23R0020 - Attach 12 - CDRLS.xlsx

XLSX spreadsheet 55 KB Posted

Attached to
McClellan AFB Radiological Remediation Federal contract opportunity
Solicitation number
FA8903-23-R-0020
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

View the file

Other files for this federal contract opportunity

Other files attached to McClellan AFB Radiological Remediation, newest first.
File Type Posted
23R0020 - Government Response to Questions - 12Oct2023.pdf PDF
Solicitation Amendment FA890323R00200002 SF 30.pdf PDF
23F0020 - Attach 1 - OMCC SOW -09182023.pdf PDF
Solicitation Amendment FA890323R00200001 SF 30.pdf PDF
23R0020 - Attach 11 - Section M.pdf PDF
23R0020 - Attach 10 - Section L.pdf PDF
23R0020 - Attach 14 - Field Trailer Sites Util.pdf PDF
23R0020 - Attach 3 - Key Personnel and Qualifications Revised.pdf PDF
23R0020 - Government Response to Questions - 25Sept2023.pdf PDF
23R0020 - Attach 4 - As Builts Part 3 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 9 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 4 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 1 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 5 of 10.pdf PDF
23F0020 - Attach 1 - OMCC SOW -04142023.pdf PDF
23R0020 - Attach 3 - Key Personnel and Qualifications.pdf PDF
23R0020 - Attach 4 - As Builts Part 7 of 10.pdf PDF
23R0020 - Attach 5 - OMCC Estimated Volumes.pdf PDF
23R0020 - Attach 4 - As Builts Part 2 of 10.pdf PDF
23R0020 - Attachment 11 - Section M.pdf PDF
23R0020-Attach_7_Transmittal_Letter.docx DOCX document
23R0020-Attach_9_Cross-Reference-Matrix.docx DOCX document
23R0020-Attach_6_Client_Authorization.docx DOCX document
23R0020 - Attach 2 - Past Performance Questionaire.docx DOCX document
23R0020 - Attach 4 - As Builts Part 10 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 8 of 10.pdf PDF
23R0020 - Attach 4 - As Builts Part 6 of 10.pdf PDF
23R0020 - Attach 13 - Wage Determination.pdf PDF
Solicitation - FA890323R0020.pdf PDF
23R0020 - Attachment 10 - Section L.pdf PDF
23R0020 - Attachment M-1 - OMCC Relevancy Matrix.pdf PDF
23R0020-Attach_8_Consent_Letter.docx DOCX document
McClellan OMCC Tour.pdf PDF
Industry Day Attendees.pdf PDF
OMCC Industry Day 11-16-2022 v2.pptx PPTX presentation
23R0020 - DRAFT SOW Old Magpie Creek 04142023.pdf PDF
23R0020-Industry Day QnA.pdf PDF
Part 3 of 10.pdf PDF
Part 6 of 10.pdf PDF
Part 8 of 10.pdf PDF
Part 4 of 10.pdf PDF
Part 2 of 10.pdf PDF
Part 9 of 10.pdf PDF
Part 7 of 10.pdf PDF
Part 10 of 10.pdf PDF
Part 1 of 10.pdf PDF
Part 5 of 10.pdf PDF
McClellan OMCC SOW 02 NOV 2022 - DRAFT.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A

RADIOLOGICAL CLEANUP AT SD290 - OLD MAGPIE CREEK CHANNEL
FORMER MCCLELLAN AIR FORCE BASE, CALIFORNIA
CONTRAT NUMBER: FA8903-20-D-0002 TO FA8903-22-F-XXXX
EXHIBIT A
Block 1: DATA ITEM NO.Block 2:
TITLEBlock 10:
FREQUENCYBlock 14: DISTRIBUTION
a. ADDRESSEEb. COPIES
CONTRACT REFERENCEINTERNAL DRAFTDRAFTDRAFT FINALFINAL
Block 3
SUBTITLEREMARKS/NOTESHCCDHCCDHCCDHCCD
A001Report, Production or Delivery Problem(s)As requiredBlock 4: DI-MGMT-81178AFCEC/CIBW COR00000011
Block 5: SOW Paragraph 2.5AFCEC/CIBW PM00000022
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Critical Issues NotificationBlock 7: LT
Block 8: A
Block 9: A

Blocks 11, 12, and 13: Submission within 3 calendar days of problem occurance.

