File C Gateway Wiring Haaland.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- 212027991
- Issued by
- New Hampshire
About this file
This is a wiring infrastructure document for a gateway system installation at a University of New Hampshire (UNH) SERC residence hall facility, supporting the networked lockset equipment and installation project. The document outlines a comprehensive wiring layout across five floors, detailing gateway equipment placement and identification codes. The infrastructure is organized by floor levels (Floors 1 through 5) and room locations, with multiple communication modules (COM-1 and COM-2) distributed throughout ultra units. The document identifies 46 gateway connection points (GW-1 through GW-46) and one primary integration module (PIM-1) strategically positioned to support the turnkey installation of the networked lockset system and supporting infrastructure for the SERC residence halls.
The document serves as a technical specifications reference for the physical wiring and gateway equipment distribution required to activate and support the networked lockset system across the residential facility. This infrastructure planning document does not specify pricing terms, contract duration, renewal options, funding sources, or set-aside requirements, as it functions as a technical schematic supporting the broader mechanical-to-network lockset equipment and installation procurement managed by USNH on behalf of UNH in New Hampshire.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Room 329 Floor 5
| Ultra 7 COM-1 | GW-41 | GW-42 | GW-43 |
| Ultra 7 COM-2 | GW-44 | GW-45 | GW-46 |
Floor 4
| Ultra 5 COM-2 | GW-30 | GW-31 | GW-32 | |
| Ultra 6 COM-1 | GW-33 | GW-34 | GW-35 | GW-36 |
| Ultra 6 COM-2 | GW-37 | GW-38 | GW-39 | GW-40 |
Floor 3
| Ultra 4 COM-1 | GW-19 | GW-20 | GW-21 | |
| Ultra 4 COM-2 | GW-22 | GW-23 | GW-24 | GW-25 |
| Ultra 5 COM-1 | GW-26 | GW-27 | GW-28 | GW-29 |
Floor 2
| Ultra 2 COM-2 | GW-8 | GW-9 | GW-10 | |
| Ultra 3 COM-1 | GW-11 | GW-12 | GW-13 | GW-14 |
| Ultra 3 COM-2 | GW-15 | GW-16 | GW-17 | GW-18 |
Floor 1
| Ultra 1 COM-1 | GW-1 | GW-2 | GW-3 | |
| Ultra 1 COM-2 | GW-4 | GW-5 | GW-6 | GW-7 |
| Ultra 2 COM-1 | PIM-1 |
Haaland Wiring
File details come from the government source that posted it. Updated .