 03 to 09 o'clock 050% OM: 5 2.6 Ft

Camera Underwater 5.2 Ft

Alignment Left 025% OM: 4 24.6 Ft

End of Pipe End of Survey 35.4 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 114 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 35.4 Ft Height 4 Width ins

Joint length

Up HQ-CO2 Rim to invert Ft Down HQ-MHA10-HQ-MHA1 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info Finish MH ID is HQ-MHA10-HQ-MHA10-1

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO2 B NPSfor Certificate # U-1008-7698

Time 13:21 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 35.40

Northing Easting Elevation Coordinate System GPS Accuracy

Project Headquarters Work Order

R&R Visual Inc. Phone: 574-223-5426 Fax: 574-223-7953

Video Index Count 2.6 Ft Code Deposits Settled Fine

Remarks File Name 3828.jpg

Video Index Count 5.2 Ft Code Camera Underwater

Remarks File Name 3829.jpg

Video Index Count 24.6 Ft Code Alignment Left

Remarks File Name 3830.jpg

Video Index Count 35.4 Ft Code End of Pipe

Remarks File Name 3831.jpg

Video Index Count 35.4 Ft Code End of Survey

Remarks File Name 3832.jpg

CCTV Picture List of Work Order Setup 114 Video 11182013

HQ-CO2 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\

VideoCount CD Code Fr To RemarksImRefIn1 % JntIn2

0.0 ST Start of Survey

0.0 AMH Manhole HQ-CO2

0.0 MWL Water Level 0

2.6 DSF Deposits Settled Fine 03 0950

5.2 MCU Camera Underwater

24.6 LL Alignment Left 25

35.4 AEP End of Pipe

35.4 FH End of Survey

Total Length Surveyed35.4 Ft

Scores Pipe Ratings Index Pipe Ratings Index

3.3

Peak Peak

Mean Pipe Mean Pipe

0.4

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 114 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 35.4 Height 4 Width ins

Joint length

Up HQ-CO2 Rim to invert Ft Down HQ-MHA10-HQ-MHA1 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info Finish MH ID is HQ-MHA10-HQ-MHA10-1

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO2 B NPSfor Certificate # U-1008-7698

Time 13:21 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 35.4

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

76.1 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-CO11] Water Level 0%

0.0 Ft

Alignment Right 025% OM: 4 15.4 Ft

Manhole [HQ-MHG3] End of Survey 76.1 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 111 Surveyor Heath Drainage

Street Ruhle Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 76.1 Ft Height 4 Width ins

Joint length

Up HQ-CO11 Rim to invert Ft Down HQ-MHG3 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO11 B NPSfor Certificate # U-1008-7698

Time 11:01 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 76.10

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 15.4 Ft Code Alignment Right

Remarks File Name 3810.jpg

Video Index Count 76.1 Ft Code End of Survey

Remarks File Name 3811.jpg

CCTV Picture List of Work Order Setup 111 Video 11182013

HQ-CO11 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-CO11

0.0 MWL Water Level 0

15.4 LR Alignment Right 25

76.1 AMH Manhole HQ-MHG3

76.1 FH End of Survey

Total Length Surveyed76.1 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.1

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 111 Surveyor Heath Drainage

Street Ruhle Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 76.1 Height 4 Width ins

Joint length

Up HQ-CO11 Rim to invert Ft Down HQ-MHG3 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO11 B NPSfor Certificate # U-1008-7698

Time 11:01 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 76.1

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

56.4 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHG4] Water Level 0%

0.0 Ft

Material change [DIP] 2.9 Ft

Alignment Left 025% OM: 4 51.1 Ft

Cleanout House End of Survey 56.4 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 110 Surveyor Heath Drainage

Street Fire Management Office

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 56.4 Ft Height 4 Width ins

Joint length

Up HQ-CO14 Rim to invert Ft Down HQ-MHG4 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO14 B NPSfor Certificate # U-1008-7698

Time 10:47 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 56.40

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 2.9 Ft Code Material change

