31S5-2FSQ217(T1)-2.pdf
PDF 6 MB Posted
- Attached to
- Pre-Solicitation Conference (Industry Day)
- Solicitation number
- FA8823-12-R-0004
About this file
31S5-2FSQ217(T1)-2
View the file
Other files
Show 40 more
Latest 50 of 118 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO-31S5-2FSQ217(T1)-2
TECHNICAL MANUAL
OPERATION AND MAINTENANCE INSTRUCTIONS
ORGANIZATIONAL MAINTENANCE
POSITIONAL TRAINING EMULATOR
GLOBAL POSITIONING SYSTEM
AN/FSQ-217-T1
PART NUMBERS
873-04-00049-01 The Boeing Company F04701-96-C-0025
This revision supersedes TO 31S5-2FSQ217(T1)-2 dated 31 March 2010 and all changes.
DISTRIBUTION STATEMENT - E - Distribution authorized to DOD components only for Administrative or Operational use, 31 December 2011. Other requests shall be referred to SMC_SLG/GPL - TOMA, 1050 East Stewart Avenue, Peterson AFB, CO 80914-2902.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC., Sec. 2751 et. seq.) or the Export Administration Act of 1979, as amended (Title 50, USC., App. 2401 et. seq.). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
HANDLING AND DESTRUCTION NOTICE - Handle in compliance with distribution statement and destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Published under authority of the Secretary of the Air Force
31 DECEMBER 2011
LIST OF EFFECTIVE PAGES INSERT LATEST CHANGED PAGES. DESTROY SUPERSEDED PAGES.
NOTE The portion of the text affected by the changes is indicated by a vertical line in the outer margins of the page. Changes to illustrations are indicated by shaded or screened areas, or by miniature pointing hands.
Dates of issue for original and changed pages are:
Original . . . . . . . . . . . . . . . . . . 0 . . .31 DECEMBER 2011
TOTAL NUMBER OF PAGES IN THIS PUBLICATION IS 270 CONSISTING OF THE FOLLOWING:
Page *Change Page *Change Page *Change No. No. No. No. No. No.
Title A i - xix xx Blank 1-1 - 1-20 2-1 2-2 Blank 3-1 3-2 Blank 4-1 - 4-72 5-1 - 5-40 6-1 - 6-36 7-1 7-2 Blank 7-3 7-4 Blank 7-5 7-6 Blank 7-7 7-8 Blank 7-9 7-10 Blank 7-11 7-12 Blank 7-13 7-14 Blank 7-15 7-16 Blank 7-17 7-18 Blank 7-19 7-20 Blank 7-21 7-22 Blank 7-23 7-24 Blank 7-25 7-26 Blank 7-27
7-28 Blank 7-29 7-30 Blank 7-31 7-32 Blank 7-33 7-34 Blank 7-35 7-36 Blank 7-37 7-38 Blank 7-39 7-40 Blank 7-41 7-42 Blank 7-43 7-44 Blank 7-45 7-46 Blank 8-1 - 8-26 A-1 - A-4
*Zero in this column indicates an original page
A USAF
TABLE OF CONTENTS
Chapter Page
LIST OF ILLUSTRATIONS ........................................................................................................................................... xi
LIST OF TABLES ........................................................................................................................................................... xiii
FOREWORD................................................................................................................................................................... xv
SAFETY SUMMARY .................................................................................................................................................... xix
1 GENERAL INFORMATION .......................................................................................................................................... 1-1
1.1 INTRODUCTION ....................................................................................................................................... 1-1
1.2 GPS PTE DESCRIPTION AND PURPOSE............................................................................................... 1-1
1.3 SYSTEM CAPABILITIES .......................................................................................................................... 1-2
1.3.1 PTE Components ......................................................................................................................................... 1-2
1.3.1.1 PTE-MCS..................................................................................................................................................... 1-2
1.3.1.2 PTE-SIM...................................................................................................................................................... 1-2
1.3.1.3 Instructor Control......................................................................................................................................... 1-3
1.3.1.3.1 Instructor Control Workstation .................................................................................................................... 1-3
1.3.1.3.1.1 Instructor Control PC (11A1A10)................................................................................................................ 1-3
1.3.1.3.1.2 Sun Ray 2FS (11A1A11, 11A1A12)............................................................................................................ 1-3
1.3.1.3.1.3 21.3-inch Monitor (11A1A2, 11A1A3) ....................................................................................................... 1-3
1.3.1.3.1.4 22-inch Widescreen LCD Monitor (11A1A4, 11A1A5).............................................................................. 1-3
1.3.1.3.1.5 Keyboard and Mouse (11A1A6, 11A1A14) ................................................................................................ 1-3
1.3.1.3.1.6 VGA Distribution Amplifier (11A1A7, 11A1A8) ....................................................................................... 1-3
1.3.1.3.1.7 Switch, VGA and Audio Matrix (11A1A9)................................................................................................. 1-3
1.3.1.3.1.8 Printer, Color (11A1A1) .............................................................................................................................. 1-3
1.3.1.3.2 Student COSE .............................................................................................................................................. 1-3
1.3.1.3.2.1 Sun Ray 2FS (1A1A5 - 1A1A7, 2A1A5 - 2A1A7, 3A1A5 - 3A1A7, 4A1A5 - 4A1A7, 5A1A5 - 5A1A7, 6A1A5 - 6A1A7, 7A1A5 - 7A1A7, 8A1A5 - 8A1A7, 10A1A5 - 10A1A7, 11A1A4, 11A1A5) ............ 1-4
1.3.1.3.2.2 22-inch Widescreen LCD Monitor (1A1A1 - 1A1A3, 2A1A1 - 2A1A3, 3A1A1 - 3A1A3, 4A1A1 -
