This document is a payment plan attachment to a request for proposal for National Security Space Launch Phase 2 Launch Service Procurement. The Air Force Space and Missile Systems Center is seeking proposals for launch services delivering multiple National Security Space missions from fiscal year 2020 through 2024. Two requirements contracts will be awarded. The payment plan outlines twelve milestones and associated success criteria, completion evidence, and estimated completion dates. Payments will be made upon verification that contractors have met milestones such as providing integration plans, completing design reviews, delivering configuration documentation, and conducting launch operations. The final acceptance milestone will be paid upon verification that orbital parameters meet requirements and the mission is not deemed a failure.

Payment Plan

View the file

Other files for this federal contract opportunity

Other files attached to National Security Space Launch (NSSL) Phase 2 Launch Service Procurement (LSP) Request for Proposal (RFP), newest first.
File Type Posted
3 Attachment 1 PWS 20 December 2019.pdf PDF
5 Attachment 5 Instructions to Offerors 20 December 2019.pdf PDF
1 NSSL Phase 2 Model Contract 20 December 2019.pdf PDF
2 Exhibit A CDRLs 20 December 2019.pdf PDF
4A Attachment 2 DD254 20 December 2019.pdf PDF
0 FA8811-19-R-0002 0002 Phase 2 LSP Amendment 2.pdf PDF
4B Attachment 2 DD254 SAP and SCI Addenda 20 December 2019.pdf PDF
6 Attachment 6 Evaluation Criteria 20 December 2019.pdf PDF
Exhibit_A_CDRLs_23_July_2019.pdf PDF
NSSL_Phase_2_LSP_Model_Contract_28_June_2019.pdf PDF
Attachment_8_Pricing_Tables_23_July_2019.xlsx XLSX spreadsheet
Attachment_1_PWS_23_July_2019.pdf PDF
Attachment_5_Instructions_to_Offerors_23_July_2019.pdf PDF
Phase_2_Amendment_1_SF30_and_Summary_of_Changes.pdf PDF
Attachment_5_Instructions_to_Offerors_3_May_19.pdf PDF
Attachment_2_DD254_3_May_19.pdf PDF
Attachment_7_Government_Property_Cover_3_May_19.pdf PDF
Attachment_3B_Small_Business_Participation_Commitment_3_May_19.pdf PDF
Attachment_1_PWS_3_May_19.pdf PDF
Attachment_3A_Small_Business_Subcontracting_Plan_Cover_3_May_19.pdf PDF
Attachment_10B_Award_Fee_Plan_3_May_19.pdf PDF
Attachment_13A_NRO_Phase_2_Requirements_Description_and_CDRLs_3_May19.pdf PDF
Attachment_10A_Cumulative_Mission_Success_Incentive_Plan_3_May_19.pdf PDF
NSSL_Phase_2_Model_Contract_3_May_19.pdf PDF
Attachment_8_Pricing_Tables_3_May_19.xlsx XLSX spreadsheet
Exhibit_A_CDRLs_3_May_19.pdf PDF
Attachment_6_Evaluation_Criteria_3_May_19.pdf PDF
Attachment_4_Acceptance_Criteria_3_May_19.pdf PDF
Attachment_11_OCI_Plan_Cover_3_May_19.pdf PDF
Attachment_13_NRO_Phase_2_DD254_3_May_2019.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Payment Plan FA8811-19-R-0002

National Security Space Launch (NSSL)

Phase 2 Launch Service Procurement

FA8811-19-R-0002

Attachment 9

Payment Plan

3 May 2019

1 BASIS OF PAYMENT

The launch service shall be paid based on payment milestones. The milestones represent meaningful efforts or actions that are an integral and necessary part of performance. The basis for an event should be either specifically described events or a measurable criterion of performance. Included within this Payment Plan is what constitutes successful performance of each event. The task order will include the payment amounts, which are listed here as a percentage of the launch service price for all applicable firm fixed price (FFP) Contract Line Item Numbers (CLINs) pertaining to the mission (CLINs 0001, 0002, 0006 and 0010).

2 MILESTONE SUCCESS CRITERIA AND COMPLETION EVIDENCE

Each event milestone has associated measurable success criteria that serve to validate milestone accomplishment. All milestone success criteria must be met before the milestone payment will be authorized. When the Contractor has successfully completed all applicable milestone success criteria, the Contractor shall submit a Notice of Completion (NOC) for the milestone to the Procuring Contracting Officer (PCO). The NOC shall include supporting documentation to substantiate meeting the milestone success criteria as provided in the completion evidence defined herein.

3 EVENT MILESTONE PAYMENTS AND EVENT TIMING

Completion of milestone and subsequent NOCs may be submitted non-successively (e.g., if milestone two is completed before milestone one, then the Contractor may submit a NOC for milestone two before a NOC for milestone one). Additionally, the NOC may be for multiple milestones. In the event the Contractor completes a milestone ahead of the milestone completion date, the Contractor may include that milestone in the monthly NOC and the Government will consider, on a case-by-case basis, the early payment of the milestone.

The PCO will determine whether or not the Contractor has successfully met each of the milestone success criteria based on inputs provided by the United States Government (USG) Team (for Air Force missions) and the Mission Team (for NRO missions).

For Air Force missions, the USG team consists of the Air Force Space and Missile Systems Center Launch Enterprise Systems Directorate (SMC/LE), and the Air Force Program Executive Officer for Space office personnel; and also includes The Aerospace Corporation, LE’s Systems Engineering and Integration (SE&I) support contractors, LE’s Systems Engineering and Technical Assistance (SETA) support contractors, the NRO/Office of Space Launch (OSL) (as applicable), the SMC Independent Readiness Review Team, Defense Contract Management Agency, Defense Contract Audit Agency, 30th Space Wing (30 SW), 45th Space Wing (45 SW), and other organization as designated by the SMC/LE PCO.

For NRO missions, in addition to the USG Team listed above for Air Force missions, the Mission Team consists of the OSL Mission Manager (OMM), the OSL Contracting Officer’s Technical Representative (COTR), and their support personnel (to include Government, Aerospace Corporation, and SETA personnel). At their discretion, the OMM and COTR may solicit inputs from SMC/LE to assist in their determination of the Contractor’s satisfactory completion of the milestone success criteria. Written concurrence from both the OMM and COTR that the Contractor has successfully met the milestone success criteria is required before the PCO will authorize payment of the milestone.

To the maximum extent possible within fifteen (15) business days after receipt of the Contractor’s NOC, the PCO will provide written notification to the Contractor specifying which milestones contained in the NOC are determined to be “met” (complete) and, if necessary, which are considered “not met” (incomplete). For milestones identified as incomplete, the PCO will:

(1) specify in the notification, the issues(s) that led to the determination based upon the milestone success criteria and completion evidence provided herein, and (2) the corrective action(s) required to complete the milestone. The Government will ensure that the Contractor understands the required corrective actions. The Contractor will make a good faith effort to quickly complete the corrective actions. When the Contractor accomplishes the corrective actions, the Contractor will submit an NOC addendum to the PCO for Government review. To the maximum extent possible within fifteen (15) business days after receipt of the Contractor’s NOC addendum, the PCO will provide written notification to the Contractor specifying whether the Government concurs that all corrective actions have been accomplished and the milestone has been “met” (completed).

For each milestone, the Estimated Completion Date is the estimated date that the Contractor will complete the payment event and submit the associated NOC for payment of each milestone under this Plan. For each milestone, the value in the percentage “%” column of Table 1 indicates the percentage of the assigned mission value of all applicable FFP CLINs (CLINs 0001, 0002, 0006 and 0010) that will be used to calculate the dollar amount to be paid to the Contractor upon successful completion of the milestone. The Government reserves the right to withhold up to fifty percent (50%) of the total payment value for any unpaid milestone(s) in the event of a Government-approved Class 1 change required for the launch service that is not implemented or completed to meet the Government’s approval by the implementation deadlines specified in and in accordance with (IAW) Attachment 1 Performance Work Statement (PWS) section 3.2.4.4.

4 EVENT MILESTONE SCHEDULE

Criteria for payment of each event milestone appears in Table 1. In no event shall the Contractor receive payments in excess of 90% of the total contract price until after acceptance of the launch service IAW Milestone 12 (Government Acceptance of Launch Service IAW contract clause Federal Acquisition Regulation [FAR] 52.212-04, Addendum to Contract Terms and Conditions

– Commercial Items [October 2018]). Given that defects in service for the last Milestone 12, Acceptance of Launch Service, are not suitable for correction by re-performance, the PCO has determined that, pursuant to FAR 52.246-4(e), the appropriate relief for the Government in the event of Milestone 12 defect (e.g., mission failure) is to reduce the contract price by the amount of the full Milestone 10, Upper Stage Disposal, Final As-Built Configuration List (ABCL), and Final Fleet Insight ABCL: Milestone 11, Mission Orbital Parameter Accuracy Verification; and Milestone 12 payment, which appropriately reflects the reduced value of the services performed.

Table 1: Mission Set Payment Event Schedule

Milestone

Payment Event Accomplishment Criteria Est.

Comp.

Date

Total Payment

% of FFP CLINs 0001, 0002, 0006, and 0010

Initial Integration & Ops Plan;

Initial Flight Critical Items List (FCIL) and Ground Critical Items List (GCIL); Updated Mission-Specific Integrated Master Schedule (IMS;

Procurement initiated of long lead hardware; and completed Mission Kickoff Review (MKR)

- First submission and Government acknowledgement of receipt of the following: Initial Integration & Ops Plan IAW CDRL A023; and Initial FCIL and GCIL IAW CDRL A035; updated mission-specific IMS IAW CDRL A008.

- Long lead hardware procurement or build initiated as required.

- MKR completed IAW PWS Appendix F.

Authority to

Proceed

(ATP) +

1 month

To be filled in by the

Government at task order issuance

10%

Initial Draft Mission Integration Schedule (MIS) (non-NRO missions); Initial Safety Assessment Report; and Initial As Designed Configuration List (ADCL);); Launch Service Provider Non-Recurring Design Validation (NRDV) Work Closure Plan

- Submission and Government acknowledgement of receipt of the following: Initial MIS IAW CDRL A009 (non-NRO missions); Initial Safety Assessment Report IAW CDRL A029;

and Initial ADCL for the launch vehicle

IAW CDRL A033.

- Submission and Government approval of baseline schedule for NRDV Work Closure Plan IAW CDRL A038.

ATP + 2

months

To be filled in by the

Government at task order issuance

5%

First draft of the Baseline Mission Interface Control Document (ICD); Initial Launch Vehicle Test & Verification Plan (LVT&VP); Updated MIS (non-NRO missions)

- Submission and Government acknowledgement of receipt of the following: First draft of the Baseline Mission ICD IAW CDRL A025; initial LVT&VP IAW CDRL A037; updated

ATP + 3

months

To be filled in by the

Government at task order issuance

10%

MIS (non-NRO missions) IAW CDRL A009, as required.

Initial Verification Planning Matrix (VPM); Initial Flight Hardware Interface Checks (non-NRO missions); Updated FCIL and GCIL; Updated ADCL; Updated Integration & Ops Plan; Final MIS (non-NRO missions)

- Submission and Government acknowledgement of receipt of the initial VPM IAW CDRL A027 and initial Flight Hardware Interface Checks (non- NRO missions) IAW CDRL A024.

- Submission and Government approval of the following: updated FCIL and GCIL IAW CDRL A035; updated ADCL IAW CDRL A033; updated Integration & Ops Plan IAW CDRL A023; and final MIS (non-NRO missions) IAW CDRL A009.

ATP + 6

Months

To be filled in by the

Government at task order issuance

10%

Preliminary Coupled Loads Analysis (CLA); Updated

ADCL

- Submission and Government acknowledgement of receipt of the preliminary CLA complete and delivery of results IAW CDRL A039.

- Submission and Government approval of the updated ADCL IAW CDRL A033.

ATP + 8

Months

To be filled in by the

Government at task order issuance

5%

Final ADCL; Second draft of the Baseline Mission ICD;

Updated VPM; Final Integration and Ops Plan; Final FCIL and GCIL; Secondary Objectives Risk Analysis; Initial ABCL;

Initial Fleet Insight ABCL;

Completion of all NRDV Work Closure Plan tasks; Final Technical Rationale for all Class 1A changes; Mission Design Review completed; and Completed Flight Hardware

- Submission and Government approval of the following: Final ADCL IAW CDRL A033; second draft of the Baseline Mission ICD IAW CDRL A025; updated VPM IAW CDRL A027;

final Integration & Ops Plan IAW CDRL A023; final FCIL and GCIL IAW CDRL A035; and Secondary Objectives Risk Analysis (as applicable) IAW CDRL A030.

- Submission and Government acknowledgement of receipt of the initial

ABCL IAW CDRL A034.

Launch

(L) – 12 Months

To be filled in by the

Government at task order

20%

Interface Checks (non-NRO missions), Final Facility Requirements Document (FRD) (non-NRO missions); Final

LVT&VP

- Submission and Government acknowledgement of receipt of the initial Fleet Insight ABCL IAW CDRL A020.

- Evidence demonstrating the completion of all NRDV Work Closure Plan tasks IAW CDRL A038.

- Final technical rationale for all Class 1A changes IAW PWS section 3.2.4.3.1 and CDRL A036.

- Mission Design Review completed IAW PWS Appendix F.

- Flight Hardware Interface Checks (non-NRO missions) completed IAW PWS paragraph 3.4.9 and CDRL A024.

- Government approval of Final FRD (non-NRO missions) IAW CDRL A017.

- Submission and Government approval of final LVT&VP IAW CDRL A037.

Launch countdown parameters and operational redline limits;

Mission Assurance Data;

Updated ABCL; Updated Fleet Insight ABCL; and completion of the Mission Verification Review

- Submission and Government acknowledgement of receipt of the launch countdown parameters and operational redline limits baseline IAW PWS section 3.2.7; and Mission Assurance Independent Assessment Data IAW CDRL A039 to include:

intermediate unguided three Degrees of Freedom (3-DOF); Collision and Contamination Avoidance Maneuver Memo; acoustics, shock, and vibration environments; vibroacoustic modeling and analysis; engineering drawings; and transportation environments.

L – 6 Months

To be filled in by the

Government at task order

10%

- Submission and Government approval of the updated ABCL IAW CDRL A034.

- Submission and Government approval of the updated Fleet Insight ABCL IAW

CDRL A020.

- Mission Verification Review completed IAW PWS Appendix F.

Verification Evidence Record (VER); Updated ABCL;

Updated Fleet Insight ABCL;

Completion of Ground Operations Readiness Review

- Submission and Government acknowledgement of receipt of at least 30% of VER IAW CDRL A028.

- Submission and Government approval of updated ABCL IAW CDRL A034.

- Submission and Government approval of updated Fleet Insight ABCL IAW

CDRL A020.

- Ground Operations Readiness Review completed IAW PWS Appendix F.

L – 3 Months

To be filled in by the

Government at task order issuance

5%

VER; Updated ABCL; Updated Fleet Insight ABCL; Mission Assurance Data; Completion of Pre-Ship Review(s) and Independent Hardware Review(s); and Completion of Component and Subsystem Readiness Review

- Submission and Government acknowledgement of receipt of at least 60% of VER IAW CDRL A028; Mission Assurance Independent Assessment Data IAW CDRL A039: controls tools input data; controls analysis outputs (except pad/launch drift analysis); acoustics, shock, and vibration testing; and interface environment.

- Submission and Government approval of the updated ABCL IAW CDRL A034.

- Submission and Government approval of the updated Fleet Insight ABCL IAW

CDRL A020.

- Completion of major launch vehicle pre-ship reviews and Government

L- 2 Months

To be filled in by the

Government at task order

15% independent hardware review(s) IAW PWS sections 3.6.5.1 and 3.6.4, respectively.

- Completion of Component and Subsystem Readiness Review IAW PWS Appendix F.

Upper Stage Disposal; Final

ABCL

- Submission and Government approval of compliance with upper stage disposal requirements IAW CDRL A044.

- Submission and Government approval of final ABCL IAW CDRL A034.

L + 2 Months

To be filled in by the

Government at task order issuance

1.5%

Mission Orbital Parameter Accuracy Verification

- Submission and Government approval of final Post Flight Assessment Report IAW CDRL A044; and IAW the Success Criteria outlined in Milestone 12 in this attachment.

L + 2 Months

To be filled in by the

Government at task order issuance

3.5%

Government Acceptance of Launch Service

- Submission and Government approval of final Post Flight Assessment Report IAW CDRL A044; and Government approval of the launch (launch has not been deemed “mission failure”) IAW PWS Appendix A and the Acceptance Criteria outlined in contract Attachment 4.

L + 2 Months

To be filled in by the

Government at task order

5%

5 EVENT MILESTONE DESCRIPTIONS

5.1 MILESTONE 1: Initial Integration & Ops Plan; Initial Flight Critical Items List (FCIL); Updated Mission-Specific Integrated Master Schedule (IMS); Procurement initiated of long lead hardware; and Completed Mission Kickoff Review (MKR)

Description:

1. Initial Integration and Ops Plan. Contractor’s initial Integration and Ops Plan delivered and the Government has acknowledged receipt IAW CDRL A023.

2. Initial FCIL. Contractor’s initial FCIL and GCIL delivered, and the Government has acknowledged receipt IAW PWS paragraphs 3.2.4.2.3, 3.2.4.2.4, and CDRL A035.

3. Updated Mission-Specific IMS. Contractor’s updated mission-specific IMS delivered, and the Government has acknowledged receipt IAW CDRL A008.

4. Long Lead Hardware Procurement or Production Initiated. Contractor has initiated procurement orders for or production of long lead hardware required for the mission.

5. Mission Kickoff Review. Contractor has conducted the MKR IAW with PWS Appendix F with actions and action closure plans, and accepted by the Government.

Success Criteria:

1. The Contractor has delivered and the Government has acknowledged receipt of initial Integration and Ops Plan IAW and CDRL A023.

2. The Contractor has delivered and the Government has acknowledged receipt of initial FCIL and GCIL IAW PWS paragraph 3.2.4.2.3, 3.2.4.2.4, and CDRL A035.

3. The Contractor has delivered and the Government has acknowledged receipt of updated mission-specific IMS IAW CDRL A008.

4. The Contractor has initiated procurement orders for or production of long lead hardware required for the mission.

5. The Contractor has conducted the MKR IAW with PWS Appendix F with actions and action closure plans, and the Government has accepted.

Completion Evidence:

1. CDRL A023 initial draft Integration and Ops Plan accepted by the PCO, appropriate Contracting Officer’s Representative (COR), or appropriate COTR.

2. CDRL A035 initial FCIL and GCIL accepted by the PCO, appropriate COR, or appropriate COTR.

3. CDRL A008 updated mission-specific IMS accepted by the PCO, appropriate COR, or appropriate COTR.

4. Long lead hardware procurement or build initiated as required for the mission. Long lead hardware procurement or build initiated status provided in first PMR after mission order IAW PWS 3.1.4 and 3.1.7. Status for all long lead hardware required for the mission received and accepted by the PCO, appropriate COR, or appropriate

COTR.

5. MKR meeting minutes documenting meeting completion, action items, and action item closure plans.

5.2 MILESTONE 2: First Submission MIS (non-NRO missions); First Submission Safety Assessment Report; Initial ADCL and Launch Service Provider Non-Recurring Design Validation (NRDV) work closure schedule

Description:

1. MIS. The Contractor’s initial MIS delivered (non-NRO missions), and the Government has acknowledged receipt IAW PWS paragraph 3.4.2.1 and CDRL A009.

2. Safety Assessment Report. The Contractor’s initial Safety Assessment Report delivered, and the Government has acknowledged receipt IAW PWS paragraph

3.1.10 and CDRL A029.

3. ADCL. Contractor’s initial ADCL delivered, and the Government has acknowledged receipt IAW CDRL A033.

4. NRDV Work Closure Plan. Contractor’s baseline launch service provider NRDV work closure schedule and plan delivered and approved by the Government IAW

CDRL A038.

Success Criteria:

1. The Contractor has delivered and the Government has acknowledged receipt of the initial MIS IAW PWS paragraph 3.4.2.1 and CDRL A009 (non-NRO missions).

2. The Contractor has delivered and the Government has acknowledged receipt of the initial Safety Assessment Report IAW PWS paragraph 3.1.10 and CDRL A029.

3. The Contractor has delivered and the Government has acknowledged receipt of the initial ADCL IAW CDRL A033.

4. The Contractor has delivered and the Government has approved the baseline launch service provider NRDV work closure schedule and plan IAW CDRL A038.

Completion Evidence:

1. CDRL A009 initial MIS accepted by the PCO, appropriate COR, or appropriate COTR (non-NRO missions).

2. CDRL A029 initial Safety Assessment Report accepted by the PCO, appropriate COR, or appropriate COTR.

3. CDRL A033 initial ADCL accepted by the PCO, appropriate COR, or appropriate

COTR.

4. CDRL A038 baseline launch service provider NRDV work closure schedule and plan accepted by the PCO, appropriate COR, or appropriate COTR.

5.3 MILESTONE 3: First draft of the Baseline Mission ICD; Initial LVT&VP; and updated MIS (non-NRO missions)

Description:

1. ICD. Contractor’s first draft of the Baseline Mission ICD delivered, and the Government has acknowledged receipt IAW PWS paragraph 3.4.4 and CDRL A025.

2. LVT&VP. Contractor’s initial LVT&VP delivered, and the Government has acknowledged receipt IAW PWS paragraph 3.2.5 and CDRL A037.

3. MIS. The Contractor’s updated MIS delivered, and the Government has acknowledged receipt IAW PWS paragraph 3.4.2.1 and CDRL A009 (non-NRO missions).

Success Criteria:

1. The Contractor has delivered and the Government has acknowledged receipt of the first draft of the Baseline Mission ICD IAW CDRL A025.

2. The Contractor has delivered and the Government has acknowledged receipt of the initial LVT&VP IAW CDRL A037.

3. The Contractor has delivered and the Government has acknowledge receipt of the updated MIS IAW PWS paragraph 3.4.2.1 and CDRL A009 (non-NRO missions).

Completion Evidence:

1. CDRL A025 first draft of the Baseline Mission ICD accepted by the PCO, appropriate COR, or appropriate COTR.

2. CDRL A037 initial LVT&VP accepted by the PCO, appropriate COR, or appropriate

COTR.

3. CDRL A009 updated MIS accepted by the PCO, appropriate COR, or appropriate COTR (non-NRO missions).

5.4 MILESTONE 4: Initial VPM; Initial Flight Hardware Interface Checks (non-NRO missions); updated FCIL and GCIL; updated ADCL; updated Integration and Ops Plan;

and Final MIS (non-NRO missions)

Description:

1. VPM. Contractor’s first draft VPM delivered, and the Government has acknowledged receipt IAW CDRL A027.

2. Flight Hardware Interface Checks. Contractor’s initial Flight Hardware Interface Checks (non-NRO missions) delivered, and the Government has acknowledged receipt IAW CDRL A024.

3. FCIL and GCIL. The Contractor has delivered, and the Government has approved the updated FCIL and GCIL IAW PWS paragraph 3.2.4.2.3, 3.2.4.2.4, and CDRL A035.

4. ADCL. The Contractor has delivered, and the Government has approved the updated

ADCL IAW CDRL A033.

5. Integration and Ops Plan. The Contractor has delivered, and the Government has approved the updated Integration and Ops Plan IAW CDRL A023.

6. MIS. The Contractor’s has delivered and the Government has approved the final MIS IAW PWS paragraph 3.4.2.1 and CDRL A009 (non-NRO missions).

Success Criteria:

1. The Contractor has delivered and the Government has acknowledged receipt of the first draft VPM IAW CDRL A027.

2. The Contractor has delivered and the Government has acknowledged receipt of initial Flight hardware Interface Checks (non-NRO missions) IAW CDRL A024.

3. The Contractor has delivered and the Government has approved the updated FCIL and GCIL IAW PWS paragraph 3.2.4.2.3, 3.2.4.2.4, and CDRL A035.

4. The Contractor has delivered and the Government has approved the updated ADCL

IAW CDRL A033.

5. The Contractor has delivered and the Government has approved the updated Integration and Ops Plan IAW CDRL A023.

6. The Contractor has delivered and the Government has approved the final MIS (non- NRO missions) IAW PWS paragraph 3.4.2.1 and CDRL A009.

Completion Evidence:

1. CDRL A027 first draft VPM accepted by the PCO, appropriate COR, or appropriate

COTR.

2. CDRL A024 initial Flight Hardware Interface Checks (non-NRO missions) accepted by the PCO, appropriate COR, or appropriate COTR.

3. CDRL A035 updated FCIL and GCIL accepted by the PCO, appropriate COR, or appropriate COTR.

4. CDRL A033 updated ADCL accepted by the PCO, appropriate COR, or appropriate

COTR.

5. CDRL A023 updated Integration and Ops Plan accepted by the PCO, appropriate COR, or appropriate COTR.

6. CDRL A009 final MIS (non-NRO missions) accepted by the PCO, appropriate COR, or appropriate COTR.

5.5 MILESTONE 5: Preliminary Coupled Loads Analysis (CLA) and Updated ADCL

Description:

1. Preliminary CLA. The Contractor has completed preliminary CLA, submitted the preliminary CLA data, and the Government has acknowledged receipt of the CLA data IAW CDRL A039.

2. Updated ADCL. The Contractor has delivered, and Government has approved the updated ADCL IAW CDRL A033.

1. The Contractor has completed preliminary CLA, submitted the preliminary CLA data, and the Government has acknowledged receipt of the CLA data IAW CDRL A039.

2. The Contractor has delivered and the Government has approved the updated ADCL

IAW CDRL A033.

Completion Evidence:

1. CDRL A039 preliminary CLA data accepted by the PCO, appropriate COR, or appropriate COTR.

2. CDRL A033 updated ADCL accepted by the PCO, appropriate COR, or appropriate

COTR.

5.6 MILESTONE 6: Final ADCL; Updated Baseline Mission ICD; Updated VPM; Final Integration & Ops Plan; Final FCIL and GCIL; Approved Secondary Objectives Risk Analysis; Initial ABCL; Initial ABCL; NRDV Work Closure Plan Complete; Submission of Rationale for All Class 1A Changes; Mission Design Review Complete; Flight Hardware Interface Checks (non-NRO missions) Complete; Facility Requirements Document (non- NRO missions) and Final LVT&VP

Description:

1. Final ADCL. Contractor’s final ADCL delivered, and Government has approved

IAW CDRL A033.

2. Updated Baseline Mission ICD. Contractor’s updated Baseline Mission ICD delivered, and Government has approved IAW CDRL A025.

3. Updated VPM. Contractor’s updated VPM submitted, and the Government has approved IAW CDRL A027.

4. Final Integration and Ops Plan. Contractor’s final Integration and Ops Plan delivered, and the Government has approved IAW CDRL A023.

5. Final FCIL and GCIL. Contractor’s final FCIL and GCIL delivered, and the Government has approved IAW PWS paragraph 3.2.4.2.3, 3.2.4.2.4, and CDRL A035.

6. Approved Secondary Objectives Risk Analysis (as applicable). The Contractor has delivered and the Government has approved the final Secondary Objectives Risk Analysis IAW CDRL A030.

7. Initial ABCL. Contractor’s initial ABCL delivered, and the Government has acknowledged receipt IAW CDRL A034.

8. Initial Fleet Insight ABCL. Contractor’s initial Fleet Insight ABCL delivered, and the Government has acknowledged receipt IAW CDRL A020.

9. NRDV Work Closure Plan Complete. Contractor’s launch service provider NRDV work is complete with Government-approved exceptions allowed, and all action items have been closed, with Government-approved exceptions allowed IAW the

Contractor’s Government-approved baseline NRDV work closure plan and schedule, CDRL A038.

10. Rationale for All Class 1A Changes. Contractor has submitted technical rationale for all Class 1A changes, and the Government has approved IAW PWS paragraph

3.2.4.3.1 and CDRL A036.

11. Mission Design Review. Contractor has conducted the Mission Design Review IAW with PWS Appendix F with actions and action closure plans, and accepted by the Government.

12. Flight Hardware Interface Checks (non-NRO missions). The Contractor shall perform tests to verify the compatibility of the physical and electrical interfaces and clearances between the LV and Payload IAW PWS paragraph 3.4.9 and CDRL A024.

The Contractor shall perform electrical and mechanical fit-checks of the adapter harness to the standard electrical interfaces panel for each payload. The testing shall verify that all physical and electrical interfaces, including electrical continuity, meet mission ICD requirements. These tests shall be performed, with SV Contractor, to satisfy all applicable requirements in the ICD, PWS, and CDRL A024.

13. Facility Requirements Document. The Contractor has delivered (non-NRO missions) and the Government has approved the final Facility Requirements Document submission IAW CDRL A017.

14. LVT&VP. The Contractor has delivered, and the Government has approved the final

LVT&VP IAW CDRL A037.

Success Criteria:

1. The Contractor has delivered and the Government has approved final ADCL IAW

CDRL A033.

2. The Contractor has delivered and the Government has approved updated Mission ICD

IAW CDRL A025.

3. The Contractor has delivered and the Government has approved updated VPM IAW

CDRL A027.

4. The Contractor has delivered and the Government has approved final Integration and Ops Plan IAW CDRL A023.

5. The Contractor has delivered and the Government has approved final FCIL and GCIL IAW PWS paragraph 3.2.4.2.3, 3.2.4.2.4, and CDRL A035.

6. The Contractor has delivered and the Government has approved final Secondary Objectives Risk Analysis (as applicable) IAW CDRL A030.

7. The Contractor has delivered and the Government has acknowledged receipt of the initial ABCL IAW CDRL A034.

8. The Contractor has delivered and the Government has acknowledged receipt of the initial Fleet Insight ABCL IAW CDRL A020.

9. The Contractor has completed and the Government has approved (with allowed exceptions) the launch service provider NRDV work IAW CDRL A038.

10. The Contractor has delivered and the Government has approved the technical rational for all Class 1A changes IAW PWS paragraph 3.2.4.3.1 and CDRL A036.

11. The Contractor has conducted the Mission Design Review IAW with PWS Appendix F with actions and action closure plans, and the Government has accepted.

12. The Contractor has performed Flight Hardware Interface Checks (non-NRO missions) IAW PWS paragraph 3.4.9 and CDRL A024.

a. The Contractor has delivered a second submission of as-run interface check procedures, and the Government has accepted receipt.

13. The Contractor has delivered and the Government has acknowledged receipt of the final Facility Requirements Document (non-NRO missions) IAW CDRL A017.

14. The Contractor has delivered and the Government has approved the final LVT&VP

IAW CDRL A037.

Completion Evidence:

1. CDRL A033 final ADCL accepted by the PCO, appropriate COR, or appropriate

COTR.

2. CDRL A025 updated Mission ICD accepted by the PCO, appropriate COR, or appropriate COTR.

3. CDRL A027 updated VPM accepted by the PCO, appropriate COR, or appropriate

COTR.

4. CDRL A023 final Integration and Ops Plan accepted by the PCO, appropriate COR, or appropriate COTR.

5. CDRL A035 final FCIL and GCIL accepted by the PCO, appropriate COR, or appropriate COTR.

6. CDRL A030 final Secondary Objectives Risk Analysis (as applicable) accepted by the PCO, appropriate COR, or appropriate COTR.

7. CDRL A034 initial ABCL accepted by the PCO, appropriate COR, or appropriate

COTR.

8. CDRL A020 initial Fleet Insight ABCL accepted by the PCO, appropriate COR, or appropriate COTR.

9. CDRL A038 baseline launch service provider NRDV work completion (with allowed exceptions) accepted by the PCO, appropriate COR, or appropriate COTR.

10. CDRL A036 Class 1A changes technical rationale accepted by the PCO, appropriate COR, or appropriate COTR

11. Mission Design Review meeting minutes documenting meeting completion, action items, and action item closure plans.

12. CDRL A024 Flight Hardware Interface Checks completion accepted by the PCO, appropriate COR, or appropriate COTR (non-NRO missions).

13. CDRL A017 final Facility Requirements Document accepted by the PCO, appropriate COR, or appropriate COTR (non-NRO missions).

14. CDRL A037 final LVT&VP accepted by the PCO, appropriate COR, or appropriate

5.7 MILESTONE 7: Launch Countdown Parameters and Operational Redline Limits;

Mission Assurance Data; Updated ABCL; Updated Fleet Insight ABCL; Mission Verification Review Completion

Description:

1. Launch Countdown Parameters and Operational Redline Limits. Contractor’s Launch Countdown Parameters and Operational Redline Limits delivered, and Government has acknowledged receipt IAW PWS paragraph 3.2.7.

2. Mission Assurance Data. Contractor’s Mission Assurance Independent Assessment Data delivered, and Government has acknowledged receipt IAW CDRL A039 to include: intermediate unguided 3-DOF; Collision and Contamination Avoidance Maneuver memo; acoustics, shock, and vibration environments; vibroacoustic modeling and analysis; engineering drawings; and transportation environments.

3. Updated ABCL. Contractor’s updated ABCL delivered, and the Government has approved IAW CDRL A034.

4. Updated Fleet Insight ABCL. Contractor’s updated Fleet Insight ABCL delivered, and the Government has approved IAW PWS CDRL A020.

5. Mission Verification Review Completion. Contractor has conducted the Mission Verification Review IAW with PWS Appendix F with actions and action closure plans, and accepted by the Government.

Success Criteria:

1. The Contractor has delivered and the Government has acknowledged receipt of Launch Countdown Parameters and Operational Redline Limits IAW PWS paragraph 3.2.7.

2. The Contractor has delivered and the Government has acknowledged receipt of Mission Assurance Independent Assessment Data IAW CDRL A039 to include:

intermediate unguided 3-DOF; Collision and Contamination Avoidance Maneuver memo; acoustics, shock, and vibration environments; vibroacoustic modeling and analysis; engineering drawings; and transportation environments.

3. The Contractor has delivered and the Government has approved the updated ABCL

IAW CDRL A034.

4. The Contractor has delivered and the Government has approved the updated Fleet Insight ABCL IAW CDRL A020.

5. The Contractor has conducted the Mission Verification Review IAW with PWS Appendix F with actions and action closure plans, and the Government has accepted.

Completion Evidence:

1. Written acknowledgement of receipt of Launch Countdown Parameters and Operational Redline Limits by the PCO, appropriate COR, or appropriate COTR.

2. CDRL A039 Mission Assurance Independent Assessment Data accepted by the PCO, appropriate COR, or appropriate COTR.

3. CDRL A034 updated ABCL accepted by the PCO, appropriate COR, or appropriate

4. CDRL A020 updated Fleet Insight ABCL accepted by the PCO, appropriate COR, or appropriate COTR.

5. Mission Verification Review meeting minutes documenting meeting completion, action items, and action item closure plans.

5.8 MILESTONE 8: ER; Updated ABCL; Updated Fleet Insight ABCL; and Ground Operations Readiness Review Completion

Description:

1. VER. Contractor’s delivery of at least 30% of VER, and Government has acknowledged receipt IAW CDRL A028.

2. Updated ABCL. Contractor’s updated ABCL delivered, and the Government has approved IAW CDRL A034.

3. Updated Fleet Insight ABCL. Contractor’s updated Fleet Insight ABCL delivered, and the Government has approved IAW CDRL A020.

4. Ground Operations Readiness Review. Contractor has conducted the Ground Operations Readiness Review IAW with PWS Appendix F with actions and action closure plans, and accepted by the Government.

Success Criteria:

1. The Contractor has delivered and the Government has acknowledged receipt of at least 30% of the VER IAW CDRL A028.

2. The Contractor has delivered and the Government has approved the updated ABCL

IAW CDRL A034.

3. The Contractor has delivered and the Government has approved the updated Fleet Insight ABCL IAW CDRL A020.

4. The Contractor has conducted the Ground Operations Readiness Review IAW with PWS Appendix F with actions and action closure plans, and the Government has accepted.

Completion Evidence:

1. CDRL A028 delivery of at least 30% VER accepted by the PCO, appropriate COR, or appropriate COTR.

2. CDRL A034 updated ABCL accepted by the PCO, appropriate COR, or appropriate

COTR.

3. CDRL A020 updated Fleet Insight ABCL accepted by the PCO, appropriate COR, or appropriate COTR.

4. Ground Operations Readiness Review meeting minutes documenting meeting completion, action items, and action item closure plans.

5.9 MILESTONE 9: VER; Updated ABCL; Updated Fleet Insight ABCL; Mission Assurance Data; Completion of Pre-Ship Review(s) and Independent Hardware Review(s);

Component and Subsystem Readiness Review Completion

Description:

1. VER. Contractor’s delivery of at least 60% of VER, and Government has acknowledged receipt IAW CDRL A028.

2. Updated ABCL. Contractor’s updated ABCL delivered, and the Government has approved IAW CDRL A034.

3. Updated Fleet Insight ABCL. Contractor’s updated Fleet Insight ABCL delivered, and the Government has approved IAW CDRL A020.

4. Mission Assurance Data. Contractor’s Mission Assurance Data delivered, and Government has acknowledged receipt IAW and CDRL A039 to include: controls tools input data; controls analysis outputs (except pad/launch drift analysis);

acoustics, shock, and vibration testing; and interface environments.

5. Pre-Ship Review(s) and Independent Hardware Review(s). The Contractor shall conduct and complete pre-ship review(s) for the major launch vehicle elements prior to shipment to the launch site IAW PWS paragraph 3.6.5. The major launch vehicle elements shall include: core booster(s), upper stage, payload fairing, payload adapter, and solid rocket motors (as applicable).

6. Component and Subsystem Readiness Review. Contractor has conducted the Component and Subsystem Readiness Review (MKR) IAW with PWS Appendix F with actions and action closure plans, and accepted by the Government.

Success Criteria:

1. The Contractor has delivered and the Government has acknowledged receipt of at least 60% of the VER IAW CDRL A028.

2. The Contractor has delivered and the Government has approved the updated ABCL

IAW CDRL A034.

3. The Contractor has delivered and the Government has approved the updated Fleet Insight ABCL IAW CDRL A020.

4. The Contractor has delivered and the Government has acknowledged receipt of Mission Assurance Data IAW CDRL A039 to include: controls tools input data;

controls analysis outputs (except pad/launch drift analysis); acoustics, shock, and vibration testing; and interface environments.

5. The Contractor has delivered and the Government has acknowledged receipt of the pre-ship reviews for the major launch vehicle elements prior to shipment to the launch site IAW PWS paragraph 3.6.5 to include: core booster(s), upper stage, payload fairing, payload adapter, and solid rocket motors (as applicable).

6. The Contractor has conducted the Component and Subsystem Readiness Review IAW with PWS Appendix F with actions and action closure plans, and the Government has accepted.

Completion Evidence:

1. CDRL A028 delivery of at least 60% VER accepted by the PCO, appropriate COR, or appropriate COTR.

2. CDRL A034 updated ABCL accepted by the PCO, appropriate COR, or appropriate

COTR.

3. CDRL A020 updated Fleet Insight ABCL accepted by the PCO, appropriate COR, or appropriate COTR.

4. CDRL A039 Mission Assurance Data accepted by the PCO, appropriate COR, or appropriate COTR.

5. Delivery of the Pre-Ship Review(s) and Independent hardware Review(s) IAW PWS paragraphs 3.6.5 and 3.6.4 accepted by the PCO, appropriate COR, or appropriate COTR. Written acknowledgement by the Government that pre-ship reviews have been completed for the core booster(s), upper stage, payload fairing, payload adapter, and solid rocket motors (as applicable) IAW PWS paragraph 3.6.5.1.

6. Component and Subsystem Readiness Review meeting minutes documenting meeting completion, action items, and action item closure plans.

5.10 MILESTONE 10: Upper Stage Disposal; Final ABCL; Final ABCL

Description:

1. Upper Stage Disposal. The Contractor shall identify which upper stage disposal method was planned and flown (random atmospheric reentry, controlled atmospheric reentry, maneuvering to a storage orbit, direct retrieval) IAW CDRL A044. The Contractor shall provide telemetry data confirming the depletion of upper stage propellant (by blowdown, depletion burn, or the release of compressed gases) IAW CDRL A044. The Contractor shall provide the following information dependent upon which disposal method was flown:

a. Random atmospheric reentry: Value for risk of human casualty, state vector for end of mission upper stage disposal orbit, disposal orbit lifetime for upper stage based on as-flown end of mission, description of analysis that produced the upper stage disposal orbit lifetime value.

b. Controlled atmospheric reentry: Latitude and longitude of upper stage reentry impact location and comparison to Notice to Airmen and Mariners box.

c. Maneuvering to storage orbit: Orbital elements at end of mission for as flown upper stage.

d. Direct retrieval: Description of retrieval operation. Time after end of mission when upper stage will be removed.

2. Final ABCL. Contractor’s final ABCL delivered, and the Government has approved

IAW CDRL A034.

3. The Launch Service Order has been accepted by the Government IAW contract clause FAR 52.212-04 and contract Attachment 4, Acceptance Criteria.

1. The Contractor identified which upper stage disposal method was flown IAW CDRL A044. The Contractor provided telemetry data confirming the depletion of upper stage propellant (by blowdown, depletion burn, or the release of compressed gases) IAW CDRL A044. The Government accepted the Upper Stage disposal using the following criteria dependent upon which disposal method was flown:

a. Random atmospheric reentry: Risk of human casualty is less than 1 in 10,000.

Disposal orbit lifetime is no longer than 25 years.

b. Controlled atmospheric reentry: Impact location is within the Notice to Airmen and Mariners box.

c. Maneuvering to storage orbit: End of mission disposal orbit is within one of the storage orbit regimes described in the USG Orbital Debris Mitigation Standard Practices (4-1b).

d. Direct retrieval: Upper stage is removed within the time defined in the Space Debris Assessment Report for this mission.

2. The Contractor has delivered and the Government has approved the final ABCL IAW

CDRL A034.

3. The Launch Service Order has been accepted by the PCO IAW contract clause FAR 52.212-04 and contract Attachment 4, Acceptance Criteria.

Completion Evidence:

1. CDRL A044 Orbital Debris Compliance, via telemetry data confirming depletion of propellant and disposal approach, accepted by the PCO, appropriate COR, or appropriate COTR.

2. CDRL A034 updated ABCL accepted by the PCO, appropriate COR, or appropriate

COTR.

3. No written determination by the SMC/LE Director deeming the Launch Service Order a “Mission Failure” IAW PWS Appendix A, and Attachment 4, Acceptance Criteria. PCO’s written notification to the Contractor that the mission launched has been accepted by the Government IAW contract clause FAR 52.212-04 and contract Attachment 4, Acceptance Criteria.

5.11 MILESTONE 11: Mission Orbital Parameter Accuracy Verification

Description:

1. Mission Orbital Parameter Accuracy Verification. The orbital parameter accuracy requirement is met IAW the Mission ICD and CDRL A025.

2. The Contractor had delivered the Final Post Flight Assessment Report IAW CDRL A044.

3. The Launch Service Order has been accepted by the Government IAW contract clause FAR 52.212-04 and contract Attachment 4, Acceptance Criteria.

1. The orbital parameter accuracy requirement is met IAW the Mission ICD and CDRL A025.

2. The Contractor has delivered and the Government has approved the Final Post Flight Assessment Report IAW CDRL A044.

3. The Launch Service Order has been accepted by the PCO IAW contract clause FAR 52.212-04 and contract Attachment 4, Acceptance Criteria.

Completion Evidence:

1. CDRL A044 final submission accepted by the PCO, appropriate COR, or appropriate

COTR.

2. No written determination by the SMC/LE Director deeming the Launch Service Order a “Mission Failure” IAW PWS Appendix A, and Attachment 4, Acceptance Criteria. PCO’s written notification to the Contractor that the mission launched has been accepted by the Government IAW contract clause FAR 52.212-04 and contract Attachment 4, Acceptance Criteria.

5.12 MILESTONE 12: Government Acceptance of Launch Service

Description:

1. The Contractor has delivered and the Government has approved the Final Post Flight Assessment Report IAW CDRL A044.

2. The Launch Service Order has been accepted by the Government IAW contract clause FAR 52.212-04 and contract Attachment 4, Acceptance Criteria.

Success Criteria:

1. The Contractor has delivered and the Government has approved the Final Post Flight Assessment Report IAW CDRL A044.

2. The mission has not been deemed a “Mission Failure” IAW PWS Appendix A, and Attachment 4, Acceptance Criteria. The Launch Service Order has been accepted by the PCO IAW contract clause FAR 52.212-04 and contract Attachment 4, Acceptance Criteria.

Completion Evidence:

1. CDRL A044 final submission accepted by the PCO, appropriate COR, or appropriate

COTR.

2. No written determination by the SMC/LE Director deeming the Launch Service Order a “Mission Failure” IAW PWS Appendix A, and Attachment 4, Acceptance Criteria. PCO’s written notification to the Contractor that the mission launched has been accepted by the Government IAW contract clause FAR 52.212-04 and contract Attachment 4, Acceptance Criteria.

File details come from the government source that posted it. Updated .