Remarks DIP File Name 3806.jpg

Video Index Count 51.1 Ft Code Alignment Left

Remarks File Name 3807.jpg

Video Index Count 56.4 Ft Code Cleanout House

Remarks File Name 3808.jpg

CCTV Picture List of Work Order Setup 110 Video 11182013

HQ-CO14 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHG4

0.0 MWL Water Level 0

2.9 MMC Material change DIP

51.1 LL Alignment Left 25

56.4 ACOH Cleanout House

56.4 FH End of Survey

Total Length Surveyed56.4 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.1

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 110 Surveyor Heath Drainage

Street Fire Management Office

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 56.4 Height 4 Width ins

Joint length

Up HQ-CO14 Rim to invert Ft Down HQ-MHG4 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO14 B NPSfor Certificate # U-1008-7698

Time 10:47 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 56.4

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

126.9 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA11-1] Water Level 0%

0.0 Ft

Alignment Right 025% OM: 4 122.0 Ft

Cleanout House End of Survey 126.9 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 118 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 126.9 Ft Height 4 Width ins

Joint length

Up HQ-CO21 Rim to invert Ft Down HQ-MHA11-1 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO21 B NPSfor Certificate # U-1008-7698

Time 14:56 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 126.90

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 122.0 Ft

Remarks File Name 3848.jpg

Video Index Count 126.9 Ft Code Cleanout House

Remarks File Name 3849.jpg

CCTV Picture List of Work Order Setup 118 Video 11182013

HQ-CO21 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA11-1

0.0 MWL Water Level 0

122.0 LR Alignment Right 25

126.9 ACOH Cleanout House

126.9 FH End of Survey

Total Length Surveyed126.9 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 118 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 126.9 Height 4 Width ins

Joint length

Up HQ-CO21 Rim to invert Ft Down HQ-MHA11-1 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO21 B NPSfor Certificate # U-1008-7698

Time 14:56 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 126.9

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

96.1 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA11-1] Water Level 0%

0.0 Ft

Alignment Left 025% OM: 4 16.0 Ft

General Photo 76.4 Ft

Tap Factory 4.000 12 o'clock 94.8 Ft

Cleanout House End of Survey 96.1 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 117 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 96.1 Ft Height 4 Width ins

Joint length

Up HQ-CO22 Rim to invert Ft Down HQ-MHA11-1 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO22 B NPSfor Certificate # U-1008-7698

Time 14:21 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 96.10

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 16.0 Ft Code Alignment Left

Remarks File Name 3842.jpg

Video Index Count 76.4 Ft Code General Photo

Remarks File Name 3843.jpg

Video Index Count 94.8 Ft Code Tap Factory

Remarks File Name 3844.jpg

Video Index Count 96.1 Ft Code Cleanout House

Remarks File Name 3845.jpg

Video Index Count 96.1 Ft Code End of Survey

Remarks File Name 3846.jpg

CCTV Picture List of Work Order Setup 117 Video 11182013

HQ-CO22 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA11-1

0.0 MWL Water Level 0

16.0 LL Alignment Left 25

76.4 MGP General Photo

94.8 TF Tap Factory 4.000 12

96.1 ACOH Cleanout House

96.1 FH End of Survey

Total Length Surveyed96.1 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 117 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 96.1 Height 4 Width ins

Joint length

Up HQ-CO22 Rim to invert Ft Down HQ-MHA11-1 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO22 B NPSfor Certificate # U-1008-7698

Time 14:21 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 96.1

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

32.4 Ft

Pipe Flow

Survey Dir

Start of Survey Cleanout House [HQ-CO35] Water Level 0%

0.0 Ft

Camera Underwater 23.6 Ft

Joint Offset Large ST: 2 Abandoned Survey [Camera stopped on offset joint.] 32.4 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 113 Surveyor Heath Drainage

Street Ruhle Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length Ft Height 4 Width ins

Joint length

Up HQ-CO35 Rim to invert Ft Down HQ-CO36-HQ-MHG1 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO35 B NPSfor Certificate # U-1008-7698

Time 11:52 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 32.40

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 23.6 Ft Code Camera Underwater

Remarks File Name 3824.jpg

Video Index Count 32.4 Ft Code Joint Offset Large

Remarks File Name 3825.jpg

Video Index Count 32.4 Ft Code Abandoned Survey

Remarks Camera stopped on offset joint.

File Name 3826.jpg

CCTV Picture List of Work Order Setup 113 Video 11182013

HQ-CO35 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 ACOH Cleanout House HQ-CO35

0.0 MWL Water Level 0

23.6 MCU Camera Underwater

32.4 JOL Joint Offset Large

32.4 MSA Abandoned Survey Camera stopped on offset join...

Total Length Surveyed32.4 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.1 0.1

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 113 Surveyor Heath Drainage

Street Ruhle Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length Height 4 Width ins

Joint length

Up HQ-CO35 Rim to invert Ft Down HQ-CO36-HQ-MHG1 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO35 B NPSfor Certificate # U-1008-7698

Time 11:52 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 32.4

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

84.6 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHB3-3] Water Level 0%

0.0 Ft

Material change [PVC] 29.8 Ft

Deposits Settled Other 04 to 08 o'clock 025% OM: 4 [Debris] 60.3 Ft

Material change [DIP] 80.7 Ft

Alignment Left 025% OM: 4 82.3 Ft

Cleanout House End of Survey 84.6 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 122 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 84.6 Ft Height 4 Width ins

Joint length

Up HQ-CO49 Rim to invert Ft Down HQ-MHB3-3 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-CO49 X NPSfor Certificate # U-1008-7698

Time 16:48 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 84.60

Northing Easting Elevation Coordinate System GPS Accuracy

Debris

Video Index Count 29.8 Ft Code Material change

Remarks PVC File Name 3863.jpg

Video Index Count 60.3 Ft Code Deposits Settled Other

Remarks File Name 3864.jpg

Video Index Count 80.7 Ft Code Material change

Remarks DIP File Name 3865.jpg

Video Index Count 84.6 Ft Code Cleanout House

Remarks File Name 3866.jpg

Video Index Count 84.6 Ft Code End of Survey

Remarks File Name 3867.jpg

CCTV Picture List of Work Order Setup 122 Video 11182013

HQ-CO49 X

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHB3-3

0.0 MWL Water Level 0

29.8 MMC Material change PVC

60.3 DSZ Deposits Settled Other 04 08 Debris25

80.7 MMC Material change DIP

82.3 LL Alignment Left 25

84.6 ACOH Cleanout House

84.6 FH End of Survey

Total Length Surveyed84.6 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.1

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 122 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 84.6 Height 4 Width ins

Joint length

Up HQ-CO49 Rim to invert Ft Down HQ-MHB3-3 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-CO49 X NPSfor Certificate # U-1008-7698

Time 16:48 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 84.6

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

162 Ft

Pipe Flow

Survey Dir

Start of Survey Manhole [HQ-C0213] Water Level 0%

0.0 Ft

Material change [DIP] 22.3 Ft

Roots Medium Joint 08 to 04 o'clock 025% OM: 3 22.6 Ft

Material change [VCP] 22.9 Ft

Roots Ball Joint 08 to 04 o'clock 080% OM: 4 41.3 Ft

Water Level Sag 025% ST: 2 [S01] Camera Underwater 48.8 Ft

Water Level Sag 025% ST: 2 [F01] Abandoned Survey [Maximum push capability.] 162.0 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 112 Surveyor Heath Drainage

Street Ruhle Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length Ft Height 4 Width ins

Joint length

Up HQ-CO213 Rim to invert Ft Down HQ-CO36-HQ-MHG1 Rim to invert Ft

Downstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-C0213 B NPSfor Certificate # U-1008-7698