4A1A3, 5A1A1 -5A1A3, 6A1A1 - 6A1A3, 7A1A1 - 7A1A3, 8A1A1 - 8A1A3, 9A1A3 - 9A1A3, 10A1A1 - 10A1A3, 11A1A4, 11A1A5) ................................................................................................... 1-4
1.3.1.3.2.3 External CD ROM (1A1A9 - 10A1A9)....................................................................................................... 1-4
1.3.1.3.2.4 Keyboard and Mouse (1A1A4 - 10A1A4)................................................................................................... 1-4
1.3.2 Instructor, Training/Scenario Developer...................................................................................................... 1-4
1.4 ADMINISTRATOR..................................................................................................................................... 1-4
1.5 DATA PROCESSING HARDWARE PLATFORMS.................................................................................. 1-4
1.6 AUXILIARY STORAGE SYSTEMS AND TAPE DRIVES ..................................................................... 1-5
1.7 ADDITIONAL HARDWARE..................................................................................................................... 1-6
1.7.1 Quiet Rack (14A1, 15A1) ............................................................................................................................ 1-6
1.7.1.1 2821 Router (14A1A1) ................................................................................................................................ 1-6
1.7.1.2 2960-48TC Switch (14A1A3, 14A1A4)...................................................................................................... 1-6
1.7.1.3 3480 Tape Drive (14A1A13A1) .................................................................................................................. 1-6
1.7.1.4 LTO 2V Tape Drive (14A1A13A2) ............................................................................................................. 1-6
1.7.1.5 KVM (14A1A19)......................................................................................................................................... 1-6
1.7.2 3120 RAID Arrays (15A1A2, 15A1A3)...................................................................................................... 1-6
1.7.3 Projector (12A1, 13A1) ............................................................................................................................... 1-6
1.7.4 Projector Screen (17A1, 17A2).................................................................................................................... 1-6 i
Chapter Page
1.7.5 Time Display Unit (16A1, 16A2) ................................................................................................................ 1-6
1.8 LEADING PARTICULARS........................................................................................................................ 1-6
1.9 CAPABILITIES AND LIMITATIONS ....................................................................................................... 1-7
1.10 EQUIPMENT SUPPLIED........................................................................................................................... 1-17
1.11 ITEMS REQUIRED BUT NOT SUPPLIED .............................................................................................. 1-19
1.12 SPECIAL TOOLS AND TEST EQUIPMENT ........................................................................................... 1-19
1.13 RELATED TECHNICAL MANUALS ....................................................................................................... 1-19
1.14 LIST OF CONSUMABLE MATERIALS................................................................................................... 1-20
2 INSTALLATION ............................................................................................................................................................. 2-1
2.1 INSTALLATION ......................................................................................................................................... 2-1
3 PREPARATION FOR USE AND RESHIPMENT.......................................................................................................... 3-1
3.1 INTRODUCTION ....................................................................................................................................... 3-1
4 OPERATIONS ................................................................................................................................................................. 4-1
SECTION I CONTROLS AND INDICATORS................................................................................................................. 4-1
4.1 INTRODUCTION ....................................................................................................................................... 4-1
4.2 CONTROLS AND INDICATORS.............................................................................................................. 4-1
SECTION II OPERATING INSTRUCTIONS................................................................................................................... 4-43
4.3 INTRODUCTION ....................................................................................................................................... 4-43
4.4 PRELIMINARY POWER SETTINGS ....................................................................................................... 4-43
4.4.1 Set the Preliminary Power Condition for Racks 14A1 and 15A1 ............................................................... 4-44
4.4.2 Set the Preliminary Power Condition for Other Equipment ........................................................................ 4-44
4.5 PTE SYSTEM POWER UP PROCEDURES ............................................................................................. 4-45
4.5.1 Breaker Panel Start-Up ................................................................................................................................ 4-45
4.5.2 Powering ON Peripheral Hardware ............................................................................................................. 4-45
4.5.2.1 Power ON the Instructor Control PC (11A1A10)........................................................................................ 4-45
4.5.2.2 Power ON the Color Printer (11A1A1) ....................................................................................................... 4-46
4.5.2.3 Power ON the VGA/Audio Matrix Switch (11A1A9)................................................................................. 4-46
4.5.2.4 Power ON the VGA Distribution Amps (11A1A7, 11A1A8) ..................................................................... 4-46
4.5.2.5 Power ON all Consolidated Operators Support Environment (COSE) (1A1A5 – 1A1A7, 2A1A5 –
2A1A7, 3A1A5 – 3A1A7, 4A1A5 – 4A1A7, 5A1A5 – 5A1A7, 6A1A5 – 6A1A7, 7A1A5 – 7A1A7, 8A1A5 – 8A1A7, 9A1A5 – 9A1A7, 10A1A5 – 10A1A7)....................................................................... 4-47
4.5.2.6 Power ON the CP-SX1350 Projectors (12A1, 13A1).................................................................................. 4-47
4.5.2.7 Power ON the Ventilation Fans for the Racks (14A1, 15A1)...................................................................... 4-47
4.5.2.8 Power ON the 2821 Router (14A1A1) ........................................................................................................ 4-48
4.5.2.9 Power ON the 3480 Tape Drive (14A1A13A1) .......................................................................................... 4-48
4.5.2.10 Power ON the LTO 2V Tape Drive (14A1A13A2) ..................................................................................... 4-48
4.5.2.11 Power ON the KVM (14A1A19)................................................................................................................. 4-48
4.5.3 Powering ON SIM Hardware....................................................................................................................... 4-49
4.5.3.1 Power ON the 3120 RAID1 and RAID2 Arrays (15A1A2, 15A1A3) ........................................................ 4-49
4.5.3.2 Place the Simulation Engine (14A1A23) in Run Level 3............................................................................ 4-49 ii
Chapter Page
4.5.3.3 Place the SCP1 Processor (15A1A28) in Run Level 3 ................................................................................ 4-50
4.5.3.4 Place the SCP2 Processor (15A1A29) in Run Level 3 ................................................................................ 4-51
4.5.4 Power ON MCS Processors ......................................................................................................................... 4-52
4.5.4.1 Place the MCS MISSION1 Processor (15A1A21) in Run Level 3 ............................................................. 4-52
4.5.4.2 Place the MCS MISSION2 Processor (15A1A7) in Run Level 3 ............................................................... 4-53
4.5.4.3 Place the MCS TTC1 Processor (15A1A16) in Run Level 3 ...................................................................... 4-53
4.5.4.4 Place the MCS ADMIN Processor (15A1A18) in Run Level 3 .................................................................. 4-54
4.5.4.5 Place the MCS ARTS Processor (15A1A17) in Run Level 3...................................................................... 4-55
4.5.5 Post Power-Up Run Checks......................................................................................................................... 4-56
4.5.5.1 Verify MCS is Running................................................................................................................................ 4-56
4.5.5.2 Verify SimEng Servers are Up and Running ............................................................................................... 4-57
4.6 PTE SYSTEM POWER DOWN PROCEDURES ...................................................................................... 4-58
4.6.1 Launching OCS SSM................................................................................................................................... 4-58
4.6.2 Place the MCS-ARTS in Run Level 5 ......................................................................................................... 4-58
4.6.3 Place the Simulation Engine (SimEng) in Run Level 5............................................................................... 4-59
4.6.4 Place the MCS in Run Level 5..................................................................................................................... 4-62
4.6.5 Power OFF RAID1 and RAID2 Servers (15A1A2, 15A1A3) .................................................................... 4-62
4.6.6 Power OFF the Instructor Control Workstation (11A1A10)........................................................................ 4-63
4.6.7 Power OFF Peripheral Hardware................................................................................................................. 4-64
4.6.7.1 Power OFF All COSE Workstations (1A1A5 – 1A1A7, 2A1A5 – 2A1A7, 3A1A5 – 3A1A7, 4A1A5 –
4A1A7, 5A1A5 – 5A1A7, 6A1A5 – 6A1A7, 7A1A5 – 7A1A7, 8A1A5 – 8A1A7, 9A1A5 – 9A1A7, 10A1A5 – 10A1A7).................................................................................................................................. 4-64
4.6.7.2 Power OFF the 2821 Router (14A1A1)....................................................................................................... 4-65
4.6.7.3 Power OFF the 3480 Tape Drive (14A1A13A1)......................................................................................... 4-66
4.6.7.4 Power OFF the LTO 2V Tape Drive (14A1A13A2).................................................................................... 4-66
4.6.7.5 Power OFF the KVM (14A1A19) ............................................................................................................... 4-66
4.6.7.6 Power OFF the Server Rack Ventilation Fans (15A1)................................................................................. 4-66
4.6.7.7 Power OFF the VGA/Audio Matrix Switch (11A1A9) ............................................................................... 4-67
4.6.7.8 Place the CP-SX1350 Projectors in Standby Mode (12A1, 13A1) ............................................................. 4-67
4.6.7.9 Power OFF the Color Printer (11A1A1)...................................................................................................... 4-68
4.6.7.10 Power OFF the Time Displays (16A1, 16A2) ............................................................................................. 4-68
SECTION III EMERGENCY OPERATION...................................................................................................................... 4-72
4.7 INTRODUCTION ....................................................................................................................................... 4-72
5 THEORY OF OPERATION ............................................................................................................................................ 5-1
SECTION I FUNCTIONAL SYSTEM OPERATION....................................................................................................... 5-1
5.1 INTRODUCTION ....................................................................................................................................... 5-1
5.2 SYSTEM...................................................................................................................................................... 5-1
5.2.1 Reuse............................................................................................................................................................ 5-2
5.2.2 Single Universe............................................................................................................................................ 5-2
5.2.3 Time Source ................................................................................................................................................. 5-2
5.2.4 Security ........................................................................................................................................................ 5-2
5.2.5 Student Monitoring ...................................................................................................................................... 5-2
5.2.6 Virtual Network Computing ........................................................................................................................ 5-2 iii
Chapter Page
5.3 INSTRUCTOR CONTROL......................................................................................................................... 5-2
5.3.1 User Interface............................................................................................................................................... 5-3
5.3.2 Training Scenario......................................................................................................................................... 5-3
5.3.3 Ghost Operations ......................................................................................................................................... 5-3
5.3.4 Script Players ............................................................................................................................................... 5-3
5.3.5 Unconditional Script Execution................................................................................................................... 5-3
5.3.6 Model Data Viewer ...................................................................................................................................... 5-3
5.4 PTE-SIM...................................................................................................................................................... 5-3
5.5 PTE-MCS..................................................................................................................................................... 5-4
5.5.1 Master Control Station Time Manipulation ................................................................................................. 5-4
5.5.2 PTE-MCS – MCS State Save and Restore .................................................................................................. 5-4
SECTION II PTE SOFTWARE FUNCTIONAL DESCRIPTION .................................................................................... 5-5
5.6 INTRODUCTION ....................................................................................................................................... 5-5
5.6.1 Software Components.................................................................................................................................. 5-5
5.6.2 PTE Software Component Relationships .................................................................................................... 5-5
5.6.3 Instructor Control Component ..................................................................................................................... 5-6
5.6.3.1 Scenario Director ......................................................................................................................................... 5-6
5.6.3.1.1 Script Player................................................................................................................................................. 5-6
5.6.3.1.2 Model Data Viewer ...................................................................................................................................... 5-7
5.6.3.1.3 Student Monitor ........................................................................................................................................... 5-7
5.6.3.2 Script Composer .......................................................................................................................................... 5-7
5.6.3.2.1 Instructor Control......................................................................................................................................... 5-7
5.6.3.2.2 IC Scenario Director .................................................................................................................................... 5-8
5.6.3.2.3 Script Player – Numbered (1-10)................................................................................................................. 5-10
5.6.3.2.4 Student Monitor ........................................................................................................................................... 5-11
5.6.3.2.5 Model Data Viewer ...................................................................................................................................... 5-12
5.6.3.2.6 Script Composer .......................................................................................................................................... 5-15
5.6.3.2.7 The Directive Generator .............................................................................................................................. 5-16
5.6.3.2.8 IC Database Description .............................................................................................................................. 5-17
5.6.4 PTE-SIM Component .................................................................................................................................. 5-19
5.6.4.1 The PTE-SIM Executive.............................................................................................................................. 5-19
5.6.4.1.1 PTE-SIM Executive Activation ................................................................................................................... 5-19
5.6.4.1.2 PTE-SIM Executive Communication Channels .......................................................................................... 5-19
5.6.4.2 TRICS .......................................................................................................................................................... 5-20
5.6.4.3 Space Sim .................................................................................................................................................... 5-20
5.6.4.3.1 SV Models ................................................................................................................................................... 5-20
5.6.4.3.2 Flight Software Use ..................................................................................................................................... 5-20
5.6.4.3.3 SV Anomalies .............................................................................................................................................. 5-20
5.6.4.3.4 Space Sim Activation................................................................................................................................... 5-20
5.6.4.3.5 Space Sim Communications Channels ........................................................................................................ 5-20
5.6.4.4 Environment Sim ......................................................................................................................................... 5-20
5.6.4.4.1 Env Anomalies............................................................................................................................................. 5-20
5.6.4.4.2 Env Sim Activation...................................................................................................................................... 5-20
5.6.4.4.3 Env Sim Communication Channels ............................................................................................................. 5-21
5.6.4.5 Ground Sim.................................................................................................................................................. 5-21 iv
Chapter Page
5.6.4.5.1 Ground Sim Models..................................................................................................................................... 5-21
5.6.4.5.2 Ground Sim Anomalies ............................................................................................................................... 5-21
5.6.4.5.3 Ground Sim Activation ................................................................................................................................ 5-21
5.6.4.5.4 Ground Sim Executable Name..................................................................................................................... 5-21
5.6.4.6 Ground Sim Comm Channels ...................................................................................................................... 5-22
5.6.4.7 PTE-SIM Database ...................................................................................................................................... 5-22
5.6.5 PTE-MCS Component ................................................................................................................................. 5-22
5.6.5.1 PTE-MCS Database Save and Restore ........................................................................................................ 5-22
5.6.5.2 Instructor Control Executor ......................................................................................................................... 5-22
5.6.5.3 Ghosting....................................................................................................................................................... 5-22
5.6.5.4 Positional Training Database Support.......................................................................................................... 5-22
5.7 CONCEPT OF EXECUTION ..................................................................................................................... 5-23
5.7.1 System Modes.............................................................................................................................................. 5-23
5.7.1.1 Crew Mode................................................................................................................................................... 5-23
5.7.1.2 Positional Mode ........................................................................................................................................... 5-23
5.7.2 System States ............................................................................................................................................... 5-23
5.7.2.1 Start .............................................................................................................................................................. 5-24
5.7.2.2 Idle ............................................................................................................................................................... 5-25
5.7.2.3 Load ............................................................................................................................................................. 5-25
5.7.2.4 Pause ............................................................................................................................................................ 5-25
5.7.2.5 Run............................................................................................................................................................... 5-25
5.7.2.6 Speed............................................................................................................................................................ 5-25
5.7.2.7 Save.............................................................................................................................................................. 5-25
5.7.2.8 Quit .............................................................................................................................................................. 5-25
5.7.3 System Training Scenario Data.................................................................................................................... 5-25
5.7.4 Execution Flow ............................................................................................................................................ 5-26
5.7.4.1 Simulated Signal .......................................................................................................................................... 5-27
5.7.4.1.1 S-Band Uplink Message .............................................................................................................................. 5-28
5.7.4.1.2 L-Band Tracking Message ........................................................................................................................... 5-28
5.7.4.1.3 S-Band Downlink Message.......................................................................................................................... 5-28
5.7.4.1.4 L-Band Downlink Message ......................................................................................................................... 5-29
5.7.4.2 PTE-MCS/Ground Equipment Interaction .................................................................................................. 5-29
5.7.4.2.1 Ground Antenna Model ............................................................................................................................... 5-30
5.7.4.2.2 Monitor Station Model................................................................................................................................. 5-32
5.7.4.2.3 National Geospatial-Intelligence Agency Model......................................................................................... 5-33
5.7.4.2.4 External User Agency Model....................................................................................................................... 5-33
5.7.4.2.5 Automated Remote Tracking Station........................................................................................................... 5-33
5.7.4.2.6 Workstation Control..................................................................................................................................... 5-33
5.7.4.2.7 Workstation Monitor .................................................................................................................................... 5-34
5.7.4.3 OS/COMET Host Workstation Configuration ............................................................................................. 5-34
5.7.4.4 GA/MS......................................................................................................................................................... 5-34
5.7.4.5 ARTS............................................................................................................................................................ 5-34
5.7.5 Hardware to Software Allocation ................................................................................................................ 5-35
SECTION III PTE HARDWARE FUNCTIONAL DESCRIPTION ................................................................................. 5-38
5.8 Hardware Overview..................................................................................................................................... 5-38 v
Chapter Page
5.8.1 PTE-MCS Server ......................................................................................................................................... 5-38
5.8.2 PTE-SIM Server........................................................................................................................................... 5-38
5.8.3 Instructor Control......................................................................................................................................... 5-39
5.8.4 Instructor Control Workstation .................................................................................................................... 5-39
5.8.5 Student COSE Workstations ........................................................................................................................ 5-39
5.8.6 Quiet Racks (14A1, 15A1) .......................................................................................................................... 5-39
5.8.6.1 2821 Router.................................................................................................................................................. 5-39
5.8.6.2 2960-48TC Switch ....................................................................................................................................... 5-39
5.8.6.3 3120 RAID Array ........................................................................................................................................ 5-39
5.8.6.4 3480 Tape Drive........................................................................................................................................... 5-39
5.8.6.5 LTO 2V Tape Drive ..................................................................................................................................... 5-40
5.8.6.6 KVM ............................................................................................................................................................ 5-40
5.8.6.7 Projector and Screens................................................................................................................................... 5-40
5.8.6.8 Time Display Unit........................................................................................................................................ 5-40
6 MAINTENANCE ............................................................................................................................................................ 6-1
6.1 INTRODUCTION ....................................................................................................................................... 6-1
6.2 RESTRICTIONS AND LIMITATIONS...................................................................................................... 6-1
6.3 MAINTENANCE SUPPORT EQUIPMENT.............................................................................................. 6-2
6.4 INSPECTION AND SERVICING .............................................................................................................. 6-2
6.4.1 Unique Identification (UID) Label Inspection............................................................................................. 6-3
6.5 PTE TROUBLESHOOTING PROCESS .................................................................................................... 6-3
6.5.1 PTE Troubleshooting Procedures ................................................................................................................ 6-3
6.5.1.1 Troubleshooting Procedures for the COSE 22–inch LCD Color Monitor (1A1A1 - 1A1A3, 2A1A1 -
2A1A3, 3A1A1 - 3A1A3, 4A1A1 - 4A1A3, 5A1A1 - 5A1A3, 6A1A1 - 6A1A3, 7A1A1 - 7A1A3, 8A1A1 - 8A1A3, 9A1A1 - 9A1A3, 10A1A1 - 10A1A3)......................................................................... 6-5
6.5.1.2 Troubleshooting Procedures for the COSE Keyboard and Mouse (1A1A4 -10A1A4)............................... 6-5
6.5.1.3 Troubleshooting Procedures for the COSE Sun Ray 2FS (1A1A5 - 1A1A7, 2A1A5 - 2A1A7, 3A1A5 -
3A1A7, 4A1A5 - 4A1A7, 5A1A5 - A1A7, 6A1A5 - 6A1A7, 7A1A5 - 7A1A7, 8A1A5 - 8A1A7, 9A1A5 - 9A1A7, 10A1A5 - 10A1A7) ..................................................................................................... 6-5
6.5.1.4 Troubleshooting Procedures for the Color Printer (11A1A1)...................................................................... 6-5
6.5.1.5 Troubleshooting Procedures for the Instructor Control PC (11A1A10)...................................................... 6-5
6.5.1.6 Troubleshooting Procedures for the Instructor Control Sun Ray 2FS (11A1A11, 11A1A12) .................... 6-5
6.5.1.7 Troubleshooting Procedures for the 21.3-IInch LCD Color Monitor (11A1A2, 11A1A3) ......................... 6-5
6.5.1.8 Troubleshooting Procedures for the Instructor Control Keyboard and Mouse (11A1A6, 11A1A14)......... 6-5
6.5.1.9 Troubleshooting Procedures for the Distribution Amplifier (11A1A7, 11A1A8) ....................................... 6-5
6.5.1.10 Troubleshooting Procedures for the VGA/Audio Matrix Switch (11A1A9)............................................... 6-6
6.5.1.11 Troubleshooting Procedures for the CP-SX1350 Projector (12A1, 13A1) ................................................. 6-6
6.5.1.12 Troubleshooting Procedures for the 2821 Router (14A1A1)....................................................................... 6-6
6.5.1.13 Troubleshooting Procedures for the 3480 Tape Drive (14A1A13A1)......................................................... 6-6
6.5.1.14 Troubleshooting Procedures for the LTO 2V (14A1A13A2) ...................................................................... 6-6
6.5.1.15 Troubleshooting Procedures for the KVM (14A1A19) ............................................................................... 6-6
6.5.1.16 Troubleshooting Procedures for the Power Distribution Unit (14A1B20, 15A1B20) ................................ 6-6
6.5.1.17 Troubleshooting Procedures for the V890 Server (14A1A23) .................................................................... 6-6
6.5.1.17.1 Troubleshooting Procedures for the V890 Chassis (14A1A23) .................................................................. 6-6
6.5.1.17.2 Troubleshooting Procedures for the V890 Disk Drive (14A1A23A1 - 14A1A23A6) ................................ 6-6 vi
Chapter Page
6.5.1.17.3 Troubleshooting Procedures for the V890 Graphics Accelerator Card (14A1A23A7)............................... 6-7
6.5.1.18 Troubleshooting Procedures for the 2960 Catalyst Switch (14A1A3, 14A1A4) ........................................ 6-7
6.5.1.19 Troubleshooting Procedures for the V210 Servers (15A1A16 - 15A1A18, 15A1A28, 15A1A29)............ 6-7
6.5.1.20 Troubleshooting Procedures for the RAID Arrays (15A1A2, 15A1A3) ..................................................... 6-7
6.5.1.21 Troubleshooting Procedures for the V440 Server (15A1A21) .................................................................... 6-7
6.5.1.22 Troubleshooting Procedures for the V240 Server (15A1A7) ...................................................................... 6-7
6.5.1.23 Troubleshooting Procedures for the Time Display Unit (16A1, 16A2)....................................................... 6-7
6.5.1.24 Troubleshooting Procedures for the Projector Screen (17A1, 17A2).......................................................... 6-7
6.5.1.25 MCS TTC1, MISSION1, or MISSION2 (15A1A16, 15A1A28, 15A1A29) Status on OCS SSM Turns
Black ......................................................................................................................................................... 6-8
6.5.1.26 ARTS or MCS/ADMIN1 (15A1A17, 15A1A18) Status on OCS SSM Turns Black.................................. 6-9
6.5.1.27 Troubleshooting Procedures for the External CD-ROM (1A1A9 - 10A1A9)............................................. 6-10
6.6 REMOVAL AND REPLACEMENT PROCEDURES ............................................................................... 6-10
6.6.1 Remove and Replace Procedures for the COSE 22–inch LCD Color Monitor (1A1A1 - 1A1A3, 2A1A1
- 2A1A3, 3A1A1 - 3A1A3, 4A1A1 - 4A1A3, 5A1A1 - 5A1A3, 6A1A1 - 6A1A3, 7A1A1 - 7A1A3, 8A1A1 - 8A1A3, 9A1A1 - 9A1A3, 10A1A1 - 10A1A7, 11A1A4, 11A1A5) ......................................... 6-10
6.6.1.1 Remove the COSE 22–inch LCD Color Monitor ........................................................................................ 6-10
6.6.1.2 Replace the COSE 22–inch LCD Color Monitor ........................................................................................ 6-11
6.6.2 Remove and Replace Procedures for the COSE Keyboard and Mouse (1A1A4 -10A1A4) ....................... 6-11
6.6.2.1 Remove the COSE Keyboard and Mouse.................................................................................................... 6-11
6.6.2.2 Replace the COSE Keyboard and Mouse .................................................................................................... 6-11
6.6.3 Remove and Replace Procedures for the COSE Sun Ray 2FS (1A1A5 - 1A1A7, 2A1A5 - 2A1A7, 3A1A5 - 3A1A7, 4A1A5 - 4A1A7, 5A1A5 - A1A7, 6A1A5 - 6A1A7, 7A1A5 - 7A1A7, 8A1A5 - 8A1A7, 9A1A5 - 9A1A7, 10A1A5 - 10A1A7)........................................................................................ 6-11
6.6.3.1 Remove the COSE Sun Ray 2FS................................................................................................................. 6-11
6.6.3.2 Replace the COSE Sun Ray 2FS ................................................................................................................. 6-11
6.6.4 Remove and Replace Procedures for the Color Printer (11A1A1).............................................................. 6-11
6.6.4.1 Remove the Color Printer ............................................................................................................................ 6-11
6.6.4.2 Replace the Color Printer............................................................................................................................. 6-12
6.6.5 Remove and Replace Procedures for the Instructor Control PC (11A1A10) .............................................. 6-12
6.6.5.1 Remove for the Instructor Control PC......................................................................................................... 6-12
6.6.5.2 Replace for the Instructor Control PC ......................................................................................................... 6-12
6.6.6 Remove and Replace Procedures for the Instructor Control Sun Ray 2FS (11A1A11, 11A1A12)............. 6-12
6.6.6.1 Remove the Instructor Control Sun Ray 2FS .............................................................................................. 6-12
6.6.6.2 Replace the Instructor Control Sun Ray 2FS............................................................................................... 6-12
6.6.7 Remove and Replace Procedures for the 21.3 Inch LCD Color Monitor (11A1A2, 11A1A3) ................... 6-13
6.6.7.1 Remove the 21.3 Inch LCD Color Monitor ................................................................................................. 6-13
6.6.7.2 Replace the 21.3 Inch LCD Color Monitor ................................................................................................. 6-13
6.6.8 Remove and Replace Procedures for the Instructor Control Keyboard and Mouse (11A1A6)................... 6-13
6.6.8.1 Remove the Instructor Control Keyboard and Mouse ................................................................................. 6-13
6.6.8.2 Replace the Instructor Control Keyboard and Mouse.................................................................................. 6-13
6.6.9 Remove and Replace Procedures for the Distribution Amplifier (11A1A7, 11A1A8) ............................... 6-13
6.6.9.1 Remove the Distribution Amplifier ............................................................................................................. 6-13
6.6.9.2 Replace the Distribution Amplifier.............................................................................................................. 6-13
6.6.10 Remove and Replace Procedures for the VGA/Audio Matrix Switch (11A1A9) ....................................... 6-13
6.6.10.1 Remove the Switch Matrix .......................................................................................................................... 6-13
6.6.10.2 Replace the Switch Matrix........................................................................................................................... 6-14 vii
Chapter Page
6.6.11 Remove and Replace Procedures for the CP-SX1350 Projector (12A1, 13A1).......................................... 6-14
6.6.11.1 Remove and Replace Procedures for the CP-SX1350 Projector Chassis (12A1, 13A1)............................. 6-14
6.6.11.1.1 Remove the CP-SX1350 Projector .............................................................................................................. 6-14
6.6.11.1.2 Replace the CP-SX1350 Projector............................................................................................................... 6-14
6.6.11.2 Remove and Replace Procedures for the Projector Bulb in the A/V Projector (12A1A1, 13A1A1) .......... 6-16
6.6.11.2.1 Remove the Projector Bulb in the A/V Projector ........................................................................................ 6-16
6.6.11.2.2 Replace the Projector Bulb in the A/V Projector......................................................................................... 6-16
6.6.12 Remove and Replace Procedures for the 2821 Router (14A1A1)............................................................... 6-17
6.6.12.1 Remove the 2821 Router ............................................................................................................................. 6-17
6.6.12.2 Replace the 2821 Router.............................................................................................................................. 6-17
6.6.13 Remove and Replace Procedures for the LTO 2V Tape Drive (14A1A13A2)............................................ 6-18
6.6.13.1 Remove the LTO 2V Tape Drive ................................................................................................................. 6-18
6.6.13.2 Replace the LTO 2V Tape Drive.................................................................................................................. 6-18
6.6.14 Remove and Replace Procedures for the 3480 Tape Drive (14A1A13A1) ................................................. 6-18
6.6.14.1 Remove…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .