Project NumberSSM A - THUP A Preliminary Design - 100% 10121250

8/ 3/

:0

1:

P M

B

IM

_L

B N

L S

S M

T

H U

P

-A -C

E N

T R

A L

LB

N L

S S

M -T

H U

P .r vt

HDR Architecture 201 California St

San Francisco, CA 94111

GHD

Civil Enginner | Landscape Architect

655 Montgomery Street, Suite 1010 San Francisco, CA 95111 t 415.283.4970

Smith, Fause & McDonald Inc

IT/ AV/ Acoustics Consultants

Rutherford + Chekene

Structural Engineer

The Marshall Associates

Food Service Consultant

UNIVERSITY OF

CALIFORNIA

LAWRENCE

BERKELEY

NATIONAL

LABORATORY

1 CYCLOTRON ROAD

BERKELEY, CALFORNIA 94720

LBNL SSM-THUP

Building 54

1 Cyclotron Rd Berkeley, CA 94720

351 8th Street San Franscisco, CA 94103 t 415.255.9140 f 415.255.9180

375 Beale Street, Suite 310 San Francisco, CA 94105 t 415.568.4400 f 415.618.0684

1929 Parkmont Drive Alamo, CA 94507 t 415.677.1200

P re li m in a ry

D e s ig n

/0

3/

08/03/2020

(PROGRESS, ESTIMATE, BID, CONSTRUCTION,

CONFORMED, REVISION, RECORD)(IF REVISION, APPLIES ONLY TO REVISED WORK)

ISSUEPROFESSIONAL SEAL

PROJECT NO. 10221250

DRAWING NO.

SHEET

DATE

SCALE

APPROVED BY

CHECKED BY

DRAWN BY

REMARKSDATE

BY

APPR'D

BY

CHECKED

BY

DRAWN

NUMBER

REVISIONCONSULTING A/E FIRMCONSULTING FIRMCONSULTING FIRM

100%

FACILITIES DIVISION

LBNL SSM A-THUP A

Preliminary

Design

Pre lim ina ry Des ign

4' 8' 16'

UNIVERSITY OF CALIFORNIA

LAWRENCE BERKELEY NATIONAL LABORATORY

SHEET INDEX

G-001A08/03/2020

HDR Architecture

201 California St

San Francisco, CA 94111

Author 08/03/2020

SHEET INDEX - SSM 3A/THUP A

Sheet Number Sheet Name Sheet Issue Date

01-GENERAL

G-000A COVER SHEET 08/03/2020

G-001A SHEET INDEX 08/03/2020

G-002A CODE ANALYSIS AND PROJECT INFORMATION 08/03/2020

G-003 SITE WALLS PHASING DIAGRAM -THUP A/ SSM A 08/03/2020

G-004 SITE WALLS PHASING DIAGRAM -THUP B/ SSM B 08/03/2020

G-005 SITE SECTIONS DIAGRAMS 08/03/2020

G-006 SITE SECTIONS DIAGRAMS 08/03/2020

05-CIVIL

C-001 CIVIL NOTES, ABBREVIATIONS AND LEGEND 08/03/2020

C-003 CIVIL KEY MAP AND SURVEY CONTROL DIAGRAM 08/03/2020

C-101 EXISTING SITE PLAN 08/03/2020

C-102 CIVIL DEMOLITION STORM DRAINAGE 08/03/2020

C-103 CIVIL DEMOLITION SANITARY SEWER 08/03/2020

C-104 CIVIL DEMOLITION DOMESTIC AND FIRE WATER 08/03/2020

C-105 CIVIL DEMOLITION ELECTRIC AND

TELECOMMUNICATIONS

08/03/2020

C-106 CIVIL DEMOLITION NATURAL GAS 08/03/2020

C-107 CIVIL SSM 3A HORIZONTAL CONTROL AND PAVING

DIAGRAM

08/03/2020

C-111 GRADING AND DRAINAGE PLAN 08/03/2020

07-STRUCTURAL

S-001.1 STRUCTURAL GENERAL & NOTES 08/03/2020

S-002.1 STRUCTURAL GENERAL & NOTES 08/03/2020

S-100.1 SITE WALL OVERALL PLANS 08/03/2020

S-101A.1 ENLARGED PLAN - LL THUP A/ SSM 3A 08/03/2020

S-101B.1 ENLARGED PLAN - LL THUP A/ SSM 3A 08/03/2020

S-101C.1 ENLARGED PLAN - LL THUP A/ SSM 3A 08/03/2020

S-102A.1 ENLARGED PLAN - L2 THUP A/ SSM 3A 08/03/2020

S-102B.1 ENLARGED PLAN - L2 THUP A/ SSM 3A 08/03/2020

S-201.1 SITE WALL ELEVATIONS - LL THUP A/ SSM 3A 08/03/2020

S-202.1 SITE WALL ELEVATIONS - LL THUP A/ SSM 3A 08/03/2020

S-203.1 SITE WALL ELEVATIONS - LL THUP A/ SSM 3A 08/03/2020

S-204.1 SITE WALL ELEVATIONS - LL THUP A/ SSM 3A 08/03/2020

S-300.1 TYPICAL CONCRETE DETAILS 08/03/2020

S-301.1 TYPICAL CONCRETE DETAILS 08/03/2020

S-302.1 SITE WALL SECTIONS AND DETAILS 08/03/2020

S-303.1 SITE WALL SECTIONS AND DETAILS 08/03/2020

08-ARCHITECTURAL

AD-001 ARCHITECTURAL DEMOLITION & NOTES 08/03/2020

AS-050 ARCHITECTURAL SITE PLAN - SSM 3A / THUP A 08/03/2020

14-MECHANICAL

MD-101 MECHANICAL SITE DEMOLITION PLAN 08/03/2020

MS-101 MECHANICAL SITE PLAN 08/03/2020

15-ELECTRICAL

E-001. ELECTRICAL SYMBOLS AND LEGENDS 08/03/2020

E-002. ELECTRICAL SYMBOLS AND LEGENDS 08/03/2020

ED-101. ELECTRICAL SITE DEMOLITION PLAN 08/03/2020

ED-110. ENLARGED ELECTRICAL DEMOLITION PLAN 08/03/2020

ED-111. ENLARGED ELECTRICAL DEMOLITION PLAN 08/03/2020

ES-101. ELECTRICAL SITE PLAN 08/03/2020

EP-110. ENLARGED POWER SITE PLAN 08/03/2020

EP-111. ENLARGED POWER SITE PLAN 08/03/2020

EP-112. ENLARGED POWER SITE PLAN 08/03/2020

ES-401 ELECTRICAL ENLARGED SITE PLAN 08/03/2020

ES-402 ELECTRICAL ENLARGED SITE PLAN 08/03/2020

ED-601 ELECTRICAL ONE LINE DIAGRAM - DEMOLITION 08/03/2020

E-601. ELECTRICAL ONE LINE DIAGRAM - NEW 08/03/2020

E-602. ELECTRICAL ONE LINE DIAGRAM - STANDBY 08/03/2020

17-TELECOMMUNICATIONS

TN1.1 SITE PLAN 08/03/2020

(PROGRESS, ESTIMATE, BID, CONSTRUCTION,

CONFORMED, REVISION, RECORD)(IF REVISION, APPLIES ONLY TO REVISED WORK)

ISSUEPROFESSIONAL SEAL

PROJECT NO. 10221250

DRAWING NO.

SHEET

DATE

SCALE

APPROVED BY

CHECKED BY

DRAWN BY

REMARKSDATE

BY

APPR'D

BY

CHECKED

BY

DRAWN

NUMBER

REVISIONCONSULTING A/E FIRMCONSULTING FIRMCONSULTING FIRM

100%

FACILITIES DIVISION

LBNL SSM A-THUP A

Preliminary

Design

Pre lim ina ry Des ign

UNIVERSITY OF CALIFORNIA

LAWRENCE BERKELEY NATIONAL LABORATORY

CODE ANALYSIS AND PROJECT INFORMATION

G-002A08/03/2020

HDR Architecture 201 California St San Francisco, CA 94111

OP 08/03/2020

VICINITY MAP LOCATION MAP PROJECT DESCRIPTION

CODE ANALYSIS

THE THUP/SSM PROJECT IS DESCRIBED IN THIS AND RELATED DOCUMENTS AND INCLUDES BUT IS NOT LIMITED TO: THE DEMOLITION OF THE EXISTING BUILDING 54 CAFETERIA AND CONFERENCE BUILDING, THE CONSTRUCTION OF A NEW APPROX. 47,500 GSF WELCOME CENTER BUILDING AND RELATED UTILITY WORK, AND SITE IMPROVEMENTS INCLUDING REFURBISHED AND NEW VEHICLE ACCESS AND DROP OFF, A NEW PEDESRIAN ENTRY PLAZA AND RELATED SIDEWALKS, RAMPS AND SITE STAIRS, NEW AND RECONFIGURED ACCESSIBE PARKING SPACES, A NEW SHUTTLE BUS SHELTER, AND

IMPROVEMENTS AND MOFICATIONS TO THE B70 LOADING AREA.

THE THUP/SSM PROJECT WILL CONSIST OF TWO PHASES. THIS DRAWING SET DOCUMENTS THE PHASE A WORK.

PHASE A SCOPE OF WORK

TRANSIT HUB UTILITIES PROJECT (THUP) - PHASE A

THUP A: NEW AND RELOCATED UTILITIES 5' FROM WELCOME CENTER BUILDING FOOTPRINT, ROUGH SITE GRADING AND RELATED SITE RETAINING WALLS OUTSIDE OF WELCOME CENTER BUILDING AND LOADING DOCK FOOTPRINT AND LANDSCAPE DEMOLITION.

SEISMIC SAFETY & MODERNIZATION (SSM) - PHASE A

SSM A: DEMOLITION AND CAPPING OF EXISTING UTILITIES AT EXISTING CAFETERIA BUILDING; ROUGH SITE GRADING AND RELATED SITE RETAINING WALLS WITHIN THE WELCOME CENTER BUILDING AND LOADING DOCK FOOTPRINT, AND MAKE-READY WORK AT B70 LOADING AREA.

NOTE: ALL PHASE A WORK IS CLASSIFIED AS THUP A, EXCEPT FOR THE FOLLWING, WHICH ARE CLASSIFIED AS SSM A:

• DEMOLITION AND CAPPING OF EXISTING UTILITIES AT EXISTING CAFETERIA BUILDING

• ROUGH SITE GRADING AND RELATED SITE RETAINING WALLS WITHIN THE WELCOME CENTER BUILDING AND LOADING DOCK FOOTPRINT

• MAKE-READY WORK AT B70 LOADING AREA.

788' - 6"

774'TOW APROX. 785' - 0" -

TIE IN TO EXISTING

WALL ADJACENT

SLOPES WITH GRADE

TOW 790' - 0"

TOW 790' - 0"

TOW 789' - 0" TOW 789' - 0"

TOW 789' - 0"

TOW 789' - 0"

TOW 789' - 0"

TOW 789' - 0"

770'

770'

770'

TOW 770' - 0"

(NOMINAL)

TOW 770' - 0"

(NOMINAL)

TOW 770' - 0"

(NOMINAL)

TOW 770' - 0"

TOW 770' - 0"

TOW 770 - 0"

G-005

G-006

G-005

G-005

G-005

G-005

G-006

G-006

G-006

G-006

G-006

BUILDING PAD FOR SSM B - THUP B CONSTRUCTION

B70

B70A

GUEST HOUSE

LAWRENCE ROAD

TOW APROX 792' - 0"

TOW APROX 801' - 0"

SLOPES WITH GRADE

TOW APROX 801' - 0"

TOW 805' - 0"

TOW 804' - 0"

TOW 805' - 6"

SLOPES WITH GRADE

TOW 805' - 6"

TOW 805' - 6"

TOW 804' - 6"

TOW 805' - 6"

TOW 804' - 6"

TOW 805' - 6"

805'

807' (TBD)

793'

796'

800'

TOW 803' - 6"

TOW 805' - 6"

SLOPES WITH GRADE

TOW 808' - 6"

TOW 808' - 6"

TOW 796' - 0"

SLOPES WITH STAIR

TOW APROX

794' - 0"

TOW 807' - 6"

SLOPES WITH

GRADE

G-005

G-006

G-005

G-005

G-005

G-005

G-006

G-006

G-006

G-006

G-006

G-006

G-006

G-006

BUILDING PAD FOR SSM B -

THUP B CONSTRUCTION

B70

B70A

GUEST HOUSE

LAWRENCE ROAD

SITE WALLS: SSM A SCOPE

SITE WALLS: THUP A SCOPE

FUTURE SITE CONSTRUCTION IN SSM B/THUP B

EXISTING SITE WALLS TO REMAIN

SITE WALLS LEGEND

SITE SCOPE NOTES:

THUP A: NEW AND RELOCATED UTILITIES 5' FROM WELCOME CENTER

BUILDING FOOTPRINT, ROUGH SITE GRADING AND RELATED SITE

RETAINING WALLS OUTSIDE OF WELCOME CENTER BUILDING AND

LOADING DOCK FOOTPRINT AND LANDSCAPE DEMOLITION.

SSM A: DEMOLITION AND CAPPING OF EXISTING UTILITIES AT EXISTING

CAFETERIA BUILDING; ROUGH SITE GRADING AND RELATED SITE

RETAINING WALLS WITHIN THE WELCOME CENTER BUILDING AND

LOADING DOCK FOOTPRINT, AND MAKE-READY WORK AT B70 LOADING

AREA.

THUP B: FINAL GRADING AND SUBSURFACE FILL, PLANTERS AND

RELATED SITE WALLS, REMAINING SITE WALLS, SHUTTLE BUS

SHELTER, ALL FINISHED LANDSCAPE FILL AND PLANTINGS.

SSM B: NEW AND RESURFACED SIDEWALKS, PAVING AND SURFACING

AT TRANSIT HUB AND PATIO, REFURBISHMENT OF EXISTING STAIRS

AND RAILNGS, NEW STAIRS AND RAILINGS, SITE RAILINGS.

(PROGRESS, ESTIMATE, BID, CONSTRUCTION,

CONFORMED, REVISION, RECORD)(IF REVISION, APPLIES ONLY TO REVISED WORK)

ISSUEPROFESSIONAL SEAL

PROJECT NO. 10221250

DRAWING NO.

SHEET

DATE

SCALE

APPROVED BY

CHECKED BY

DRAWN BY

REMARKSDATE

BY

APPR'D

BY

CHECKED

BY

DRAWN

NUMBER

REVISIONCONSULTING A/E FIRMCONSULTING FIRMCONSULTING FIRM

100%

FACILITIES DIVISION

LBNL SSM A-THUP A

Preliminary

Design

Pre lim ina ry Des ign

4' 8' 16'

As indicated

UNIVERSITY OF CALIFORNIA

LAWRENCE BERKELEY NATIONAL LABORATORY

SITE WALLS PHASING DIAGRAM -THUP A/ SSM A

G-00308/03/2020

HDR Architecture 201 California St San Francisco, CA 94111

OP 08/03/2020

1/32" = 1'-0" 1

SITE WALLS PHASING DIAGRAM - LL THUP A/ SSM A

1/32" = 1'-0" 2

SITE WALLS PHASING DIAGRAM - L2 THUP A/ SSM 3A

NOTE:

INFORMATION REPRESENTED ON THIS DRAWING IS

DIAGRAMATIC. NOT TO BE USED FOR CONSTRUCTION

PURPOSES. THUP SCOPE OF WORK SHOWN FOR

CLARITY PURPOSES.

774'

770'

770'

770'

TOW 773' - 6" (NOMINAL)

TOW 773' - 6" (NOMINAL)

TOW 773' - 6" (NOMINAL)

TOW 773' - 6" (NOMINAL)

G-005

G-006

G-005

G-005

G-005

G-005

G-006

G-006

G-006

G-006

G-006

G-006

G-006

G-006

G-006

B70

B70A

GUEST HOUSE

LAWRENCE ROAD

806' - 6"

TOW 2' - 0" ABOVE GRADE

EXISTING SITE WALL TO

REMAIN; TIE NEW SITE WALLS

INTO EXISTING

TOW SLOPES WITH STAIR, 2' - 0"

ABOVE GRADE

TOW 2' - 0" ABOVE

GRADE

805' -0"

812' -0"

810' -0"

805'

807' (TBD)

793'

796'

800'

TOW 2' - 0" ABOVE

GRADE

TOW 2' - 0"

ABOVE GRADE

TOW 810' - 0"

TOW 810' - 0"

SLOPES WITH GRADE

TOW 812' - 0"

TOW 796' - 0"

TOW APROX

794' - 0"

790'

TOW 791' - 0"

SLOPES WITH GRADE

TOW APROX

792' - 0"

TOW APROX

792' - 0"

SLOPES WITH RAMP

SLOPES WITH RAMP

TOW 807 - 0"

SLOPES WITH GRADE

TOW 807' - 6"

TOW 2' - 0"

ABOVE GRADE

TOW 810' - 0"

TOW 805' - 6"

SLOPES DOWN

G-005

G-006

G-005

G-005

G-005

G-005

G-006

G-006

G-006

G-006

G-006

G-006

G-006

G-006

B70

B70A

GUEST HOUSE

LAWRENCE ROAD

SITE WALLS LEGEND

SITE WALLS: SSM B SCOPE

SITE WALLS: THUP B SCOPE

EXISTING SITE WALLS TO REMAIN

SITE SCOPE NOTES:

THUP A: NEW AND RELOCATED UTILITIES 5' FROM WELCOME CENTER

BUILDING FOOTPRINT, ROUGH SITE GRADING AND RELATED SITE

RETAINING WALLS OUTSIDE OF WELCOME CENTER BUILDING AND

LOADING DOCK FOOTPRINT AND LANDSCAPE DEMOLITION.

SSM A: DEMOLITION AND CAPPING OF EXISTING UTILITIES AT EXISTING

CAFETERIA BUILDING; ROUGH SITE GRADING AND RELATED SITE

RETAINING WALLS WITHIN THE WELCOME CENTER BUILDING AND

LOADING DOCK FOOTPRINT, AND MAKE-READY WORK AT B70 LOADING

AREA.

THUP B: FINAL GRADING AND SUBSURFACE FILL, PLANTERS AND

RELATED SITE WALLS, REMAINING SITE WALLS, SHUTTLE BUS

SHELTER, ALL FINISHED LANDSCAPE FILL AND PLANTINGS.

SSM B: NEW AND RESURFACED SIDEWALKS, PAVING AND SURFACING

AT TRANSIT HUB AND PATIO, REFURBISHMENT OF EXISTING STAIRS

AND RAILNGS, NEW STAIRS AND RAILINGS, SITE RAILINGS.

(PROGRESS, ESTIMATE, BID, CONSTRUCTION,

CONFORMED, REVISION, RECORD)(IF REVISION, APPLIES ONLY TO REVISED WORK)

ISSUEPROFESSIONAL SEAL

PROJECT NO. 10221250

DRAWING NO.

SHEET

DATE

SCALE

APPROVED BY

CHECKED BY

DRAWN BY

REMARKSDATE

BY

APPR'D

BY

CHECKED

BY

DRAWN

NUMBER

REVISIONCONSULTING A/E FIRMCONSULTING FIRMCONSULTING FIRM

100%

FACILITIES DIVISION

LBNL SSM A-THUP A

Preliminary

Design

Pre lim ina ry Des ign

4' 8' 16'

As indicated

UNIVERSITY OF CALIFORNIA

LAWRENCE BERKELEY NATIONAL LABORATORY

SITE WALLS PHASING DIAGRAM -THUP B/ SSM B

G-00408/03/2020

HDR Architecture 201 California St San Francisco, CA 94111

OP 08/03/2020

1/32" = 1'-0" 1

SITE WALLS PHASING - LL THUP B/ SSM B

1/32" = 1'-0" 2

SITE WALLS PHASING - L2 THUP B/ SSM 3B

NOTE:

INFORMATION REPRESENTED ON THIS DRAWING IS

DIAGRAMATIC. NOT TO BE USED FOR CONSTRUCTION

PURPOSES. THUP SCOPE OF WORK SHOWN FOR

CLARITY PURPOSES.

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

774' - 0"

LEVEL 00

770' - 0" LEVEL 00 - (E) Loading Dock

1'1.5'4' 2'3'

TOW 810' - 9"

TOW 806' - 2"

LIGHT WELL

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

774' - 0"

LEVEL 00

770' - 0" LEVEL 00 - (E) Loading Dock

804' - 6" 805' - 0" 805' - 0" 805' - 0"

TOW 806' - 6"

TOW 770' - 0" NOMINAL

PARKING

ACCESS ROAD PARKING/ SIDEWALK

PARKING/

SIDEWALK

PLANTER

ENTRY PLAZA

DROP OFF

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

774' - 0"

LEVEL 00

770' - 0" LEVEL 00 - (E) Loading Dock

3 2 14

TOW 770' - 0" NOMINAL

794' - 0"

801' - 4"

PARKING

PLANTER

OUTDOOR

WALKWAY

PARKING ACCESS ROAD

VARIES

VARIES

55.5

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

774' - 0"

LEVEL 00

770' - 0" LEVEL 00 - (E) Loading Dock

1'1.5'4' 2'3'

TOW 807' - 6"

805' - 0"

TOW 770' - 0" NOMINAL

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

774' - 0"

LEVEL 00

770' - 0" LEVEL 00 - (E) Loading Dock

3 2 14

791' - 0"790' - 0" 790' - 0"

TOW 794' - 0" SLOPES W/ GRADE

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

774' - 0"

LEVEL 00

770' - 0" LEVEL 00 - (E) Loading Dock

LOADING DOK

VARIES

LEGEND

SITE WALL BUILT IN SSM THUP A

SITE WALL BUILT IN SSM THUP B

EXISTING TO REMAIN SITE WALL

SITE WALL BUILT IN SSM A

SITE WALL BUILT IN SSM B

NEW BUILDING WALL

SITE SCOPE NOTES:

THUP A: NEW AND RELOCATED UTILITIES 5' FROM WELCOME CENTER

BUILDING FOOTPRINT, ROUGH SITE GRADING AND RELATED SITE

RETAINING WALLS OUTSIDE OF WELCOME CENTER BUILDING AND

LOADING DOCK FOOTPRINT AND LANDSCAPE DEMOLITION.

SSM A: DEMOLITION AND CAPPING OF EXISTING UTILITIES AT EXISTING

CAFETERIA BUILDING; ROUGH SITE GRADING AND RELATED SITE

RETAINING WALLS WITHIN THE WELCOME CENTER BUILDING AND

LOADING DOCK FOOTPRINT, AND MAKE-READY WORK AT B70 LOADING

AREA.

THUP B: FINAL GRADING AND SUBSURFACE FILL, PLANTERS AND

RELATED SITE WALLS, REMAINING SITE WALLS, SHUTTLE BUS

SHELTER, ALL FINISHED LANDSCAPE FILL AND PLANTINGS.

SSM B: NEW AND RESURFACED SIDEWALKS, PAVING AND SURFACING

AT TRANSIT HUB AND PATIO, REFURBISHMENT OF EXISTING STAIRS

AND RAILNGS, NEW STAIRS AND RAILINGS, SITE RAILINGS.

(PROGRESS, ESTIMATE, BID, CONSTRUCTION,

CONFORMED, REVISION, RECORD)(IF REVISION, APPLIES ONLY TO REVISED WORK)

ISSUEPROFESSIONAL SEAL

PROJECT NO. 10221250

DRAWING NO.

SHEET

DATE

SCALE

APPROVED BY

CHECKED BY

DRAWN BY

REMARKSDATE

BY

APPR'D

BY

CHECKED

BY

DRAWN

NUMBER

REVISIONCONSULTING A/E FIRMCONSULTING FIRMCONSULTING FIRM

100%

FACILITIES DIVISION

LBNL SSM A-THUP A

Preliminary

Design

Pre lim ina ry Des ign

4' 8' 16'

As indicated

UNIVERSITY OF CALIFORNIA

LAWRENCE BERKELEY NATIONAL LABORATORY

SITE SECTIONS DIAGRAMS

G-00508/03/2020

HDR Architecture 201 California St San Francisco, CA 94111

OP 08/03/2020

1/16" = 1'-0"1

SITE SECTION A

1/16" = 1'-0"3

SITE SECTION C

1/16" = 1'-0"4

SITE SECTION D

1/16" = 1'-0"7

SITE SECTION B

1/16" = 1'-0"5

SITE SECTION E

1/16" = 1'-0"6

SITE SECTION F

NOTE:

INFORMATION REPRESENTED ON THIS DRAWING IS

DIAGRAMATIC. NOT TO BE USED FOR CONSTRUCTION

PURPOSES.

THUP SCOPE OF WORK SHOWN FOR CLARITY

PURPOSES.

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

774' - 0"

LEVEL 00

770' - 0" LEVEL 00 - (E) Loading Dock

TOP OF NEW RETAINING WALL (BEYOND)

EXISTING RETAINING WALL

EXISTING LOADING DOCK AND

RETAINING WALL

TOW 782'- 10" NOMINAL

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

774' - 0"

LEVEL 00

770' - 0" LEVEL 00 - (E) Loading Dock

A B C D E

LOADING DOCK

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

774' - 0"

LEVEL 00

770' - 0" LEVEL 00 - (E) Loading Dock

MLKJHG

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

774' - 0"

LEVEL 00

770' - 0" LEVEL 00 - (E) Loading Dock

(E) OUTDOOR PATIO

WALKWAY

TOW 807' - 6" - SLOPES

WITH GRADE

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

774' - 0"

LEVEL 00

770' - 0" LEVEL 00 - (E) Loading Dock

OUTDOOR WALKWAY

TOW 801'- 0" NOMINAL

SLOPES WITH GRADE

TOW 792'- 0" NOMINAL

SLOPES WITH GRADE

TOW 790'- 0"

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

774' - 0"

LEVEL 00

770' - 0" LEVEL 00 - (E) Loading Dock

TOW 807' - 0" SLOPES W/ GRADE

TOW 2' ABOVE GRADE

TOW 2' ABOVE GRADE

ENTRY PLAZA PLANTER

PATHWAY

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

TOW 807' - 6" NOMINAL

ENTRY PLAZA

PARKING

LAWRENCE ROAD

GRADE 796' NOMINAL

790' - 0"

LEVEL 01

805' - 0"

LEVEL 02

820' - 0"

LEVEL 03 ROOF

TOW 805' - 6"

TOW 2' ABOVE GRADE

TOW 807' - 6" NOMINAL

804' - 6"

805' - 0"

PLANTER

LAWRENCE ROAD

ROADBUS DROP OFF

SIDEWALK

/PARKING

PLANTER

GRADE APROX

800 ' NOMINAL

TOW 2' ABOVE GRADE

805' - 0" 805' - 0"

TOW 807' - 6" NOMINAL

SIDEWALK

/PARKING

SIDEWALK

/PARKING

PLANTER

LAWRENCE

ROAD

PLANTER

LEGEND

SITE WALL BUILT IN SSM THUP A

SITE WALL BUILT IN SSM THUP B

EXISTING TO REMAIN SITE WALL

SITE WALL BUILT IN SSM A

SITE WALL BUILT IN SSM B

NEW BUILDING WALL

SITE SCOPE NOTES:

THUP A: NEW AND RELOCATED UTILITIES 5' FROM WELCOME CENTER

BUILDING FOOTPRINT, ROUGH SITE GRADING AND RELATED SITE

RETAINING WALLS OUTSIDE OF WELCOME CENTER BUILDING AND

LOADING DOCK FOOTPRINT AND LANDSCAPE DEMOLITION.

SSM A: DEMOLITION AND CAPPING OF EXISTING UTILITIES AT EXISTING

CAFETERIA BUILDING; ROUGH SITE GRADING AND RELATED SITE

RETAINING WALLS WITHIN THE WELCOME CENTER BUILDING AND

LOADING DOCK FOOTPRINT, AND MAKE-READY WORK AT B70 LOADING

AREA.

THUP B: FINAL GRADING AND SUBSURFACE FILL, PLANTERS AND

RELATED SITE WALLS, REMAINING SITE WALLS, SHUTTLE BUS

SHELTER, ALL FINISHED LANDSCAPE FILL AND PLANTINGS.

SSM B: NEW AND RESURFACED SIDEWALKS, PAVING AND SURFACING

AT TRANSIT HUB AND PATIO, REFURBISHMENT OF EXISTING STAIRS

AND RAILNGS, NEW STAIRS AND RAILINGS, SITE RAILINGS.

(PROGRESS, ESTIMATE, BID, CONSTRUCTION,

CONFORMED, REVISION, RECORD)(IF REVISION, APPLIES ONLY TO REVISED WORK)

ISSUEPROFESSIONAL SEAL

PROJECT NO. 10221250

DRAWING NO.

SHEET

DATE

SCALE

APPROVED BY

CHECKED BY

DRAWN BY

REMARKSDATE

BY

APPR'D

BY

CHECKED

BY

DRAWN

NUMBER

REVISIONCONSULTING A/E FIRMCONSULTING FIRMCONSULTING FIRM

100%

FACILITIES DIVISION

LBNL SSM A-THUP A

Preliminary

Design

Pre lim ina ry Des ign

4' 8' 16'

As indicated

UNIVERSITY OF CALIFORNIA

LAWRENCE BERKELEY NATIONAL LABORATORY

SITE SECTIONS DIAGRAMS

G-00608/03/2020

HDR Architecture 201 California St San Francisco, CA 94111

OP 08/03/2020

1/16" = 1'-0"1

SITE SECTION G

1/16" = 1'-0"2

SITE SECTION G

1/16" = 1'-0"3

SITE SECTION J

1/16" = 1'-0"4

SITE SECTION K

1/16" = 1'-0"5

SITE SECTION L

1/16" = 1'-0"6

SITE SECTION M

1/16" = 1'-0"7

SITE SECTION

1/16" = 1'-0"8

SITE SECTION

1/16" = 1'-0"9

SITE SECTION

NOTE:

INFORMATION REPRESENTED ON THIS

DRAWING IS DIAGRAMATIC. NOT TO BE USED

FOR CONSTRUCTION PURPOSES.

THUP SCOPE OF WORK SHOWN FOR CLARITY

PURPOSES.

GHD Inc.

6001 Shellmound Street, Suite 850

Emeryville, CA 94608 USA

T 1 510 420 0700 F 1 510 420 9170

E emeryville@ghd.com W www.ghd.com

HDR Architecture 201 California St San Francisco, CA 94111

Prel imin ary Desi gn

D

I

L

L

O

N

J

. M

O

R

R

A

No. C 79186

C I V I L

ABBREVIATIONS

AT

AGGREGATE BASE

ABANDONED

ASPHALTIC CONCRETE

ASBESTOS CONTAINING MATERIAL

AC WEARING SURFACE

ADDITIONAL

ADJACENT, ADJUSTABLE

ABOVE FINISH FLOOR

ABOVE FINISH GRADE

ALUMINUM

ALTERNATE

APPROXIMATE

APPROVED

ARCHITECTURAL

AIR RELEASE VALVE

AUTOMATIC

AUXILIARY

AUXILIARY WATER SUPPLY SYSTEM

AB

ABD, ABND

AC

ACM

ACWS ADD.

ADJ

AFF

AFG

AL

ALTN

APPROX

APVD

ARCH.

ARV

AUTO. AUX

AWSS

BFP

BLDG

BOO

BOD

BOP

BOT

BSW

BACKFLOW PREVENTER

BUILDING

BOTTOM OF OPENING

BOTTOM OF DUCT

BOTTOM OF PIPE

BOTTOM

BACK OF SIDEWALK

CB

CCR

C&G

CHK

CHWR

CHWS

CI

CJ

CLDIP

CLR

CL

CMP

CO

COMB.