Time 11:34 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 162.00

Northing Easting Elevation Coordinate System GPS Accuracy

DIP

Video Index Count 22.3 Ft Code Material change

Remarks DIP File Name 3816.jpg

Video Index Count 22.3 Ft Code Material change

Remarks File Name 3817.jpg

Video Index Count 22.6 Ft Code Roots Medium Joint

Remarks File Name 3815.jpg

Video Index Count 22.9 Ft Code Material change

Remarks VCP File Name 3818.jpg

Video Index Count 41.3 Ft Code Roots Ball Joint

Remarks File Name 3819.jpg

Video Index Count 48.8 Ft Code Water Level Sag

Remarks File Name 3820.jpg

Video Index Count 48.8 Ft Code Camera Underwater

Remarks File Name 3821.jpg

Video Index Count 162.0 Ft Code Abandoned Survey

Remarks Maximum push capability.

File Name 3822.jpg

CCTV Picture List of Work Order Setup 112 Video 11182013

HQ-C0213 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-C0213

0.0 MWL Water Level 0

22.3 MMC Material change DIP

22.6 RMJ Roots Medium Joint 08 04J25

22.9 MMC Material change VCP

41.3 RBJ Roots Ball Joint 08 04J80

48.8 S01 MWLS Water Level Sag 25

48.8 MCU Camera Underwater

162.0 F01 MWLS Water Level Sag 25

162.0 MSA Abandoned Survey Maximum push capability.

Total Length Surveyed162.0 Ft

Scores Pipe Ratings Index Pipe Ratings Index

3.7

Peak Peak

Mean Pipe Mean Pipe

0.3 0.1

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 112 Surveyor Heath Drainage

Street Ruhle Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length Height 4 Width ins

Joint length

Up HQ-CO213 Rim to invert Ft Down HQ-CO36-HQ-MHG1 Rim to invert Ft

Direction Down Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-C0213 B NPSfor Certificate # U-1008-7698

Time 11:34 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 162.0

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

14.4 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA9-2] Water Level 0%

0.0 Ft

Water Level Sag 015% ST: 2 [S01] 6.8 Ft

Material change [DIP] 13.7 Ft

Water Level Sag 015% ST: 2 [F01] Cleanout House End of Survey

14.4 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 108 Surveyor Heath Drainage

Street Mather Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 14.4 Ft Height 4 Width ins

Joint length

Up HQ-TP8 Rim to invert Ft Down HQ-MHA9-2 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP8 B NPSfor Certificate # U-1008-7698

Time 9:50 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 14.40

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 6.8 Ft Code Water Level Sag

Remarks File Name 3799.jpg

Video Index Count 13.7 Ft Code Material change

Remarks File Name 3800.jpg

Video Index Count 14.4 Ft Code Cleanout House

Remarks File Name 3801.jpg

CCTV Picture List of Work Order Setup 108 Video 11182013

HQ-TP8 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA9-2

0.0 MWL Water Level 0

6.8 S01 MWLS Water Level Sag 15

13.7 MMC Material change DIP

14.4 F01 MWLS Water Level Sag 15

14.4 ACOH Cleanout House

14.4 FH End of Survey

Total Length Surveyed14.4 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.3

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 108 Surveyor Heath Drainage

Street Mather Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 14.4 Height 4 Width ins

Joint length

Up HQ-TP8 Rim to invert Ft Down HQ-MHA9-2 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP8 B NPSfor Certificate # U-1008-7698

Time 9:50 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 14.4

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

18 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA11-3] Water Level 40%

0.0 Ft

Deposits Settled Fine 03 to 09 o'clock 040% OM: 5 0.6 Ft

End of Pipe End of Survey 18.0 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 116 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 18.0 Ft Height 4 Width ins

Joint length

Up HQ-TP24 Rim to invert Ft Down HQ-MHA11-3 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP24 B NPSfor Certificate # U-1008-7698

Time 14:04 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 18.00

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 0.6 Ft Code Deposits Settled Fine

Remarks File Name 3839.jpg

Video Index Count 18.0 Ft Code End of Pipe

Remarks File Name 3840.jpg

CCTV Picture List of Work Order Setup 116 Video 11182013

HQ-TP24 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA11-3

0.0 MWL Water Level 40

0.6 DSF Deposits Settled Fine 03 0940

18.0 AEP End of Pipe

18.0 FH End of Survey

Total Length Surveyed18.0 Ft

Scores Pipe Ratings Index Pipe Ratings Index

2.5

Peak Peak

Mean Pipe Mean Pipe

0.3

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 116 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 18.0 Height 4 Width ins

Joint length

Up HQ-TP24 Rim to invert Ft Down HQ-MHA11-3 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP24 B NPSfor Certificate # U-1008-7698

Time 14:04 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 18.0

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

126.3 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA11-3] Water Level 0%

0.0 Ft

General Photo 72.5 Ft

Tap Factory 4.000 12 o'clock 124.6 Ft

Cleanout House End of Survey 126.3 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 115 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 126.3 Ft Height 4 Width ins

Joint length

Up HQ-TP25 Rim to invert Ft Down HQ-MHA11-3 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP25 B NPSfor Certificate # U-1008-7698

Time 13:45 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 126.30

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 72.5 Ft Code General Photo

Remarks File Name 3834.jpg

Video Index Count 124.6 Ft Code Tap Factory

Remarks File Name 3835.jpg

Video Index Count 126.3 Ft Code Cleanout House

Remarks File Name 3836.jpg

Video Index Count 126.3 Ft Code End of Survey

Remarks File Name 3837.jpg

CCTV Picture List of Work Order Setup 115 Video 11182013

HQ-TP25 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA11-3

0.0 MWL Water Level 0

72.5 MGP General Photo

124.6 TF Tap Factory 4.000 12

126.3 ACOH Cleanout House

126.3 FH End of Survey

Total Length Surveyed126.3 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 115 Surveyor Heath Drainage

Street Albright Cir.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Polyvinyl Chloride Lining

Total length 126.3 Height 4 Width ins

Joint length

Up HQ-TP25 Rim to invert Ft Down HQ-MHA11-3 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP25 B NPSfor Certificate # U-1008-7698

Time 13:45 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 126.3

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

57 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHA8-1] Water Level 20%

0.0 Ft

Shape or Size Change 4.000 Material change [DIP] 0.6 Ft

Surface Corrosion Metal Pipe 12 to 12 o'clock ST: 3 [S01] 6.5 Ft

Alignment Right 025% OM: 4 50.5 Ft

Surface Corrosion Metal Pipe 12 to 12 o'clock ST: 3 [F01] Cleanout House End of Survey

57.0 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 107 Surveyor Heath Drainage

Street Mather Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 57.0 Ft Height 6 Width ins

Joint length

Up HQ-TP66 Rim to invert Ft Down HQ-MHA8-1 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP66 B NPSfor Certificate # U-1008-7698

Time 9:13 Survey Customer vGlacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 57.00

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 0.6 Ft Code Shape or Size Change

Remarks File Name 3792.jpg

Video Index Count 0.6 Ft Code Material change

Remarks File Name 3793.jpg

Video Index Count 6.5 Ft Code Surface Corrosion Metal Pipe

Remarks File Name 3794.jpg

Video Index Count 50.5 Ft Code Alignment Right

Remarks File Name 3795.jpg

Video Index Count 57.0 Ft Code Cleanout House

Remarks File Name 3796.jpg

Video Index Count 57.0 Ft Code End of Survey

Remarks File Name 3797.jpg

CCTV Picture List of Work Order Setup 107 Video 11182013

HQ-TP66 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHA8-1

0.0 MWL Water Level 20

0.6 MSC Shape or Size Change 4.000

0.6 MMC Material change DIP

6.5 S01 SCP Surface Corrosion Metal Pipe 12 12

50.5 LR Alignment Right 25

57.0 F01 SCP Surface Corrosion Metal Pipe 12 12

57.0 ACOH Cleanout House

57.0 FH End of Survey

Total Length Surveyed57.0 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.5 0.1

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 107 Surveyor Heath Drainage

Street Mather Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 57.0 Height 6 Width ins

Joint length

Up HQ-TP66 Rim to invert Ft Down HQ-MHA8-1 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP66 B NPSfor Certificate # U-1008-7698

Time 9:13 Survey Customer vGlacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 57.0

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

61.6 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHB4] Water Level 0%

0.0 Ft

General Photo 54.7 Ft

Cleanout House End of Survey 61.6 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 119 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 61.6 Ft Height 6 Width ins

Joint length

Up HQ-TP87 Rim to invert Ft Down HQ-MHB4 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP87 E NPSfor Certificate # U-1008-7698

Time 15:55 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 61.60

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 54.7 Ft Code General Photo

Remarks File Name 3851.jpg

Video Index Count 61.6 Ft Code Cleanout House

Remarks File Name 3852.jpg

CCTV Picture List of Work Order Setup 119 Video 11182013

HQ-TP87 E

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHB4

0.0 MWL Water Level 0

54.7 MGP General Photo

61.6 ACOH Cleanout House

61.6 FH End of Survey

Total Length Surveyed61.6 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 119 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 61.6 Height 6 Width ins

Joint length

Up HQ-TP87 Rim to invert Ft Down HQ-MHB4 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP87 E NPSfor Certificate # U-1008-7698

Time 15:55 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 61.6

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

66.2 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHB4] Water Level 0%

0.0 Ft

Alignment Right 050% OM: 4 0.3 Ft

Roots Fine Barrel 05 to 07 o'clock OM: 2 48.5 Ft

Roots Ball Joint 05 to 01 o'clock 070% OM: 4 54.4 Ft

Abandoned Survey [Camera stopped on root ball.] 55.7 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 120 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 66.2 Ft Height 4 Width ins

Joint length

Up HQ-TP168 Rim to invert Ft Down HQ-MHB4 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP168 E NPSfor Certificate # U-1008-7698

Time 16:07 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 55.70

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 0.3 Ft

Remarks File Name 3854.jpg

Video Index Count 48.5 Ft Code Roots Fine Barrel

Remarks File Name 3855.jpg

Video Index Count 54.4 Ft Code Roots Ball Joint

Remarks File Name 3856.jpg

Video Index Count 55.7 Ft Code Abandoned Survey

Remarks Camera stopped on root ball.

File Name 3857.jpg

CCTV Picture List of Work Order Setup 120 Video 11182013

HQ-TP168 E

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHB4

0.0 MWL Water Level 0

0.3 LR Alignment Right 50

48.5 RFB Roots Fine Barrel 05 07

54.4 RBJ Roots Ball Joint 05 01J70

55.7 MSA Abandoned Survey Camera stopped on root ball.

Total Length Surveyed55.7 Ft

Scores Pipe Ratings Index Pipe Ratings Index

3.3

Peak Peak

Mean Pipe Mean Pipe

0.2

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 120 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 66.2 Height 4 Width ins

Joint length

Up HQ-TP168 Rim to invert Ft Down HQ-MHB4 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP168 E NPSfor Certificate # U-1008-7698

Time 16:07 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 55.7

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

66.2 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHB4] Water Level 10%

0.0 Ft

Alignment Right 050% OM: 4 1.3 Ft

Fracture Circumferential 01 to 07 o'clock ST: 2 55.1 Ft

Cleanout House End of Survey 66.2 Ft

Direction 2014/07/30Date Cleaned

P/O #

Media No 11182013

Date 2014/07/30

Setup 123 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Light Highway

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 66.2 Ft Height 4 Width ins

Joint length

Up HQ-TP168 Rim to invert Ft Down HQ-MHB4 Rim to invert Ft

Upstream Preclean J

Year rehabilitated

Additional info Pipe material in video incorrect.

