OMCC Industry Day 11-16-2022 v2.pptx

PPTX presentation 2 MB Posted

Attached to
McClellan AFB Radiological Remediation Federal contract opportunity
Solicitation number
FA8903-23-R-0020
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

View the file

Other files for this federal contract opportunity

Other files attached to McClellan AFB Radiological Remediation, newest first.
File Type Posted
23R0020 - Government Response to Questions - 12Oct2023.pdf PDF
Solicitation Amendment FA890323R00200002 SF 30.pdf PDF
23F0020 - Attach 1 - OMCC SOW -09182023.pdf PDF
Solicitation Amendment FA890323R00200001 SF 30.pdf PDF
23R0020 - Attach 11 - Section M.pdf PDF
23R0020 - Attach 10 - Section L.pdf PDF
23R0020 - Attach 14 - Field Trailer Sites Util.pdf PDF
23R0020 - Attach 3 - Key Personnel and Qualifications Revised.pdf PDF
23R0020 - Government Response to Questions - 25Sept2023.pdf PDF
23R0020 - Attach 4 - As Builts Part 3 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 9 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 4 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 1 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 5 of 10.pdf PDF
23F0020 - Attach 1 - OMCC SOW -04142023.pdf PDF
23R0020 - Attach 3 - Key Personnel and Qualifications.pdf PDF
23R0020 - Attach 4 - As Builts Part 2 of 10.pdf PDF
23R0020 - Attachment 11 - Section M.pdf PDF
23R0020-Attach_7_Transmittal_Letter.docx DOCX document
23R0020-Attach_9_Cross-Reference-Matrix.docx DOCX document
23R0020-Attach_6_Client_Authorization.docx DOCX document
23R0020 - Attach 2 - Past Performance Questionaire.docx DOCX document
23R0020 - Attach 4 - As Builts Part 7 of 10.pdf PDF
23R0020 - Attach 5 - OMCC Estimated Volumes.pdf PDF
23R0020 - Attach 4 - As Builts Part 10 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 8 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 6 of 10.pdf PDF
23R0020 - Attach 13 - Wage Determination.pdf PDF
Solicitation - FA890323R0020.pdf PDF
23R0020 - Attachment 10 - Section L.pdf PDF
23R0020 - Attachment M-1 - OMCC Relevancy Matrix.pdf PDF
23R0020-Attach_8_Consent_Letter.docx DOCX document
23R0020 - Attach 12 - CDRLS.xlsx XLSX spreadsheet
McClellan OMCC Tour.pdf PDF
Industry Day Attendees.pdf PDF
23R0020 - DRAFT SOW Old Magpie Creek 04142023.pdf PDF
23R0020-Industry Day QnA.pdf PDF
Part 3 of 10.pdf PDF
Part 6 of 10.pdf PDF
Part 8 of 10.pdf PDF
Part 9 of 10.pdf PDF
Part 7 of 10.pdf PDF
Part 10 of 10.pdf PDF
Part 1 of 10.pdf PDF
Part 4 of 10.pdf PDF
Part 2 of 10.pdf PDF
Part 5 of 10.pdf PDF
McClellan OMCC SOW 02 NOV 2022 - DRAFT.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

McClellan Air Force Base (AFB) Old Magpie Creek Channel (OMCC) Industry Day

Air Force Installation & Mission Support Center

Linda CavazosSteve Mayer
772 ESS/PKSAFCEC/CIBW

November 16, 2022

Your Success is Our Mission!

UNCLASSIFIED

Classification This briefing is unclassified.

The information in it is publicly available.

Present Air Force plans and requirements for remediation of OMCC Educate offerors on how the procurement will be conducted Encourage innovative thinking about the requirements Create a level playing field for all potential offerors

Purpose

Purpose Overview Overview Multi-Functional Team Administrative Preliminary Contracting Approach/Milestone Schedule Project Objectives Site Description Remedial Approach Bldg 690 Plan view Project Phasing and Timeline Q&A

Overview

Overview Multi-Functional Team

TitleNameOffice
Procuring Contracting OfficerLinda L. Cavazos772 ESS/PKS
BuyerSamuel L. Mendez772 ESS/PKS
BuyerTSgt Mitchell Cooper772 ESS/PKS
BuyerJay Klimes772 ESS/PKS
Chief, BRAC WestGregory GangnussAFCEC/CIBP
Program ManagerChristiana HewittAFCEC/CIBE
Base Environmental CoordinatorSteven K MayerAFCEC/CIBW

Administrative Administrative Comments Rules of Engagement:

Ask questions / Follow-up in writing for telecom questions and any future questions to the Government Procurement Contracting Officer (PCO) and Contract Specialists via email to linda.cavazos@us.af.mil ; Contract Specialists: samuel.mendez@us.af.mil, Jay.klimes@us.af.mil and mitchell.cooper.1@us.af.mil The government reserves the right to contact respondent for further clarification of submitted questions Formal responses to all questions will be provided via SAM.gov website by 15 Dec 22

Administrative This briefing / training is to give you an overview of what the Government expects to see in your proposal in order to award without discussions The Government intends to award without discussions, but reserves the right to conduct discussions if necessary

Administrative - Disclaimer This conference does not:

Constitute a contract Constitute a promise to contract Form a commitment of any kind on the part of the Government Verbal questions and answers are non-binding

Preliminary Contracting Strategy Full & Open Competiton: 8(a) Lowest price Technically Acceptable (LPTA) or Past Performance Tradeoff (PPT) - TBD Type of Contract

FFP

Acquisition of Services (FAR Part 37) and Construction (FAR Part 36) Non-commercial service Non-severable Contract Period of Performance (PoP) Option 36-48 months PoP

Preliminary Milestone Schedule RFI posted: 02 and 03 Nov 2022 Industry Day/Site Visit: 16 Nov 2022 RFP release: 31 Jan 2023 Estimated contract Award Date: 18 May 2023

Project Objectives Obtain unrestricted radiological release of the OMCC Excavate all soil with radium that exceeds 2.0 picoCuries per gram (pCi/g) and dispose of it in the McClellan AFB Consolidation Unit (CU) Perform final status surveys to demonstrate cleanup level has been met Maintain or restore pre-excavation form, appearance, and function of all infrastructure affected by the project Building 690 Buildings and shelters in the Sun Gro lot Roads, fences, pavement, landscaping, utilities

Site Description OMCC is the buried channel of a former alignment of Magpie Creek Received radium-contaminated wastewater from the base sewage treatment plant and instrument repair shop Non-uniform, sporadic deposition of radium-226 Contaminated layer ~2 ft. thick and ~30 ft. wide, starting about ~12 ft. below ground surface Length to be cleared for unrestricted release ~1,500 ft.

Overburden appears to be clean fill Runs beneath Building 690, Kilzer Ave, and Sun Gro lot

Remedial Approach

6 work units Work Unit 1 – beneath Bldg 690 Work Unit 2 – Bldg 690 to just west of Bldg 708 in Sun Gro lot Work Unit 3 – From Work Unit 2 to the Sun Gro tents Work Unit 4 – underneath the Sun Gro tents Work Unit 5 - running 380 ft northwest from the Sun Gro Tents Work Unit 6 from Work Unit 5 to Magpie Creek

Remedial Approach (continued) For each work unit collect pre-excavation samples using tranches and/or continuous core borings Identify areas that can be released without excavation Prepare waste disposal profiles Excavate areas that cannot be released without excavation Reserve overburden for use as backfill Excavate to bottom of waste layer Send waste layer to CU for disposal Conduct final status survey

Remedial Approach (continued) Qualify backfill Sample overburden for use as backfill Sample other McClellan AFB soil stockpiles for use as backfill If enough backfill cannot be qualified from these sources, purchase and qualify backfill Backfill must be analyzed for chemical constituents as well as radium-226

Remedial Approach (continued) Restore work units Obtain regulator concurrence to backfill Backfill Restore surface, including all infrastructure Final Inspection Site closeout and release Final status survey reports (one for each work unit) Remedial action completion report (one for entire site) Request for state Recommendation for Unrestricted Radiological Release (one for each work unit) Permit amendment request to remove site from multi-sites radioactive materials permit (one for entire site)

Remedial Approach (concluded) Bldg 690 - maintain or restore full form, function, and appearance Slab-on-grade ribbed metal structure 127 ft. east-west x 424 ft. 10 in north-south 2 main bays (North and South) separated by a 31 ft.-wide plenum West side of each bay has hangar doors 144 ft. wide x 29 ft. high Contamination runs northeast to southwest beneath parts of both bays and the plenum Paved beneath and on west with 10 in. concrete over 6 in. aggregate base Paved east, north, south with 2 in. coarse bituminous surface over 6 in. aggregate base Sun Gro Lot – work around Sun Gro operations Mostly sampling and excavating through asphalt pavement Probably excavate beneath one metal building (Bldg 708) and two metals shelters (see photo) Maintain or restore full form, function, and appearance of Bldg 708 and shelters

Bldg 690 Plan View

Sun Gro Shelters

Project Phasing and Timeline Year 1—work plan and design preparation and approval ~8 months Year 2 (mid-April to mid-October) Pre-excavation sampling Start excavation Storm water controls to over-winter the site Year 3 (mid-April to mid-October) Finish excavation Perform final status surveys Backfill and final inspection Year 4 Reports and site release 8 months from end of Second field season (Year 4)

Q&A Industry questions on technical issues and contracting approach image1.png image2.jpeg image3.png image19.jpeg image20.jpeg image21.jpeg image12.png image13.png image14.png image15.png image16.png image17.png image18.png image4.png image5.png image6.png image7.jpg image8.png image9.png image10.png image11.png