The document is a Heating Plant Piping Diagram for a hydronic boiler system renovation project at Eielson Air Force Base in Alaska. The technical drawings show detailed piping configurations for two existing boilers (B-1 and B-2), including steam headers, feed water lines, heat exchangers, pumps (P-1A and P-1B), and associated components. The diagrams include two versions - a standard heating plant diagram and a demo diagram - both marked with multiple pipe sizes, connections, and general notes about installation and maintenance requirements. The drawings are part of the solicitation FTQW-17-1015-2 for converting the existing steam boiler system to a hydronic system, which is one component of a larger building renovation project involving HVAC systems, domestic water repairs, and roof replacement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING VENT TO ROOF

EXISTING DRAIN TO

FLOOR DRAIN

EXISTING B-1 EXISTING B-2

6" STEAM

EXISTING VENT TO ROOF

1" FEED WATER LINE

8" STEAM HEADER

EXISTING STEAM FEED

WATER HEATER LINE

FEED WATER

TO B-1

EXISTING CW

MAKEUP LINE

EXISTING

BOILER FEED

WATER PUMP

6"

3"

6"

HX-1

1" CR TO FEED

WATER PUMPS

6" ST

FEED WATER TO B-2

P-1B P-1A

GENERAL NOTES

1. DEMOLISH EXISTING PIPING, ACCESSORIES, AND APPURTENANCES ASSOCIATED WITH THE

EXISTING STEAM BOILERS. SALVAGE EXISTING STEAM TO WATER HEAT EXCHANGER AND TURN

OVER TO GOVERNMENT.

2.

6" GHS

6" GHR

CAPCAP

ET-1

1 1/4"

(E) AIR

SEPARATOR

6" GHS

6" GHR

6" GHR

(E) HOUSEKEEPING PADS

GMT-1

1 1/4" 3/4"

EXISTING B-1 EXISTING B-2

P-1B P-1A

GENERAL NOTES

1. ALL PENETRATIONS ASSOCIATED WITH DEMOLISHED ITEMS SHALL BE PATCHED TO

MATCH ADJACENT ASSEMBLIES AND FINISHES.

2. EXISTING STEAM BOILERS TO BE CONVERTED TO HOT WATER BOILERS PER

MANUFACTURER'S INSTRUCTIONS AND CERTIFIED.

3. CONTRACTOR TO PROVIDE ALL STARTUP TESTING PER MANUFACTURER'S

INSTRUCTIONS.

4. INSULATE ALL PIPING WITH 1 INCH MINIMUM FIBERGLASS WITH ASJ JACKETING. FOR

AREAS SUBJECT TO ABUSE WITHIN 8-FOOT ABOVE FINISHED FLOOR PROVIDE DIMPLED

ALUMINUM JACKETING AROUND INSULATION.

5. PROVIDE INSULATED COVERS WITH BUCKLES AT VALVES AND OTHER ACCESSORIES.

6. ALL PIPING TO BE SCHEDULE 40 STEEL WITH GROOVED OR FLANGED COUPLINGS.

7. BOILER PUMPS TO OPERATE PRIOR TO ACTIVATION OF ASSOCIATED BOILER AND

REMAIN ON FOR A MINIMUM OF 10 MINUTES (USER ADJUSTABLE) AFTER SHUT OFF.

6" GHS

6" GHR

CAPCAP

ET-1

1 1/4"

(E) AIR

SEPARATOR

6" GHS

6" GHR

6" GHR

(E) HOUSEKEEPING PADS

GMT-1

1 1/4" 3/4"

6" GHS

6" GHR

B-1 PUMP B-2 PUMP

M310 NO SCALE

1 HEATING PLANT DIAGRAM

M310 NO SCALE

2 HEATING PLANT DEMO DIAGRAM

FTQW171015 BOILER PIPING DIAGRAMS