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP168 X NPSfor Certificate # U-1008-7698

Time 8:29 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 66.20

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 1.3 Ft

Remarks File Name 3869.jpg

Video Index Count 55.1 Ft Code Fracture Circumferential

Remarks File Name 3870.jpg

Video Index Count 66.2 Ft Code Cleanout House

Remarks File Name 3871.jpg

CCTV Picture List of Work Order Setup 123 Video 11182013

HQ-TP168 X

Survey Date 2014/07/30 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHB4

0.0 MWL Water Level 10

1.3 LR Alignment Right 50

55.1 FC Fracture Circumferential 01 07

66.2 ACOH Cleanout House

66.2 FH End of Survey

Total Length Surveyed66.2 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

0.1

Pipe Rating Pipe Rating

Structural:

O&M:

2014/07/30Date Cleaned

P/O #

Media No 11182013

Date 2014/07/30

Setup 123 Surveyor Heath Drainage

Street Logan Ln

Weather Dry

City West Glacier

Flow control Not Controlled

Location Light Highway

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 66.2 Height 4 Width ins

Joint length

Up HQ-TP168 Rim to invert Ft Down HQ-MHB4 Rim to invert Ft

Direction Up Preclean J

Year rehabilitated

Additional info Pipe material in video incorrect.

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP168 X NPSfor Certificate # U-1008-7698

Time 8:29 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 66.2

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

89.5 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHE2] Water Level 5%

0.0 Ft

Roots Ball Barrel 12 to 12 o'clock 080% OM: 5 Abandoned Survey [Camera stopped on root ball.] 2.1 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 106 Surveyor Heath Drainage

Street Mather Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 89.5 Ft Height 6 Width ins

Joint length

Up HQ-TP995 Rim to invert Ft Down HQ-MHE2 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP995 B NPSfor Certificate # U-1008-7698

Time 8:47 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 02.10

Northing Easting Elevation Coordinate System GPS Accuracy

Camera stopped on root ball.

Video Index Count 2.1 Ft Code Roots Ball Barrel

Remarks File Name 3789.jpg

Video Index Count 2.1 Ft Code Abandoned Survey

Remarks File Name 3790.jpg

CCTV Picture List of Work Order Setup 106 Video 11182013

HQ-TP995 B

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHE2

0.0 MWL Water Level 5

2.1 RBB Roots Ball Barrel 12 1280

2.1 MSA Abandoned Survey Camera stopped on root ball.

Total Length Surveyed2.1 Ft

Scores Pipe Ratings Index Pipe Ratings Index

Peak Peak

Mean Pipe Mean Pipe

2.4

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 106 Surveyor Heath Drainage

Street Mather Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 89.5 Height 6 Width ins

Joint length

Up HQ-TP995 Rim to invert Ft Down HQ-MHE2 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP995 B NPSfor Certificate # U-1008-7698

Time 8:47 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 2.1

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

89.5 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHE2] Water Level 5%

0.0 Ft

Roots Medium Joint 08 to 04 o'clock 030% OM: 3 Material change [DIP] Shape or Size Change 4.000

1.3 Ft

General Photo 41.3 Ft

Alignment Left 050% OM: 4 74.4 Ft

Alignment Left 025% OM: 4 84.9 Ft

End of Pipe End of Survey 89.5 Ft

Direction 2014/07/30Date Cleaned

P/O #

Media No 11182013

Date 2014/07/30

Setup 124 Surveyor Heath Drainage

Street Mather Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Light Highway

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 89.5 Ft Height 6 Width ins

Joint length

Up HQ-TP995 Rim to invert Ft Down HQ-MHE2 Rim to invert Ft

Upstream Preclean J

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TP995 X NPSfor Certificate # U-1008-7698

Time 8:41 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 89.50

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 1.3 Ft Code Roots Medium Joint

Remarks File Name 3873.jpg

Video Index Count 1.3 Ft Code Material change

Remarks File Name 3874.jpg

Video Index Count 1.3 Ft Code Shape or Size Change

Remarks File Name 3875.jpg

Video Index Count 41.3 Ft Code General Photo

Remarks File Name 3876.jpg

Video Index Count 74.4 Ft Code Alignment Left

Remarks File Name 3877.jpg

Video Index Count 84.9 Ft Code Alignment Left

Remarks File Name 3878.jpg

Video Index Count 89.5 Ft Code End of Pipe

Remarks File Name 3879.jpg

CCTV Picture List of Work Order Setup 124 Video 11182013

HQ-TP995 X

Survey Date 2014/07/30 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHE2

0.0 MWL Water Level 5

1.3 RMJ Roots Medium Joint 08 04J30

1.3 MMC Material change DIP

1.3 MSC Shape or Size Change 4.000

41.3 MGP General Photo

74.4 LL Alignment Left 50

84.9 LL Alignment Left 25

89.5 AEP End of Pipe

89.5 FH End of Survey

Total Length Surveyed89.5 Ft

Scores Pipe Ratings Index Pipe Ratings Index

2.8

Peak Peak

Mean Pipe Mean Pipe

0.1

Pipe Rating Pipe Rating

Structural:

O&M:

2014/07/30Date Cleaned

P/O #

Media No 11182013

Date 2014/07/30

Setup 124 Surveyor Heath Drainage

Street Mather Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Light Highway

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length 89.5 Height 6 Width ins

Joint length

Up HQ-TP995 Rim to invert Ft Down HQ-MHE2 Rim to invert Ft

Direction Up Preclean J

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TP995 X NPSfor Certificate # U-1008-7698

Time 8:41 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 89.5

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

71.8 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHE1] Water Level 10%

0.0 Ft

Alignment Right 025% OM: 4 1.6 Ft

Alignment Left 025% OM: 4 66.6 Ft

End of Pipe End of Survey 71.8 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 121 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 71.8 Ft Height 4 Width ins

Joint length

Up HQ-TPE1 Rim to invert Ft Down HQ-MHE1 Rim to invert Ft

Upstream Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Pipe Graphic Report of PSR HQ-TPE1 E NPSfor Certificate # U-1008-7698

Time 16:22 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 71.80

Northing Easting Elevation Coordinate System GPS Accuracy

Video Index Count 1.6 Ft

Remarks File Name 3859.jpg

Video Index Count 66.6 Ft Code Alignment Left

Remarks File Name 3860.jpg

Video Index Count 71.8 Ft Code End of Pipe

Remarks File Name 3861.jpg

CCTV Picture List of Work Order Setup 121 Video 11182013

HQ-TPE1 E

Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\

NPSfor

Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\

0.0 AMH Manhole HQ-MHE1

0.0 MWL Water Level 10

1.6 LR Alignment Right 25

66.6 LL Alignment Left 25

71.8 AEP End of Pipe

71.8 FH End of Survey

Total Length Surveyed71.8 Ft

Scores Pipe Ratings Index Pipe Ratings Index

2.7

Peak Peak

Mean Pipe Mean Pipe

0.1

Pipe Rating Pipe Rating

Structural:

O&M:

Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 121 Surveyor Heath Drainage

Street Grinnell Dr.

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Ductile Iron Pipe Lining

Total length 71.8 Height 4 Width ins

Joint length

Up HQ-TPE1 Rim to invert Ft Down HQ-MHE1 Rim to invert Ft

Direction Up Preclean N

Year rehabilitated

Additional info

Further location details

Structural Miscellaneous

O & M Hydralic

Constructional

System Owner National Park Service

Year laid

Tabular Report of PSR HQ-TPE1 E NPSfor Certificate # U-1008-7698

Time 16:22 Survey Customer Glacier National Park

Grade to invert Rim to grade Grade to invert Rim to grade

Length Surveyed 71.8

Pressure

Northing Easting Elevation Coordinate System GPS Accuracy

0.3 Ft

Pip e F low

Survey Dir

Start of Survey Manhole [HQ-MHG4] Water Level 0%

0.0 Ft

Collapse Pipe Sewer 100% ST: 5 Abandoned Survey [Camera stopped on collapsed pipe.] 0.3 Ft

Direction Date Cleaned

P/O #

Media No 11182013

Date 2014/07/29

Setup 109 Surveyor Heath Drainage

Street Fire Management Office

Weather Dry

City West Glacier

Flow control Not Controlled

Location Easement/Right of Way

Cat Not knownPurpose Maintenance Related

Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining

Total length Ft Height 4 Width ins

J…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .