19 March 25 Site Visit Questions and Answers.pdf
PDF 586 KB Posted
- Attached to
- FTQW 20 0504 2 CHPP Electrical Upgrades
- Solicitation number
- FTQW2005042
About this file
This is a Questions and Answers document for Solicitation FA500425B0001, Project FTQW 20-0504, issued by the 354th Contracting Squadron at Eielson Air Force Base, Alaska. The document addresses contractor inquiries regarding the repair of CHPP Electric Panels & Circuits, Phase C.
Key clarifications provided include: demolition of panels CO-1 and CO-2 includes the 25kVa pole mount 120/240V transformer and post removal to 6 inches below grade; the Government does not provide protections against trade war-related material cost adjustments; contract award will be based on total price with a required price breakdown per DFARS 252.236-7000; panel schedules have been revised to reduce branch circuits from approximately 239 unknown items to 35 total circuits, with circuits marked "Unknown" no longer requiring identification by the contractor; existing panels may be gutted and reused as junction boxes, and existing lighting conduits may be reused with new conductors; GRC pendant fixtures do not require additional anti-sway wires; existing lighting fixtures are 120V with no emergency circuit supply, while new fixtures are 277V except in the Ash House which uses battery packs; and existing branch circuitry shall remain in place with only interception and extension to new panel locations rather than complete replacement. A 180-day bid guarantee is required per section 13.d. of the solicitation. Government responses were issued between March 28, 2025 and May 5, 2025.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
354th CONTRACTING SQUADRON
MEMORANDUM FOR: 354 Civil Engineering 2310 Central Ave, Building 2258 Eielson AFB, AK 99702
FROM: 354 CONS/PKA
2310 Central Ave, Building 2258 Eielson AFB, AK 99702
SUBJECT: Question and Answers – Solicitation FA500425B0001, Project FTQW 20-0504 Repair CHPP Electric Panels & Circuits, Phase C.
Please find the list of Contractor questions and Government responses for the Solicitation Phase of the above labeled project:
# Contractor QuesƟons
Government Response
Date of
GOV
Response
1 Drawing E1-0 Sheet note no. 7 details the demo of panels co-1 and cO-2, for uƟlity disconnect at CO-1, does that include the 25kVa pole mount 120/240V transformer to be demolished?
AffirmaƟve. 3/28/2025
2 Sheet note no.7 also menƟons to "demolish post to 6" below grade", is that the post for panel CO-1 or the pole where the 120/240 transformer is mounted?
AffirmaƟve. 3/28/2025
3 The solicitaƟon, in 13.d., requires 180 day bid guarantee. With the world engaging in trade wars currently, can the Government offer any protecƟon against materials adjustments post bid?
The Government does not garantee any protecƟons due to trade wars.
4/11/2025
4 Drawing E0.2 general note 11 states to provide per foot bid items, however secƟon B of the solicitaƟon only has a single item for the bid schedule. Please provide clarity.
This contract award will be determined based on total price.
IAW DFARS 252.236-7000 A Price Breakdown is required for all submiƩed Bids.
4/11/2025
5 There are approximately 239 non-lighƟng items on the panel schedules
The government has revised and updated all panel schedules displayed
4/24/2025
The information herein is For Official Use Only (FOUO) which must be protected under the Freedom of Information Act of 1966 and Privacy Act of 1974, as amended. Unauthorized disclosure or misuse of this
PERSONAL INFORMATION may result in criminal and/or civil penalties.
that are not shown on the prints, with a large porƟon of those called out as unknown. It would be an impossible task to gather that informaƟon on a site visit, and it would not be cost effecƟve for every bidder to send a team out to gather that informaƟon, that could take a week or more. Please provide the locaƟon of those items on the drawing set and an abundance of pictures to reference while bidding.
in the prints. The total number of branch circuits on the new panels has been reduced to approximately 35.
AddiƟonally, note 10 on E0.2, Note 6 on E1.1, and Note 1 on E1.4 have been updated to indicate that tracing circuits marked as ‘unknown’ by the contractor is no longer required.
These circuits will remain labeled as ‘Unknown’ on the new panel directories if they are not idenƟfied by the facility during construcƟon.
6 The above-menƟoned unknown items.
Since it is impossible to bid the unknown, can these items be a separate T&M in the bid schedule?
Refer to response to quesƟon 5. 4/24/2025
7 E0.2 general note 10 cannot be quanƟfied at bid Ɵme. Please provide a list of criƟcal loads and the allowable shut down Ɵme for each item, and if the item can only be shut down aŌer hours or during certain Ɵmes.
The government has revised and updated all panel schedules, highlighƟng all criƟcal branch circuits impacted by this project. These criƟcal branch circuits were also idenƟfied during the site visit. As this facility operates 24 hours a day, there will be no aŌer-hours shutdown.
4/24/2025
8 Can exisƟng panels be guƩed and used as juncƟon boxes?
Yes, they can. 5/5/2025
9 Sheet 2 of 24, General Note 3 seems to say that conduits can be reused. Can exisƟng lighƟng conduits be reused if new branch circuit conductors are pulled?
Yes, they can. 5/5/2025
10 How many ‘anƟ-sway wires are required for lights on GRC pendants?
GRC Pendent fixtures do not require additional anti sway wires.
5/5/2025
11 Is any of the exisƟng lighƟng on emergency circuits?
ExisƟng lighƟng fixtures are rated at 120V, but there are no 120V emergency panels supplying circuits to these fixtures. All new lighƟng fixtures, except those in the 'Ash House,' are rated at 277V. The new emergency lighƟng fixtures are
5/5/2025
The information herein is For Official Use Only (FOUO) which must be protected under the Freedom of Information Act of 1966 and Privacy Act of 1974, as amended. Unauthorized disclosure or misuse of this
PERSONAL INFORMATION may result in criminal and/or civil penalties.
connected to the 277V panel 'LTEM.' Emergency lighƟng in the Ash House is provided with a baƩery pack
12 Sheet 4 of 24, General Note 5, seems to imply pulling all new branch circuitry. Is this the proper interpretaƟon of this note?
The exisƟng branch circuitry to remain in place. The exisƟng branch circuits shall only be intercepted and extended to the new panel locaƟon.
5/5/2025