The file is a Submittal Register for a federal contract opportunity (Solicitation Number FTQW-17-1015-2) for renovating Building 1300 at Eielson Air Force Base in Alaska. The project scope includes converting a steam boiler to a hydronic boiler system, performing HVAC testing and balancing, repairing the domestic water system, testing fire suppression systems, repairing fire pumps, and replacing the roof, roof drains, and interior rain leaders.

Key project details include a site visit scheduled for 4 June 2025 at 9:00am AKDT, with questions due by 11 June 2025 at 2:00pm AKDT. The contract is classified under NAICS code 236210 with a small business size standard of $45M, and the project magnitude is between $1-5 million. Electronic bids must be submitted via email to 354CONS.PKA.MonitorConstruction@us.af.mil. The solicitation notes that funds are not currently available, and the government reserves the right to cancel the solicitation. The contract will be awarded by the Department of the Air Force Pacific Air Forces.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
RENO CAC B1300CONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 11 00SD-01 Preconstruction Submittals
Scope Of Work Description1.5.2G CES
Site Plan With Area Of Work1.5.2G CES
Noted
Commercial Utility Clearance1.5.2G CES
Number
Hazardous Materials Training1.5.2G CES
Certificates
Environmental Management1.5.2G CES
System (Ems) Training Certificats
Approved Sampling And Analysis1.5.2
Plan
Salvage Plan1.8G CES
Radioactive Material Permit1.6G BIOE
Laser Permit1.6G BIOE
Hot Work Permits1.5.5G CEF
Waste/Borrow Permit1.5.5G CEIE
Work Clearance Request1.5.5G CES
01 14 00SD-01 Preconstruction Submittals
List of Contact Personnel1.2.1.1
FAA Form 74601.2.5CENP
FAA Determination Letter1.2.5CENP
01 30 00SD-01 Preconstruction Submittals
Progress and Completion1.3
Pictures
01 32 01SD-01 Preconstruction Submittals
01 32 01Project Scheduler Qualifications1.3
Preliminary Project Schedule3.4.1G CES
Submission
Initial Project Schedule3.4.2G CES
Submission
Periodic Schedule Updates3.4.3G CES
01 33 00SD-01 Preconstruction Submittals
Submittal Register1.7G CES
01 35 26SD-01 Preconstruction Submittals
Accident Prevention Plan (APP)1.8G CES
SD-06 Test Reports
Accident Reports1.12.2G CES
LHE Inspection Reports1.12.3
Monthly Exposure Reports1.5G CES
SD-07 Certificates
Activity Hazard Analysis (AHA)1.9G CES
Certificate of Compliance1.12.4
Standard Lift Plan1.12.4G CES
01 45 00SD-01 Preconstruction Submittals
Contractor Quality Control (CQC)1.5.2G
Plan
SD-06 Test Reports
Verification Statement1.11.3
SD-07 Certificates
Certificate Of Readiness1.6.5.1G
01 50 00SD-01 Preconstruction Submittals
01 50 00Construction Site Plan1.3G CES
Traffic Control Plan3.3.1G CES
SD-06 Test Reports
Backflow Preventer Tests3.4
SD-07 Certificates
Backflow Tester1.4.1
Backflow Preventers1.4
01 57 19SD-01 Preconstruction Submittals
Preconstruction Survey1.6.1G CEIE
Solid Waste Management Permit1.10G CEIE
Regulatory Notifications1.6.2G CEIE
ENVIRONMENTAL1.7G CEIE
PROTECTION PLAN (EPP)
Stormwater Notice of Intent3.2.1.2G CEIE
Dirt and Dust Control Plan1.7.12.1G CEIE
Employee Training Records1.6.5G CEIE
Environmental Manager1.6.4G CEIE
Qualifications
Stormwater Pollution Prevention3.2.1.1G CEIE
Plan
Wastewater Management Plan1.7.5G CEIE
Evidence of Delivery of the1.15.1G CEIE
SWPPP to ADEC
Initial Hazardous Material3.8G CEIE
Inventory Log
01 57 19Initial Hazardous Waste1.7.8G CEIE
Accumulation Log
Revisions To The SWPPP1.15.1.1G CEIE
EMS General Awareness1.4.1
Training
SD-03 Product Data
Product Data1.7.12.3G CEIE
SD-06 Test Reports
Laboratory Analysis3.7.1.1.2
Inspection Reports3.2.1.3
Solid Waste Management Report3.7.2.1G CEIE
Laboratory Test Reports1.14.2G CEIE
SD-07 Certificates
Employee Training Records1.6.5G CEIE
Erosion and Sediment Control1.6.5
Lead
Certificate Of Disposal3.7.2.1
Phase I Environmental1.17G CEIE
Assessment
Completed Checklist for Spruce1.11.1G CEIE
Lake C&D Landfill
ADEC Transport, Treatment, &3.7.5.1G CEIE
Disposal Approval Form
ADEC Transport, Treatment, &3.14.1G CEIE
Disposal Approval Form
01 57 19Hazardous Waste Accumulation1.14G CEIE
Log
SD-11 Closeout Submittals
Stormwater Pollution Prevention3.2.1.4G CEIE
Plan Compliance Notebook
Stormwater Notice of Termination3.2.1.5G CEIE
Waste Determination3.7.1G CEIE
Documentation
Disposal Documentation for3.7.3.6G CEIE
Hazardous and Regulated Waste
Assembled Employee Training1.6.5G CEIE
Records
Solid Waste Management Permit1.10G CEIE
Solid Waste Management Report3.7.2.1G CEIE
Hazardous Waste/Debris3.7.3.1G CEIE
Management
Regulatory Notifications1.6.2G CEIE
Sales Documentation3.7.2.1G CEIE
Contractor Certification3.7.2.1
As-Built Topographic Survey3.2.1.5
Certificate of Disposal3.7.2.1
ADEC Approved Disposal Facility3.14.1G CEIE
Weight and/or Acceptance Ticket
ADEC Approved Disposal Facility3.14.1G CEIE
Certificate of Incineration or
Disposal
01 57 19Hazardous Waste Accumulation1.14G CEIE
Log
Final Hazardous Material3.8G CEIE
Inventory Log
Ammendment to the EAFB Oil3.13.2
Discharge Prevention and
Contingency Plan
Nonhazardous Solid Waste3.6.2G CEIE
Diversion Report
01 58 00SD-02 Shop Drawings
Example Project Sign1.3G
01 74 19SD-01 Preconstruction Submittals
Construction Waste Management1.7G CEIE
Plan
SD-06 Test Reports
Quarterly Reports1.9.2
Annual Report1.9.3
SD-11 Closeout Submittals
Final Construction Waste1.10S
Diversion Report
01 78 00SD-03 Product Data
Warranty Management Plan1.8.1G CES
Warranty Tags1.8.5
Spare Parts Data1.6
SD-08 Manufacturer’s Instructions
Instructions1.8.1
01 78 00SD-10 Operation and Maintenance
Data
Operation and Maintenance3.5G CES
Manuals
SD-11 Closeout Submittals
As-Built Drawings3.1G CES
Record Drawings3.3G CES
Record Model2.2G CES
Warranted Equipment and1.8.1
Materials
Final Approved Shop Drawings3.4G CES
Interim DD FORM 13543.7.1G CES
List Of Installed Building3.7.2
Equipment Items For DD Form
1354
01 78 23SD-10 Operation and Maintenance
Data
Facility Data Workbook1.4G
Training Plan3.1.1G
Training Outline3.1.3G
Training Content3.1.2G
Operation And Maintenance3.2.1G
Manual, Progress Submittal
Operation And Maintenance3.2.2G
Manual, Prefinal Submittal
01 78 23Operation And Maintenance3.2.3G
Manual, Final Submittal
SD-11 Closeout Submittals
Training Video Recording3.1.4G
Validation of Training Completion3.1.6G
Training Plan3.1.1G
Record Drawings And Utility1.6.6.7G
Systems
01 91 00.15SD-01 Preconstruction Submittals
Commissioning Firm1.7G
Lead Commissioning Specialist1.7.1G
Technical Commissioning1.7.2G
Specialists
SD-06 Test Reports
Interim Construction Phase3.1.2.1G
Commissioning Plan
Final Construction Phase3.1.2.2G
Commissioning Plan
Pre-Functional Checklists3.1.4.2G
Issues Log1.8G
Commissioning Report3.2G
Post-Construction Trend Log3.3.1G
Report
SD-07 Certificates
Certificate of Readiness1.9G
01 91 00.15SD-10 Operation and Maintenance
Data
Training Plan3.1.5G
Training Attendance Rosters3.1.5G
Maintenance And Service Life3.1.7G
Plans
Systems Manual3.1.6G
SD-11 Closeout Submittals
Construction Phase3.1.2.1G
Commissioning Plan
Final Commissioning Report3.2G
02 41 00SD-01 Preconstruction Submittals
Demolition Plan1.2.1G
Existing Conditions1.11G
SD-07 Certificates
Notification1.7G
SD-11 Closeout Submittals
Receipts3.3.4G
02 61 13SD-01 Preconstruction Submittals
Work Plan1.3G
Sampling and Analysis Plan1.3.3G
SD-02 Shop Drawings
Surveys3.1
SD-06 Test Reports
Backfill2.2
Surveys3.1
02 61 13Confirmation Sampling and3.4
Analysis
Compaction3.8.2
Sampling of Stored Material3.6.1G
Sampling Liquid3.6.2G
SD-11 Closeout Submittals
Closure Report3.10G
02 81 00SD-03 Product Data
Packaging Notifications2.1.1
Hazardous Waste Management3.1G
Plan
Onsite Hazardous Waste3.2G
Management
Notices of Non-Compliance and3.3
Notices of Violation
SD-06 Test Reports
Recordkeeping3.6G
Exception Report3.6G
Spill Response3.7
SD-07 Certificates
Transportation and Disposal1.4.1G
Coordinator
Training1.4.2G
Certification1.4.3
Shipping Documents and3.3.3G
Packagings Certification
02 81 00Security Plan3.3.4
Certificates of Disposal3.3.5
Waste Minimization3.5
02 82 00SD-03 Product Data
Amended Water1.2.2G
Safety Data Sheets (SDS) for All1.3.9G
Materials
Encapsulants2.1G
Respirators3.1.2.1G
Local Exhaust Equipment3.1.7G
Pressure Differential Automatic3.1.7G
Recording Instrument
Vacuums3.1.8G
Glovebags3.1.10G
SD-06 Test Reports
Air Sampling Results1.5.5G
Pressure Differential Recordings1.5.6G
for Local Exhaust System
Clearance Sampling3.2.12.5G
Asbestos Disposal Quantity3.3.3.2G
Report
SD-07 Certificates
Employee Training1.3.4G
Notifications1.3.5G
Respiratory Protection Program1.3.7G
Asbestos Hazard Abatement Plan1.3.10G
02 82 00Testing Laboratory1.3.11G
Landfill Approval1.3.12G
Delivery Tickets1.3.12G
Waste Shipment Records1.3.12G
Transporter Certification1.3.13G
Medical Certification1.3.14G
Private Qualified Person1.5.1G
Documentation
Designated Competent Person1.5.2G
Worker's License1.5.3G
Contractor's License1.5.4G
Federal, State or Local Citations1.5.9G
on Previous Projects
Encapsulants2.1G
Equipment Used to Contain3.1G
Airborne Asbestos Fibers
Water Filtration Equipment3.1.3.3G
Vacuums3.1.8G
Ventilation Systems3.1.8G
SD-11 Closeout Submittals
Permits and Licenses1.3.5G
Notifications1.3.5G
Respirator Program Records1.3.7.1G
Protective Clothing1.5.7G
Decontamination Quality Control
Records
02 82 00Protective Clothing1.5.8G
Decontamination Facility
Notification
Rental Equipment1.7.1G
02 83 00SD-01 Preconstruction Submittals
Competent Person1.5.1.1G
Training Certification1.5.1.2G
Occupational and Environmental1.5.2.3G
Assessment Data Report
Medical Examinations1.5.2.4G
Lead Waste Management Plan1.5.2.8G
Licenses, Permits and1.5.4G
Notifications
Occupant Protection Plan1.5.5G
Lead Compliance Plan1.5.2.2G
Lead Compliance Plan3.1.1.6G
Initial Sample Results3.4.1.1G
Written Evidence of TSD3.5.2.1G
Approval
SD-03 Product Data
Respirators1.6.1G
Vacuum Filters1.6.4G
Negative Air Pressure System1.6.7G
Materials and Equipment2.1G
Expendable Supplies2.1.1G
Local Exhaust Equipment3.1.1.5G
02 83 00Pressure Differential Automatic3.1.1.5G
Recording Instrument
Pressure Differential Log3.1.1.6G
SD-06 Test Reports
Sampling and Analysis1.3.3G
Occupational and Environmental1.5.2.3G
Assessment Data Report
Sampling Results1.5.2.3G
Pressure Differential Recordings1.5.3G
For Local Exhaust System
SD-07 Certificates
Testing Laboratory1.5.1.3G
Third Party Consultant1.5.1.4G
Qualifications
Clearance Certification3.5.1.1G
SD-11 Closeout Submittals
Hazardous Waste Manifest3.5.2.1G
Turn-In Documents or Weight3.5.2.1G
Tickets
02 84 33SD-07 Certificates
Training certification1.7.1G
Qualifications of CIH1.7.2G
PCB removal work plan1.7.3G
PCB disposal plan1.7.4G
Notification1.7.5G
Transporter certification3.8G
02 84 33Certification of Decontamination3.5.4G
Post cleanup sampling3.5.5G
Certificate of disposal3.8.1G
07 22 00SD-02 Shop Drawings
Insulation Board Layout1.3G
Verification of Existing Conditions1.3G
SD-03 Product Data
Insulation2.1G
Cover Board1.4G
Fasteners2.4G
Moisture Control2.3G
Recycled Content For Insulation2.1.2S
SD-05 Design Data
Wind Resistance1.7G
SD-06 Test Reports
Flame Spread Rating1.8.1G
SD-07 Certificates
Installer Qualifications1.6G
Certificates Of Compliance For1.6G
Felt Materials
Indoor Air Quality For Insulation2.1.3S
Acceptable Foam Blowing Agents2.1.4S
SD-08 Manufacturer’s Instructions
Fasteners2.4G
Insulation2.1G
07 54 19SD-02 Shop Drawings
07 54 19Detail Drawings1.6G
Roof Plan1.6G
SD-03 Product Data
PVC Roofing Membrane3.3.2G
Bonding Adhesive2.1.2
Flashing1.5.3G
Flashing3.3.2.2G
Membrane Fasteners and Plates2.1.5
Roof Insulation2.1.7G
Protection Mat3.3.2.5
Water Cutoffs3.7.1
Information Card1.10.1G
SD-05 Design Data
Wind Uplift Resistance1.3.2G
SD-07 Certificates
Qualification of Manufacturer1.5.1
Qualifications of Applicator1.5.2
Fire Resistance1.3.1
Minimum Polymer Thickness2.1.1
Minimum Polymer Thickness2.1.4
Sample1.10G
SD-08 Manufacturer’s Instructions
Application Method3.3G
Membrane Flashing2.1.4G
Membrane Flashing3.4.2G
07 54 19Perimeter and High Wind3.3.4
Attachment
Auxiliary Fasteners2.1.5.2
Cold Weather1.8G
SD-11 Closeout Submittals
Warranty1.10G
Information Card1.10.1G
Instructions to Government3.10G
Personnel
07 60 00SD-02 Shop Drawings
Exposed Sheet Metal2.1.1G
Gravel Stops and fascia2.1.1G
Flashing for Roof Drains3.1.12G
Counterflashing3.1.9G
Flashing at Roof Penetrations3.1.15G
and Equipment Supports
Copings3.1.16G
Drip Edges3.1.11G
Eave Flashing3.1.13G
SD-08 Manufacturer’s Instructions
Instructions for Installation1.4.2G
Quality Control Plan3.5G
SD-10 Operation and Maintenance
Data
Cleaning and Maintenance1.4.2G
07 84 00SD-02 Shop Drawings
07 84 00Firestopping System2.1G
SD-03 Product Data
Firestopping Materials2.2G
SD-06 Test Reports
Inspection3.3G
SD-07 Certificates
Inspector Qualifications1.5.2G
Installer Qualifications1.5.1G
07 92 00SD-03 Product Data
Sealants2.1
Primers2.2
Bond Breakers2.3
Backstops2.4
SD-07 Certificates
Indoor Air Quality For Interior2.1.1
Sealants
Indoor Air Quality For Interior2.1.3
Floor Joint Sealants
Indoor Air Quality For Interior2.1.4
Acoustical Sealants
Indoor Air Quality For Interior2.5
Caulking
09 90 00SD-03 Product Data
Product Data Sheets2.1G
SD-04 Samples
Color2.2
09 90 00SD-07 Certificates
Indoor Air Quality For Paints And1.4.2
Primers
21 13 13SD-01 Preconstruction Submittals
Qualified Fire Protection Engineer1.2.3G
(QFPE)
Sprinkler System Designer1.4.2.1G
Sprinkler System Installer1.4.2.2G
SD-02 Shop Drawings
Shop Drawings1.4.1.1G
SD-03 Product Data
Fittings2.2.1.2G
Valves2.2.4G
Relief Valves2.5.5G
Sprinklers2.4G
Pipe Hangers and Supports2.2.3G
Sprinkler Alarm Switch2.3.1G
Valve Supervisory (Tamper)2.3.2G
Switch
Air Vent2.5.6G
Seismic Bracing2.2.3G
Nameplates2.1.2G
Pipe2.2.1.1G
SD-05 Design Data
Seismic Bracing2.2.3G
Hydraulic Calculations1.2.1.2G
21 13 13SD-06 Test Reports
Test Procedures3.5.1G
SD-07 Certificates
Verification of Compliant3.5.2.1G
Installation
Request for Government Final3.5.2.2G
Test
SD-10 Operation and Maintenance
Data
Operating and Maintenance3.7G
(O&M) Instructions
Spare Parts1.6G
SD-11 Closeout Submittals
As-built drawings3.7G
22 00 00SD-03 Product Data
Backflow Prevention Assemblies3.6.1.1G
Water Heaters2.6G
Pumps2.7G
Relief Valves2.3.1G
Thermostatic Mixing Valves2.3.2G
Backflow Preventers2.4G
SD-06 Test Reports
Tests, Flushing and Disinfection3.6G
Test of Backflow Prevention3.6.1.1G
Assemblies
SD-07 Certificates
22 00 00Materials and Equipment1.3G
SD-10 Operation and Maintenance
Data
Plumbing System3.6.1G
23 05 48.19SD-02 Shop Drawings
Coupling and Bracing3.1G
Equipment Restraint2.2G
Contractor Designed Bracing1.2.4G
SD-03 Product Data
Equipment Restraint2.2G
Contractor Designed Bracing1.2.4G
Anchor Bolts3.6G
SD-05 Design Data
Design Calculations1.2.4G
SD-06 Test Reports
Anchor Bolts3.6G
23 05 93SD-01 Preconstruction Submittals
Records of Existing Conditions1.3.3G
TAB Firm1.5.3.1G
TAB Team Assistants1.2G
TAB Team Engineer1.2G
TAB Specialist1.5.3.2G
TAB Team Field Leader1.2G
Prerequisite HVAC Work Check1.7.2G
Out List
SD-02 Shop Drawings
23 05 93TAB Schematic Drawings and1.3.3G
Report Forms
SD-03 Product Data
Equipment and Performance1.3G
Data
TAB Related HVAC Submittals1.5.3.4G
TAB Procedures1.5.2G
Calibration1.5.2G
Systems Readiness Check1.3.3G
TAB Execution1.5.4G
TAB Verification1.5.4.3G
SD-06 Test Reports
TAB Report1.5.5.2G
Completed Pre-Final DALT3.3.5G
Report
Certified Final DALT Report3.3.8G
TAB Design Review Report1.3.3G
TAB Design Review Report1.7.2.1G
SD-07 Certificates
Independent TAB Agency and1.5.1G
Personnel Qualifications
DALT and TAB Submittal and1.7.2G
Work Schedule
TAB Pre-Field Engineering1.7.2.3G
Report
23 05 93Pre-field DALT Preliminary1.7.2.2G
Notification
Advanced Notice for TAB Field1.7.2G
Work
23 07 00SD-02 Shop Drawings
Pipe Insulation Systems2.3G
Duct Insulation Systems3.3G
SD-03 Product Data
Pipe Insulation Systems2.3G
recycled content for insulation2.3.1G
materials
Duct Insulation Systems3.3G
Thermal Insulation2.2.1.3G
SD-07 Certificates
Indoor air quality for adhesives2.2.1G
SD-08 Manufacturer’s Instructions
Pipe Insulation Systems2.3G
Duct Insulation Systems3.3G
23 09 00SD-02 Shop Drawings
DDC Contractor Design Drawings3.2G
Draft As-Built Drawings3.2G
Final As-Built Drawings3.2G
SD-03 Product Data
Manufacturer's Product Data2.2G
SD-06 Test Reports
Start-Up Testing Report3.4.2G
23 09 00PVT Procedures3.5.1G
PVT Report3.5.3G
Pre-Construction Quality Control1.8.1G
(QC) Checklist
Post-Construction Quality Control1.8.2G
(QC) Checklist
Control Contractor’s Performance3.6.5G
Verification Testing Plan
Equipment Supplier’s3.6.3.1G
Performance Verification Testing
Plan
Endurance Testing Results3.6.8.3G
Performance Verification Test3.6.9G
Report
SD-10 Operation and Maintenance
Data
Operation and Maintenance3.7G
(O&M) Instructions
Training Documentation3.8.1G
SD-11 Closeout Submittals
Enclosure Keys2.4G
Password Summary Report3.1.5.1G
Closeout Quality Control (QC)1.8.3G
Checklist
23 09 13SD-03 Product Data
Automatic Control Valves2.4G
23 09 13Carbon Monoxide Analyzer2.5.8G
Nox Monitor2.5.9G
Damper End Switches2.5.11G
Temperature Switch2.5.10G
Temperature Sensors2.5.3G
Pressure Sensors2.5.6G
Actuators2.7.1G
23 23 00SD-02 Shop Drawings
Refrigerant Piping System2.3G
SD-03 Product Data
Refrigerant Piping System2.3G
Spare Parts1.5.2G
Refrigerant Piping Tests3.5G
Verification of Dimensions3.1G
Piping Accessories2.6G
SD-06 Test Reports
Refrigerant Piping Tests3.5G
SD-07 Certificates
Service Organization2.1G
SD-10 Operation and Maintenance
Data
Maintenance1.5G
Operation and Maintenance3.4G
Manuals
Demonstrations3.4G
23 30 00SD-02 Shop Drawings
23 30 00Detail Drawings1.4.4G
SD-03 Product Data
Metallic Flexible Duct2.8.1.1G
Insulated Nonmetallic Flexible2.8.1.2G
Duct Runouts
Duct Connectors2.8.1.2G
Duct Access Doors2.8.2G
Fire Dampers2.8.3G
Acoustical Duct Liner2.8.6.1G
Diffusers2.8.7.1G
Registers and Grilles2.8.7.2G
Louvers2.8.8G
Air Vents, Penthouses, and2.8.9G
Goosenecks
Panel Type Power Wall2.9.1.1G
Ventilators
Air Handling Units2.10G
Variable Volume, Single Duct2.11.1.1G
Terminal Units
Energy Recovery Devices2.12G
Test Procedures1.4.5G
Indoor Air Quality for Duct2.8.1G
Sealants
Volume Dampers2.8.4G
Heavy-Duty Residential Range2.9.1.2G
Hood
23 30 00Vehicle Apparatus Bay Fan Filter2.9.1.3G
Units
SD-04 Samples
Service Labeling1.2.2G
SD-06 Test Reports
Performance Tests3.10G
Damper Acceptance Test3.8G
SD-07 Certificates
Ozone Depleting Substances1.4.3G
Technician Certification
SD-08 Manufacturer’s Instructions
Manufacturer's Installation3.2G
Instructions
Operation and Maintenance3.12.2G
Training
SD-10 Operation and Maintenance
Data
Operation and Maintenance3.12.1G
Manuals
SD-11 Closeout Submittals
Indoor Air Quality During3.11G
Construction
23 81 29SD-01 Preconstruction Submittals
Qualification Of Installer1.5.1.1G
Verification Of Existing3.1G
Conditions
23 81 29SD-02 Shop Drawings
VRF System Contractor Design1.4.1G
Drawings
SD-03 Product Data
Spare Parts Data3.7.1G
Manufacturer's Standard Catalog2.1G
Data
Sample Warranty1.8G
Refrigerant SDS Sheets1.5.1.2G
SD-05 Design Data
Manufacturer's Engineering Data1.5.3G
SD-06 Test Reports
System Performance Tests3.5G
SD-07 Certificates
Service Organizations3.7.2G
Warranty3.7.3G
Electronic Refrigerant Leak3.3G
Detector Calibration
Ozone Depleting Substances1.5.1.2G
Technician Certification
SD-08 Manufacturer’s Instructions
Manufacturer's Instructions1.5.4G
SD-09 Manufacturer’s Field
Reports
Refrigerant Charging3.4G
SD-11 Closeout Submittals
23 81 29Posted Instructions3.7.5G
Inventory1.7G
25 05 11SD-01 Preconstruction Submittals
Wireless and Wired Broadcast3.2.1.3G
Communication Request
Multiple Ethernet Connection3.2.3.2G
Device Request
Contractor Computer1.8.1.6G
Cybersecurity Compliance
Statements
Contractor Temporary Network1.8.6G
Cybersecurity Compliance
Statements
Proposed STIG and SRG1.6.1G
Applicability Report
SD-02 Shop Drawings
Cybersecurity Riser Diagram1.6.4G
SD-03 Product Data
Control System Cybersecurity1.6.6G
Documentation
SD-06 Test Reports
Control System Cybersecurity3.13.1G
Testing Procedures
Control System Cybersecurity3.13.3G
Testing Report
SD-07 Certificates
25 05 11Software Licenses1.7G
SD-11 Closeout Submittals
Password Change Summary3.3.5.5G
Report
Software and Configuration1.6.3G
Backups
Auditing Front End Software3.4.3G
Device Audit Record Upload3.4.4.1G
Software
System Maintenance Tool3.8G
Software
Control System Scanning Tools3.10.2G
STIG, SRG and Vendor Guide1.6.5G
Compliance Result Report
Control System Inventory Report1.6.2G
26 20 00SD-02 Shop Drawings
Panelboards2.13G
Cable Trays2.4G
Wireways2.24G
SD-03 Product Data
Receptacles2.12G
Circuit Breakers2.13.3G
Switches2.10G
Enclosed Circuit Breakers2.14G
Motor Controllers2.16G
Manual Motor Starters2.17G
26 20 00Secondary Bonding Busbar2.19.2G
Cable Trays2.4G
Cable Tray Design2.4G
600-volt Wiring Test3.4.2G
Ground-fault Receptacle Test3.4.3G
SD-07 Certificates
Fuses2.11G
26 29 23SD-02 Shop Drawings
Schematic Diagrams1.5.1G
SD-03 Product Data
Adjustable Speed Drives2.1G
Wires and Cables2.3
Equipment Schedule1.5.2G
SD-06 Test Reports
ASD Test3.3.1G
Performance Verification Tests3.3.2G
Endurance Test3.3.3G
SD-08 Manufacturer’s Instructions
Installation instructions1.5.3G
SD-09 Manufacturer’s Field
Reports
Standard Products1.5.4G
SD-10 Operation and Maintenance
Data
Adjustable Speed Drives2.1G
28 31 76SD-01 Preconstruction Submittals
28 31 76Qualified Fire Protection Engineer1.3.2G
(QFPE)
Fire alarm system designer1.9.2.1G
Supervisor1.9.2.2G
Technician1.9.2.3G
Installer1.9.2.4G
Test Technician1.9.2.5G
Fire Alarm System Site-Specific1.7G
Software Acknowledgement
SD-02 Shop Drawings
Nameplates1.9.1.3G
Wiring Diagrams1.9.1.4G
System Layout1.9.1.5G
Notification Appliances1.9.1.6G
Initiating devices1.9.1.7G
Amplifiers1.9.1.8G
Battery Power1.9.1.9G
Voltage Drop Calculations1.9.1.10G
SD-03 Product Data
Fire Alarm and Mass Notification2.3G
Control Unit (FMCU)
Local Operating Console (LOC)1.4.4G
Amplifiers1.9.1.8G
Manual Stations2.6G
Smoke Detectors2.7G
Duct Smoke Detectors2.7.2G
28 31 76Carbon monoxide detector2.8G
Addressable Interface Devices2.9G
Addressable Control Modules2.10G
Notification Appliances1.9.1.6G
Textual Display Signs2.11.3G
Batteries2.13.1G
Battery Chargers2.13.2G
Surge Protective Devices2.14G
Alarm Wiring2.14G
Back Boxes and Conduit3.3.4G
Automatic Fire Alarm2.17G
Transmitters
Radio Transmitter and Interface2.17.1G
Panels
Mass Notification Transceiver2.16.1G
Document Storage Cabinet3.12.3G
SD-06 Test Reports
Test Procedures3.8.1G
SD-07 Certificates
Verification of Compliant3.8.2.1G
Installation
Request for Government Final3.8.2.2G
Test
SD-10 Operation and Maintenance
Data
28 31 76Operation and Maintenance3.10G
(O&M) Instructions
Instruction of Government3.11G
Employees
SD-11 Closeout Submittals
As-Built Drawings1.9.1.13G
Spare Parts1.11.1G