31S1-2FYN1-6WC-1.pdf

PDF 270 KB Posted

Attached to
Pre-Solicitation Conference (Industry Day)
Solicitation number
FA8823-12-R-0004
Issued by

About this file

31S1-2FYN1-6WC

View the file

Other files

File Type Posted
FBO_Synopsis_GCS.docx DOCX document
SRS-MOST-555-1.pdf PDF
icd_gps_202c-1.pdf PDF
31S5-2FSQ217-2.pdf PDF
ss-pte-615_b.doc DOC document
SS_GIN_660.pdf PDF
31S5-2FSQ-217(T1)-6WC-1.pdf PDF
ICD-CS-605_Rev_B.doc DOC document
TAT2 description.docx DOCX document
MOW description.docx DOCX document
31S5-2FSQ217-01.pdf PDF
mg50539000013e5_new.doc DOC document
31S1-2FYN1-06.pdf PDF
31S5-2FSQ217-6WC-2.pdf PDF
31S5-2FSQ217(T1)-2.pdf PDF
ss-sys-600_e.doc DOC document
31S1-2FYN1-2.pdf PDF
mg50539000013e2_e.doc DOC document
SS_GIN_660_25 Jan 11signed.pdf PDF
31S1-2FYN1-1.pdf PDF
mg50539000013e5_new_appendix_a.doc DOC document
mg50539000013e6_b.doc DOC document
31S5-2FSQ217-06.pdf PDF
31S5-2FSQ217(T1)-1.pdf PDF
31S5-2FSQ217(T1)-06.pdf PDF
31S5-2FSQ217-6WC-1.pdf PDF
Amended RFP coverletter and final changes.pdf PDF
GCS Amend 1 dtd 13 Aug 2012.pdf PDF
Final RFP Industry Questions Answers —
SS_GIN_660_25 Jan 11signed.pdf PDF
Final RFP Industry Questions Answers —
GCS Section L Volume Matrix Table - 20120731.docx DOCX document
CTO 08-005.pdf PDF
Final RFP Industry Questions Answers - 20120726.xlsx XLSX spreadsheet
SS-CS-800F.docx DOCX document
GSMS-IM-01.pdf PDF
ATO IATO CHART.docx DOCX document
Final RFP Industry Questions Answers - 20120723.xlsx XLSX spreadsheet
Notice of Solicitation Ltr GCS.pdf PDF
GCS FA8823-12-R-0004.pdf PDF
Responses.docx DOCX document
2SOPS-OLM-DM-WI-202_Manual_Repro_Data_Sync.doc DOC document
2SOPS-OM-AEP-WI-202_Virus_Workstation-Scan_Media.doc DOC document
2SOPS-OM-AEP-WI-201_Oracle-Backup_Logs_for_DBA.doc DOC document
GCS Release.docx DOCX document
MIL-STD-461F.PDF PDF
SMC-S-021_15SEP2009.PDF PDF
MIL-HDBK-29612-4A 1 .pdf PDF
DoD 5220.22-M NISPOM.pdf PDF
20120201 PPP Letter to Industry.pdf PDF
Show 40 more

Latest 50 of 118 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TO 31S1-2FYN1-6WC-1

WORK CARDS

SCHEDULED MAINTENANCE

FOR

GLOBAL POSITIONING SYSTEM

INFORMATION NETWORK (GIN)

AN/FYN-1

Space and Missile Systems Center, Global Positioning System Wing/OSG

2SC0491

DISTRIBUTION STATEMENT - E - Distribution authorized to DoD Components only for Administrative or Operational Use, (1 May 2011). Other requests shall be referred to SMC_SLG/GPL - TOMA, 1050 East Stewart Avenue, Peterson AFB, CO 80914-2102.

WARNING - This Document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751et.seq.) or the Export Administration Act of 1979, as amended (Title 50, USC, App 2401et.seq.). Violations of these export laws are subject to severe criminal penalties.

Disseminate in accordance with provisions of DoD Directive 5230.25.

HANDLING AND DESTRUCTION NOTICE - Handle in compliance with the Distribution Statement and destroy by any method that will prevent disclosure of the contents or reconstruction of the document.

Published under authority of the Secretary of the Air Force

1 MAY 2011

LIST OF EFFECTIVE CARDS INSERT LATEST CHANGED CARDS. DESTROY SUPERSEDED CARDS.

NOTE The portion of the text affected by the changes is indicated by a vertical line in the outer margins of the card. Changes to illustrations are indicated by shaded or screened areas, or by miniature pointing hands.

Dates of issue for original and changed cards are:

Original . . . . . . . . . . . . . . . . . . .0 . . . . . . . . . . . . . . . . . . . . . . .1 MAY 2011

TOTAL NO OF CARDS IN THIS PUBLICATION IS 13 CONSISTING OF THE FOLLOWING:

Card *Change Card *Change Card *Change No. No. No. No. No. No.

Title A i - vi A-001 - A-002 B-001 - B-004

*Zero in this column indicates an original card

A USAF

PUBLICATION NUMBER

INSPECTION REQUIREMENTS

TABLE OF CONTENTS

FIGURE CHANGE NO CARD NO.

i

TABLE OF CONTENTS

Section Card

INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii

SAFETY SUMMARY, GENERAL SAFETY INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii

SAFETY SUMMARY, WARNINGS, CAUTIONS AND NOTES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv

SAFETY SUMMARY, ELECTRICAL POWER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv

INSPECTION

7-DAY INSPECTION, GIN EQUIPMENT RACK (MCS: 3A69) (AMCS: 3A69) . . . . . . . . . . . . . . . . . . . . . . A-001

7-DAY INSPECTION, GIN WORKSTATIONS (MCS: GPSOC-01 - GPSOC-04, GPSOC-06 - GPSOC-10, GPSOC-12 - GPSOC-15) (AMCS: BGPSOC-01 - BGPSOC-03) . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-002

SERVICING

28-DAY SERVICING, GIN EQUIPMENT RACK (MCS: 3A69) (AMCS: 3A69) . . . . . . . . . . . . . . . . . . . . . . B-001

28-DAY SERVICING, GIN WORKSTATIONS (MCS: GPSOC-01 - GPSOC-04, GPSOC-06 - GPSOC-10, GPSOC-12 - GPSOC-15) (AMCS: BGPSOC-01 - BGPSOC-03) . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-002

84-DAY SERVICING, TAPE DRIVE CLEANING (MCS: 3A69A1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-004

INSPECTION REQUIREMENTS

TABLE OF CONTENTS

FIGURE CHANGE NO CARD NO.

i

INSPECTION REQUIREMENTS

INTRODUCTION

FIGURE CHANGE NO CARD NO.

ii

INTRODUCTION

1. THIS WORK CARD IS A STEP-BY-STEP GUIDE IN ABBREVIATED FORM FOR USE AS A REFERENCE TO ENSURE ACCOMPLISHMENT OF SELECTED TASKS BY A PREDETERMINED SEQUENCE PROCEDURE. THE INTENT OF THIS WORK CARD IS TO ELIMINATE THE PROBABILITY OF OMISSION OF A STEP IN THE ACCOMPLISHMENT OF THE INTENDED TASK. THE PROCEDURES CONTAINED HERE IN ARE PRESENTED IN THE SHORTEST PRACTICAL FORM FOR USE BY QUALIFIED PERSONNEL AND ARE NOT INTENDED TO PROVIDE FULL TECHNICAL INSTRUCTIONS. THIS WORK CARD PROVIDES, IN AN ABBREVIATED FORM, PROCEDURES FOR APPROPRIATE TASKS, INSPECTIONS, ETC. THESE PROCEDURES ARE DERIVED FROM, BUT DO NOT REPLACE, THE DETAILED PROCEDURES CONTAINED IN TECHNICAL ORDERS (TOs). WHENMALFUNCTIONS OCCUR REFERENCE TO THE TO SHALL BE MADE.

2. CHANGES AND REVISIONS TO THESE WORK CARDS WILL BE PUBLISHED WHEN NECESSARY TO ADD, DELETE, REVISE, OR CHANGE REQUIREMENTS. SUCH CHANGES AND REVISIONS WILL BE BASED ON FACTUAL DATA AS A RESULT OF EXPERIENCE WITH EQUIPMENT. DATA WILL BE GATHERED THROUGH AFI 21-116 DATA, FIELD EVALUATION, UNSATISFACTORY REPORTS, AND OTHER FACTUAL/FAILURE DATA.

3. FOR ALL OUT OF SERVICE WORK CARDS, COORDINATE SERVICING TASK WITH JOB CONTROL. FAILURE TO DO SO CAN RESULT

IN LOSS OF MISSION EFFECTIVENESS.

4. RECOMMENDED CHANGES TO THIS SET OF WORK CARDS SHALL BE SUBMITTED ON AFTO FORM 22, THROUGH COMMAND

HEADQUARTERS, IN ACCORDANCE WITH TO 00-5-1.

5. WORK CARDS CONTAINING STEPS REQUIRING THE USE OF ELECTRICAL POWER FOR ACCOMPLISHMENT CAN BE IDENTIFIED BY

THE HEADER DEMARCATION IN THE ELECTRICAL POWER FIELD AS ON OR OFF.

INSPECTION REQUIREMENTS

INTRODUCTION

FIGURE CHANGE NO CARD NO.

ii

6. THEGLOBAL POSITIONING SYSTEM INFORMATIONNETWORK (GIN) EQUIPMENT IS DIVIDED INTO FOURWORKAREAS AS FOLLOWS:

• WORK AREA 1 - GIN EQUIPMENT RACK (3A69) LOCATED IN BUILDING 400, MOD 17A, ROOM 1, SCHRIEVER AFB, CO.

• WORK AREA 2 - GIN WORKSTATIONS (GPSOC-01 - GPSOC-04, GPSOC-06 - GPSOC-10, GPSOC-12 - GPSOC-015) LOCATED IN

BUILDING 400, MOD 11B, ROOM 1, SCHRIEVER AFB, CO.

• WORK AREA 3 - GIN EQUIPMENT RACK (3A69) LOCATED IN BUILDING 23229, ROOM 32, VANDENBERG AFB, CA.

• WORK AREA 4 - GIN WORKSTATIONS (BGPSOC-01 - BGPSOC-03) LOCATED IN BUILDING 23229, ROOM 34, VANDENBERG

AFB, CA.

INSPECTION REQUIREMENTS

SAFETY SUMMARY

FIGURE CHANGE NO CARD NO.

iii

1. GENERAL SAFETY INSTRUCTIONS.

THE FOLLOWING GENERAL SAFETY PRECAUTIONS ARE NOT RELATED TO ANY SPECIFIC PROCEDURE AND THEREFORE DO NOT APPEAR ELSEWHERE IN THIS PUBLICATION. THESE ARE RECOMMENDED PRECAUTIONS THAT PERSONNEL MUST UNDERSTAND AND

APPLY DURING ANY PHASE OF OPERATION AND MAINTENANCE.

1.1. KEEP AWAY FROM LIVE CIRCUITS. OPERATING PERSONNEL MUST AT ALL TIMES OBSERVE ALL SAFETY REGULATIONS. DO NOT REPLACE COMPONENTS WITH THE AC POWER TURNED ON. UNDER CERTAIN CONDITIONS, DANGEROUS POTENTIALS DUE TO CHARGES RETAINED BY CAPACITORS MAY STILL EXIST WHEN THE POWER CONTROL IS SET TO THE OFF POSITION. TO AVOID SEVERE SHOCK OR INJURIES, ALWAYS REMOVE POWER AND DISCHARGE A CIRCUIT TO GROUND BEFORE TOUCHING IT.

1.3. DO NOT SERVICE OR ADJUST ALONE. UNDER NO CIRCUMSTANCES SHOULD ANY PERSON REACH INTO OR ENTER THE ENCLOSURE FOR THE PURPOSE OF SERVICING OR ADJUSTING THE EQUIPMENT, EXCEPT IN THE

PRESENCE OF SOMEONE WHO IS CAPABLE OF RENDERING AID.

1.4. RESUSCITATION. PERSONNEL WORKING WITH OR NEAR HIGH VOLTAGES SHOULD BE FAMILIAR WITH MODERN METHODS OF RESUSCITATION. CARDIOPULMONARY RESUSCITATION PROCEDURES ARE PROVIDED IN TO 31-1-141-1 AND ANNUAL REFRESHER TRAINING REQUIREMENTS ARE OUTLINED IN AIR FORCE OCCUPATIONAL SAFETY AND HEALTH (AFOSH) STANDARD (STD 91-50). OTHER INFORMATION MAY BE OBTAINED FROM BASE MEDICAL SERVICES.

INSPECTION REQUIREMENTS

SAFETY SUMMARY

FIGURE CHANGE NO CARD NO.

iii

1.5. ELECTROSTATIC SENSITIVE DEVICES. IF A CIRCUIT CARD CONTAINS A PART IDENTIFIED AS AN ESD ITEM, APPLICABLE PRECAUTIONS WILL APPEAR IN THIS PUBLICATION. ALL ELECTROSTATICALLY SENSITIVE DEVICES WILL BE MARKED WITH THE SYMBOL . WHEN AN ENTIRE PARAGRAPH, INCLUDING ALL SUBPARAGRAPHS, IS CONSIDERED ESD CRITICAL, THE SYMBOL WILL BE PLACED BETWEEN THE STEP NUMBER AND TITLE. WHEN ALL SUBORDINATE PARAGRAPH AND STEPS ARE NOT RELATED TO HANDLING MAINTENANCE, WHICH COULD DAMAGE ESD PARTS, ONLY THOSE RELATED, WILL BE

ANNOTATED. THE FOLLOWING CAUTION WILL IMMEDIATELY PRECEDE ESD PROCEDURES/STEPS:

INSPECTION REQUIREMENTS

SAFETY SUMMARY

FIGURE CHANGE NO CARD NO.

iv

CAUTION

OBSERVE PRECAUTIONS FOR HANDLING ELECTROSTATIC DISCHARGE SENSITIVE ITEMS. (REFER TO TO 00-25-234)

2. WARNINGS, CAUTIONS AND NOTES.

2.1. DEFINITIONS OF WARNINGS, CAUTIONS, AND NOTES ARE DESCRIBED BELOW.

WARNING

AN OPERATING OR MAINTENANCE PROCEDURE, PRACTICE, CONDITION, STATEMENT, ETC., WHICH, IF NOT

STRICTLY OBSERVED, COULD RESULT IN INJURY TO OR DEATH OF PERSONNEL.

CAUTION

AN OPERATING OR MAINTENANCE PROCEDURE, PRACTICE, CONDITION, STATEMENT, ETC., WHICH, IF NOT STRICTLY OBSERVED, COULD RESULT IN DAMAGE TO, OR DESTRUCTION OF EQUIPMENT OR LOSS OF MISSION EFFECTIVENESS.

NOTE

AN ESSENTIAL OPERATING OR MAINTENANCE PROCEDURE, CONDITION, OR STATEMENT WHICH MUST BE HIGHLIGHTED.

INSPECTION REQUIREMENTS

SAFETY SUMMARY

FIGURE CHANGE NO CARD NO.

iv

3. ELECTRICAL POWER.

3.1. ON. When power is required during the accomplishment of the tasks entered on the card, the word “ON” will be placed in this block.

3.2. OFF. When it is mandatory that power be off during the accomplishment of the tasks entered on the card, the word “OFF” will be placed in this block.

3.3. ON or OFF. When power may be on or off during the accomplishment of the tasks entered on the card, this block will be left blank.

3.4. ON and OFF. When some items require power on but some require it to be off, the words “ON/OFF” will be placed in this block and each power on requirement will be preceded by an “at” (@) symbol in the body of the card.

INSPECTION REQUIREMENTS

WORK AREA DIAGRAM

v

INSPECTION REQUIREMENTS

WORK AREA DIAGRAM

v

INSPECTION REQUIREMENTS

WORK AREA DIAGRAM

vi

INSPECTION REQUIREMENTS

WORK AREA DIAGRAM

vi

CARD NO.

A-001

WORK AREA(S)

1/3

TYPE MECH RQR MECH NO. CARD TIME

01:00

PUBLICATION NUMBER

TO 31S1-2FYN1-6WC-1

CHANGE NO.

MAN

MIN

WORK

AREA

WORK UNIT CODE

SYS SUB 7-DAY INSPECTION

INSPECTION

REQUIREMENTS

ELECTRICAL POWER

ON

SERVICE

IN

FIGURE CARD NO.

A-001

GIN EQUIPMENT RACK (MCS: 3A69) (AMCS: 3A69)

1. PRELIMINARY ACTIONS.

A. REQUIRED EQUIPMENT: NONE.

B. NOTIFY JOB CONTROL THAT THE 7-DAY INSPECTION OF THE EQUIP-

MENT RACK IS ABOUT TO BEGIN.

060 1/3 CA A00 2. EQUIPMENT RACK CLEANLINESS AND AIRFLOW CHECKS.

A. CHECK EXTERIOR OF RACK FOR GENERAL CLEANLINESS.

B. OPEN FRONT AND REAR DOORS OF RACK AND CHECK INTERIORS FOR

CLEANLINESS, DAMAGE, EVIDENCE OF OVERHEATING, AND CORROSION. ENSURE

SIGNAL AND POWER CABLES ARE SECURED.

C. CHECK THAT SIGNAL AND POWER CABLES ARE SECURED.

D. CHECK FANS ON INSIDE OF BACK DOORS OF RACKS FOR DIRT AND DUST.

E. CHECK RACK CABLING AND WIRING FOR DAMAGE, CHAFING, AND WEAR.

3. NOTIFY JOB CONTROL THAT THE 7-DAY INSPECTION OF THE EQUIPMENT RACK IS COMPLETED.

(REVERSE BLANK)

CARD NO.

A-001

WORK AREA(S)

1/3

TYPE MECH RQR MECH NO. CARD TIME

01:00

PUBLICATION NUMBER

CHANGE NO.

INSPECTION REQUIREMENTS

7-DAY INSPECTION

A-001

A-002

WORK AREA(S)

2/4

TYPE MECH RQR MECH NO. CARD TIME

00:30

PUBLICATION NUMBER

TO 31S1-2FYN1-6WC-1

CHANGE NO.

MAN

MIN

WORK

AREA

WORK UNIT CODE

SYS SUB 7-DAY INSPECTION

INSPECTION

REQUIREMENTS

ELECTRICAL POWER

ON

SERVICE

IN

FIGURE CARD NO.

A-002

GIN WORKSTATIONS (MCS: GPSOC-01 - GPSOC-04, GPSOC-06 - GPSOC-10,

GPSOC-12 - GPSOC-15) (AMCS: BGPSOC-01 - BGPSOC-03)

1. PRELIMINARY ACTIONS.

A. REQUIRED EQUIPMENT: NONE.

B. NOTIFY JOB CONTROL THAT THE 7-DAY INSPECTION OF THE WORK-

STATIONS IS ABOUT TO BEGIN.

030 2/4 CW

CW

A00 B00

2. CHECK WORKSTATION COMPUTERS, MONITORS AND KEYBOARDS FOR EXTERNAL

CLEANLINESS, DAMAGE, AND EVIDENCE OF OVERHEATING.

3. NOTIFY JOB CONTROL THAT THE 7-DAY INSPECTION OF THE WORKSTATIONS IS COMPLETED.

(REVERSE BLANK)

CARD NO.

A-002

WORK AREA(S)

2/4

TYPE MECH RQR MECH NO. CARD TIME

00:30

PUBLICATION NUMBER

INSPECTION REQUIREMENTS

7-DAY INSPECTION

A-002

B-001

WORK AREA(S)

1/3

TYPE MECH RQR MECH NO. CARD TIME

01:30

PUBLICATION NUMBER

TO 31S1-2FYN1-6WC-1

CHANGE NO.

MAN

MIN

WORK

AREA

WORK UNIT CODE

SYS SUB 28-DAY SERVICING

INSPECTION

REQUIREMENTS

ELECTRICAL POWER

OFF

SERVICE

OUT

FIGURE CARD NO.

B-001

GIN EQUIPMENT RACK (MCS: 3A69) (AMCS: 3A69)

1. PRELIMINARY ACTIONS.

A. REQUIRED EQUIPMENT:

• ANTISTATIC VACUUM CLEANER

• LINT-FREE CLOTHS

• GENERAL PURPOSE CLEANER

B. NOTIFY JOB CONTROL THAT THE 28-DAY SERVICING OF THE EQUIP-

MENT RACK IS ABOUT TO BEGIN.

090 1/3 CA A00 2. CLEAN EQUIPMENT RACK.

WARNING

ENSURE THE SERVICING CLOTH IS ONLY DAMP. CLEANER MUST NOT RUN

FROM THE CLOTH WHILE WIPING EQUIPMENT. EXCESSIVE MOISTURE WILL

CAUSE ARCING AND SHORTING OF POWER. CLEANING CLOTHS SHALL

BE DISPOSED OF IN PROPER CONTAINER.

A. WIPE OUTSIDE SURFACES OF RACK ASSEMBLY WITH DAMP CLOTH.

B. OPEN REAR DOOR OF RACK.

(CONTINUED ON BACK)

CARD NO.

B-001

WORK AREA(S)

1/3

TYPE MECH RQR MECH NO. CARD TIME

01:30

PUBLICATION NUMBER

MAN

MIN

WORK

AREA

WORK UNIT CODE

SYS SUB 28-DAY SERVICING

INSPECTION

REQUIREMENTS

ELECTRICAL POWER

OFF

SERVICE

OUT

FIGURE CARD NO.

B-001

(CONTINUED FROM FRONT)

C. VACUUM DUST AND DEBRIS FROM REAR OF EQUIPMENT.

D. WIPE DOWN OUTSIDE OF ALL COMPONENTS WITH DAMP CLOTH.

E. VACUUM ANY AIR VENTS ON COMPONENTS IN EQUIPMENT RACK.

F. VACUUM ALL FANS AND GUARDS ON INSIDE OF EQUIPMENT RACK BACK DOOR.

(1) VACUUM ALL FANS AND GUARDS ON OUTSIDE OF EQUIPMENT RACK BACK DOOR.

(2) CLOSE REAR DOOR OF RACK BEING CAREFUL NOT TO PINCH CABLES.

(3) CLOSE FRONT DOORS OF RACK.

3. NOTIFY JOB CONTROL THAT THE 28-DAY SERVICING OF THE EQUIPMENT RACK IS COMPLETED.

B-002

WORK AREA(S)

2/4

TYPE MECH RQR MECH NO. CARD TIME

00:45

PUBLICATION NUMBER

TO 31S1-2FYN1-6WC-1

CHANGE NO.

MAN

MIN

WORK

AREA

WORK UNIT CODE

SYS SUB 28-DAY SERVICING

INSPECTION

REQUIREMENTS

ELECTRICAL POWER

OFF

SERVICE

OUT

FIGURE CARD NO.

B-002

GIN WORKSTATIONS (MCS: GPSOC-01 - GPSOC-04, GPSOC-06 - GPSOC-10,

GPSOC-12 - GPSOC-15) (AMCS: BGPSOC-01 - BGPSOC-03)

1. PRELIMINARY ACTIONS.

A. REQUIRED EQUIPMENT:

• ANTISTATIC VACUUM CLEANER

• LINT-FREE CLOTHS

• GENERAL PURPOSE CLEANER

B. NOTIFY JOB CONTROL THAT THE 28-DAY SERVICING OF THE WORK-

STATIONS IS ABOUT TO BEGIN.

005 2/4 CW AD0 2. CLEAN THE MOUSE.

WARNING

ENSURE THE SERVICING CLOTH IS ONLY DAMP. CLEANER MUST NOT RUN

FROM THE CLOTH WHILE WIPING EQUIPMENT. EXCESSIVE MOISTURE WILL

CAUSE ARCING AND SHORTING OF POWER. CLEANING CLOTHS SHALL

BE DISPOSED OF IN PROPER CONTAINER.

CW BD0 A. DAMPEN A LINT-FREE CLOTH WITH GENERAL PURPOSE CLEANER.

(CONTINUED ON BACK)

CARD NO.

B-002

WORK AREA(S)

2/4

TYPE MECH RQR MECH NO. CARD TIME

00:45

PUBLICATION NUMBER

MAN

MIN

WORK

AREA

WORK UNIT CODE

SYS SUB 28-DAY SERVICING

INSPECTION

REQUIREMENTS

ELECTRICAL POWER

OFF

SERVICE

OUT

FIGURE CARD NO.

B-002

(CONTINUED FROM FRONT)

B. WIPE DOWN EXTERIOR SURFACES OF MOUSE.

010 2/4 CW AB0 3. CLEAN MONITOR.

CW BB0 A. ENSURE POWER IS OFF BY DEPRESSING THE POWER BUTTON ON THE

FRONT OF THE LCD MONITOR.

WARNING

ENSURE THE SERVICING CLOTH IS ONLY DAMP. CLEANER MUST NOT RUN

FROM THE CLOTH WHILE WIPING EQUIPMENT. EXCESSIVE MOISTURE WILL

CAUSE ARCING AND SHORTING OF POWER. CLEANING CLOTHS SHALL

BE DISPOSED OF IN PROPER CONTAINER.

B. DAMPEN A LINT-FREE CLOTH WITH GENERAL PURPOSE CLEANER.

C. WIPE DOWN SCREEN FIRST.

D. WIPE DOWN EXTERIOR SURFACES OF MONITOR.

E. RETURN POWER TO THE MONITOR.

010 2/4 CW AE0 4. CLEAN KEYBOARD.

CW BE0 A. VACUUM DUST AND DEBRIS FROM KEYS.

B. DAMPEN A LINT-FREE CLOTH WITH GENERAL PURPOSE CLEANER.

C. WIPE DOWN KEY BOARD AND REMOVE ALL STAINS.

010 2/4 CW AA0 5. CLEAN COMPUTER.

CW BA0 A. VACUUM DUST AND DEBRIS FROM AIR INTAKES ON COMPUTER.

B. DAMPEN A LINT-FREE CLOTH WITH GENERAL PURPOSE CLEANER.

(CONTINUED ON NEXT CARD)

B-003

WORK AREA(S)

2/4

TYPE MECH RQR MECH NO. CARD TIME

00:45

PUBLICATION NUMBER

TO 31S1-2FYN1-6WC-1

CHANGE NO.

MAN

MIN

WORK

AREA

WORK UNIT CODE

SYS SUB 28-DAY SERVICING

INSPECTION

REQUIREMENTS

ELECTRICAL POWER

OFF

SERVICE

OUT

FIGURE CARD NO.

B-003

(CONTINUED FROM PREVIOUS CARD

C. WIPE DOWN COMPUTER AND REMOVE ALL STAINS.

010 2/4 CW

CW

A00 B00

6. VACUUM DUST AND DEBRIS FROM DESK TOP AND FLOOR AROUND WORKSTATION.

7. REPEAT STEPS 2 THROUGH 6 FOR REMAINING WORKSTATIONS.

8. NOTIFY JOB CONTROL THAT THE 28-DAY SERVICING OF THE WORKSTATION IS COMPLETED.

(REVERSE BLANK)

CARD NO.

B-003

WORK AREA(S)

2/4

TYPE MECH RQR MECH NO. CARD TIME

00:45

PUBLICATION NUMBER

INSPECTION REQUIREMENTS

28-DAY SERVICING

B-003

B-004

WORK AREA(S)

TYPE MECH RQR MECH NO. CARD TIME

00:15

PUBLICATION NUMBER

TO 31S1-2FYN1-6WC-1

CHANGE NO.

MAN

MIN

WORK

AREA

WORK UNIT CODE

SYS SUB 84-DAY SERVICING

INSPECTION

REQUIREMENTS

ELECTRICAL POWER

ON

SERVICE

IN

FIGURE CARD NO.

B-004

TAPE DRIVE CLEANING (MCS: 3A69A1)

1. PRELIMINARY ACTIONS.

A. REQUIRED EQUIPMENT:

• UNIVERSAL CLEANING CARTRIDGE

B. NOTIFY JOB CONTROL THAT THE 84-DAY SERVICING OF THE TAPE DRIVE IS ABOUT TO BEGIN.

015 1 CA AA0 2. CLEAN TAPE DRIVE.

CAUTION

CLEANING CARTRIDGE IS GOOD FOR 50 CLEANINGS. IF ERROR CODE 7 IS

DISPLAYED ON TAPE DRIVE, REPLACE CARTRIDGE WITH A NEW CARTRIDGE

FAILURE TO COMPLY MAY DAMAGE TAPE DRIVE.

A. INSERT A CLEANING CARTRIDGE INTO THE TAPE DRIVE. THE TAPE DRIVE

PERFORMS THE CLEANING AUTOMATICALLY.

B. TAPE DRIVE EJECTS THE CARTRIDGE WHEN CLEANING IS FINISHED.

C. REMOVE CLEANING CARTRIDGE FROM THE TAPE DRIVE.

3. NOTIFY JOB CONTROL THAT THE 84-DAY SERVICING OF THE TAPE DRIVE IS COMPLETED.

(REVERSE BLANK)

CARD NO.

B-004

WORK AREA(S)

TYPE MECH RQR MECH NO. CARD TIME

00:15

PUBLICATION NUMBER

INSPECTION REQUIREMENTS

84-DAY SERVICING

B-004

toc
SCHEDULED MAINTENANCE
INTRODUCTION
1.GENERAL SAFETY INSTRUCTIONS.
1.1.KEEP AWAY FROM LIVE CIRCUITS. OPERATING PERSONNEL MUST AT AL
1.3.DO NOT SERVICE OR ADJUST ALONE. UNDER NO CIRCUMSTANCES SHOUL
1.4.RESUSCITATION. PERSONNEL WORKING WITH OR NEAR HIGH VOLTAGES
1.5.ELECTROSTATIC SENSITIVE DEVICES. IF A CIRCUIT CARD CONTAINS
2.WARNINGS, CAUTIONS AND NOTES.
2.1.DEFINITIONS OF WARNINGS, CAUTIONS, AND NOTES ARE DESCRIBED B
3.ELECTRICAL POWER.
3.1.ON. When power is required during the accomplishment of the
3.2.OFF. When it is mandatory that power be off during the accom
3.3.ON or OFF. When power may be on or off during the accomplish
3.4.ON and OFF. When some items require power on but some requir
GIN EQUIPMENT RACK (MCS: 3A69) (AMCS: 3A69)
GIN WORKSTATIONS (MCS: GPSOC-01 - GPSOC-04, GPSOC-06 - GPSOC-10,
GIN EQUIPMENT RACK (MCS: 3A69) (AMCS: 3A69)
GIN WORKSTATIONS (MCS: GPSOC-01 - GPSOC-04, GPSOC-06 - GPSOC-10,
TAPE DRIVE CLEANING (MCS: 3A69A1)

File details come from the government source that posted it. Updated .