File F Project Guidelines All Docs.pdf

PDF 106 KB Posted

Attached to
UNH SERC Mechanical to Network Lockset Equipment & Installation
Solicitation number
212027991
Issued by
New Hampshire

About this file

This file contains project guidelines for the University of New Hampshire Department of Housing related to the 2026 SERC M2N Project, which involves the installation of a networked lockset system in SERC residence halls. The guidelines establish operational parameters for contractor work within occupied housing facilities, including mandatory coordination with Housing Access Control Teams (HAC) for all project activities. Work start times are restricted to 9:00 AM or later for activities within occupied rooms or buildings with significant noise generation, with outdoor work subject to Durham municipal regulations beginning at 7:00 AM. All contractors must comply with specific work end times and weekend work schedules as approved by HAC staff, and work in occupied rooms requires the presence of a Department of Housing or University staff member.

The guidelines establish requirements for contractor operations and facility usage, including mandatory removal of all project-generated waste through coordination with UNH Facilities Project Management or HAC for dumpster placement. Contractors must provide their own equipment and are prohibited from using University furniture, moving carts, or recycling bins for material transport. Building access is available through access cards upon request, with activation parameters specified by requestor, company, door locations, responsible personnel, and time parameters. Parking is the contractor's responsibility, with vendor passes available through Transportation Services. Restroom access is limited to single-use facilities coordinated through HAC, with contractors otherwise required to provide portable facilities. All contractors must display company identification through badges or logo shirts, and doors may not be propped open except during active material loading and unloading.

View the file

Other files

File Type Posted
File E Com and Gateway Layout Peterson.pdf PDF
RFP 212027991 SERC Mechanical to Network Lockset Equipment & Installation.pdf PDF
Appendix A - General Response Workbook.xlsx XLSX spreadsheet
File A Bill of Materials Handler.xlsx XLSX spreadsheet
File E Com and Gateway Layout Haaland.pdf PDF
File D Com and Gateway to Door List Handler.xlsx XLSX spreadsheet
File C Gateway Wiring Peterson.xlsx XLSX spreadsheet
File D Com and Gateway to Door List Peterson.xlsx XLSX spreadsheet
File D Com and Gateway to Door List Haaland.xlsx XLSX spreadsheet
File C Gateway Wiring Handler.xlsx XLSX spreadsheet
Appendix B - Financial Response Workbook.xlsx XLSX spreadsheet
File A Bill of Materials Peterson.xlsx XLSX spreadsheet
File B Door List Peterson.xlsx XLSX spreadsheet
1434421-event.pdf PDF
File A Bill of Materials Haaland.xlsx XLSX spreadsheet
File B Door List Haaland.xlsx XLSX spreadsheet
File C Gateway Wiring Haaland.xlsx XLSX spreadsheet
Appendix C - Sample USNH Agreement (Primary Template) 7.23.26-1.docx DOCX document
File B Door List Handler.xlsx XLSX spreadsheet
File E Com and Gateway Layout Handler.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2026 SERC M2N PROJECT File F - Housing Project Guidelines

University of New Hampshire

Department of Housing

Project Guidelines

• Project work within Department of Housing must be coordinated with the Housing Access Control Teams (HAC)

• Work Start/End Times o Work within an occupied room must start after 9am.

o Work of significant noise in an occupied building must start after 9am.

o Work outside and occupied building must follow town of Durham rules, 7am.

o Work end times must be approved and coordinated by HAC staff.

o Weekend work must be approved and coordinated by HAC staff.

• Work in an occupied room must be accompanied by a staff member of the Department of Housing or the University of New Hampshire.

• Trash removal o All demo or project generated trash must be removed by contractor. Contractors may coordinate through UNH Facilities Project Management (FPM) or HAC an onsite dumpster for the project.

• Rest rooms o Contractors may coordinate use of building restroom(s) with HAC depending on availability This can only be a single use restroom and not a community restroom.

o Otherwise, contractor will provide exterior portable unit(s)

• Building Access o Contractors can request an access card(s) for entry into the building.

o Info needed:

Requestor:

Company:

Number of cards:

Door Access Needed (buildings):

Person(s) responsible for each individual card:

Dates card is to be active (ex. June 1st-July 30th):

Days of the week for access (ex. Mon-Fri.):

Time of day for card to be active (ex 6am-4pm):

o Doors may not be propped open unless during active loading and unloading of materials.

o Room specific keys (if required) should be signed out from the UNH lock shop or Housing.

• Use of Housing equipment or FFE o Contractors will use their own equipment for the project.

o Contractors may not use furniture to stand on for elevated work.

o Contractors many not use Housing moving carts or recycle bins to move materials.

2026 SERC M2N PROJECT File F - Housing Project Guidelines

• Parking o Parking is the responsibility of the contractor.

o Vendor/contractor passed may be purchased through Transportation Services.

• Identification o Contractors should wear identification that connects them to their company

ID badges or logo shirts are acceptable.

2025 SERC M2N PROJECT File A Attachment 1 Housing Project Guidelines
2025 SERC M2N PROJECT File A-Attachment 2 Projected Project Control Panel Enclosure
2025 SERC M2N PROJECT File A-Attachment 3 All SERC Locksets to be replaced
Haaland
Handler
Peterson

File details come from the government source that posted it. Updated .