Exhibit A
| RADIOLOGICAL CLEANUP AT SD290 - OLD MAGPIE CREEK CHANNEL | |||||||||||||
| FORMER MCCLELLAN AIR FORCE BASE, CALIFORNIA | |||||||||||||
| CONTRAT NUMBER: FA8903-20-D-0002 TO FA8903-22-F-XXXX | |||||||||||||
| EXHIBIT A | |||||||||||||
| Block 1: DATA ITEM NO. | Block 2: | ||||||||||||
| TITLE | Block 10: | ||||||||||||
| FREQUENCY | Block 14: DISTRIBUTION | ||||||||||||
| a. ADDRESSEE | b. COPIES | ||||||||||||
| CONTRACT REFERENCE | INTERNAL DRAFT | DRAFT | DRAFT FINAL | FINAL | |||||||||
| Block 3 | |||||||||||||
| SUBTITLE | REMARKS/NOTES | HC | CD | HC | CD | HC | CD | HC | CD | ||||
| A001 | Report, Production or Delivery Problem(s) | As required | Block 4: DI-MGMT-81178 | AFCEC/CIBW COR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | |
| Block 5: SOW Paragraph 2.5 | AFCEC/CIBW PM | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 2 | ||||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | ||||
| Critical Issues Notification | Block 7: LT | ||||||||||||
| Block 8: A | |||||||||||||
| Block 9: A |
Blocks 11, 12, and 13: Submission within 3 calendar days of problem occurance.
| Block 16: | ||||||||||||
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A002a | Technical Data Package | As required | Block 4: DI-CMAN-80776 | AFCEC/CIBW COR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 2.6 | AFCEC/CIBW PM | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Geographic Information System (GIS) Data | Block 7: LT | |||||||||||
| Block 8: A | ||||||||||||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: | ||||||||||||
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A002b | Technical Data Package | As required | Block 4: DI-CMAN-80776 | AFCEC/CIBW COR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 2.6 | AFCEC/CIBW BEC | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKS CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| COMPUTER AIDED DESIGN DRAWING (CADD) | Block 7: LT | |||||||||||
| Block 8: A | ||||||||||||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: |
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt@us.af.mil) |
| AFCEC/CIBW BEC POC: Steven Mayer (steven.mayer@us.af.mil) |
| 772 ESS/PKS CO POC: Linda Cavazos (linda.cavazos@us.af.mil) |
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) |
| All deliverables shall be submitted according to Block 14. |
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. |
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. |
| LT designates a letter submission via email only. |
| A003a | Project Activities | ||||||||||||
| (Work Plan) | Once/Revisions | Block 4: DI-ENVR-81377 | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 | ||
| Block 5: SOW Paragraph 3.2 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | ||||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | ||||
| Remedial Action Work Plan | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 5 | 12 | 5 | 12 | |||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | ||||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: |
| The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments. |
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | |||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | |||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | |||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | |||||||||||||
| All deliverables shall be submitted according to Block 14. | |||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | |||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | |||||||||||||
| LT designates a letter submission via email only. | |||||||||||||
| A003b | Project Activities | ||||||||||||
| (Work Plan) | Once/Revisions | Block 4: DI-ENVR-81377 | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 | ||
| Block 5: SOW Paragraph 3.3 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | ||||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | ||||
| Site Specific Quality Assurance Project Plan Addendum | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 5 | 12 | 5 | 12 | |||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | ||||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: |
| The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments. |
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A004 | Environment Sampling and Analysis Plan (SAP) | Once/Revisions | Block 4: DI-ENVR-81374 | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraphs 3.4 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 5 | 12 | 5 | 12 | |||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | |||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
Once for each pre-excavation sampling event and each final status survey The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments.
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | |||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | |||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | |||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | |||||||||||||
| All deliverables shall be submitted according to Block 14. | |||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | |||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | |||||||||||||
| LT designates a letter submission via email only. | |||||||||||||
| A005a | Project Activities | ||||||||||||
| (Work Plan) | Once/Revisions | Block 4: DI-ENVR-81377 | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 | ||
| Block 5: SOW Paragraph 3.5 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | ||||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | ||||
| Construction Work Plan | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 5 | 12 | 5 | 12 | |||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | ||||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: |
| The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments. |
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | |||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | |||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | |||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | |||||||||||||
| All deliverables shall be submitted according to Block 14. | |||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | |||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | |||||||||||||
| LT designates a letter submission via email only. | |||||||||||||
| A005b | Project Activities | ||||||||||||
| (Work Plan) | Once/Revisions | Block 4: DI-ENVR-81377 | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 | ||
| Block 5: SOW Paragraph 3.6 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | ||||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | ||||
| Construction Quality Plan | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 5 | 12 | 5 | 12 | |||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | ||||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: |
| The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments. |
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | |||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | |||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | |||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | |||||||||||||
| All deliverables shall be submitted according to Block 14. | |||||||||||||
| 0 | The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | |||||||||||||
| LT designates a letter submission via email only. | |||||||||||||
| A005c | Project Activities | ||||||||||||
| (Work Plan) | Once/Revisions | Block 4: DI-ENVR-81377 | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 | ||
| Block 5: SOW Paragraph 3.8 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | ||||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | ||||
| Miscellaneous Plans | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 5 | 12 | 5 | 12 | |||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | ||||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: |
| The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments. |
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A006 | Environment Health and Safety Plan (HSP) | Once/Revisions | Block 4: DI-ENVR-81375 | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 3.7 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 5 | 12 | 5 | 12 | |||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | |||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: |
| The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments. |
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A007a | Scientific and Technical Reports | Once/Revisions | Block 4: DI-MISC-80711A | AFCEC/CIBW COR | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 3.9 | AFCEC/CIBW PM | 0 | 0 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Engineering Study for B690 | Block 7: LT | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | ||
| Block 8: A | ||||||||||||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: | ||||||||||||
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A007b | Scientific and Technical Reports | Once/Revisions | Block 4: DI-MISC-80711A | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 3.10 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Biological Resources Field Investigation Report | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 3 | 6 | 1 | 1 | 3 | 6 | ||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | |||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: | ||||||||||||
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A007c | Scientific and Technical Reports | Once/Revisions | Block 4: DI-MISC-80711A | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 3.11 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Pre-excavation Sampling Report | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 5 | 12 | 5 | 12 | ||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | |||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: | ||||||||||||
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| Once for each radiation scoping survey | The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | |||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A007d | Scientific and Technical Reports | As Required | Block 4: DI-MISC-80711A | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 3.12 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Final Status Survey Report | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 5 | 12 | 5 | 12 | ||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | |||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: | ||||||||||||
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| Once for each final status survey | The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | |||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A007e | Scientific and Technical Reports | Once/Revisions | Block 4: DI-MISC-80711A | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 3.13 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Backfill Suitability Report | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 0 | 0 | 5 | 12 | ||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | |||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: | ||||||||||||
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| Once for each excavation | The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | |||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A007f | Scientific and Technical Reports | Once/Revisions | Block 4: DI-MISC-80711A | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 3.14 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Final Inspection Reports | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 0 | 0 | 5 | 12 | ||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | |||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: | ||||||||||||
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| Once for each excavation | The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | |||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A007g | Scientific and Technical Reports | Once/Revisions | Block 4: DI-MISC-80711A | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 3.15 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Remedial Action Completion Report | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 5 | 12 | 5 | 12 | ||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | |||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: | ||||||||||||
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A007h | Scientific and Technical Reports | As Required | Block 4: DI-MISC-80711A | AFCEC/CIBW COR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 4.2 | AFCEC/CIBW PM | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
| Waste Profiles | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | ||
| Block 8: A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: | ||||||||||||
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A008a | Construction Drawings and Specifications - 60% Design | Once/Revisions | Block 4: DI-MISC-81274 | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 3.16 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 5 | 12 | 5 | 12 | |||
| Block 8: N/A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | |||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A008b | Construction Drawings and Specifications - As-built | Once/Revisions | Block 4: DI-MISC-81274 | AFCEC/CIBW COR | 1 | 1 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 3.16 | AFCEC/CIBW PM | 1 | 2 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Block 7: LT | Regulators/Stakeholders | 0 | 0 | 5 | 12 | 5 | 12 | 5 | 12 | |||
| Block 8: N/A | AFCEC/AR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 | |||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A009 | Environmental Permits | Once/Revisions | Block 4: DI-MISC-81274 | AFCEC/CIBW COR | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 |
| Block 5: SOW Paragraph 4.9 | AFCEC/CIBW PM | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
| Encroachment Permits | Block 7: LT | Regulators/Stakeholders | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 8 | ||
| Block 8: N/A | ||||||||||||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| A010 | Scientific and Technical Reports | As required | Block 4: DI-MISC-80711A | AFCEC/CIBW COR | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 4.12 | AFCEC/CIBW PM | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 0 | 0 | 0 | 0 | LT | 0 | |||
| Occupational Safety and Health Administration (OSHA) Reports | Block 7: LT | |||||||||||
| Block 8: A | ||||||||||||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: |
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) |
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) |
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) |
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) |
| All deliverables shall be submitted according to Block 14. |
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. |
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. |
| LT designates a letter submission via email only. |
&"Arial,Bold"F41624-03-D-8595/T0338
Page &P of &N June 16, 2005
&"Arial,Bold"F41624-03-D-8595/T0338
June 08, 2005
&"Arial,Bold"F41624-03-D-8613/0046/01
September 30, 2004
&"Arial,Bold"A8903-04-D-XXXX/TBD
November 17, 2004
&"Arial,Bold"F41624-03-D-8613/0046/01
September 30, 2004
&"Arial,Bold"F41624-03-D-8595/0338/01
January 31, 2006
&"Arial,Bold"FA8903-16-D-0027-TBD E&K000000xhibit A
5 October 2016
&"Arial,Bold"Page &P of &N
&"Arial,Bold"Page &P of &N
&"Arial,Bold"Page &P of &N
&"Arial,Bold"Page &P of &N
&"Arial,Bold"Page &P of &N
Exhibit B
| RADIOLOGICAL CLEANUP AT SD290 - OLD MAGPIE CREEK CHANNEL | |||||||||||||
| FORMER MCCLELLAN AIR FORCE BASE, CALIFORNIA | |||||||||||||
| CONTRAT NUMBER: FA8903-20-D-0002 TO FA8903-22-F-XXXX | |||||||||||||
| EXHIBIT B | |||||||||||||
| Block 1: DATA ITEM NO. | Block 2: | ||||||||||||
| TITLE | Block 10: | ||||||||||||
| FREQUENCY | Block 14: DISTRIBUTION | ||||||||||||
| a. ADDRESSEE | b. COPIES | ||||||||||||
| CONTRACT REFERENCE | INTERNAL DRAFT | DRAFT | DRAFT FINAL | FINAL | |||||||||
| Block 3 | |||||||||||||
| SUBTITLE | REMARKS/NOTES | HC | CD | HC | CD | HC | CD | HC | CD | ||||
| B001 | Project Management Plan | Once/Revisions | Block 4: DI-MGMT-81334D | AFCEC/CIBW COR | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 | |
| Block 5: SOW Paragraph 2.1 | AFCEC/CIBW PM | 0 | 0 | 1 | 2 | 0 | 0 | 1 | 2 | ||||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 | ||||
| Block 7: LT | |||||||||||||
| Block 8: A | |||||||||||||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: |
| The government will require 20 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments. |
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| B002 | Contractor Progress, Status, and Management Report | Monthly | Block 4: DI-MGMT-80227 | AFCEC/CIBW COR | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 2.2 | AFCEC/CIBW PM | 0 | 0 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 | |||
| Block 7: LT | ||||||||||||
| Block 8: A | ||||||||||||
| Block 9: A |
Blocks 11, 12, and 13: All deliverable submissions will be dictated by project progress.
| Block 16: |
| The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments. |
| AFCEC/CIBW COR POC: Christiana Hewitt (christiana.hewitt.1@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Steve Mayer (steven.mayer@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Linda Cavazos (linda.cavazos@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| B003 | Conference Agenda | As Required | Block 4: DI-ADMN-81249 B | AFCEC/CIBW COR | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 2.3 | AFCEC/CIBW PM | 0 | 0 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 | |||
| Block 7: LT | ||||||||||||
| Block 8: A | ||||||||||||
| Block 9: A |
Block 11: As of Date shall be the date of the first analytical sample collection for each period sampled.
Blocks 12 and 13: ERPIMS data submissions shall be submitted no later than 90 days after collection of the first analytical sample collected for the applicable periodic data submission (unless written extension or waiver is approved by CO). If the ERPIMS system is down during the 90 day period, one additional day will be added to the 90 days for each day the system is down. For each 30 day period that the system is down, an additional five days will be added to account for backlogging purposes. Any data submitted by the Contractor in subsequent reports or other documents shall match the data submitted to ERPIMS. The ERPIMS data requirement will only be satisfied upon the data's insertion into the ERPIMS Production database and formal acceptance.
| Block 16: |
| The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments. |
| AFCEC/CIBW COR POC: David Farnsworth (david.farnsworth@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Michael Self (michael.self.4@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Edgard Flores (edgard.flores@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| B004 | Conference Minutes | As Required | Block 4: DI-ADMN-81250 B | AFCEC/CIBW COR | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 2.3 | AFCEC/CIBW PM | 0 | 0 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 | |||
| Block 7: LT | ||||||||||||
| Block 8: A | ||||||||||||
| Block 9: A |
Block 11: As of Date shall be the date of the first analytical sample collection for each period sampled.
Blocks 12 and 13: ERPIMS data submissions shall be submitted no later than 90 days after collection of the first analytical sample collected for the applicable periodic data submission (unless written extension or waiver is approved by CO). If the ERPIMS system is down during the 90 day period, one additional day will be added to the 90 days for each day the system is down. For each 30 day period that the system is down, an additional five days will be added to account for backlogging purposes. Any data submitted by the Contractor in subsequent reports or other documents shall match the data submitted to ERPIMS. The ERPIMS data requirement will only be satisfied upon the data's insertion into the ERPIMS Production database and formal acceptance.
| Block 16: |
| The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments. |
| AFCEC/CIBW COR POC: David Farnsworth (david.farnsworth@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Michael Self (michael.self.4@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Edgard Flores (edgard.flores@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| B005 | Presentation Materials | As Required | Block 4: DI-ADMN-81373 | AFCEC/CIBW COR | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 2.3 | AFCEC/CIBW PM | 0 | 0 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 | |||
| Block 7: LT | ||||||||||||
| Block 8: A | ||||||||||||
| Block 9: A |
Block 11: As of Date shall be the date of the first analytical sample collection for each period sampled.
Blocks 12 and 13: ERPIMS data submissions shall be submitted no later than 90 days after collection of the first analytical sample collected for the applicable periodic data submission (unless written extension or waiver is approved by CO). If the ERPIMS system is down during the 90 day period, one additional day will be added to the 90 days for each day the system is down. For each 30 day period that the system is down, an additional five days will be added to account for backlogging purposes. Any data submitted by the Contractor in subsequent reports or other documents shall match the data submitted to ERPIMS. The ERPIMS data requirement will only be satisfied upon the data's insertion into the ERPIMS Production database and formal acceptance.
| Block 16: |
| The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments. |
| AFCEC/CIBW COR POC: David Farnsworth (david.farnsworth@us.af.mil) | ||||||||||||
| AFCEC/CIBW PM POC: Michael Self (michael.self.4@us.af.mil) | ||||||||||||
| 772 ESS/PKC CO POC: Edgard Flores (edgard.flores@us.af.mil) | ||||||||||||
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) | ||||||||||||
| All deliverables shall be submitted according to Block 14. | ||||||||||||
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. | ||||||||||||
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. | ||||||||||||
| LT designates a letter submission via email only. | ||||||||||||
| B006 | Technical Data Package | As Required | Block 4: DI-CMAN-80776 | AFCEC/CIBW COR | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 |
| Block 5: SOW Paragraph 2.6 | AFCEC/CIBW PM | 0 | 0 | 1 | 2 | 0 | 0 | 1 | 2 | |||
| Block 6: AFCEC/CIBW | 772 ESS/PKC CO | 0 | 0 | 1 | 1 | 0 | 0 | 1 | 1 | |||
| Environmental Restoration Program Information Management System (ERPIMS) Submittals | Block 7: LT | |||||||||||
| Block 8: A | ||||||||||||
| Block 9: A |
Block 11: As of Date shall be the date of the first analytical sample collection for each period sampled.
Blocks 12 and 13: ERPIMS data submissions shall be submitted no later than 90 days after collection of the first analytical sample collected for the applicable periodic data submission (unless written extension or waiver is approved by CO). If the ERPIMS system is down during the 90 day period, one additional day will be added to the 90 days for each day the system is down. For each 30 day period that the system is down, an additional five days will be added to account for backlogging purposes. Any data submitted by the Contractor in subsequent reports or other documents shall match the data submitted to ERPIMS. The ERPIMS data requirement will only be satisfied upon the data's insertion into the ERPIMS Production database and formal acceptance.
| Block 16: |
| The government will require 30 days for review. The Contractor shall incorporate government comments and submit next/final version within 15 days of receipt of government comments. |
| AFCEC/CIBW COR POC: David Farnsworth (david.farnsworth@us.af.mil) |
| AFCEC/CIBW PM POC: Michael Self (michael.self.4@us.af.mil) |
| 772 ESS/PKC CO POC: Edgard Flores (edgard.flores@us.af.mil) |
| AFCEC AR POC: Mr. Justin Prochnow (justin.prochnow@us.af.mil) |
| All deliverables shall be submitted according to Block 14. |
| The final version shall include hard copies and web ready versions submitted in a single pdf format compatible with current AFCEC Administrative Record requirements. |
| All deliverables shall be submitted via email in addition to distribution requirements specified in Block 14. |
| LT designates a letter submission via email only. |
&"Arial,Bold"FA8903-16-D-0027-TBD Exhibit B
5 October 2016