Block 16:
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A002aTechnical Data PackageAs requiredBlock 4: DI-CMAN-80776AFCEC/CIBW COR00000011
Block 5: SOW Paragraph 2.6AFCEC/CIBW PM00000022
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Geographic Information System (GIS) DataBlock 7: LT
Block 8: A
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A002bTechnical Data PackageAs requiredBlock 4: DI-CMAN-80776AFCEC/CIBW COR00000011
Block 5: SOW Paragraph 2.6AFCEC/CIBW BEC00000022
Block 6: AFCEC/CIBW772 ESS/PKS CO000000LT0
COMPUTER AIDED DESIGN DRAWING (CADD)Block 7: LT
Block 8: A
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt@us.af.mil)
AFCEC/CIBW BEC POC: Steven Mayer (steven.mayer@us.af.mil)
772 ESS/PKS CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A003aProject Activities
(Work Plan)Once/RevisionsBlock 4: DI-ENVR-81377AFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.2AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Remedial Action Work PlanBlock 7: LTRegulators/Stakeholders00512512512
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A003bProject Activities
(Work Plan)Once/RevisionsBlock 4: DI-ENVR-81377AFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.3AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Site Specific Quality Assurance Project Plan AddendumBlock 7: LTRegulators/Stakeholders00512512512
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A004Environment Sampling and Analysis Plan (SAP)Once/RevisionsBlock 4: DI-ENVR-81374AFCEC/CIBW COR11110011
Block 5: SOW Paragraphs 3.4AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Block 7: LTRegulators/Stakeholders00512512512
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Once for each pre-excavation sampling event and each final status survey The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.

AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A005aProject Activities
(Work Plan)Once/RevisionsBlock 4: DI-ENVR-81377AFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.5AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Construction Work PlanBlock 7: LTRegulators/Stakeholders00512512512
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A005bProject Activities
(Work Plan)Once/RevisionsBlock 4: DI-ENVR-81377AFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.6AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Construction Quality PlanBlock 7: LTRegulators/Stakeholders00512512512
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
0The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A005cProject Activities
(Work Plan)Once/RevisionsBlock 4: DI-ENVR-81377AFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.8AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Miscellaneous PlansBlock 7: LTRegulators/Stakeholders00512512512
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A006Environment Health and Safety Plan (HSP)Once/RevisionsBlock 4: DI-ENVR-81375AFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.7AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Block 7: LTRegulators/Stakeholders00512512512
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A007aScientific and Technical ReportsOnce/RevisionsBlock 4: DI-MISC-80711AAFCEC/CIBW COR00110011
Block 5: SOW Paragraph 3.9AFCEC/CIBW PM00120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Engineering Study for B690Block 7: LTAFCEC/AR00000011
Block 8: A
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A007bScientific and Technical ReportsOnce/RevisionsBlock 4: DI-MISC-80711AAFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.10AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Biological Resources Field Investigation ReportBlock 7: LTRegulators/Stakeholders00361136
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A007cScientific and Technical ReportsOnce/RevisionsBlock 4: DI-MISC-80711AAFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.11AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Pre-excavation Sampling ReportBlock 7: LTRegulators/Stakeholders00512512512
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
Once for each radiation scoping surveyThe final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A007dScientific and Technical ReportsAs RequiredBlock 4: DI-MISC-80711AAFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.12AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Final Status Survey ReportBlock 7: LTRegulators/Stakeholders00512512512
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
Once for each final status surveyThe final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A007eScientific and Technical ReportsOnce/RevisionsBlock 4: DI-MISC-80711AAFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.13AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Backfill Suitability ReportBlock 7: LTRegulators/Stakeholders0051200512
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
Once for each excavationThe final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A007fScientific and Technical ReportsOnce/RevisionsBlock 4: DI-MISC-80711AAFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.14AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Final Inspection ReportsBlock 7: LTRegulators/Stakeholders0051200512
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
Once for each excavationThe final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A007gScientific and Technical ReportsOnce/RevisionsBlock 4: DI-MISC-80711AAFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.15AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Remedial Action Completion ReportBlock 7: LTRegulators/Stakeholders00512512512
Block 8: AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A007hScientific and Technical ReportsAs RequiredBlock 4: DI-MISC-80711AAFCEC/CIBW COR00000011
Block 5: SOW Paragraph 4.2AFCEC/CIBW PM00000012
Block 6: AFCEC/CIBW772 ESS/PKC CO00000000
Waste ProfilesBlock 7: LTRegulators/Stakeholders00000011
Block 8: AAFCEC/AR00000000
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A008aConstruction Drawings and Specifications - 60% DesignOnce/RevisionsBlock 4: DI-MISC-81274AFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.16AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Block 7: LTRegulators/Stakeholders00512512512
Block 8: N/AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A008bConstruction Drawings and Specifications - As-builtOnce/RevisionsBlock 4: DI-MISC-81274AFCEC/CIBW COR11110011
Block 5: SOW Paragraph 3.16AFCEC/CIBW PM12120012
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Block 7: LTRegulators/Stakeholders00512512512
Block 8: N/AAFCEC/AR00000011
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A009Environmental PermitsOnce/RevisionsBlock 4: DI-MISC-81274AFCEC/CIBW COR00000001
Block 5: SOW Paragraph 4.9AFCEC/CIBW PM00000002
Block 6: AFCEC/CIBW772 ESS/PKC CO00000000
Encroachment PermitsBlock 7: LTRegulators/Stakeholders00000008
Block 8: N/A
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
A010Scientific and Technical ReportsAs requiredBlock 4: DI-MISC-80711AAFCEC/CIBW COR00000011
Block 5: SOW Paragraph 4.12AFCEC/CIBW PM00000022
Block 6: AFCEC/CIBW772 ESS/PKC CO000000LT0
Occupational Safety and Health Administration (OSHA) ReportsBlock 7: LT
Block 8: A
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.

&"Arial,Bold"F41624-03-D-8595/T0338

Page &P of &N June 16, 2005

&"Arial,Bold"F41624-03-D-8595/T0338

June 08, 2005

&"Arial,Bold"F41624-03-D-8613/0046/01

September 30, 2004

&"Arial,Bold"A8903-04-D-XXXX/TBD

November 17, 2004

&"Arial,Bold"F41624-03-D-8613/0046/01

September 30, 2004

&"Arial,Bold"F41624-03-D-8595/0338/01

January 31, 2006

&"Arial,Bold"FA8903-16-D-0027-TBD E&K000000xhibit A

5 October 2016

&"Arial,Bold"Page &P of &N

&"Arial,Bold"Page &P of &N

&"Arial,Bold"Page &P of &N

&"Arial,Bold"Page &P of &N

&"Arial,Bold"Page &P of &N

Exhibit B

RADIOLOGICAL CLEANUP AT SD290 - OLD MAGPIE CREEK CHANNEL
FORMER MCCLELLAN AIR FORCE BASE, CALIFORNIA
CONTRAT NUMBER: FA8903-20-D-0002 TO FA8903-22-F-XXXX
EXHIBIT B
Block 1: DATA ITEM NO.Block 2:
TITLEBlock 10:
FREQUENCYBlock 14: DISTRIBUTION
a. ADDRESSEEb. COPIES
CONTRACT REFERENCEINTERNAL DRAFTDRAFTDRAFT FINALFINAL
Block 3
SUBTITLEREMARKS/NOTESHCCDHCCDHCCDHCCD
B001Project Management PlanOnce/RevisionsBlock 4: DI-MGMT-81334DAFCEC/CIBW COR00110011
Block 5: SOW Paragraph 2.1AFCEC/CIBW PM00120012
Block 6: AFCEC/CIBW772 ESS/PKC CO00110011
Block 7: LT
Block 8: A
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
The government will require 20 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
B002Contractor Progress, Status, and Management ReportMonthlyBlock 4: DI-MGMT-80227AFCEC/CIBW COR00110011
Block 5: SOW Paragraph 2.2AFCEC/CIBW PM00120012
Block 6: AFCEC/CIBW772 ESS/PKC CO00110011
Block 7: LT
Block 8: A
Block 9: A

Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.

Block 16:
The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil)
AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil)
772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
B003Conference AgendaAs RequiredBlock 4: DI-ADMN-81249 BAFCEC/CIBW COR00110011
Block 5: SOW Paragraph 2.3AFCEC/CIBW PM00120012
Block 6: AFCEC/CIBW772 ESS/PKC CO00110011
Block 7: LT
Block 8: A
Block 9: A

Block 11: As of Date shall be the date of the first analytical sample collection for each period sampled.

Blocks 12 and 13: ERPIMS data submissions shall be submitted no later than 90 days after collection of the first analytical sample collected for the applicable periodic data submission (unless written extension or waiver is approved by CO). If the ERPIMS system is down during the 90 day period, one additional day will be added to the 90 days for each day the system is down. For each 30 day period that the system is down, an additional five days will be added to account for backlogging purposes. Any data submitted by the Contractor in subsequent reports or other documents shall match the data submitted to ERPIMS. The ERPIMS data requirement will only be satisfied upon the data's insertion into the ERPIMS Production database and formal acceptance.

Block 16:
The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
AFCEC/CIBW COR POC: David Farnsworth (david.farnsworth@us.af.mil)
AFCEC/CIBW PM POC: Michael Self (michael.self.4@us.af.mil)
772 ESS/PKC CO POC: Edgard Flores (edgard.flores@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
B004Conference MinutesAs RequiredBlock 4: DI-ADMN-81250 BAFCEC/CIBW COR00110011
Block 5: SOW Paragraph 2.3AFCEC/CIBW PM00120012
Block 6: AFCEC/CIBW772 ESS/PKC CO00110011
Block 7: LT
Block 8: A
Block 9: A

Block 11: As of Date shall be the date of the first analytical sample collection for each period sampled.

Blocks 12 and 13: ERPIMS data submissions shall be submitted no later than 90 days after collection of the first analytical sample collected for the applicable periodic data submission (unless written extension or waiver is approved by CO). If the ERPIMS system is down during the 90 day period, one additional day will be added to the 90 days for each day the system is down. For each 30 day period that the system is down, an additional five days will be added to account for backlogging purposes. Any data submitted by the Contractor in subsequent reports or other documents shall match the data submitted to ERPIMS. The ERPIMS data requirement will only be satisfied upon the data's insertion into the ERPIMS Production database and formal acceptance.

Block 16:
The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
AFCEC/CIBW COR POC: David Farnsworth (david.farnsworth@us.af.mil)
AFCEC/CIBW PM POC: Michael Self (michael.self.4@us.af.mil)
772 ESS/PKC CO POC: Edgard Flores (edgard.flores@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
B005Presentation MaterialsAs RequiredBlock 4: DI-ADMN-81373AFCEC/CIBW COR00110011
Block 5: SOW Paragraph 2.3AFCEC/CIBW PM00120012
Block 6: AFCEC/CIBW772 ESS/PKC CO00110011
Block 7: LT
Block 8: A
Block 9: A

Block 11: As of Date shall be the date of the first analytical sample collection for each period sampled.

Blocks 12 and 13: ERPIMS data submissions shall be submitted no later than 90 days after collection of the first analytical sample collected for the applicable periodic data submission (unless written extension or waiver is approved by CO). If the ERPIMS system is down during the 90 day period, one additional day will be added to the 90 days for each day the system is down. For each 30 day period that the system is down, an additional five days will be added to account for backlogging purposes. Any data submitted by the Contractor in subsequent reports or other documents shall match the data submitted to ERPIMS. The ERPIMS data requirement will only be satisfied upon the data's insertion into the ERPIMS Production database and formal acceptance.

Block 16:
The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
AFCEC/CIBW COR POC: David Farnsworth (david.farnsworth@us.af.mil)
AFCEC/CIBW PM POC: Michael Self (michael.self.4@us.af.mil)
772 ESS/PKC CO POC: Edgard Flores (edgard.flores@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.
B006Technical Data PackageAs RequiredBlock 4: DI-CMAN-80776AFCEC/CIBW COR00110011
Block 5: SOW Paragraph 2.6AFCEC/CIBW PM00120012
Block 6: AFCEC/CIBW772 ESS/PKC CO00110011
Environmental Restoration Program Information Management System (ERPIMS) SubmittalsBlock 7: LT
Block 8: A
Block 9: A

Block 11: As of Date shall be the date of the first analytical sample collection for each period sampled.

Blocks 12 and 13: ERPIMS data submissions shall be submitted no later than 90 days after collection of the first analytical sample collected for the applicable periodic data submission (unless written extension or waiver is approved by CO). If the ERPIMS system is down during the 90 day period, one additional day will be added to the 90 days for each day the system is down. For each 30 day period that the system is down, an additional five days will be added to account for backlogging purposes. Any data submitted by the Contractor in subsequent reports or other documents shall match the data submitted to ERPIMS. The ERPIMS data requirement will only be satisfied upon the data's insertion into the ERPIMS Production database and formal acceptance.

Block 16:
The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
AFCEC/CIBW COR POC: David Farnsworth (david.farnsworth@us.af.mil)
AFCEC/CIBW PM POC: Michael Self (michael.self.4@us.af.mil)
772 ESS/PKC CO POC: Edgard Flores (edgard.flores@us.af.mil)
AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil)
All deliverables shall be submitted according to Block 14.
The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements.
All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14.
LT designates a letter submission via email only.

&"Arial,Bold"FA8903-16-D-0027-TBD Exhibit B

5 October 2016

File details come from the government source that posted it. Updated .