23R0020 - Attach 3 - Key Personnel and Qualifications.pdf

PDF 663 KB Posted

Attached to
McClellan AFB Radiological Remediation Federal contract opportunity
Solicitation number
FA8903-23-R-0020
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

View the file

Other files for this federal contract opportunity

Other files attached to McClellan AFB Radiological Remediation, newest first.
File Type Posted
Solicitation Amendment FA890323R00200002 SF 30.pdf PDF
23R0020 - Government Response to Questions - 12Oct2023.pdf PDF
Solicitation Amendment FA890323R00200001 SF 30.pdf PDF
23R0020 - Attach 11 - Section M.pdf PDF
23R0020 - Attach 10 - Section L.pdf PDF
23F0020 - Attach 1 - OMCC SOW -09182023.pdf PDF
23R0020 - Attach 14 - Field Trailer Sites Util.pdf PDF
23R0020 - Attach 3 - Key Personnel and Qualifications Revised.pdf PDF
23R0020 - Government Response to Questions - 25Sept2023.pdf PDF
23R0020 - Attach 4 - As Builts Part 2 of 10.pdf PDF
23R0020 - Attachment 11 - Section M.pdf PDF
23R0020-Attach_7_Transmittal_Letter.docx DOCX document
23R0020-Attach_9_Cross-Reference-Matrix.docx DOCX document
23R0020-Attach_6_Client_Authorization.docx DOCX document
23R0020 - Attach 2 - Past Performance Questionaire.docx DOCX document
23R0020 - Attach 4 - As Builts Part 7 of 10.pdf PDF
23R0020 - Attach 5 - OMCC Estimated Volumes.pdf PDF
23R0020 - Attach 4 - As Builts Part 3 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 9 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 4 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 1 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 5 of 10.pdf PDF
23F0020 - Attach 1 - OMCC SOW -04142023.pdf PDF
23R0020 - Attach 4 - As Builts Part 10 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 8 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 6 of 10.pdf PDF
23R0020 - Attach 13 - Wage Determination.pdf PDF
Solicitation - FA890323R0020.pdf PDF
23R0020 - Attachment 10 - Section L.pdf PDF
23R0020 - Attachment M-1 - OMCC Relevancy Matrix.pdf PDF
23R0020-Attach_8_Consent_Letter.docx DOCX document
23R0020 - Attach 12 - CDRLS.xlsx XLSX spreadsheet
McClellan OMCC Tour.pdf PDF
23R0020 - DRAFT SOW Old Magpie Creek 04142023.pdf PDF
23R0020-Industry Day QnA.pdf PDF
Industry Day Attendees.pdf PDF
OMCC Industry Day 11-16-2022 v2.pptx PPTX presentation
Part 9 of 10.pdf PDF
Part 7 of 10.pdf PDF
Part 10 of 10.pdf PDF
Part 1 of 10.pdf PDF
Part 4 of 10.pdf PDF
Part 2 of 10.pdf PDF
Part 3 of 10.pdf PDF
Part 6 of 10.pdf PDF
Part 8 of 10.pdf PDF
Part 5 of 10.pdf PDF
McClellan OMCC SOW 02 NOV 2022 - DRAFT.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Former McClellan Air Force Base (AFB)

Old Magpie Creek Channel (OMCC)

3 July 2023

Key Personnel and Qualifications (attachment)

• Project Manager: Bachelor’s degree in science or engineering plus fifteen (15) years experience in environmental remediation or no bachelor’s degree but twenty (20) years experience in environmental remediation. Experience as project manager for at least three radiological soil cleanup projects. 40-hr. OSHA HAZWOPER training.

• Health Physicist: Bachelor’s degree in radiation-related field such as physics or nuclear engineering or bachelor’s degree in science or engineering coupled with formal training and job experience in radiation health and safety. Experience as a health physicist on at least three soil cleanup projects. Experience applying MARSSIM to soil cleanup projects. Experience obtaining unrestricted radiological release from CDPH. Experience selecting appropriate radiation data collection and analysis methods and interpreting radiological data, data reviews, quality checks.

• Program Health and Safety Manager: Education and/or certification in industrial health or other safety related discipline. Experience as health and safety manager for at least three soil cleanup projects. Experience on at least one excavation project. 40-hr. OSHA

HAZWOPER training.

• Superintendent for Construction: Fifteen (15) years’ experience managing construction or renovation of large commercial buildings such as warehouses and aircraft hangars.

Experience working on renovation or construction projects involving preservation and protection of existing structures. Experience using the specific technical approach proposed for Building 690.

• Chemist: Bachelor’s degree in chemistry plus ten (10) years’ experience as a chemist on environmental cleanup projects or bachelor’s degree in science or engineering plus fifteen (15) years’ experience as a chemist on environmental cleanup projects.

• Program QA/QC: PE licensed in California or a state with a reciprocity agreement with

California or no license but a bachelor’s degree in engineering plus fifteen (15) years’ experience in construction of large commercial buildings such as warehouses or aircraft hangars. Ten (10) years’ experience inspecting construction of large commercial buildings. Ten (10) years’ experience reviewing designs and specifications for construction of large commercial buildings. Experience as a construction QA/QC manager, project manager, or construction manager on three soil cleanups, at least one of which must be a radiological cleanup. Must have been construction QA/QC manager at least one of those projects.

FA890323R0020

Attachment #3

File details come from the government source that posted it. Updated .