Fire Suppression System RFP (1).pdf
PDF 722 KB Posted
- Solicitation number
- PE-64800-NONST-2026-000000077
- Issued by
- Douglas County, Georgia
About this file
This is a Request for Proposal (RFP) issued by the Douglas County Board of Commissioners Procurement Department for fire suppression system design, fabrication, and installation services at two locations in Douglasville, Georgia. The project encompasses installation of an NFPA 13 wet sprinkler system at the DOT Storage Complex (8251 Chicago Avenue), comprising 15,342 square feet on the first floor and 2,723 square feet on the second floor, and installation of clean agent fire suppression systems in the server/computer room and telecom room, plus hydra mist suppression systems in the main and emergency electrical rooms at the Douglas County Sheriff's Office Law Enforcement & Adult Detention Center (8470 Earl D. Lee Boulevard). A mandatory pre-bid meeting is scheduled for June 10, 2026, at 2:00 PM, beginning at Location #1 and proceeding to Location #2. The question deadline is June 18, 2026, at 4:00 PM EDT, with responses posted on BidNet. The bid closing date is June 25, 2026, at 4:00 PM EDT, and award notification is scheduled for July 2, 2026, at 2:00 PM EDT. The contract period is 180 consecutive calendar days after the effective date, with liquidated damages assessed at $500 per day for delays beyond the contract time.
Pricing proposals must be submitted in Exhibit G, with costs broken down by design services, water suppression system installation/labor, alternates, and contingency (10%). Both locations are funded with SPLOST funds and must comply with state, federal, and local statutes and regulations. A local vendor participation requirement mandates that a minimum of 15 percent of total contract value be performed by businesses maintaining physical offices within Douglas County and holding applicable local business licenses. The RFP requires submission of a bid bond equal to 5 percent of the estimated project cost, and upon award, the contractor must provide performance and payment bonds totaling 100 percent and 110 percent of the contract price, respectively. Respondents must comply with the Georgia Security and Immigration Compliance Act by submitting notarized affidavits confirming E-Verify registration and participation. A Disadvantaged Business Enterprise (DBE) goal of 15 percent has been established for the project. The County reserves the right to reject any or all proposals, waive technicalities, and make awards in its best interest, with proposals remaining valid for 90 days from the opening date.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Douglas County Board of Commissioners Procurement Department
8700 Hospital Drive Douglasville, GA 30134
Request for Proposal
COVER SHEET
BID NUMBER: 26-019
BID TITLE: FIRE SUPPRESSION SYSTEM -DOT STORAGE AND SHERRIFF
DEPT IT AND ELECTRICAL ROOMS
ISSUE DATE:
PRE-BID MEETING
MAY 28, 2026
MANDATORY AT 2 PM ON JUNE 10, 2026 AT LOCATION
#1- 8251 CHICAGO AVENUE, DOUGLASVILLE, GEORGIA
30134 – THEN LEAVE TO MEET AT LOCATION #2- 8470
EARL D. LEE BLVD, DOUGLASVILLE, GEORGIA 30134
QUESTION DEADLINE: JUNE 18, 2026, 4:00 PM EDT
https://www.bidnetdirect.com/georgia/douglascounty
RESPONSE TO QUESTIONS
BID CLOSING DATE:
JUNE 25, 2026, 4:00 PM EDT
JULY 2, 2026 AT 2:00 PM EDT
The County reserves the right to modify or alter the following procurement schedule as needed.
GOODS OR SERVICES TO BE DELIVERED TO OR
PERFORMED AT:
Douglas County Board of Commissioners 8700 Hospital Drive Douglasville, Georgia 30134
SINGLE POINT OF CONTACT (SPC)
Anthony Choice, Director of Procurement
EMAIL ADDRESS: dcprocurementoffice@douglascountyga.gov
DOCUMENTS INCLUDED IN THIS PACKAGE: Request for PROPOSAL
Douglas County Board of Commissioners promotes equal opportunity for all individuals without regard to age, color, disability, marital status, national origin, race, religion or creed, sex or gender, sexual orientation, or veteran status. Douglas County reserves the right to cancel this BID at any time and for any reason prior to the award of a contract by the Board of Commissioners.
mailto:dcprocurementoffice@douglascountyga.gov
I. INTRODUCTION
Douglas County (“Owner” or the “County”) is issuing this Request for Proposal (RFP) to solicit commercial and technical proposals (“Proposals”) from bidders (“Respondents”) for the site contractor to design, fabricate and install a fire suppression system at the DOT Maintenance Complex located at 8251 Chicago Avenue Douglasville, GA 30134 and at the Douglas County Sheriffs Dept Complex located at 8470 Earl D.
Lee Blvd Douglasville, GA 30134 (the “Project”). Capitalized terms in this RFP, if not defined here, are defined in the Agreement (defined below) for the Project. Refer to the included bidding documents and contract documents for the full project scope.
Location #1- DOT Storage Complex located at 8251 Chicago Avenue:
• The project scope includes the installation of a new NFPA 13 wet sprinkler system throughout an existing / remodeled storage building. The building is a combination of pre-engineered metal building (single story) and poured concrete elevated slab (2 story portion) and will primarily be utilized for DOT equipment storage and a small print shop office area. Awarded subcontractor will be responsible for coordinating work and the schedule with the already awarded prime contractor. The sprinkler system will be tied into a building wide fire alarm system under a separate contract; however, the sprinkler subcontractor is responsible for coordination with fire alarm subcontractor to ensure interoperability of both systems.
Location #2 - Douglas County Sheriff's Office Law Enforcement & Adult Detention Center located at 8470 Earl D. Lee Blvd:
The project scope includes the deactivation of an existing wet sprinkler system and installation of a new Clean Agent Fire Suppression systems in an existing server / computer room and adjacent telecom room. Also, the deactivation of wet sprinkler system and installation of a hydra mist (or as recommended for application) suppression system in main electrical room and emergency electrical room, located within the secure area of the detention center. The awarded subcontractor will be responsible for the turnkey design, permitting, and installation of the new systems along with any required room-sealing requirements, electrical, mechanical, or plumbing modifications.
Both locations will be funded with SPLOST funds. The Project is required to comply with State and Federal statutes, rules and regulations, as well as those of Douglas County. Additionally, the Project must comply with all SPLOST rules, regulations, specifications, and requirements.
The time allowed for performance of the overall project will be 180 consecutive calendar days after the effective date of the contract for both locations, it is assumed that some effort can be done in parallel. Liquidated damages for this contract shall be assessed in the amount of $500 for each day that expires after the Contract Time for substantial completion.
The Contractor shall maintain a daily summary of weather conditions, personnel on site (including subcontractors), and tasks performed in a Daily Activity Diary (i.e., Daily Log). The Contractor shall submit a monthly invoice in form and substance satisfactory to the County.
II. QUESTIONS AND RESTRICTIONS ON COMMUNICATION WITH COUNTY PERSONNEL
Respondents must submit any questions regarding this solicitation electronically in BidNet by the due date and time for questions specified in this RFP. Only questions submitted via BidNet will be accepted and addressed.
Responses to questions received during the solicitation time period are posted on the website at https://www.bidnetdirect.com/georgia/douglascounty in an addendum. Respondents who fail to report a known or suspected problem with this solicitation or who fail to seek clarification or correction of this solicitation do so at their own risk.
From the issue date of this RFP and until a builder is selected for contract award and the selection is made public, Respondents are not allowed to communicate for any reason with members of the Board of Commissioners, Douglas County employees and/or contracted agents (collectively, “Douglas County Personnel”) related to the solicitation except through the issuing officer (or his/her designee) named in the solicitation. Prohibited communications with Douglas County Personnel include but are not limited to telephone calls, electronic mail, facsimiles, letters, and in-person communications, such as lunch meetings or entertainment.
A Respondent’s violation of these communication restrictions may lead to disqualification of the Respondent’s Proposal from consideration for award and other disciplinary actions from the County, including suspension or debarment from business with the County.
Notwithstanding the foregoing, the communication restrictions with Douglas County Personnel shall not apply to (a) communications during the pre-bid conference in the presence; (b) as necessary to perform existing contracts with the County; or (c) pursuant to any protest process.
III. PROJECT LIMITS AND OVERVIEW
As part of the Project, -Builder shall provide all labor, equipment, material, and services described in and reasonably inferable from the plans, specifications, schematics, narratives, and other documents provided by the County (the “Criteria Documents”), which are attached to and part of this RFP. By submitting a proposal, the -Builder acknowledges it has carefully reviewed the RFP, its exhibits, and the Criteria Documents.
Costs proposal should be submitted in EXHIBIT G-Proposal Schedule Bid Form
The -Builder shall review the County’s -Build Agreement (the “Agreement”), which shall be utilized for this Project. A copy of the Agreement is attached to and a part of this RFP or will be issued in a subsequent addendum. -Builder acknowledges Owner will not make modifications to terms and conditions of the Agreement, except in Owner’s sole discretion.
IV. ADDENDA TO THE RFP
Owner will issue any additions or revisions to this RFP by addenda electronically in BidNet. The addenda will become part of the solicitation. Failure to acknowledge any addenda shall not relieve a Respondent of compliance with the terms thereof. The County assumes no responsibility for oral instructions. It is the bidder’s responsibility to review BidNet periodically to determine if addenda have been prepared and posted.
All addenda to the RFP will become part of the Contract Documents and the Agreement.
V. GENERAL SCOPE OF WORK
The following is a non-exhaustive list of the work to be provided by the Builder. The full scope of services will be defined further within the Criteria Design Documents and the Agreement.
A. Design Phase The Contractor shall ensure that design documents are prepared and presented to PM Department for review and approval. These design documents shall include any required interface with existing security, mechanical, structural, electrical, plumbing, lighting, fire protection and standby power systems. A final project schedule shall be completed at this phase of the project.
B. Construction Phase
1. Maintain on-site staff for construction management.
2. Establish and maintain coordinating procedures.
3. Conduct and record job meetings.
4. Prepare and submit change order documentation for approval of the County.
5. Maintain a system for review and approval of shop drawings.
6. Maintain records and submit bi-weekly reports and formal monthly reports to the
County.
7. Maintain quality control and ensure conformity with plans.
8. Provide cost control through progress payment review and verifications according to the approved schedule and contract amounts.
9. Coordinate post-completion activities, including the assembly and delivery of guarantees, manuals, closeout documents, training, to the County for the County’s final acceptance of the Project.
C. Warranty Phase
1. Coordinate, monitor and complete the resolution of remaining “punch-list” items.
2. Coordinate, monitor, and resolve all warranty issues to the satisfaction of the County during the correction of work warranty period and as extended.
3. Warranty Administration
The Contractor shall provide the PM Department with complete information on warranty coverage, claims filing, warranty contacts, and warranty procedures for all work completed as part of this project. The Contractor shall provide the Sheriff with any preventative maintenance schedules, contacts and manufacturer information for all components within the scope of this project. The Contractor shall identify their point-of-contact to handle all warranty requests for a period of one (1) year after completion of the project and shall assist County staff in obtaining any service agreements necessary for the ongoing operation of the new Fire Suppression System(s) after expiration of any warranty period.
Contractor shall adhere to all local, county, state, and federal laws, codes, statutes, and regulations applicable to the Project, including but limited to any building codes, life safety codes, and the Americans with Disabilities Act.
D. Local Vendor Participation Requirement
The Contractor shall make a good faith effort to ensure that a minimum of 15 % of the total contract value is performed by businesses located within Douglas County; whether it’s with a local business to purchase goods and or local contract to provide services. For the purposes of this solicitation, a “local vendor” is defined as a business that maintains a physical office or place of business within Douglas County, Georgia and holds all applicable local business licenses.
Bidders shall identify all proposed local vendors and subcontractors in their proposal and indicate the estimated percentage of work to be performed by each. Documentation demonstrating compliance with this requirement shall be submitted prior to contract execution and may be requested throughout the term of the contract.
Failure to make a good faith effort to meet the local participation requirement may be considered a material breach of contract.
VI. SUBMITTING PROCEDURES
Proposals must be submitted in BidNet and shall be presented in accordance with the instructions of this solicitation and within the time constraints stated.
All Proposals must be in accordance with the purposes, conditions, and instructions provided in this RFP.
Douglas County assumes no responsibility for proposals received after the submission time, whether due to mail delays or any other reason. Proposals received after the submission period will be filed unopened and considered non-responsive. Unsigned proposals will not be considered. Douglas County reserves the right to retain all proposals submitted. It is the Respondent’s responsibility to ensure that its proposal is submitted in a timely and proper manner.
DOCUMENTS
A. Information and Bidding Documents can be found at the following designated website:
www.douglascountyga.gov (select “Doing Business” – “Bid Opportunities)
Bid Documents may be downloaded from the designated website. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a bid for the project.
Bid Documents are provided as the complete set of Construction Documents – all drawings and all specifications. Partial sets are not available and neither the Owner nor PSI Place Services, Inc will be responsible for any project information issued from any other source.
The County reserves the right to accept or reject any or all proposals and to waive minor irregularities and technicalities. The judgment of the County on such matters shall be final.
Except, as otherwise provided by law, information submitted by a Respondent in the proposal process shall be subject to disclosure after proposal award in accordance with the Georgia Open Records Act. Proprietary information in a Proposal must be identified by a Respondent. Entire Proposals may not be deemed proprietary.
VII. SELECTION CRITERIA, Qualification and Information
The proposals will be evaluated based on the information presented in the RFP. Award will be made to the highest scoring, responsive and responsible proposer according to the criteria stated in the RFP. The County may conduct such investigations or interviews, as it deems necessary to assist in the evaluation of any qualifications submitted and to establish to Douglas County’s satisfaction the responsibility, qualifications, and financial ability of any Respondent. Respondents shall not assume that the County will elect to pursue any discussion or interviews.
A selection committee designated by Douglas County will evaluate and rank each responsive proposal, with the three top-ranked Respondents presented to the Douglas County Board of Commissioners for authorization to negotiate an Agreement with the top-ranked Respondent. The failure to reach an acceptable contract with the top ranked Respondent in time will result in the termination of those negotiations and the commencement of negotiations for an acceptable contract with the next highest http://www.douglascountyga.go/ ranked Respondent and successive Respondents, if necessary. The ranking of the proposals will be based on the evaluation and qualifications and completeness of proposal package.
1. Experience and Performance
a. Review of past performance on Douglas County projects or other projects of similar nature and complexity as the proposed project.
b. Evaluation of client references whether included in the response or not; and
c. Evaluation of litigation history for the past five (5) years, including for each case:
i. Style of the case, parties to the litigation, court in which litigation was filed, and civil action number.
ii. Nature of claims; Whether the case is pending or resolved, and, if resolved, the date of and manner in which it was resolved (e.g., relief granted by court, settlement by or among parties, dispositive motion, trial verdict).
2. Respondent’s Information Provide the following:
a. Respondent local name, address, and telephone number
b. Primary local contact person(s) and telephone number(s)
c. Total number of Respondent’s local full-time employees
d. Year firm established
e. List of all litigation (including description and outcome) involving the Respondent in the last five (5) years.
f. List any OSHA violations within the past three (3) years.
g. State your Experience Modification Factor for the past three (3) years, as related to your Workman’s Comp. Rates.
3. Staffing
1. Evaluation of the list of personnel specifically assigned to the proposed project, including their qualifications, overall experience and recent experience on projects of similar scope and complexity to the proposed project.
2. Provide a proposed Organizational Chart, which identifies individual names and areas of responsibility, including their County and those individuals listed below.
a) Submit brief resumes of each key team member, as listed below, in this section of the proposal.
a) Project Manager
b) Superintendent
c) Field Engineer
d) Safety Supervisor
e) Specialty consultants as applicable
f) Materials testing & inspection consultant
g) Major Subcontractors key individuals
3. Resumes shall show at least the following:
a) Name, specialty, job title, and project job title.
b) Years of relevant experience with Respondent, and experience with previous employers. Project experience descriptions must include dates.
c) Academic degree(s), discipline and year degree(s) received.
d) Professional licenses and registrations.
e) Name of the firm(s) responsible for the individual and office location where employed.
f) A synopsis of specific experience, skills, training, or other qualities, which demonstrate the individual’s ability to fulfill the duties of their position.
4. Please identify the individual who, from project start to finish, will be the leader of your construction team and the principal point of contact between your firm and the County along with other consultants.
4. Availability
a. Evaluation of the workload of the Respondent and the staffing to be assigned to the proposed project;
b. Evaluation of Respondent’s ability to properly staff and complete the Project.
c. Time schedule of the Respondent in relation to that of the proposed project location of the offices or facilities from which the services are to be provided to the County.
d. Provide a statement of Respondent’s capability to absorb the workload for this Project, including the availability of personnel, and commitment to providing services on a timely basis and within the milestone dates for the Project.
e. Provide a current list of other commitments by the Build Contractor and its key team members and estimated completion dates by project in this section of the proposal.
Indicate the current commitments of individual staff to be assigned to the project and involvement with other projects.
f. List of comparable construction projects completed in the last five (5) years. Include:
i. Size and type of the Project,
ii. Cost of the Project,
iii. Time to construct facility,
iv. Description and cost of prime contract change orders,
v. Special features (e.g., energy conservation), and
vi. Awards received for the Project.
g. Provide no more than 3-5 examples of your experience as prime contractor in constructing facilities similar to this project (OR other public and private projects that indicate similar experience). For each of these projects:
i. Provide photographs.
ii. Provide a reference familiar with your performance on the project. It is the
Respondent’s responsibility to ensure that the listed contact and phone number are current.
iii. Provide a Program Manager reference (if applicable).
iv. List the individual who served as the Project Executive/Director, architect, Project Manager, Superintendent, and Cost Estimator. Please note whether this individual is still employed with Respondent.
h. For those projects listed in 1 and 2 above, indicate those projects that included architect, engineering consultant, and contractor serving a corporate or public client as a team.
5. Approach
a. Evaluation of the overall understanding of the scope of the proposed project
b. Completeness, adequacy, and responsiveness to the required information of the RFP.
c. Provide a comprehensive outline of the steps you propose in order to meet the services required in this RFP. This detail shall indicate what is to be done, who individually, and by name is responsible for doing it, and when it is to be completed.
d. Provide your proposed solution for the RFP, detailing your design, project set-up and schedule.
e. Please answer the following questions and/or provide adequate responses:
i. Provide a one-page overview of services typically performed for similar projects.
ii. How would you implement these services to ensure the success of this project?
iii. How does your firm implement cost control and scheduling activities during preconstruction?
iv. Explain your approach to value engineering, citing relevant, specific examples.
v. Occasionally, subcontractors and suppliers go bankrupt during the course of a project. What would you do to protect the County from being adversely affected by such an occurrence?
vi. Describe how your firm would assist the County in assuring participation by local contractors. Include examples of other projects where you have been successful in meeting similar goals.
vii. Describe your approach to team work on a project of this magnitude.
viii. Describe how your firm intends to arrange the construction into bid packages in order to reach the county’s schedule and budget objectives.
6. Financial Stability
a. The Respondent shall submit a statement of financial stability prepared by a financial data service (e.g. Moody’s), an audited financial statement, or a certification to the effect that the Respondent has sufficient financial resources and stability to successfully complete the project and that a financial statement is available upon request.
b. Submit a summary of receipts and fees for the last three (3) years, most recent year first, indicating gross receipts for Respondent and gross receipts for local office.
c. Provide a copy of the most recent three (3) complete years of audited financial statements (Income Statement and Balance Sheet).
d. Provide a letter of commitment from Surety or sureties regarding bonding capacity and availability.
7. Cost of Services
a. Evaluation of the Respondent’s cost estimates and percentages and ability to provide the services required within this RFP within the Project Budget.
b. Provide a pricing proposal that includes the following:
i. Proposed Fee for Construction Phase services. Provide your proposed fee for construction phase services as a percentage of Cost of the Work (defined in the Agreement) with an explanation of the basis for such fee. This fee should represent your total profit and home office overhead for the Project since all costs of the work, including subcontract costs. This Fee shall not apply to General Conditions Work Items (defined below), preconstruction services, any unused Construction Contingency, permit fees, and premiums for insurance and bonds.
ii. Proposed Fee and schedule for General Conditions/Overhead Items. Based upon the scope and character of the Project, provide (a) a detailed listing of all General Conditions Work Items (defined below) to be provided by the Respondent and not included in the construction services fee, and (b) the costs associated with such General Conditions Work Items. Such costs should directly correspond with the organizational chart and staffing plan. Please note that all such General Conditions Work Items are to be provided and paid for on a separate line-item basis. “General Conditions Work Items” include all direct personnel expenses and reimbursable expenses of the Respondent (including the Project-dedicated staff set forth in the staffing chart), jobsite trailers, temporary utilities, temporary facilities, and other reimbursable expenses (e.g., office supplies, equipment, furniture, reproduction costs, progress Project photos, computer software, and other items required specifically for the Project but that cannot be allocated to any particular trade).
c. Construction Contingency. Indicate the anticipated level of construction contingency to be contained within the GMP. Indicate your willingness to accept construction contingency reductions at pre-established levels and times to fund pre-designated add alternatives.
d. Billing Rates. Include any proposed hourly individual billing rates that correspond to the organizational chart and staffing plan.
e. Other
i. Other information the County requests pertinent to completion of a successful Project.
ii. At your option, you may provide any additional supporting documentation or information which would be helpful in evaluating your firm’s qualifications and commitment.
iii. Other Relevant Information. At the discretion of the Respondent, other relative information may be submitted with the Proposal in an effort to further demonstrate that the Respondent can serve the best interests and particular needs of the County on this Project.
iv. Alternative Proposals. Alternative Proposals for suggested alternate approaches may be submitted; however, the base Proposal will be used for the comparison, evaluation, and ranking of Respondents. Alternative proposals must be clearly labeled and arranged in a separate section of the submittal package. Any alternative Proposals would only be considered if the County elects to pursue discussions, negotiations, and revisions of the base Proposal.
It is anticipated that an Agreement for the described work will be entered into with the Respondent that, in the opinion of Douglas County, offers the most favorable qualifications. The evaluation by the Selection Committee will be based on the criteria listed above and the ability of the Respondent to successfully carry out the Agreement. Proposals shall be prepared per the following Sections, as well as a one-page letter of transmittal signed by an owner, officer, or authorized agent of the Respondent acknowledging and accepting the terms and conditions of this RFP, an executed Conflict of Interest Statement and non-collusion affidavit.
The County reserves the right to reject or accept any or all proposals and to waive technicalities, informalities and minor irregularities in the proposals received. Failure to observe any of the instructions or conditions in this request for proposal may constitute grounds for rejection of the proposal. The County reserves the right to make an award as deemed in its best interest, which may include awarding a proposal to a single Respondent or multiple Respondents; or to award the whole proposal, only part of the proposal, or none of the proposal to single or multiple Respondents, based on its sole discretion of its best interest.
AT THE TIME OF THE CONTRACT PRICE AMENDMENT, THE COUNTY MAY, IN ITS SOLE DISCRETION
ELECT TO PROCEED WITH THE PROJECT ON EITHER A GUARANTEED MAXIMUM PRICE OR LUMP
SUM PRICE
VIII. PROVIDE THE FOLLOWING QUALIFICATIONS AND INFORMATION:
B. Experience/Performance
C. Staffing
D. Availability
E. Approach
F. Financial Stability
G. Cost of Services
H. Other
IX. MISCELLANEOUS
A. Addenda Each proposal schedule shall include specific acknowledgment in the space provided of receipt of all addenda issued by the County. Failure to acknowledge may result in the proposal being rejected as non-responsive.
B. Land Acquisition This project will be constructed on land currently owned by Douglas County.
C. Interpretations No interpretation of the meaning of the drawings, specifications or other pre-RFP documents will be made to any Respondent orally. Every request for such interpretation must be in writing, addressed to the Douglas County Purchasing Department. Any and all such interpretations and any supplemental instructions will be in the form of written addenda. All addenda so issued shall become a part of the Contract Documents.
D. Site Examination The Respondent shall examine the site and shall make such examinations on the ground as may be necessary to thoroughly familiarize itself with the nature and extent of the proposed construction and with all local conditions affecting the work. The Respondent shall also accept the premises in its present condition and carry out all work in accordance with the requirements of the specifications and as shown on the drawings. The County will not be responsible for Respondent’s errors and misjudgment nor for failure to obtain any information on local conditions or general laws or regulations pertaining thereto. At the time of the opening of proposals each Respondent will also be presumed to have read and to be thoroughly familiar with the drawings, Contract Documents (including all addenda), and the construction specifications. The failure or omission of any Respondent to examine any form, instrument, or document shall in no way relieve any Respondent from any obligation in respect to his proposal.
E. Laws and Regulations; Licensing
The Respondent’s attention is directed to the fact that all applicable Federal and state laws, county and municipal ordinances and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the Project throughout, and they will be deemed to be included in the Contract the same as though herein written out in full.
The State of Georgia has requirements for the licensing of contractors engaged in specific types of construction, including general contracting, electrical, plumbing, and underground utility work [re: OCGA § 43-14]. Any contractor (or subcontractor of any tier) performing regulated work on this project shall furnish proof of valid and current registration to the County. Similarly, the State requirements concerning local business licenses shall be met.
F. Execution of Proposals The Respondent, in signing its proposal on the whole or any portion of the work, shall conform to the following requirements:
1. Proposals which are not signed by individuals providing said proposal shall have attached thereto the power of attorney evidencing authority to sign the proposal in the name of the person for whom it is signed.
2. Proposals which are signed for a partnership, shall be signed by all of the partners or by an attorney-in-fact. There should be attached to the proposal a power of attorney executed by the partners, evidencing authority to sign the proposal.
G. Non-Collusion Affidavit The Georgia statute concerning public works construction contracting requires that any person who procures such work by bidding or proposal shall make an oath in writing that he/she has not prevented or attempted to prevent competition in such bidding [OCGA § 36- 91-21(d), I]. If the successful Respondent (“Builder”) is a partnership, all of the partners and any officer, agent, or other person who may have represented or acted for them in bidding for or procuring the contract shall make the oath and complete the Affidavit. If the Builder is a corporation, all officers, agents, or other persons who may have acted for or represented the corporation in bidding for or procuring the contract shall make the oath and complete the Affidavit. If such oath is false, the Agreement shall be void, and all sums paid by the County to the Respondent for and under the Agreement are refundable to the County.
H. Award of Project The Respondent to whom the Project is awarded will be required to execute the Agreement and obtain the performance bond, payment bond and provide insurance certificates acceptable to the County within twenty-one (21) calendar days from the date when the notice of award is issued to the Respondent. In case of failure of the Respondent to execute the Agreement or provide insurance or meet bonding requirements, the County may consider the Respondent in default, in which case the bid security accompanying the proposal shall become payable to the County.
X. SUBSTITUTIONS
Respondents offering and quoting on substitutions or who are deviating from the attached specifications shall list such deviations on a separate sheet to be submitted with their proposal. The absence of such a substitution list shall indicate that the Respondent has taken no exception to the specifications contained therein.
XI. INELIGIBLE RESPONDENTS
The County may choose not to accept the proposal of one who is in default on the payment of taxes, licenses or other monies owed to the County. Failure to respond three (3) consecutive times for any given commodity may result in removal from the list under that commodity.
XII. FIRM PRICES
Prices quoted in the Proposal shall be firm and at the best prices. Prices quoted must be valid for a minimum of ninety (90) days from the date of bid opening.
XIII. BONDS
For all projects with Proposals over $100,000 Respondents shall provide bid bonds using the form attached to this RFP. The penal sum of the bid-bond shall be five percent (5%) of the estimated cost of the project.
Further, the winning Respondent agrees to obtain payment and performance bonds for itself and each subcontractor with a contract in excess of $50,000. The payment and performance bonds shall be procured in the manner provided in the Agreement.
XIV. PROPOSAL/PRESENTATION COSTS
The costs for development of the Proposal are the sole responsibility of the Respondent. Douglas County is not liable for any costs incurred by the respondent in preparation and/or presentation of proposals in response to this RFP or for travel and other costs related to this RFP.
SCOPE
Douglas County Board of Commissioners is seeking a contractor to provide services for fire suppression installation at two separate locations. It will be the responsibility of selected contractor to survey existing locations.
DOT STORAGE COMPLEX
First floor consists of 15,342sf.
• First floor consists of 8 large garage bays, 2 small garage bays and 2 storage rooms.
• The building will be provided with heat throughout, ensuring freeze protection of the sprinkler system.
• The sprinkler scope is limited to interior sprinkler design, permitting and installation only; the site fire water line will be brought into the building under a separate contract.
Second floor consists of 2,723sf.
• Second floor consists of 1 large open office, 1 small room (for stair access), 1 ADA restroom and 1 mechanical room.
• Second floor will also be provided with heat throughout, ensuring freeze protection of the sprinkler system.
• The sprinkler scope is limited to interior sprinkler design, permitting and installation only; the site fire water line will be brought into the building under a separate contract, as mentioned on the first floors scope.
• The DOT Storage Complex does not have an existing fire suppression system.
Contractor must work in controlled work zones throughout the duration of the project. The DOT Maintenance complex location operates 7:00 am to 4:30 pm. This location also works on call shifts (24/7) which requires employees to visit the location all hours of the day and night. Contractor must keep areas clear and accessible at all times, due to heavy traffic at this location.
DOUGLAS COUNTY SHERIFFS OFFICE LAW ENFORCEMENT & ADULT DETENTION CENTER
Existing Square Footage
• (S150) Server/ Computer Room 817 sq.ft.
• (S151) Telecom Room 241 sq.ft.
• (S123) Main Electrical Room 1,100 sq.ft.
• (S124) Emergency Electrical Room 825 sq.ft.
The selected firm must be qualified and have the ability to accomplish the following services:
Computer Room S150 and Telecom Room S151
• Provide engineering, design and installation for a new Sapphire Novec 1230 (or equal) fire suppression system in rooms S150 and S151 at the Detention Center
• Remove the current fire suppression system in rooms S150 and S151
• Ensure that the new system is compatible with the current Notifier Fire Alarm system
• Coordinate with Base Six Fire/Life Alarm and Monitoring Company with the installation of any necessary sensors and/or activators for the new system
• Any other necessary programming, equipment, software, infrastructure, components or devices related to the removal of the current fire suppression system and the installation of the new Novec 1230 fire suppression system
Main Electrical Room S123 and Emergency Electrical S124
• Provide engineering, design and installation for a new Hydra mist (or as recommended for application) fire suppression system in rooms S123 and S124 at the Detention Center
• Remove the current fire suppression system in room S123. There is no current wet sprinkler system in Emergency Electrical room S124.
• Ensure that the new system is compatible with the current Notifier Fire Alarm system
• Coordinate with Base Six Fire/Life Alarm and Monitoring Company with the installation of any necessary sensors and/or activators for the new system
• Any other necessary programming, equipment, software, infrastructure, components or devices related to the removal of the current fire suppression system and the installation of the new suppression system
(a) Design The selected firm shall be required to develop a design for the new fire suppression systems that meets all legal compliance, code compliance, regulations, and constructability for a Detention Facility.
The project location includes Electronic Security and Electrical Rooms located in the
Detention Center only. The existing systems and infrastructure were purchased and installed as part of the original construction of the facility in 2011. The Contractor will be required to work with members of the Sheriff’s staff including the IT Department and Facility Maintenance. All work will be done under strict jail supervision and inside the Detention Center while in operation.
EXHIBIT A
COMPLIANCE WITH GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT
PROCEDURES & REQUIREMENTS
Pursuant to the “Georgia Security and Immigration Compliance Act,” Douglas County cannot enter into a contract for the physical performance of services unless the contractor registers and participates in the federal work authorization program to verify information of all newly hired employees or subcontractors.
Neither may any contractor or subcontractor enter into a contract with the county in connection with the physical performance of services unless the contractor and/or subcontractor registers and participates in the federal work authorization program to verify information of all new employees. O.C.G.A. § 13-10-91.
Before any bid for the physical performance of services is considered, the bid must include a signed, notarized affidavit from the contractor attesting to the following: (1) the affiant has registered with and is authorized to use the federal work authorization program; (2) the user ID number and date of authorization for the affiant; and (3) the affiant is using and will continue to use the federal work authorization program throughout the contract period. O.C.G.A. § 13-10-91 (b) (1). Affidavits shall be maintained for five years from the date of receipt. O.C.G.A. § 13-10-91 (b) (1).
Upon contracting with a new subcontractor, a contractor or subcontractor shall, as a condition of the contract or subcontract, provide Douglas County with notice of the identity of any and all subsequent subcontractors hired or contracted by that contractor or subcontractor within five (5) business days of entering into a contract or agreement for hire with any subcontractor. Such notice shall include an affidavit including the subcontractor’s name, address, user ID number, and date of authorization to use the federal work authorization program. O.C.G.A. § 13-10-91 (b) (3).
Based upon the County’s experience and desire for full compliance, no work may be commenced by any subsequent subcontractor prior to notice being received by the County that the subcontractor (regardless of tier) is in compliance with the law and the attached Procedures & Requirements, including the preparation and submission of the Contractor (or Subcontractor) Affidavit & Agreement AND the Immigration Compliance Certificate PRIOR to the commencement of any work.
DEFINITIONS
Affidavit – a written statement made or taken under oath before an officer of the court or a notary public or other person who duly has been authorized so to act.
Affiant – the person who makes and subscribes to a statement made under oath (affidavit).
Physical Performance of Services – any performance of labor or services for a public employer using a bidding process or by contract wherein the labor or services exceed $2,499.99.
PROCEDURES & REQUIREMENTS. Proposals MUST INCLUDE a signed, notarized affidavit from the Respondent in the form attached as EXHIBIT A (CONTRACTOR AFFIDAVIT & AGREEMENT). If the affidavit is not submitted at the time of the bid, the Proposal will be non-responsive, and the Respondent will be disqualified.
Contract Language & Contractual Requirements: Affirmative language shall be contained in agreements for the performance of services to cover all statutory and County requirements; such language shall require that:
Affidavits in the form attached to these “Procedures & Requirements” must be executed from a contractor (and any subcontractors, regardless of tier) and notarized, showing compliance with the requirements of O.C.G.A. § 13-10-91 and that such be made part of the contract and/or subcontracts;
That the contractor (and any subcontractors, regardless of tier) fully comply with the requirements for completing and submitting the “Immigration Compliance Certification” and that such certification be received by the County prior to the commencement of any work under the contract or subcontract;
That the contractor (or any subcontractor, regardless of tier) notify the County within five (5) business days of entering into a contract or other agreement for hire with any subcontractor(s), regardless of tier;
That the contractor be responsible for obtaining and providing to the County the “Subcontractor Affidavit & Agreement” and “Immigration Compliance Certification” attached to and required under these “Procedures & Requirements” from each subcontractor, regardless of tier, employed or retained for work under the contract prior to the commencement of any work under the contract or any subcontract;
That Douglas County, Georgia, reserves the right to dismiss, or require the dismissal of, any contractor or subcontractor for failing to provide the required affidavit or certification and/or for failure to comply with the statutory requirements of O.C.G.A. § 13-10-91 and/or for providing false or misleading information upon the required affidavit(s) or certification(s);
That any contractor and/or subcontractor retaining any other subcontractor to perform services under the contract provide legal notice to any subcontractor of the requirements of Douglas County for immigration compliance and further provide notice that Douglas County, Georgia, reserves the right to dismiss, or require the dismissal of, any contractor or subcontractor for failing to provide the required affidavit or certification and/or for failure to comply with the statutory requirements of O.C.G.A. § 13-10-91 and/or for providing false or misleading information upon the required affidavit(s) or certification(s);
That failure to comply with any of the requirements and procedures of the County (i.e., failure to timely supply required affidavits or compliance certification documents; failure to utilize federal work authorization procedures; failure to permit or facilitate audits or reviews of records by County or State officials upon request; and/or failure to continue to meet any of the statutory or County obligations during the life of the contract) shall constitute a material breach of the agreement and shall entitle the County to dismiss any general contractor or to require the dismissal of any subcontractor or sub/subcontractor (irrespective of tier) for failing to fully comply with these requirements; and
That upon notice of a material breach of these provisions, the contractor (or subcontractor, regardless of tier) shall be entitled to cure the breach within ten (10) days and provide evidence of such cure. Should the breach not be cured, the County shall be entitled to all available remedies, including termination of the contract, the requirement that a subcontractor be dismissed from performing work under the contract, and any and all damages permissible by law.
Immigration Compliance Certification: Prior to commencing work under any contract for the physical performance of services, the contractor shall complete the “IMMIGRATION COMPLIANCE CERTIFICATION” form attached to these “Procedures & Requirements” and submit the same to the County. Prior to allowing any other subcontractor to perform work under the contract, the contractor shall obtain a completed “IMMIGRATION COMPLIANCE CERTIFICATION” from each subcontractor (regardless of tier) and submit the same to the County.
ATTACHMENTS:
CONTRACTOR AFFIDAVIT & AGREEMENT (EXHIBIT A);
SUBCONTRACTOR AFFIDAVIT & AGREEMENT (EXHIBIT A-1);
IMMIGRATION COMPLIANCE CERTIFICATION (EXHIBIT A-2).
DISADVANTAGE BUSINESS ENTERPRISE (DBE) (EXHIBIT B)
DEB MONTHLY PARTICIPATION REPORT (EXHIBIT C)
CONFLICT OF INTEREST (EXHIBIT D)
NON-COLLUTION ADDENDUM (EXHIBIT E)
PROPOSAL LETTER (EXHIBIT F)
PROPOSAL SCHEDULE (EXHIBIT G)
BID BOND (EXHIBIT H)
CIVIL PLANS (EXHIBIT I)
ARCHITECTURAL PLANS (EXHIBIT J)
CONTRACTOR AFFIDAVIT & AGREEMENT
(EXHIBIT A)
This affidavit must be signed, notarized, and submitted with any bid requiring the performance of physical services. If the affidavit is not submitted at the time of the bid, the bid will be determined non-responsive and will be disqualified.
By executing this affidavit, the undersigned contractor verifies compliance with O.C.G.A. §13-10-91, stating affirmatively that the individual, firm or corporation which is contracting with Douglas County, Georgia, has registered with, is authorized to use, and is participating in a federal work authorization program (an electronic verification of work authorization program operated by the U.S. Department of Homeland Security or any equivalent federal work authorization program operated by the U.S. Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA)). The undersigned contractor further attests that it will continue to use the federal Employment Eligibility Verification (EEV) work authorization program throughout the contract period.
The undersigned further agrees that should it employ or contract with any subcontractor(s) or should its subcontractor(s) employ other subcontractor(s) for the physical performance of services pursuant to the contract with Douglas County, Georgia, the contractor, or subcontractor will:
(1) Notify the County within five business days of entering into a contract or agreement for hire with any subcontractor(s);
(2) Secure from any subcontractor(s) and/or their subcontractor(s) verification of compliance with O.C.G.A. § 13-10-91 on the attached Subcontractor Affidavit (EXHIBIT A-1) prior to the commencement of any work under the contract/agreement.
(3) Secure from any subcontractor(s) and/or their subcontractor(s) a completed Immigration Compliance Certification (EXHIBIT A-2) prior to the commencement of any work under the contract/agreement.
(4) Provide the subcontractor(s) with legal notice that Douglas County, Georgia, reserves the right to dismiss, or require the dismissal of, any contractor or subcontractor for failing to provide the affidavit and/or for failure to comply with the requirements referenced in the affidavit;
(5) Maintain records of such compliance and provide a copy of each such verification to Cobb County, Georgia, at the time the subcontractor(s) is retained to perform such services or upon any request from Douglas County, Georgia; and
(6) Maintain such records for a period of five (5) years.
EEV (E-Verify) Program Number EEV Program Date of Authorization
BY: Authorized Officer or Agent Contractor Business Name [Contractor Name]
Printed Name Date
SWORN AND SUBSCRIBED BEFORE ME
ON THIS THE ____ DAY OF ____________, 20__
Notary Public Commission Expires: _______
SUBCONTRACTOR AFFIDAVIT & AGREEMENT
(EXHIBIT A-1)
By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A.
§ 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of Douglas County, Georgia, has registered with, is authorized to use, and is participating in a federal work authorization program (an electronic verification of work authorization program operated by the U.S. Department of Homeland Security or any equivalent federal work authorization program operated by the U.S. Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA)). The undersigned contractor further attests that it will continue to use the federal Employment Eligibility Verification (EEV) work authorization program throughout the contract period.
The undersigned further agrees that should it employ or contract with any subcontractor(s) or should its subcontractor(s) employ other subcontractor(s) for the physical performance of services pursuant to the contract with Douglas County, Georgia, the undersigned subcontractor will:
(1) Notify the County within five business days of entering into a contract or agreement for hire with any subcontractor(s);
(2) Secure from any subcontractor(s) and/or their subcontractor(s) verification of compliance with O.C.G.A. § 13-10-91 on this Subcontractor Affidavit form (EXHIBIT A-1) prior to the commencement of any work under the contract/agreement;
(3) Secure from any subcontractor(s) and/or their subcontractor(s) a completed I immigration
Compliance Certification (EXHIBIT A-2) prior to the commencement of any work under the contract/agreement;
(4) Provide the subcontractor(s) with legal notice that Douglas County, Georgia, reserves the right to dismiss, or require the dismissal of, any contractor or subcontractor for failing to provide the affidavit and/or for failure to comply with the requirements referenced in the affidavit;
(5) Maintain records of such compliance and provide a copy of each such verification to Douglas County, Georgia, at the time the subcontractor(s) is retained to perform such services or upon any request from Douglas County, Georgia; and
(6) Maintain such records for a period of five (5) years.
EEV…