CONC

CONN

CONT

COORD

CPS

CR

CS

CSMH

CTD

CTR

C TO C

CU

CV

CATCH BASIN

CURB CUT RAMP

CURB AND GUTTER

CHECK

CHILLED WATER RETURN

CHILLED WATER SUPPLY

CAST IRON

CONSTRUCTION JOINT

CEMENT-LINED DUCTILE IRON PIPE

CLEAR

CENTERLINE, CLASS

CORRUGATED METAL PIPE

CLEANOUT

COMBINED

CONCRETE

CONNECTION

CONTINUOUS, CONTINUATION

COORDINATE

CATHODIC PROTECTION SYSTEM

CURB RETURN

COMBINED SEWER

COMBINED SEWER MANHOLE

CENTERED

CENTER

CENTER TO CENTER

CUBIC, COPPER

CHECK VALVE

DDC

DET

DI

DIA

DIAG

DN

DOE

DR

D/W

DW

DWG

DOUBLE DETECTOR CHECK

DETAIL

DROP INLET

DIAMETER

DIAGONAL

DOWN

DEPARTMENT OF ENERGY

DRAIN

DRIVEWAY

DOMESTIC WATER

DRAWING

(E), EXST

E

EA

EWEF

EF

EH&S

EL

ELEC

ENGR

EP

EQL SP

EQPT

EW

EXC

EXP

EXISTING

EAST, ELECTRIC

EACH

EACH WAY, EACH FACE

EACH FACE

ENVIRONMENTAL HEALTH & SAFETY

ELEVATION

ELECTRIC, ELECTRICAL

ENGINEER

EDGE OF PAVEMENT

EQUALLY SPACED

EQUIPMENT

EACH WAY

EXCAVATE

EXPOSED, EXPANSION

FAL

FC

FDC

FF

FG

FH

FIG.

FL

FM

FNSH

FOC

FSR

FT

FW

FWD

FWDR

FIRE ALARM

FACE OF CURB

FIRE DEPARTMENT CONNECTION

FINISH FLOOR

FINISH GRADE

FIRE HYDRANT

FIGURE

FLOW LINE

FORCE MAIN

FINISH

FACE OF CONCRETE

FIRE SERVICE RISER

FOOT OR FEET

FIRE WATER

FORWARD

FOUNDATION WEEP DRAIN

G

GAL

GCO

GL

GPM

GRTG

GVL

GWT

GAS

GALLON

GRADE CLEAN OUT

GLASS

GALLONS PER MINUTE

GRATING

GRAVEL

GROUND WATER TREATMENT SYSTEM

HDPE

HMA

HORIZ

HP

HPCW

HPG

HPNG

HPW

HR

HIGH DENSITY POLYETHYLENE

HOT MIX ASPHALT

HORIZONTAL

HIGH POINT

HIGH PRESSURE COLD WATER

HIGH PRESSURE GAS

HIGH PRESSURE NATURAL GAS

HIGH PRESSURE WATER

HANDRAIL

IN.

INV

IRR

INCH

INVERT

IRRIGATION

L

LAT

LBNL, LBL

LCWR

LCWS

LF

LLW

LOTO

LPCW

LPW

LPNG

LPGAS

LENGTH

LATERAL

LAWRENCE BERKELEY NATIONAL

LABORATORY

LOW CONDUCTIVITY WATER RETURN

LOW CONDUCTIVITY WATER SUPPLY

LINEAR FEET

LOW LEVEL WASTE

LOCK OUT TAG OUT

LOW PRESSURE COLD WATER

LOW PRESSURE (DOMESTIC) WATER

LOW PRESSURE NATURAL GAS

LOW PRESSURE GAS

MAX

MECH

MH

MIN

MISC

MTL

MUTCD

MAXIMUM

MECHANICAL ROOM

MANHOLE

MINIMUM, MINUTE

MISCELLANEOUS

MATERIAL

MANUAL ON UNIFORM TRAFFIC CONTROL

DEVICES

N/A (N) N

NE

NIC

NO.

NTS

NW

NOT APPLICABLE

NEW

NORTH

NORTHEAST

NOT IN CONTRACT

NUMBER, NUMBERING

NOT TO SCALE

NORTHWEST

(OH)

OC

OD

OF

OG

OSD

OPNG

OVERHEAD

ON CENTER

OUTSIDE DIAMETER, OVERFLOW DRAIN

OUTSIDE FACE, OVERFLOW

ORIGINAL GROUND

OPEN SITE DRAIN

OPENING

PB

PEL

PIV

PL

POC

PROP

PSF

PSI

PSIG

PTS

PVC

PVMT

PVT

PWR

PULL BOX

PERMISSIBLE EXPOSURE LIMITS

POST INDICATOR VALVE

PLATE, PROPERTY LINE

POINT OF CONNECTION

PROPERTY

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

POUNDS PER SQUARE

INCH, GAUGE

POINTS

POLYVINYLCHLORIDE

PAVEMENT

PRIVATE

POWER

RACM

R, RAD

RC

RD

RDCR

REQD

RJ

RLC

RLCR

RM

RO

RST

RTN

RWL

ROW

REGULATED ASBESTOS

CONTAINING MATERIAL

RADIUS, RIGHT

RELATIVE COMPACTION

ROAD

REDUCER

REQUIRED

RESTRAINED JOINT

RECONNAISSANCE LEVEL

CHARACTERIZATION

RECONNAISSANCE LEVEL

CHARACTERIZATION REPORT

ROOM

ROUGH OPENING

REINFORCING STEEL

RETURN

RECLAIMED WATER LINE

RIGHT-OF-WAY

S

SCH

SD

SDMH

SECT

SERC

SH

SIM

SL

SP

SPEC

SQ

SQ FT

SQ IN

SS

SSMH

ST

STL

STA

STD

STR

S/W

SOUTH, SLOPE

SCHEDULE

STORM DRAIN

STORM DRAIN MANHOLE

SECTION

SOLAR ENERGY RESEARCH

CENTER

SHEET

SIMILAR

STREET LIGHT

SPACE OR SPACES

SPECIFICATIONS

SQUARE

SQUARE FOOT

SQUARE INCH

SANITARY SEWER

SANITARY SEWER MANHOLE

STREET

STEEL

STATION

STANDARD

STRAIGHT

SIDEWALK

T&B

TC

TEL

TEMP

TF

TG

THK

TOC

TP

TRANS

TRANSV

TRWR

TRWS

TSB

TST

TW

TYP

TOP AND BOTTOM

TOP OF CURB

TELEPHONE

TEMPORARY

TOP FACE

TOP OF GRATE

THICK

TOP OF CURB

TURNING POINT

TRANSITION

TRANSVERSE

TREATED WATER RETURN

TREATED WATER SUPPLY

TRAFFIC SIGNAL BOX

TOP OF STEEL

TOP OF WALL

TYPICAL

UNDERGROUND

UNIVERSITY OF CALIFORNIA

BERKELEY

UNKNOWN

UNLESS NOTED OTHERWISE

(UG)

UCB

UNK

UNO

VC

VERT

VG

VLV

VERTICAL CURVE

VERTICAL

VALLEY GUTTER

VALVE

1. CONTRACTOR TO FIELD VERIFY SITE CONDITIONS PRIOR TO COMMENCEMENT OF WORK.

2. IDENTIFY AND PROTECT ALL STORM DRAIN INLETS SURROUNDING AND DOWNSTREAM FROM THE WORK THAT MAY BE AFFECTED BY THE WORK. NOTE THAT ALL STORM DRAIN INLETS REQUIRING PROTECTION MAY NOT BE IDENTIFIED IN THE CONTRACT DOCUMENTS. ALL

WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SWPPP.

3. CLEARING AND GRUBBING IS ONLY PERMITTED TO THE EXTENT NEEDED TO EXECUTE THE WORK. ALL OTHER VEGETATION IS TO REMAIN AND BE PROTECTED. CONTRACTOR SHALL PROTECT ALL TREES IN-PLACE UNLESS SPECIFICALLY SHOWN OTHERWISE.

4. CONTRACTOR SHALL OBTAIN FROM THE LBNL PROJECT MANAGER A PERMIT TO PENETRATE, SAWCUT OR EXCAVATE EXISTING SURFACES OF LBNL PROPERTY PRIOR TO START OF ANY UNDERGROUND WORK. NOTE THAT UNDERGROUND SERVICES, AND OTHER UTILITIES MAY NOT BE FIELD MARKED. CONTRACTOR SHALL REFER TO PLAN FOR APPROXIMATE LOCATION OF KNOWN UTILITIES AND SHALL POTHOLE

OR HAND DIG WHERE REQUIRED.

5. UNAUTHORIZED CHANGES AND USES: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY

LBNL AND/OR THE PREPARER OF THESE PLANS.

6. NO GUARANTEE IS INTENDED THAT ALL CONFLICTS OR OBSTRUCTIONS ARE SHOWN ON THE PLANS. THOSE SHOWN ARE BASED ON THE BEST INFORMATION AVAILABLE AND THE CONTRACTOR IS CAUTIONED THAT LBNL OR ENGINEER ASSUMES NO RESPONSIBILITY FOR ANY CONFLICTS OR OBSTRUCTIONS EITHER SHOWN OR NOT SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ACTUAL

LOCATIONS, DEPTHS AND SIZES.

7. THE LBNL REPRESENTATIVE (CONSTRUCTION MANAGER) WILL APPROVE ALL MATERIAL STORAGE AND EQUIPMENT PARKING AREAS.

8. ALL WORK SHALL BE IN CONFORMANCE WITH CURRENT STANDARD SPECIFICATIONS EXCEPT AS MODIFIED BY THESE CONTRACT

DOCUMENTS.

9. LBNL SHALL BE IMMEDIATELY NOTIFIED IN WRITING BY THE CONTRACTOR OF ANY IDENTIFIED CONDITIONS THAT REQUIRE DEVIATIONS

FROM THESE PLANS AND/OR SPECIFICATIONS.

10. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF ALL WORK ASSOCIATED WITH THIS PROJECT INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY

CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO ADJACENT PUBLIC OR PRIVATE PROPERTY CAUSED BY THE CONTRACT WORK, AND SHALL BE RESPONSIBLE FOR ANY OTHER WORK REQUIRED TO PREVENT SUCH DAMAGE.

12. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A PERMIT COPY OF CONSTRUCTION PLANS AS WELL AS OTHER REQUIRED

PERMITS AT THE PROJECT SITE DURING CONSTRUCTION.

13. ALL EXCAVATIONS 5 FEET IN DEPTH OR GREATER WHEN NECESSARY SHALL BE SHORED AND BRACED ACCORDING TO OSHA REGULATIONS. SLOPE ROUNDING AND BENCHING MAY BE USED ON CUT AND FILL SLOPES, WHERE APPLICABLE.

14. ANY EXISTING SYSTEMS OR IMPROVEMENTS TO REMAIN THAT ARE DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE, AS DIRECTED BY THE ENGINEER, AND TO THE SATISFACTION OF LBNL.

15. THE CONTRACTOR SHALL EXERCISE CARE WHEN WORKING NEAR EXISTING UTILITIES OR SYSTEMS AND SHALL BE RESPONSIBLE FOR ALL DAMAGE, BREAKAGE, OR LEAKS CAUSED BY HIS WORK. ALL EXCAVATIONS WITH 30" OF ANOTHER UTILITY (BASED ON GPR SCANNING OF SUB-SURFACE UTILITIES) SHALL BE HAND-DUG PER LBNL POLICY. DRY VACUUM EXCAVATION AND USE OF A 30 POUND PNEUMATIC CHIPPING GUN WITH A 4-INCH FLAT SPADE BIT IS ALSO PERMISSIBLE AS IT IS CONSIDERED "NON-DESTRUCTIVE". A WET VACUUM AND AIR

KNIFE ARE NOT PERMISSIBLE.

16. WHERE EXISTING ABANDONED UNDERGROUND UTILITIES ARE ENCOUNTERED AND ARE IN CONFLICT WITH WORK ASSOCIATED WITH THIS CONTRACT, THE CONTRACTOR SHALL CONTACT LBNL CONSTRUCTION MANAGER OR PROJECT MANAGER, CONFIRM ABANDONMENT, THEN CAP AND REMOVE SUCH UTILITIES AS NEEDED TO COMPLETE WORK AND DISPOSE OF THE MATERIAL ACCORDING TO THE LATEST OSHA

AND LBNL REQUIREMENTS.

17. IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND TO THE SATISFACTION OF LBNL, CONTRACTOR SHALL PROVIDE DETAILED RECORD ("AS-BUILT") PLANS SHOWING ALL DEVIATIONS, CHANGES, ADDITIONS AND DELETIONS MADE DURING THE COURSE OF THE WORK.

ONE SET SHALL BE MAINTAINED AT THE SITE AND UPDATED DAILY. RECORD PLANS WILL BE PROVIDED IN ACCORDANCE WITH CONTRACT

DOCUMENTS.

18. COMPLY WITH LBNL TRUCK TRAFFIC ROUTES AND NUMBER OF ALLOWABLE TRUCK TRIPS PER DAY, WHICH MUST BE COORDINATED IN

ADVANCE WITH LBNL CONSTRUCTION MANAGER.

19. CONTRACTOR SHALL NOT DISRUPT OPERATIONS AT ADJACENT RESEARCH FACILITIES INCLUDING DISRUPTIONS CAUSED BY VIBRATION AND OPERATING OF HEAVY EQUIPMENT (AS PER SPECIFICATIONS). CONTRACTOR SHALL COORDINATE WITH LBNL CONSTRUCTION

MANAGER TO SEE IF THIS WORK SHOULD BE PERFORMED OFF-HOURS.

20. THIS PROJECT MAY INVOLVE DISTURBING HAZARDOUS SOILS DURING TRENCH EXCAVATION. IF HAZARDOUS SOILS ARE FOUND, THEY WILL

BE DISPOSED OF BY LBNL.

21. THE CONTRACTOR SHALL REVIEW REPORTED EXISTING HAZARDOUS MATERIALS AND VERIFY THE LOCATION AND EXTENT OF HAZARDOUS MATERIALS PRESENT AND LIKELY TO BE DISTURBED BY THE WORK OF THIS PROJECT. CONTRACTOR SHALL COMMUNICATE THE RESULTING INFORMATION TO ALL PROJECT PERSONNEL AND THIRD TIER CONTRACTORS FOR THE PURPOSE OF IDENTIFYING ALL APPLICABLE OCCUPATIONAL AND ENVIRONMENTAL PROTECTION REQUIREMENTS AND PROCEDURES TO SAFELY COMPLETE THE WORK OF THE PROJECT IN ACCORDANCE WITH LBNL REQUIREMENTS AND APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS.

22. ALL EXCAVATION AND SOIL REMOVAL SHALL BE IN ACCORDANCE WITH THE "SOIL MANAGEMENT PLAN" FOR THIS PROJECT. REFER TO THE PROJECT RFP DOCUMENTATION FOR INFORMATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL NONHAZARDOUS SOILS AND

LBNL SHALL BE RESPONSIBLE FOR ALL HAZARDOUS SOILS.

23. ALL PERSONNEL EXPOSURES TO HAZARDOUS MATERIALS SHALL BE MAINTAINED BELOW THE RESPECTIVE OSHA PERMISSIBLE EXPOSURE LIMITS (PEL) OR ACGIH TLV (WHICH EVER IS LOWER) FOR THE CHEMICAL AGENT AND IN THE EVENT THAT FEASIBLE CONTROL MEASURES FAIL TO PREVENT AIRBORNE LEVELS FROM EXCEEDING THE PEL OF A CHEMICAL AGENT, RESPIRATORY PROTECTIVE EQUIPMENT SHALL BE USED THAT HAVE MAXIMUM USE CONCENTRATIONS THAT EXCEED THE ACTUAL AIRBORNE EXPOSURE LEVELS AS MEASURED FOR

COMPLIANCE.

24. ALL WATER SYSTEM COMPONENTS SHALL BE NSF-61 CERTIFIED.

25. EXISTING HPCW MAINS TO BE ABANDONED SHALL REMAIN IN SERVICE UNTIL NEW HPCW MAINS ARE INSTALLED, TESTED AND TIED.

CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING HPCW BACKFEED AND TIE-IN ACTIVITIES WITH LBNL PROJECT MANAGER.

26. ABANDON (E) HPCW MAIN PER LBNL STD DRAWING U101. REMOVE WHERE IN CONFLICT WITH THE WORK. FILL WITH FLOWABLE CELLULAR

CONCRETE WHERE (E) HPCW IS LOCATED UNDER BUILDINGS AND ROADWAYS.

27. REFER TO GEOTECHNICAL DATA REPORT "CMLC WATER LINE REPLACEMENT PROJECT, PRIORITY 1-3 ALIGNMENTS, LAWRENCE BERKELY NATIONAL LABORATORY, BERKELEY, CALIFORNIA" (A3GEO, MARCH 15 2019) CONTAINED IN THE PROJECT RFP DOCUMENTATION FOR GEOTECHNICAL DATA COMPILATION MAPS, PHOTOGRAPHS OF SURFACE CONDITIONS AND LOGS OF PREVIOUS EXPLORATORY BORINGS, TRENCHES AND TEST PITS IN THE VICINITY OF THE PROPOSED ALIGNMENTS.

28. ALL (N) PIPEWORK TO BE CATHODICALLY PROTECTED. CATHODIC PROTECTION WORKS TO BE UNDERTAKEN IN ACCORDANCE WITH THE DIRECTION AND NOTES SHOWN ON THESE DRAWINGS, LBNL SPECIFICATION SECTION 264200 – CATHODIC PROTECTION, AND AS PER

CATHODIC PROTECTION DETAILS CP-501 AND CP-502.

29. WHERE (N) PIPEWORK CROSSES UNDER (E) DUCT BANK, ENCASE IN CONTROLLED DENSITY FILL A MINIMUM OF 3-FEET BEYOND DUCT BANK

LIMITS.

(N) WATER LINE

JT JOINT, JOINT TRENCH

(N) GATE VALVE

REDUCER

REMOVAL / ABANDONMENT

EDGE OF PAVEMENT

TREE LINE

(E) RECTIFIER LOCATION (APPROXIMATE)

(N) MONITORING TEST STATION LOCATION

(E) SANITARY SEWER MANHOLE

ABANDONED UTILITY

(N) VALVE (UTILITY/TYPE PER NOTE)

(E) DRAINAGE CATCH BASIN

(E) SANITARY SEWER CLEANOUT

(E) STORM DRAIN MANHOLE

(E) ELECTRICAL MANHOLE

(E) TELEPHONE MANHOLE

(E) FIRE HYDRANT

TREE

BUILDING AND NUMBER

COMPRESSED AIR PIPING

NATURAL GAS PIPING

ELECTRICAL LINES

TELEPHONE LINES

ELECTRICAL

SANITARY SEWER

IRRIGATION LINES

FIRE ALARM

STORM DRAIN

FOOTING DRAIN

LOW CONDUCTIVITY WATER

(E) ELECTRICAL BOX

(TYPE PER NOTE)

& TELEPHONE LINES

HIGH PRESSURE COLD WATER

LOW CONDUCTIVITY WATER SUPPLY

LOW CONDUCTIVITY WATER RETURN

RAIN LEADER DRAIN

TREATED WATER RETURN

HYDRAUGER

NEW CONDUIT

(E) ANODE WELL LOCATION (APPROXIMATE)

GENERAL NOTES LEGEND

SALVAGED FIRE HYDRANT

(N) AIR RELEASE VALVE

SD (N) STORM DRAIN

UTILITY POTHOLE

PH-1

C-501

C-501

DETAIL NUMBER

DRAWING WHERE DETAIL IS DRAWN

OR DRAWING THAT DETAIL AFFECTS

DWG NUMBER ON WHICH SECTION APPEARS

SECTION IDENTIFIER

CHAIN LINK FENCEX X

COPPER GROUND CABLE

(E) GROUNDING ROD

(E) CP TEST STATION LOCATION

(N) ANODE TEST STATION LOCATION

(E) BOLLARD

(N) FIRE HYDRANT

(E) VALVE (UTILITY/TYPE PER NOTE)

XX

ANNOTATION

SS (N) SANITARY SEWER

W

H

765 770

770 775

795 80

0 80

799.217

SET MAG

817.706

SET MAG

794.436

SET MAG

788.497

SET 60D

787.831

FND BRASS DISK

787.326

SET MAG

778.679

SET SCRIBED X

813.398

SET MAG

799.216

FND BOLT

805.924

FND NAIL

812.772

FND X

821.516

FND NAIL

820.728

FND NAIL

799.217

SET MAG

808.701

SET MAG

788.497

SET 60D

787.326

SET MAG

788.017

SET X

795.161

SET X

772.173

SET MAG

772.723

SET X

769.553

SET MAG

768.643

SET MAG

787.857

SCRIBED X

GHD Inc.

6001 Shellmound Street, Suite 850

Emeryville, CA 94608 USA

T 1 510 420 0700 F 1 510 420 9170

San Francisco, CA 94111

Prel imin ary Desi gn

D

I

L

L

O

R

R

A

No. C 79186

C I V I L

0 60'30'

1"=30'

KEY MAP

N

1.

NOTES:

SURVEY CONTROL TABLE

No. NORTHING EASTING DESCRIPTIONELEV

1 2146288.432 6056431.887 799.217 SET MAG

2 2146005.713 6056477.519 808.701 SET MAG

3 2146239.991 6056279.703 788.497 SET 60D

5 2146309.601 6056314.678 788.017 SET X

6 2146331.112 6056354.601 795.161 SET X

7 2145975.607 6056434.577 787.857 SCRIBED X

402 2146104.781 6056489.568 817.706 SET MAG

404 2146216.827 6056377.298 794.436 SET MAG

410 2146142.564 6056264.410 787.326 SET MAG

411 2146059.320 6056393.924 778.679 SET SCRIBED X

413 2146249.862 6056525.623 813.398 SET MAG

504 2146373.734 6056300.734 772.173 SET MAG

508 2146114.812 6056178.064 772.723 SET X

509 2146199.328 6056148.094 769.553 SET MAG

510 2146215.024 6056002.176 768.643 SET MAG

2002 2146183.506 6056278.175 787.831 FND BRASS DISK

3045 2146283.841 6056429.685 799.216 FND BOLT

3118 2146295.500 6056527.438 805.924 FND NAIL

3219 2146267.524 6056534.135 812.772 FND X

3269 2146036.842 6056505.895 821.516 FND NAIL

3274 2146050.016 6056500.113 820.720 FND NAIL

BUILDING 70

BUILDING 23

BUILDING 70A

BUILDING 54

LAWRENCE RD

LAWRENCE RD

SE

AB

OR

G

RD

LOADING DOCK

UPPER PARKING

LOWER PARKING

BUILDING 2

PROJECT BOUNDARY

770 775

795 80

0 80

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

GHD Inc.

6001 Shellmound Street, Suite 850

Emeryville, CA 94608 USA

T 1 510 420 0700 F 1 510 420 9170

San Francisco, CA 94111

Prel imin ary Desi gn

D

I

L

L

O

R

R

A

No. C 79186

C I V I L

0 60'30'

1"=30'

EXISTING SITE PLAN

N

BUILDING 70

BUILDING 23

BUILDING 70A

BUILDING 54

LAWRENCE RD

LAWRENCE RD

SE

AB

OR

G

RD

LOADING DOCK

UPPER PARKING

LOWER PARKING

BUILDING 2

1 PIPELINE TO BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND LBNL

STANDARD TRENCH DETAIL DRAWINGS U135 TO U140.

2 ALL SURFACE REPAIRS TO BE IN ACCORDANCE WITH THE SPECIFICATIONS DIVISION

32 AND LBNL STD DWG U145.

LOCATION OF ALL EXISTING UTILITIES INCLUDING, BUT NOT LIMITED TO WATER,

SEWER, ELECTRICAL, TELEPHONE, CABLE AND GAS ARE APPROXIMATE IN PLAN

AND PROFILE AND BASED ON BEST AVAILABLE MAPPING. THE CONTRACTOR IS

RESPONSIBLE TO LOCATE ALL EXISTING UTILITIES TO SUCCESSFULLY COMPLETE

THIS PROJECT. DAMAGE TO ANY EXISTING UTILITIES SHALL BE THE RESPONSIBILITY

OF THE CONTRACTOR.

ROLLED EROSION CONTROL PRODUCT IS REQUIRED ON DISTURBED SLOPES

GREATER THAN 2:1 (HORIZ:VERT).

SHOULD UNEXPECTED CONDITIONS BE ENCOUNTERED DURING EXCAVATION

ACTIVITIES, THE CONTRACTOR SHALL NOTIFY THE LBNL PROJECT MANAGER

IMMEDATELY. THE LBNL PROJECT MANAGER SHALL CONTACT THE

ENVIRONMENTAL SERVICES GROUP FOR DIRECTION. IF REQUIRED, THE

CONTRACTOR SHALL REARRANGE THE SCHEDULE AS NECESSARY, PROCEED TO THE

NEXT DESIGNATED WORK LOCATION AND CONTINUE OVERALL JOB PROGRESS

WITHOUT DELAY.

6 BACKFILL WITH CONTROLLED DENSITY FILL AS PER LBNL SPEC 312323 WHERE

COVER IS LESS THAN 30-INCH MINIMUM.

7 REFER TO LBNL STANDARD DRAWING U147 AND U148 FOR SERVICE CROSSING

REQUIREMENTS.

SHEET KEYNOTES

GENERAL NOTES

770 775

795 80

0 80

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

GHD Inc.

6001 Shellmound Street, Suite 850

Emeryville, CA 94608 USA

T 1 510 420 0700 F 1 510 420 9170

San Francisco, CA 94111

Prel imin ary Desi gn

D

I

L

L

O

R

R

A

No. C 79186

C I V I L

0 60'30'

1"=30'

DEMOLITION PLAN

N

6" CMP SD

" C

MP

S

D

6" C

I S D

10" CMP SD

4"

CI V

CP SD

6"

CM

P S D

" C

MP

S

D

4" CMPSD

10" CMP SD

8" SD

BUILDING 70

BUILDING 23

BUILDING 70A

BUILDING 54

LAWRENCE RD

LAWRENCE RD

SE

AB

OR

G

RD

LOADING DOCK

UPPER PARKING

LOWER PARKING

BUILDING 2

REMOVE

(E) SD

CATCH

BASIN

REMOVE

(E) SD

CATCH

BASIN

PROTECT

(E) SD

CATCH

BASIN

REMOVE

(E) SD

CATCH

BASIN

PROTECT

(E) SD

CATCH

BASIN

PROTECT

(E) SD

CATCH

BASIN

REMOVE

(E) SD

CATCH

BASIN

REMOVE

(E) SD

CATCH

BASIN

PROTECT

(E) SD

CATCH

BASIN

1 PIPELINE TO BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND LBNL

STANDARD TRENCH DETAIL DRAWINGS U135 TO U140.

2 ALL SURFACE REPAIRS TO BE IN ACCORDANCE WITH THE SPECIFICATIONS DIVISION

32 AND LBNL STD DWG U145.

LOCATION OF ALL EXISTING UTILITIES INCLUDING, BUT NOT LIMITED TO WATER,

SEWER, ELECTRICAL, TELEPHONE, CABLE AND GAS ARE APPROXIMATE IN PLAN

AND PROFILE AND BASED ON BEST AVAILABLE MAPPING. THE CONTRACTOR IS

RESPONSIBLE TO LOCATE ALL EXISTING UTILITIES TO SUCCESSFULLY COMPLETE

THIS PROJECT. DAMAGE TO ANY EXISTING UTILITIES SHALL BE THE RESPONSIBILITY

OF THE CONTRACTOR.

ROLLED EROSION CONTROL PRODUCT IS REQUIRED ON DISTURBED SLOPES

GREATER THAN 2:1 (HORIZ:VERT).

SHOULD UNEXPECTED CONDITIONS BE ENCOUNTERED DURING EXCAVATION

ACTIVITIES, THE CONTRACTOR SHALL NOTIFY THE LBNL PROJECT MANAGER

IMMEDATELY. THE LBNL PROJECT MANAGER SHALL CONTACT THE

ENVIRONMENTAL SERVICES GROUP FOR DIRECTION. IF REQUIRED, THE

CONTRACTOR SHALL REARRANGE THE SCHEDULE AS NECESSARY, PROCEED TO THE

NEXT DESIGNATED WORK LOCATION AND CONTINUE OVERALL JOB PROGRESS

WITHOUT DELAY.

6 BACKFILL WITH CONTROLLED DENSITY FILL AS PER LBNL SPEC 312323 WHERE

COVER IS LESS THAN 30-INCH MINIMUM.

7 REFER TO LBNL STANDARD DRAWING U147 AND U148 FOR SERVICE CROSSING

REQUIREMENTS.

SHEET KEYNOTES

GENERAL NOTES

BUILDING OUTLINE OF

(N) WELCOME CENTER

770 775

795 80

0 80

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

GHD Inc.

6001 Shellmound Street, Suite 850

Emeryville, CA 94608 USA

T 1 510 420 0700 F 1 510 420 9170

San Francisco, CA 94111

Prel imin ary Desi gn

D

I

L

L

O

R

R

A

No. C 79186

C I V I L

0 60'30'

1"=30'

DEMOLITION PLAN

N

4" CI SS

4" C

I S S

6" CI SS

6" CI SS

BUILDING 70

BUILDING 23

BUILDING 70A

BUILDING 54

LAWRENCE RD

LAWRENCE RD

SE

AB

OR

G

RD

LOADING DOCK

UPPER PARKING

LOWER PARKING

BUILDING 2

REMOVE

(E) SS

CLEANOUT

REMOVE

(E) SS

CLEANOUT

PROTECT

(E) SS

MANHOLE

REMOVE

(E) SS

CLEANOUT

REMOVE

(E) SS

CLEANOUT

REMOVE

(E) SS

CLEANOUT

BUILDING OUTLINE OF

(N) WELCOME CENTER

1 PIPELINE TO BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND LBNL

STANDARD TRENCH DETAIL DRAWINGS U135 TO U140.

2 ALL SURFACE REPAIRS TO BE IN ACCORDANCE WITH THE SPECIFICATIONS DIVISION

32 AND LBNL STD DWG U145.

LOCATION OF ALL EXISTING UTILITIES INCLUDING, BUT NOT LIMITED TO WATER,

SEWER, ELECTRICAL, TELEPHONE, CABLE AND GAS ARE APPROXIMATE IN PLAN

AND PROFILE AND BASED ON BEST AVAILABLE MAPPING. THE CONTRACTOR IS

RESPONSIBLE TO LOCATE ALL EXISTING UTILITIES TO SUCCESSFULLY COMPLETE

THIS PROJECT. DAMAGE TO ANY EXISTING UTILITIES SHALL BE THE RESPONSIBILITY

OF THE CONTRACTOR.

ROLLED EROSION CONTROL PRODUCT IS REQUIRED ON DISTURBED SLOPES

GREATER THAN 2:1 (HORIZ:VERT).

SHOULD UNEXPECTED CONDITIONS BE ENCOUNTERED DURING EXCAVATION

ACTIVITIES, THE CONTRACTOR SHALL NOTIFY THE LBNL PROJECT MANAGER

IMMEDATELY. THE LBNL PROJECT MANAGER SHALL CONTACT THE

ENVIRONMENTAL SERVICES GROUP FOR DIRECTION. IF REQUIRED, THE

CONTRACTOR SHALL REARRANGE THE SCHEDULE AS NECESSARY, PROCEED TO THE

NEXT DESIGNATED WORK LOCATION AND CONTINUE OVERALL JOB PROGRESS

WITHOUT DELAY.

6 BACKFILL WITH CONTROLLED DENSITY FILL AS PER LBNL SPEC 312323 WHERE

COVER IS LESS THAN 30-INCH MINIMUM.

7 REFER TO LBNL STANDARD DRAWING U147 AND U148 FOR SERVICE CROSSING

REQUIREMENTS.

SHEET KEYNOTES

GENERAL NOTES

CUT AND CAP

(E) HPCW

770 775

795 80

0 80

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

GHD Inc.

6001 Shellmound Street, Suite 850

Emeryville, CA 94608 USA

T 1 510 420 0700 F 1 510 420 9170

San Francisco, CA 94111

Prel imin ary Desi gn

D

I

L

L

O

R

R

A

No. C 79186

C I V I L

0 60'30'

1"=30'

DEMOLITION PLAN

N

1" CU IRR

1" CU IRR

2" C

U

HP

CW

BUILDING OUTLINE OF

(N) WELCOME CENTER

BUILDING 70

BUILDING 23

BUILDING 70A

BUILDING 54

LAWRENCE RD

LAWRENCE RD

SE

AB

OR

G

RD

LOADING DOCK

UPPER PARKING

LOWER PARKING

BUILDING 2

REMOVE

(E) VALVE

REMOVE

(E) VALVE

REMOVE

(E) VALVE VAULT

1 PIPELINE TO BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND LBNL

STANDARD TRENCH DETAIL DRAWINGS U135 TO U140.

2 ALL SURFACE REPAIRS TO BE IN ACCORDANCE WITH THE SPECIFICATIONS DIVISION

32 AND LBNL STD DWG U145.

LOCATION OF ALL EXISTING UTILITIES INCLUDING, BUT NOT LIMITED TO WATER,

SEWER, ELECTRICAL, TELEPHONE, CABLE AND GAS ARE APPROXIMATE IN PLAN

AND PROFILE AND BASED ON BEST AVAILABLE MAPPING. THE CONTRACTOR IS

RESPONSIBLE TO LOCATE ALL EXISTING UTILITIES TO SUCCESSFULLY COMPLETE

THIS PROJECT. DAMAGE TO ANY EXISTING UTILITIES SHALL BE THE RESPONSIBILITY

OF THE CONTRACTOR.

ROLLED EROSION CONTROL PRODUCT IS REQUIRED ON DISTURBED SLOPES

GREATER THAN 2:1 (HORIZ:VERT).

SHOULD UNEXPECTED CONDITIONS BE ENCOUNTERED DURING EXCAVATION

ACTIVITIES, THE CONTRACTOR SHALL NOTIFY THE LBNL PROJECT MANAGER

IMMEDATELY. THE LBNL PROJECT MANAGER SHALL CONTACT THE

ENVIRONMENTAL SERVICES GROUP FOR DIRECTION. IF REQUIRED, THE

CONTRACTOR SHALL REARRANGE THE SCHEDULE AS NECESSARY, PROCEED TO THE

NEXT DESIGNATED WORK LOCATION AND CONTINUE OVERALL JOB PROGRESS

WITHOUT DELAY.

6 BACKFILL WITH CONTROLLED DENSITY FILL AS PER LBNL SPEC 312323 WHERE

COVER IS LESS THAN 30-INCH MINIMUM.

7 REFER TO LBNL STANDARD DRAWING U147 AND U148 FOR SERVICE CROSSING

REQUIREMENTS.

SHEET KEYNOTES

770 775

795 80

0 80

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

GHD Inc.

6001 Shellmound Street, Suite 850

Emeryville, CA 94608 USA

T 1 510 420 0700 F 1 510 420 9170

San Francisco, CA 94111

Prel imin ary Desi gn

D

I

L

L

O

R

R

A

No. C 79186

C I V I L

0 60'30'

1"=30'

DEMOLITION PLAN

N

BUILDING OUTLINE OF

(N) WELCOME CENTER

BUILDING 70

BUILDING 23

BUILDING 70A

BUILDING 54

LAWRENCE RD

LAWRENCE RD

SE

AB

OR

G

RD

LOADING DOCK

UPPER PARKING

LOWER PARKING

BUILDING 2

1 PIPELINE TO BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND LBNL

STANDARD TRENCH DETAIL DRAWINGS U135 TO U140.

2 ALL SURFACE REPAIRS TO BE IN ACCORDANCE WITH THE SPECIFICATIONS DIVISION

32 AND LBNL STD DWG U145.

LOCATION OF ALL EXISTING UTILITIES INCLUDING, BUT NOT LIMITED TO WATER,

SEWER, ELECTRICAL, TELEPHONE, CABLE AND GAS ARE APPROXIMATE IN PLAN

AND PROFILE AND BASED ON BEST AVAILABLE MAPPING. THE CONTRACTOR IS

RESPONSIBLE TO LOCATE ALL EXISTING UTILITIES TO SUCCESSFULLY COMPLETE

THIS PROJECT. DAMAGE TO ANY EXISTING UTILITIES SHALL BE THE RESPONSIBILITY

OF THE CONTRACTOR.

ROLLED EROSION CONTROL PRODUCT IS REQUIRED ON DISTURBED SLOPES

GREATER THAN 2:1 (HORIZ:VERT).

SHOULD UNEXPECTED CONDITIONS BE ENCOUNTERED DURING EXCAVATION

ACTIVITIES, THE CONTRACTOR SHALL NOTIFY THE LBNL PROJECT MANAGER

IMMEDATELY. THE LBNL PROJECT MANAGER SHALL CONTACT THE

ENVIRONMENTAL SERVICES GROUP FOR DIRECTION. IF REQUIRED, THE

CONTRACTOR SHALL REARRANGE THE SCHEDULE AS NECESSARY, PROCEED TO THE

NEXT DESIGNATED WORK LOCATION AND CONTINUE OVERALL JOB PROGRESS

WITHOUT DELAY.

6 BACKFILL WITH CONTROLLED DENSITY FILL AS PER LBNL SPEC 312323 WHERE

COVER IS LESS THAN 30-INCH MINIMUM.

7 REFER TO LBNL STANDARD DRAWING U147 AND U148 FOR SERVICE CROSSING

REQUIREMENTS.

SHEET KEYNOTES

770 775

795 80

0 80

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

GHD Inc.

6001 Shellmound Street, Suite 850

Emeryville, CA 94608 USA

T 1 510 420 0700 F 1 510 420 9170

San Francisco, CA 94111

Prel imin ary Desi gn

D

I

L

L

O

R

R

A

No. C 79186

C I V I L

0 60'30'

1"=30'

DEMOLITION PLAN

N

6" H

PNG

BUILDING OUTLINE OF

(N) WELCOME CENTER

BUILDING 70

BUILDING 23

BUILDING 70A

BUILDING 54

LAWRENCE RD

LAWRENCE RD

SE

AB

OR

G

RD

LOADING DOCK

UPPER PARKING

LOWER PARKING

BUILDING 2

REMOVE (E) VALVE

CUT AND CAP

(E) HPNG LINE

REMOVE (E) VALVE

CUT AND CAP

(E) HPNG LINE

1 PIPELINE TO BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND LBNL

STANDARD TRENCH DETAIL DRAWINGS U135 TO U140.

2 ALL SURFACE REPAIRS TO BE IN ACCORDANCE WITH THE SPECIFICATIONS DIVISION

32 AND LBNL STD DWG U145.

LOCATION OF ALL EXISTING UTILITIES INCLUDING, BUT NOT LIMITED TO WATER,

SEWER, ELECTRICAL, TELEPHONE, CABLE AND GAS ARE APPROXIMATE IN PLAN

AND PROFILE AND BASED ON BEST AVAILABLE MAPPING. THE CONTRACTOR IS

RESPONSIBLE TO LOCATE ALL EXISTING UTILITIES TO SUCCESSFULLY COMPLETE

THIS PROJECT. DAMAGE TO ANY EXISTING UTILITIES SHALL BE THE RESPONSIBILITY

OF THE CONTRACTOR.

ROLLED EROSION CONTROL PRODUCT IS REQUIRED ON DISTURBED SLOPES

GREATER THAN 2:1 (HORIZ:VERT).

SHOULD UNEXPECTED CONDITIONS BE ENCOUNTERED DURING EXCAVATION

ACTIVITIES, THE CONTRACTOR SHALL NOTIFY THE LBNL PROJECT MANAGER

IMMEDATELY. THE LBNL PROJECT MANAGER SHALL CONTACT THE

ENVIRONMENTAL SERVICES GROUP FOR DIRECTION. IF REQUIRED, THE

CONTRACTOR SHALL REARRANGE THE SCHEDULE AS NECESSARY, PROCEED TO THE

NEXT DESIGNATED WORK LOCATION AND CONTINUE OVERALL JOB PROGRESS

WITHOUT DELAY.

6 BACKFILL WITH CONTROLLED DENSITY FILL AS PER LBNL SPEC 312323 WHERE

COVER IS LESS THAN 30-INCH MINIMUM.

7 REFER TO LBNL STANDARD DRAWING U147 AND U148 FOR SERVICE CROSSING

REQUIREMENTS.

SHEET KEYNOTES

BEGIN WALL "E"

N=2146127.52

E=6056239.74

BEGIN WALL "D"

N=2146193.74

E=6056231.33

BEGIN CURVE

N=2146198.32

E=6056252.00

END CURVE

N=2146196.72

E=6056266.13

N=2146164.44

E=6056323.75

N=2146137.53

E=6056308.67

N=2146085.39

E=6056401.75

N=2145929.65

E=6056445.66

END WALL "D"

N=2145938.94

E=6056478.63

N=2146096.85

E=6056294.50

N=2145917.91

E=6056410.14

END WALL "E"

N=2145927.37

E=6056443.76

L

L

L

L

L

L

L

L

C

L

BEGIN WALL "C"

N=2146189.85

E=6056301.63

BEGIN WALL "B"

N=2146188.03

E=6056327.26

END WALL "B"

N=2146204.63

E=6056397.42

BEGIN WALL "A"

N=2146204.53

E=6056372.02

BEGIN CURVE

N=2146214.36

E=6056407.78

POINT OF REVERSE CURVE

N=2146236.46

E=6056423.54

END CURVE

N=2146272.97

E=6056430.92

END WALL "A"

N=2146303.23

E=6056447.51

N=2146157.55

E=6056359.30

N=2146167.34

E=6056364.78

BEGIN CURVE

N=2146150.17

E=6056395.42

END CURVE

N=2146101.01

E=6056434.78

N=2146064.44

E=6056445.09

N=2146066.29

E=6056451.68

END WALL "C"

N=2145938.09

E=6056487.82

L

L

L

L

C

C

L

L

L

L

C

L

END CURVE

N=2146056.06

E=6056371.19

BEGIN CURVE

N=2146072.08

E=6056359.35

L

L

C

RADIUS POINT

N=2146178.74

E=6056256.94

RADIUS POINT

N=2146048.43

E=6056344.11

N=2146105.66

E=6056299.40

RADIUS POINT

N=2146067.85

E=6056342.98

RADIUS POINT

N=2146234.40

E=6056403.05

RADIUS POINT

N=2146242.78

E=6056486.27

GHD Inc.

6001 Shellmound Street, Suite 850

Emeryville, CA 94608 USA

T 1 510 420 0700 F 1 510 420 9170

San Francisco, CA 94111

Prel imin ary Desi gn

D

I

L

L

O

R

R

A

No. C 79186

C I V I L

0 60'30'

1"=30'

HORIZONTAL CONTROL AND PAVING PLAN

N

WALL COORDINATES INDICATED THE OUTER FACE OF THE WALL.

NOTES:

CURVE TABLE - WALL "E"

RADIUS LENGTHCURVE

28.14' 20.36'C4

L17

L18

L19

DELTA

41.24°

S60° 44' 40.23"E 64.77

N29° 15' 19.77"E 11.22

S60° 44' 40.23"E 35.16

L=65.05R=98.94

S15° 44' 40.23"E 38.00

N74° 15' 19.77"W 6.84

S15° 44' 40.23"E 133.20

N76° 41' 25.31"E 72.09

N76° 41' 25.31"E

37.07

L=29.64R=20.59

L=37.81R=63.05

N28° 44' 09.48"E 34.50

CURVE TABLE - WALL "C"

RADIUS LENGTHCURVE DELTA

CURVE TABLE - WALL "A"

RADIUS LENGTHCURVE

C1

DELTA

C3

LINE TABLE - WALL "A"

BEARING DISTANCELINE

BEARING DISTANCELINE

LINE TABLE - WALL "C"

L5

BEARING DISTANCELINE

LINE TABLE - WALL "B"

L1

L2

L3

L4

L6

L7

L8

L9

L20

C2

WALL "C"

WALL "A"

WALL "B"

WALL "D"

WALL "E"

N77° 30' 38.91"E 21.15

S60° 44' 40.23"E 66.05

S29° 15' 19.77"W 30.85

S60° 44' 40.23"E 105.91

S15° 44' 40.23"E 161.03

N74° 15' 19.77"E 34.25

BEARING DISTANCELINE

LINE TABLE - WALL "D"

L14

L12

L13

L10

L11

L15

BEARING DISTANCELINE

S60° 44' 40.23"E 62.77

N29° 04' 06.27"E 10.08

LINE TABLE - WALL "E"

L16

37.67°

34.36°

82.47°

BUILDING 70

BUILDING 23

BUILDING 70A

BUILDING 54

LAWRENCE RD

LAWRENCE RD

SE

AB

OR

G

RD

LOADING DOCK

UPPER PARKING

BUILDING 2

LOWER

PARKING

N74° 15' 19.77"E 34.93

S60° 44' 40.23"E 68.711

S15° 44' 36.12"E 143.540

770 775

795 80

0 80

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

GHD Inc.

6001 Shellmound Street, Suite 850

Emeryville, CA 94608 USA

T 1 510 420 0700 F 1 510 420 9170

San Francisco, CA 94111

Prel imin ary Desi gn

D

I

L

L

O

R

R

A

No. C 79186

C I V I L

0 60'30'

1"=30'

GRADING AND DRAINAGE PLAN

N

BUILDING OUTLINE OF

(N) WELCOME CENTER

BUILDING 70

BUILDING 23

BUILDING 70A

BUILDING 54

LAWRENCE RD

LAWRENCE RD

SE

AB

OR

G

RD

LOADING DOCK

UPPER PARKING

LOWER PARKING

BUILDING 2

1 PIPELINE TO BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND LBNL

STANDARD TRENCH DETAIL DRAWINGS U135 TO U140.

2 ALL SURFACE REPAIRS TO BE IN ACCORDANCE WITH THE SPECIFICATIONS DIVISION

32 AND LBNL STD DWG U145.

LOCATION OF ALL EXISTING UTILITIES INCLUDING, BUT NOT LIMITED TO WATER,

SEWER, ELECTRICAL, TELEPHONE, CABLE AND GAS ARE APPROXIMATE IN PLAN

AND PROFILE AND BASED ON BEST AVAILABLE MAPPING. THE CONTRACTOR IS

RESPONSIBLE TO LOCATE ALL EXISTING UTILITIES TO SUCCESSFULLY COMPLETE

THIS PROJECT. DAMAGE TO ANY EXISTING UTILITIES SHALL BE THE RESPONSIBILITY

OF THE CONTRACTOR.

ROLLED EROSION CONTROL PRODUCT IS REQUIRED ON DISTURBED SLOPES

GREATER THAN 2:1 (HORIZ:VERT).

SHOULD UNEXPECTED CONDITIONS BE ENCOUNTERED DURING EXCAVATION

ACTIVITIES, THE CONTRACTOR SHALL NOTIFY THE LBNL PROJECT MANAGER

IMMEDATELY. THE LBNL PROJECT MANAGER SHALL CONTACT THE

ENVIRONMENTAL SERVICES GROUP FOR DIRECTION. IF REQUIRED, THE

CONTRACTOR SHALL REARRANGE THE SCHEDULE AS NECESSARY, PROCEED TO THE

NEXT DESIGNATED WORK LOCATION AND CONTINUE OVERALL JOB PROGRESS

WITHOUT DELAY.

6 BACKFILL WITH CONTROLLED DENSITY FILL AS PER LBNL SPEC 312323 WHERE

COVER IS LESS THAN 30-INCH MINIMUM.

7 REFER TO LBNL STANDARD DRAWING U147 AND U148 FOR SERVICE CROSSING

REQUIREMENTS.

SHEET KEYNOTES

ABBREVIATIONS (MAY BE USED WITH OR WITHOUT DOT):

SLIP CRITICAL BOLTS.C.

BRBF. BUCKLING-RESTRAINED BRACE FRAME

STRUCTURAL STEEL

AESS ARCHITECTURAL EXPOSED

U.T. ULTRASONIC TESTING

TIE BEAMTB

EDGE OF DECKE.O.D.

AND

AT

CENTERLINE

DIAMETER OR ROUND

POUND OR NUMBER

EXISTING

NEW

ANCHOR BOLT

ADJACENT

APPROXIMATE

ARCHITECTURAL

BUILDING

BEAM

BLOCK OUT

BOTTOM

BOTTOM OF FOOTING

BETWEEN

CONSTRUCTION JOINT

CEILING

CLEAR

CONCRETE MASONRY UNIT

COLUMN

CONCRETE

CONNECTION

CONSTRUCTION

CONTINUOUS

COMPLETE PENETRATION

CENTER

DOUBLE

DETAIL

DIAMETER

DIMENSION

DOWN

DITTO

DRAWING

EACH

EACH FACE

EXPANSION JOINT

ELEVATION

ELECTRICAL

EMBEDMENT

EXPANDED POLYSTYRENE

EQUAL

EQUIPMENT

EACH SIDE

EACH WAY

EXTERIOR

FOUNDATION

FULL DEPTH

PARTIAL PENETRATION

FAR FACE

FINISH

FLOOR

FACE OF

FIREPROOF

FOOT OR FEET

FOOTING

FUTURE

GAUGE

GALVANIZED

GRADE BEAM

GRADE

HORIZONTAL

HIGH STRENGTH BOLT

HEIGHT

INSIDE DIAMETER

INSIDE FACE

INSULATION

INTERIOR

JOINT

POUND

LONG LEG HORIZONTAL

LONG LEG VERTICAL

MAXIMUM

MACHINE BOLT

MECHANICAL

MANUFACTURER

MINIMUM

MISCELLANEOUS

NORTH

NEAR FACE

NOT IN CONTRACT

NUMBER

NOMINAL

NOT TO SCALE

ON CENTER

OUTSIDE DIAMETER

OUTSIDE FACE

OPPOSITE HAND

OPENING

OPPOSITE

PENTHOUSE

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

POINT

PARTITION

RADIUS

REFERENCE

REINFORCING

REQUIRED

ROUGH OPENING

DEEP STEP IN FOOTING

SEE CIVIL DRAWINGS

SCHEDULE

SECTION

SHEET

SIMILAR

SAWCUT JOINT

SEE MECH. DRAWINGS

SLAB ON GRADE

SPECIFICATION

SQUARE

STAINLESS STEEL

STANDARD

STEEL

STIRRUP

STRUCTURAL

SUSPENDED

SYMMETRICAL

TOP AND BOTTOM

THICK

TOP OF CONCRETE

TOP OF FOOTING

TOP OF STEEL

TYPICAL

UNLESS OTHERWISE NOTED

VERTICAL

VERIFY IN FIELD

WITH

WORK POINT

WITHOUT

WATERPROOFING

WEIGHT

WELDED WIRE FABRICW.W.F.

WT.

WP.

W/O

W.P.

W/

V.I.F.

VERT.

U.O.N.

TYP.

T.O.S.

T.O.F.

T.O.C.

THK.

T&B

SYM.

SUSP.

STRL.

STIRR.

STL.

STD.

S.S.

SQ.

SPEC.

S.O.G.

S.M.D.

S.J.

SIM.

SHT.

SECT.

SCHED.

S.C.D.

S

R.O.

REQ.

REINF.

REFE.

RAD.

PTN.

PT.

P.S.I.

P.S.F.

PH.

OPP.

OPNG.

OH.

O.F.

O.D.

O.C.

N.T.S.

NOM.

NO.

N.I.C.

N.F.

N.

MISC.

MIN.

MFR.

MECH.

M.B.

MAX.

LLV.

LLH.

LB.

JT.

INT.

INSUL.

I.F.

I.D.

HT.

H.S.B.

HORIZ.

GR.

G.B.

GALV.

GA.

FUT.

FTG.

FT.

FPRF.

F.O.

FL.

FIN.

F.F.

F.D.P.P.

FDN.

EXT.

E.W.

E.S.

EQPT.

EQ.

E.P.S.

EMBED.

ELEC.

EL.

E.J.

E.F.

EA.

DWG.

DO.

DN.

DIM.

DIA.

DET.

DBL.

CTR.

C.P.

CONT.

CONSTR.

CONN.

CONC.

COL.

C.M.U.

CLR.

CLG.

C.J.

BTWN.

B.O.F.

BOT.

B.O.

BM

BLDG.

ARCH.

APPROX.

ADJ.

A.B.

(N)

(E)

DIA.

C

SEISMIC WELDS.W.

HOLLOW STRUCTURAL SECTIONH.S.S.

S.L.D. SEE LANDSCAPE DRAWING

NEAR SIDEN.S.

FAR SIDEF.S.

TOP OF STEEL DECKT.O.D.

TOP OF WALLT.O.W.

PARTIAL PENETRATIONP.P.

DEFORMED BAR ANCHORDBA.

ADDITIONALADD'L

CAST-IN-PLACEC.I.P.

CANTILEVERCANT

L

WEDGE ANCHORSWA

LI KA-SHING CENTERL.K.S.

NORTHWEST ANIMAL FACILITYN.A.F.

BACK-UPB.U.

STEP IN FOOTINGS

PROCEDURE QUALIFICATION RECORDP.Q.R.

WELDING PROCEDURE SPECIFICATIONW.P.S.

SEE ARCH. DRAWINGSS.A.D.

COMPLETE JOINT PENETRATIONCJP.

DEMAND CRITICAL WELDSDCW.

SEISMIC CRITICAL WELDSSCW.

SLRS. SEISMIC LOAD RESISTING SYSTEM

GENERAL CONTRACTORG.C.

DEEP SOIL MIXINGS.M.X.

DRAWING SYMBOLS:

B. SEE LEGEND ON PLAN SHEETS FOR ADDITIONAL SYMBOLS.

3.

1.

A. THE SYMBOLS ON PLANS TO INDICATE SECTIONS, ELEVATIONS,

AND DETAILS ARE AS FOLLOWS:

CONCRETE

ST…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .