This document contains CCTV inspection records for wastewater pipes in Glacier National Park. The inspections were conducted on various dates in July 2014 and document pipe locations, materials, dimensions, conditions observed and video still images. Pipes surveyed include HQ-CO2, HQ-CO11, HQ-CO14, HQ-CO21, HQ-CO22, HQ-CO35, HQ-CO49, HQ-CO213, HQ-TP8, HQ-TP24, HQ-TP25, HQ-TP66, HQ-TP87, HQ-TP168, HQ-TP995 and HQ-TPE1. Observed conditions noted include deposits, roots, fractures, offsets, water levels and collapsed sections. Video records and still images were captured to document findings. Pipe material included PVC, DIP, VCP and other vitrified clay. Dimensions ranged from 14.4 to 162 feet in length with heights from 4 to 6 inches. The related federal contract opportunity is for replacement of wastewater and backup power systems at Glacier National Park headquarters.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0 Ft
35.4 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-CO2] Water Level 0%
0.0 Ft
Deposits Settled Fine 03 to 09 o'clock 050% OM: 5 2.6 Ft
Camera Underwater 5.2 Ft
Alignment Left 025% OM: 4 24.6 Ft
End of Pipe End of Survey 35.4 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 114 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 35.4 Ft Height 4 Width ins
Joint length
Up HQ-CO2 Rim to invert Ft Down HQ-MHA10-HQ-MHA1 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info Finish MH ID is HQ-MHA10-HQ-MHA10-1
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO2 B NPSfor Certificate # U-1008-7698
Time 13:21 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 35.40
Northing Easting Elevation Coordinate System GPS Accuracy
Project Headquarters Work Order
R&R Visual Inc. Phone: 574-223-5426 Fax: 574-223-7953
Video Index Count 2.6 Ft Code Deposits Settled Fine
Remarks File Name 3828.jpg
Video Index Count 5.2 Ft Code Camera Underwater
Remarks File Name 3829.jpg
Video Index Count 24.6 Ft Code Alignment Left
Remarks File Name 3830.jpg
Video Index Count 35.4 Ft Code End of Pipe
Remarks File Name 3831.jpg
Video Index Count 35.4 Ft Code End of Survey
Remarks File Name 3832.jpg
CCTV Picture List of Work Order Setup 114 Video 11182013
HQ-CO2 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\ Path to media files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Media\GLAC\
VideoCount CD Code Fr To RemarksImRefIn1 % JntIn2
0.0 ST Start of Survey
0.0 AMH Manhole HQ-CO2
0.0 MWL Water Level 0
2.6 DSF Deposits Settled Fine 03 0950
5.2 MCU Camera Underwater
24.6 LL Alignment Left 25
35.4 AEP End of Pipe
35.4 FH End of Survey
Total Length Surveyed35.4 Ft
Scores Pipe Ratings Index Pipe Ratings Index
3.3
Peak Peak
Mean Pipe Mean Pipe
0.4
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 114 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 35.4 Height 4 Width ins
Joint length
Up HQ-CO2 Rim to invert Ft Down HQ-MHA10-HQ-MHA1 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info Finish MH ID is HQ-MHA10-HQ-MHA10-1
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO2 B NPSfor Certificate # U-1008-7698
Time 13:21 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 35.4
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
76.1 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-CO11] Water Level 0%
0.0 Ft
Alignment Right 025% OM: 4 15.4 Ft
Manhole [HQ-MHG3] End of Survey 76.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 111 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 76.1 Ft Height 4 Width ins
Joint length
Up HQ-CO11 Rim to invert Ft Down HQ-MHG3 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO11 B NPSfor Certificate # U-1008-7698
Time 11:01 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 76.10
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 15.4 Ft Code Alignment Right
Remarks File Name 3810.jpg
Video Index Count 76.1 Ft Code End of Survey
Remarks File Name 3811.jpg
CCTV Picture List of Work Order Setup 111 Video 11182013
HQ-CO11 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-CO11
0.0 MWL Water Level 0
15.4 LR Alignment Right 25
76.1 AMH Manhole HQ-MHG3
76.1 FH End of Survey
Total Length Surveyed76.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.1
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 111 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 76.1 Height 4 Width ins
Joint length
Up HQ-CO11 Rim to invert Ft Down HQ-MHG3 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO11 B NPSfor Certificate # U-1008-7698
Time 11:01 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 76.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
56.4 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHG4] Water Level 0%
0.0 Ft
Material change [DIP] 2.9 Ft
Alignment Left 025% OM: 4 51.1 Ft
Cleanout House End of Survey 56.4 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 110 Surveyor Heath Drainage
Street Fire Management Office
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 56.4 Ft Height 4 Width ins
Joint length
Up HQ-CO14 Rim to invert Ft Down HQ-MHG4 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO14 B NPSfor Certificate # U-1008-7698
Time 10:47 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 56.40
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 2.9 Ft Code Material change
Remarks DIP File Name 3806.jpg
Video Index Count 51.1 Ft Code Alignment Left
Remarks File Name 3807.jpg
Video Index Count 56.4 Ft Code Cleanout House
Remarks File Name 3808.jpg
CCTV Picture List of Work Order Setup 110 Video 11182013
HQ-CO14 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHG4
0.0 MWL Water Level 0
2.9 MMC Material change DIP
51.1 LL Alignment Left 25
56.4 ACOH Cleanout House
56.4 FH End of Survey
Total Length Surveyed56.4 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.1
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 110 Surveyor Heath Drainage
Street Fire Management Office
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 56.4 Height 4 Width ins
Joint length
Up HQ-CO14 Rim to invert Ft Down HQ-MHG4 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO14 B NPSfor Certificate # U-1008-7698
Time 10:47 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 56.4
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
126.9 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA11-1] Water Level 0%
0.0 Ft
Alignment Right 025% OM: 4 122.0 Ft
Cleanout House End of Survey 126.9 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 118 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 126.9 Ft Height 4 Width ins
Joint length
Up HQ-CO21 Rim to invert Ft Down HQ-MHA11-1 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO21 B NPSfor Certificate # U-1008-7698
Time 14:56 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 126.90
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 122.0 Ft
Remarks File Name 3848.jpg
Video Index Count 126.9 Ft Code Cleanout House
Remarks File Name 3849.jpg
CCTV Picture List of Work Order Setup 118 Video 11182013
HQ-CO21 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA11-1
0.0 MWL Water Level 0
122.0 LR Alignment Right 25
126.9 ACOH Cleanout House
126.9 FH End of Survey
Total Length Surveyed126.9 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 118 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 126.9 Height 4 Width ins
Joint length
Up HQ-CO21 Rim to invert Ft Down HQ-MHA11-1 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO21 B NPSfor Certificate # U-1008-7698
Time 14:56 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 126.9
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
96.1 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA11-1] Water Level 0%
0.0 Ft
Alignment Left 025% OM: 4 16.0 Ft
General Photo 76.4 Ft
Tap Factory 4.000 12 o'clock 94.8 Ft
Cleanout House End of Survey 96.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 117 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 96.1 Ft Height 4 Width ins
Joint length
Up HQ-CO22 Rim to invert Ft Down HQ-MHA11-1 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO22 B NPSfor Certificate # U-1008-7698
Time 14:21 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 96.10
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 16.0 Ft Code Alignment Left
Remarks File Name 3842.jpg
Video Index Count 76.4 Ft Code General Photo
Remarks File Name 3843.jpg
Video Index Count 94.8 Ft Code Tap Factory
Remarks File Name 3844.jpg
Video Index Count 96.1 Ft Code Cleanout House
Remarks File Name 3845.jpg
Video Index Count 96.1 Ft Code End of Survey
Remarks File Name 3846.jpg
CCTV Picture List of Work Order Setup 117 Video 11182013
HQ-CO22 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA11-1
0.0 MWL Water Level 0
16.0 LL Alignment Left 25
76.4 MGP General Photo
94.8 TF Tap Factory 4.000 12
96.1 ACOH Cleanout House
96.1 FH End of Survey
Total Length Surveyed96.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 117 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 96.1 Height 4 Width ins
Joint length
Up HQ-CO22 Rim to invert Ft Down HQ-MHA11-1 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO22 B NPSfor Certificate # U-1008-7698
Time 14:21 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 96.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
32.4 Ft
Pipe Flow
Survey Dir
Start of Survey Cleanout House [HQ-CO35] Water Level 0%
0.0 Ft
Camera Underwater 23.6 Ft
Joint Offset Large ST: 2 Abandoned Survey [Camera stopped on offset joint.] 32.4 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 113 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length Ft Height 4 Width ins
Joint length
Up HQ-CO35 Rim to invert Ft Down HQ-CO36-HQ-MHG1 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO35 B NPSfor Certificate # U-1008-7698
Time 11:52 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 32.40
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 23.6 Ft Code Camera Underwater
Remarks File Name 3824.jpg
Video Index Count 32.4 Ft Code Joint Offset Large
Remarks File Name 3825.jpg
Video Index Count 32.4 Ft Code Abandoned Survey
Remarks Camera stopped on offset joint.
File Name 3826.jpg
CCTV Picture List of Work Order Setup 113 Video 11182013
HQ-CO35 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 ACOH Cleanout House HQ-CO35
0.0 MWL Water Level 0
23.6 MCU Camera Underwater
32.4 JOL Joint Offset Large
32.4 MSA Abandoned Survey Camera stopped on offset join...
Total Length Surveyed32.4 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.1 0.1
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 113 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length Height 4 Width ins
Joint length
Up HQ-CO35 Rim to invert Ft Down HQ-CO36-HQ-MHG1 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO35 B NPSfor Certificate # U-1008-7698
Time 11:52 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 32.4
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
84.6 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHB3-3] Water Level 0%
0.0 Ft
Material change [PVC] 29.8 Ft
Deposits Settled Other 04 to 08 o'clock 025% OM: 4 [Debris] 60.3 Ft
Material change [DIP] 80.7 Ft
Alignment Left 025% OM: 4 82.3 Ft
Cleanout House End of Survey 84.6 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 122 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 84.6 Ft Height 4 Width ins
Joint length
Up HQ-CO49 Rim to invert Ft Down HQ-MHB3-3 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-CO49 X NPSfor Certificate # U-1008-7698
Time 16:48 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 84.60
Northing Easting Elevation Coordinate System GPS Accuracy
Debris
Video Index Count 29.8 Ft Code Material change
Remarks PVC File Name 3863.jpg
Video Index Count 60.3 Ft Code Deposits Settled Other
Remarks File Name 3864.jpg
Video Index Count 80.7 Ft Code Material change
Remarks DIP File Name 3865.jpg
Video Index Count 84.6 Ft Code Cleanout House
Remarks File Name 3866.jpg
Video Index Count 84.6 Ft Code End of Survey
Remarks File Name 3867.jpg
CCTV Picture List of Work Order Setup 122 Video 11182013
HQ-CO49 X
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHB3-3
0.0 MWL Water Level 0
29.8 MMC Material change PVC
60.3 DSZ Deposits Settled Other 04 08 Debris25
80.7 MMC Material change DIP
82.3 LL Alignment Left 25
84.6 ACOH Cleanout House
84.6 FH End of Survey
Total Length Surveyed84.6 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.1
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 122 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 84.6 Height 4 Width ins
Joint length
Up HQ-CO49 Rim to invert Ft Down HQ-MHB3-3 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-CO49 X NPSfor Certificate # U-1008-7698
Time 16:48 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 84.6
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
162 Ft
Pipe Flow
Survey Dir
Start of Survey Manhole [HQ-C0213] Water Level 0%
0.0 Ft
Material change [DIP] 22.3 Ft
Roots Medium Joint 08 to 04 o'clock 025% OM: 3 22.6 Ft
Material change [VCP] 22.9 Ft
Roots Ball Joint 08 to 04 o'clock 080% OM: 4 41.3 Ft
Water Level Sag 025% ST: 2 [S01] Camera Underwater 48.8 Ft
Water Level Sag 025% ST: 2 [F01] Abandoned Survey [Maximum push capability.] 162.0 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 112 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length Ft Height 4 Width ins
Joint length
Up HQ-CO213 Rim to invert Ft Down HQ-CO36-HQ-MHG1 Rim to invert Ft
Downstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-C0213 B NPSfor Certificate # U-1008-7698
Time 11:34 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 162.00
Northing Easting Elevation Coordinate System GPS Accuracy
DIP
Video Index Count 22.3 Ft Code Material change
Remarks DIP File Name 3816.jpg
Video Index Count 22.3 Ft Code Material change
Remarks File Name 3817.jpg
Video Index Count 22.6 Ft Code Roots Medium Joint
Remarks File Name 3815.jpg
Video Index Count 22.9 Ft Code Material change
Remarks VCP File Name 3818.jpg
Video Index Count 41.3 Ft Code Roots Ball Joint
Remarks File Name 3819.jpg
Video Index Count 48.8 Ft Code Water Level Sag
Remarks File Name 3820.jpg
Video Index Count 48.8 Ft Code Camera Underwater
Remarks File Name 3821.jpg
Video Index Count 162.0 Ft Code Abandoned Survey
Remarks Maximum push capability.
File Name 3822.jpg
CCTV Picture List of Work Order Setup 112 Video 11182013
HQ-C0213 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-C0213
0.0 MWL Water Level 0
22.3 MMC Material change DIP
22.6 RMJ Roots Medium Joint 08 04J25
22.9 MMC Material change VCP
41.3 RBJ Roots Ball Joint 08 04J80
48.8 S01 MWLS Water Level Sag 25
48.8 MCU Camera Underwater
162.0 F01 MWLS Water Level Sag 25
162.0 MSA Abandoned Survey Maximum push capability.
Total Length Surveyed162.0 Ft
Scores Pipe Ratings Index Pipe Ratings Index
3.7
Peak Peak
Mean Pipe Mean Pipe
0.3 0.1
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 112 Surveyor Heath Drainage
Street Ruhle Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length Height 4 Width ins
Joint length
Up HQ-CO213 Rim to invert Ft Down HQ-CO36-HQ-MHG1 Rim to invert Ft
Direction Down Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-C0213 B NPSfor Certificate # U-1008-7698
Time 11:34 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 162.0
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
14.4 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA9-2] Water Level 0%
0.0 Ft
Water Level Sag 015% ST: 2 [S01] 6.8 Ft
Material change [DIP] 13.7 Ft
Water Level Sag 015% ST: 2 [F01] Cleanout House End of Survey
14.4 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 108 Surveyor Heath Drainage
Street Mather Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 14.4 Ft Height 4 Width ins
Joint length
Up HQ-TP8 Rim to invert Ft Down HQ-MHA9-2 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP8 B NPSfor Certificate # U-1008-7698
Time 9:50 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 14.40
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 6.8 Ft Code Water Level Sag
Remarks File Name 3799.jpg
Video Index Count 13.7 Ft Code Material change
Remarks File Name 3800.jpg
Video Index Count 14.4 Ft Code Cleanout House
Remarks File Name 3801.jpg
CCTV Picture List of Work Order Setup 108 Video 11182013
HQ-TP8 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA9-2
0.0 MWL Water Level 0
6.8 S01 MWLS Water Level Sag 15
13.7 MMC Material change DIP
14.4 F01 MWLS Water Level Sag 15
14.4 ACOH Cleanout House
14.4 FH End of Survey
Total Length Surveyed14.4 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.3
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 108 Surveyor Heath Drainage
Street Mather Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 14.4 Height 4 Width ins
Joint length
Up HQ-TP8 Rim to invert Ft Down HQ-MHA9-2 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP8 B NPSfor Certificate # U-1008-7698
Time 9:50 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 14.4
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
18 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA11-3] Water Level 40%
0.0 Ft
Deposits Settled Fine 03 to 09 o'clock 040% OM: 5 0.6 Ft
End of Pipe End of Survey 18.0 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 116 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 18.0 Ft Height 4 Width ins
Joint length
Up HQ-TP24 Rim to invert Ft Down HQ-MHA11-3 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP24 B NPSfor Certificate # U-1008-7698
Time 14:04 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 18.00
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 0.6 Ft Code Deposits Settled Fine
Remarks File Name 3839.jpg
Video Index Count 18.0 Ft Code End of Pipe
Remarks File Name 3840.jpg
CCTV Picture List of Work Order Setup 116 Video 11182013
HQ-TP24 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA11-3
0.0 MWL Water Level 40
0.6 DSF Deposits Settled Fine 03 0940
18.0 AEP End of Pipe
18.0 FH End of Survey
Total Length Surveyed18.0 Ft
Scores Pipe Ratings Index Pipe Ratings Index
2.5
Peak Peak
Mean Pipe Mean Pipe
0.3
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 116 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 18.0 Height 4 Width ins
Joint length
Up HQ-TP24 Rim to invert Ft Down HQ-MHA11-3 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP24 B NPSfor Certificate # U-1008-7698
Time 14:04 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 18.0
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
126.3 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA11-3] Water Level 0%
0.0 Ft
General Photo 72.5 Ft
Tap Factory 4.000 12 o'clock 124.6 Ft
Cleanout House End of Survey 126.3 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 115 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 126.3 Ft Height 4 Width ins
Joint length
Up HQ-TP25 Rim to invert Ft Down HQ-MHA11-3 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP25 B NPSfor Certificate # U-1008-7698
Time 13:45 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 126.30
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 72.5 Ft Code General Photo
Remarks File Name 3834.jpg
Video Index Count 124.6 Ft Code Tap Factory
Remarks File Name 3835.jpg
Video Index Count 126.3 Ft Code Cleanout House
Remarks File Name 3836.jpg
Video Index Count 126.3 Ft Code End of Survey
Remarks File Name 3837.jpg
CCTV Picture List of Work Order Setup 115 Video 11182013
HQ-TP25 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA11-3
0.0 MWL Water Level 0
72.5 MGP General Photo
124.6 TF Tap Factory 4.000 12
126.3 ACOH Cleanout House
126.3 FH End of Survey
Total Length Surveyed126.3 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 115 Surveyor Heath Drainage
Street Albright Cir.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Polyvinyl Chloride Lining
Total length 126.3 Height 4 Width ins
Joint length
Up HQ-TP25 Rim to invert Ft Down HQ-MHA11-3 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP25 B NPSfor Certificate # U-1008-7698
Time 13:45 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 126.3
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
57 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHA8-1] Water Level 20%
0.0 Ft
Shape or Size Change 4.000 Material change [DIP] 0.6 Ft
Surface Corrosion Metal Pipe 12 to 12 o'clock ST: 3 [S01] 6.5 Ft
Alignment Right 025% OM: 4 50.5 Ft
Surface Corrosion Metal Pipe 12 to 12 o'clock ST: 3 [F01] Cleanout House End of Survey
57.0 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 107 Surveyor Heath Drainage
Street Mather Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 57.0 Ft Height 6 Width ins
Joint length
Up HQ-TP66 Rim to invert Ft Down HQ-MHA8-1 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP66 B NPSfor Certificate # U-1008-7698
Time 9:13 Survey Customer vGlacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 57.00
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 0.6 Ft Code Shape or Size Change
Remarks File Name 3792.jpg
Video Index Count 0.6 Ft Code Material change
Remarks File Name 3793.jpg
Video Index Count 6.5 Ft Code Surface Corrosion Metal Pipe
Remarks File Name 3794.jpg
Video Index Count 50.5 Ft Code Alignment Right
Remarks File Name 3795.jpg
Video Index Count 57.0 Ft Code Cleanout House
Remarks File Name 3796.jpg
Video Index Count 57.0 Ft Code End of Survey
Remarks File Name 3797.jpg
CCTV Picture List of Work Order Setup 107 Video 11182013
HQ-TP66 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHA8-1
0.0 MWL Water Level 20
0.6 MSC Shape or Size Change 4.000
0.6 MMC Material change DIP
6.5 S01 SCP Surface Corrosion Metal Pipe 12 12
50.5 LR Alignment Right 25
57.0 F01 SCP Surface Corrosion Metal Pipe 12 12
57.0 ACOH Cleanout House
57.0 FH End of Survey
Total Length Surveyed57.0 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.5 0.1
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 107 Surveyor Heath Drainage
Street Mather Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 57.0 Height 6 Width ins
Joint length
Up HQ-TP66 Rim to invert Ft Down HQ-MHA8-1 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP66 B NPSfor Certificate # U-1008-7698
Time 9:13 Survey Customer vGlacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 57.0
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
61.6 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHB4] Water Level 0%
0.0 Ft
General Photo 54.7 Ft
Cleanout House End of Survey 61.6 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 119 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 61.6 Ft Height 6 Width ins
Joint length
Up HQ-TP87 Rim to invert Ft Down HQ-MHB4 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP87 E NPSfor Certificate # U-1008-7698
Time 15:55 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 61.60
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 54.7 Ft Code General Photo
Remarks File Name 3851.jpg
Video Index Count 61.6 Ft Code Cleanout House
Remarks File Name 3852.jpg
CCTV Picture List of Work Order Setup 119 Video 11182013
HQ-TP87 E
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHB4
0.0 MWL Water Level 0
54.7 MGP General Photo
61.6 ACOH Cleanout House
61.6 FH End of Survey
Total Length Surveyed61.6 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 119 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 61.6 Height 6 Width ins
Joint length
Up HQ-TP87 Rim to invert Ft Down HQ-MHB4 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP87 E NPSfor Certificate # U-1008-7698
Time 15:55 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 61.6
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
66.2 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHB4] Water Level 0%
0.0 Ft
Alignment Right 050% OM: 4 0.3 Ft
Roots Fine Barrel 05 to 07 o'clock OM: 2 48.5 Ft
Roots Ball Joint 05 to 01 o'clock 070% OM: 4 54.4 Ft
Abandoned Survey [Camera stopped on root ball.] 55.7 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 120 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 66.2 Ft Height 4 Width ins
Joint length
Up HQ-TP168 Rim to invert Ft Down HQ-MHB4 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP168 E NPSfor Certificate # U-1008-7698
Time 16:07 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 55.70
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 0.3 Ft
Remarks File Name 3854.jpg
Video Index Count 48.5 Ft Code Roots Fine Barrel
Remarks File Name 3855.jpg
Video Index Count 54.4 Ft Code Roots Ball Joint
Remarks File Name 3856.jpg
Video Index Count 55.7 Ft Code Abandoned Survey
Remarks Camera stopped on root ball.
File Name 3857.jpg
CCTV Picture List of Work Order Setup 120 Video 11182013
HQ-TP168 E
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHB4
0.0 MWL Water Level 0
0.3 LR Alignment Right 50
48.5 RFB Roots Fine Barrel 05 07
54.4 RBJ Roots Ball Joint 05 01J70
55.7 MSA Abandoned Survey Camera stopped on root ball.
Total Length Surveyed55.7 Ft
Scores Pipe Ratings Index Pipe Ratings Index
3.3
Peak Peak
Mean Pipe Mean Pipe
0.2
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 120 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 66.2 Height 4 Width ins
Joint length
Up HQ-TP168 Rim to invert Ft Down HQ-MHB4 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP168 E NPSfor Certificate # U-1008-7698
Time 16:07 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 55.7
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
66.2 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHB4] Water Level 10%
0.0 Ft
Alignment Right 050% OM: 4 1.3 Ft
Fracture Circumferential 01 to 07 o'clock ST: 2 55.1 Ft
Cleanout House End of Survey 66.2 Ft
Direction 2014/07/30Date Cleaned
P/O #
Media No 11182013
Date 2014/07/30
Setup 123 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Light Highway
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 66.2 Ft Height 4 Width ins
Joint length
Up HQ-TP168 Rim to invert Ft Down HQ-MHB4 Rim to invert Ft
Upstream Preclean J
Year rehabilitated
Additional info Pipe material in video incorrect.
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP168 X NPSfor Certificate # U-1008-7698
Time 8:29 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 66.20
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 1.3 Ft
Remarks File Name 3869.jpg
Video Index Count 55.1 Ft Code Fracture Circumferential
Remarks File Name 3870.jpg
Video Index Count 66.2 Ft Code Cleanout House
Remarks File Name 3871.jpg
CCTV Picture List of Work Order Setup 123 Video 11182013
HQ-TP168 X
Survey Date 2014/07/30 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHB4
0.0 MWL Water Level 10
1.3 LR Alignment Right 50
55.1 FC Fracture Circumferential 01 07
66.2 ACOH Cleanout House
66.2 FH End of Survey
Total Length Surveyed66.2 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
0.1
Pipe Rating Pipe Rating
Structural:
O&M:
2014/07/30Date Cleaned
P/O #
Media No 11182013
Date 2014/07/30
Setup 123 Surveyor Heath Drainage
Street Logan Ln
Weather Dry
City West Glacier
Flow control Not Controlled
Location Light Highway
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 66.2 Height 4 Width ins
Joint length
Up HQ-TP168 Rim to invert Ft Down HQ-MHB4 Rim to invert Ft
Direction Up Preclean J
Year rehabilitated
Additional info Pipe material in video incorrect.
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP168 X NPSfor Certificate # U-1008-7698
Time 8:29 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 66.2
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
89.5 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHE2] Water Level 5%
0.0 Ft
Roots Ball Barrel 12 to 12 o'clock 080% OM: 5 Abandoned Survey [Camera stopped on root ball.] 2.1 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 106 Surveyor Heath Drainage
Street Mather Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 89.5 Ft Height 6 Width ins
Joint length
Up HQ-TP995 Rim to invert Ft Down HQ-MHE2 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP995 B NPSfor Certificate # U-1008-7698
Time 8:47 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 02.10
Northing Easting Elevation Coordinate System GPS Accuracy
Camera stopped on root ball.
Video Index Count 2.1 Ft Code Roots Ball Barrel
Remarks File Name 3789.jpg
Video Index Count 2.1 Ft Code Abandoned Survey
Remarks File Name 3790.jpg
CCTV Picture List of Work Order Setup 106 Video 11182013
HQ-TP995 B
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHE2
0.0 MWL Water Level 5
2.1 RBB Roots Ball Barrel 12 1280
2.1 MSA Abandoned Survey Camera stopped on root ball.
Total Length Surveyed2.1 Ft
Scores Pipe Ratings Index Pipe Ratings Index
Peak Peak
Mean Pipe Mean Pipe
2.4
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 106 Surveyor Heath Drainage
Street Mather Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 89.5 Height 6 Width ins
Joint length
Up HQ-TP995 Rim to invert Ft Down HQ-MHE2 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP995 B NPSfor Certificate # U-1008-7698
Time 8:47 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 2.1
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
89.5 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHE2] Water Level 5%
0.0 Ft
Roots Medium Joint 08 to 04 o'clock 030% OM: 3 Material change [DIP] Shape or Size Change 4.000
1.3 Ft
General Photo 41.3 Ft
Alignment Left 050% OM: 4 74.4 Ft
Alignment Left 025% OM: 4 84.9 Ft
End of Pipe End of Survey 89.5 Ft
Direction 2014/07/30Date Cleaned
P/O #
Media No 11182013
Date 2014/07/30
Setup 124 Surveyor Heath Drainage
Street Mather Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Light Highway
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 89.5 Ft Height 6 Width ins
Joint length
Up HQ-TP995 Rim to invert Ft Down HQ-MHE2 Rim to invert Ft
Upstream Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TP995 X NPSfor Certificate # U-1008-7698
Time 8:41 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 89.50
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 1.3 Ft Code Roots Medium Joint
Remarks File Name 3873.jpg
Video Index Count 1.3 Ft Code Material change
Remarks File Name 3874.jpg
Video Index Count 1.3 Ft Code Shape or Size Change
Remarks File Name 3875.jpg
Video Index Count 41.3 Ft Code General Photo
Remarks File Name 3876.jpg
Video Index Count 74.4 Ft Code Alignment Left
Remarks File Name 3877.jpg
Video Index Count 84.9 Ft Code Alignment Left
Remarks File Name 3878.jpg
Video Index Count 89.5 Ft Code End of Pipe
Remarks File Name 3879.jpg
CCTV Picture List of Work Order Setup 124 Video 11182013
HQ-TP995 X
Survey Date 2014/07/30 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHE2
0.0 MWL Water Level 5
1.3 RMJ Roots Medium Joint 08 04J30
1.3 MMC Material change DIP
1.3 MSC Shape or Size Change 4.000
41.3 MGP General Photo
74.4 LL Alignment Left 50
84.9 LL Alignment Left 25
89.5 AEP End of Pipe
89.5 FH End of Survey
Total Length Surveyed89.5 Ft
Scores Pipe Ratings Index Pipe Ratings Index
2.8
Peak Peak
Mean Pipe Mean Pipe
0.1
Pipe Rating Pipe Rating
Structural:
O&M:
2014/07/30Date Cleaned
P/O #
Media No 11182013
Date 2014/07/30
Setup 124 Surveyor Heath Drainage
Street Mather Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Light Highway
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length 89.5 Height 6 Width ins
Joint length
Up HQ-TP995 Rim to invert Ft Down HQ-MHE2 Rim to invert Ft
Direction Up Preclean J
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TP995 X NPSfor Certificate # U-1008-7698
Time 8:41 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 89.5
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
71.8 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHE1] Water Level 10%
0.0 Ft
Alignment Right 025% OM: 4 1.6 Ft
Alignment Left 025% OM: 4 66.6 Ft
End of Pipe End of Survey 71.8 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 121 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 71.8 Ft Height 4 Width ins
Joint length
Up HQ-TPE1 Rim to invert Ft Down HQ-MHE1 Rim to invert Ft
Upstream Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Pipe Graphic Report of PSR HQ-TPE1 E NPSfor Certificate # U-1008-7698
Time 16:22 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 71.80
Northing Easting Elevation Coordinate System GPS Accuracy
Video Index Count 1.6 Ft
Remarks File Name 3859.jpg
Video Index Count 66.6 Ft Code Alignment Left
Remarks File Name 3860.jpg
Video Index Count 71.8 Ft Code End of Pipe
Remarks File Name 3861.jpg
CCTV Picture List of Work Order Setup 121 Video 11182013
HQ-TPE1 E
Survey Date 2014/07/29 Path to picture files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Snaps\GLAC\
NPSfor
Path to video files Z:\NPS\GLACIER NATIONAL PARK\CCTV\GLAC DB_080514\Movies\GLAC\
0.0 AMH Manhole HQ-MHE1
0.0 MWL Water Level 10
1.6 LR Alignment Right 25
66.6 LL Alignment Left 25
71.8 AEP End of Pipe
71.8 FH End of Survey
Total Length Surveyed71.8 Ft
Scores Pipe Ratings Index Pipe Ratings Index
2.7
Peak Peak
Mean Pipe Mean Pipe
0.1
Pipe Rating Pipe Rating
Structural:
O&M:
Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 121 Surveyor Heath Drainage
Street Grinnell Dr.
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Ductile Iron Pipe Lining
Total length 71.8 Height 4 Width ins
Joint length
Up HQ-TPE1 Rim to invert Ft Down HQ-MHE1 Rim to invert Ft
Direction Up Preclean N
Year rehabilitated
Additional info
Further location details
Structural Miscellaneous
O & M Hydralic
Constructional
System Owner National Park Service
Year laid
Tabular Report of PSR HQ-TPE1 E NPSfor Certificate # U-1008-7698
Time 16:22 Survey Customer Glacier National Park
Grade to invert Rim to grade Grade to invert Rim to grade
Length Surveyed 71.8
Pressure
Northing Easting Elevation Coordinate System GPS Accuracy
0.3 Ft
Pip e F low
Survey Dir
Start of Survey Manhole [HQ-MHG4] Water Level 0%
0.0 Ft
Collapse Pipe Sewer 100% ST: 5 Abandoned Survey [Camera stopped on collapsed pipe.] 0.3 Ft
Direction Date Cleaned
P/O #
Media No 11182013
Date 2014/07/29
Setup 109 Surveyor Heath Drainage
Street Fire Management Office
Weather Dry
City West Glacier
Flow control Not Controlled
Location Easement/Right of Way
Cat Not knownPurpose Maintenance Related
Use Sanitary Shape Circular Material Vitrified Clay Pipe Lining
Total length Ft Height 4 Width ins
J…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .