About this file

This solicitation requests proposals for National Security Space Launch Phase 2 Launch Service Procurement. The Space and Missile Systems Center will award two requirements contracts to provide launch services for multiple National Security Space missions between fiscal years 2020 to 2024. Offerors must have the capability to integrate National Security Space payloads and deliver them to their desired orbits on schedule with high reliability. The solicitation aims to ensure assured access to space, maintain mission success, transition off non-allied propulsion systems, improve affordability, foster long-term domestic competition, and procure launch services on time. Interested parties may access additional documents in the Phase 2 Bidder's Library by signing a non-disclosure agreement. Queries should be directed to the identified contracting officer and specialist. The North American Industry Classification System code is 481212 and the small business size standard is 1,500 employees, though responses from small disadvantaged businesses are encouraged.

CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to National Security Space Launch (NSSL) Phase 2 Launch Service Procurement (LSP) Request for Proposal (RFP), newest first.
File Type Posted
3 Attachment 1 PWS 20 December 2019.pdf PDF
5 Attachment 5 Instructions to Offerors 20 December 2019.pdf PDF
2 Exhibit A CDRLs 20 December 2019.pdf PDF
4A Attachment 2 DD254 20 December 2019.pdf PDF
1 NSSL Phase 2 Model Contract 20 December 2019.pdf PDF
0 FA8811-19-R-0002 0002 Phase 2 LSP Amendment 2.pdf PDF
4B Attachment 2 DD254 SAP and SCI Addenda 20 December 2019.pdf PDF
6 Attachment 6 Evaluation Criteria 20 December 2019.pdf PDF
Exhibit_A_CDRLs_23_July_2019.pdf PDF
NSSL_Phase_2_LSP_Model_Contract_28_June_2019.pdf PDF
Attachment_5_Instructions_to_Offerors_23_July_2019.pdf PDF
Phase_2_Amendment_1_SF30_and_Summary_of_Changes.pdf PDF
Attachment_8_Pricing_Tables_23_July_2019.xlsx XLSX spreadsheet
Attachment_1_PWS_23_July_2019.pdf PDF
Attachment_5_Instructions_to_Offerors_3_May_19.pdf PDF
Attachment_2_DD254_3_May_19.pdf PDF
Attachment_9_Payment_Plan_3_May_19.pdf PDF
Attachment_7_Government_Property_Cover_3_May_19.pdf PDF
Attachment_3B_Small_Business_Participation_Commitment_3_May_19.pdf PDF
Attachment_10A_Cumulative_Mission_Success_Incentive_Plan_3_May_19.pdf PDF
NSSL_Phase_2_Model_Contract_3_May_19.pdf PDF
Attachment_8_Pricing_Tables_3_May_19.xlsx XLSX spreadsheet
Attachment_1_PWS_3_May_19.pdf PDF
Attachment_3A_Small_Business_Subcontracting_Plan_Cover_3_May_19.pdf PDF
Attachment_10B_Award_Fee_Plan_3_May_19.pdf PDF
Attachment_13A_NRO_Phase_2_Requirements_Description_and_CDRLs_3_May19.pdf PDF
Attachment_6_Evaluation_Criteria_3_May_19.pdf PDF
Attachment_4_Acceptance_Criteria_3_May_19.pdf PDF
Attachment_11_OCI_Plan_Cover_3_May_19.pdf PDF
Attachment_13_NRO_Phase_2_DD254_3_May_2019.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A

TO

FA8811-19-R-0002

NATIONAL SECURITY SPACE LAUNCH (NSSL)

PHASE 2

CONTRACT DATA REQUIREMENTS LIST (CDRLs)

3 May 2019

Department of the Air Force

Space and Missile Systems Center

Launch Enterprise Systems Directorate

Los Angeles Air Force Base, California

CDRL General Instructions CDRL Address List CDRL Distribution List CDRLs

CDRL GENERAL INSTRUCTIONS

CONTRACT DATA REQUIREMENTS LIST (CDRL)

A list of data requirements authorized for this specific procurement and made a part of this contract. The contractual method is the use of Department of Defense Form (DD Form) 1423s, Contract Data Requirement List (CDRL), which specifies the data which is required to be delivered to the government. For the purpose of this agreement, the “contract” applies for each Launch Vehicle Service order.

DATA ITEM NUMBER

If the Contract is awarded multiple Launch Vehicle Service orders, the Contractor shall use a sequential double alpha, single numeric number scheme. For example, Order 1 will have CDRLs AA01-AA46 and Order 2 will have CDRLs

BA01-BA46

DATA ITEM DESCRIPTIONS (DIDs) The DID is a specification for the preparation of data. The DIDs listed on the CDRLs were selected from the Department of Defense (DoD) Index of Specifications and Standards (DoDISS) listed on the Acquisition Streamlining and Standardization Information System (ASSIST).

DID TAILORING

DID tailoring is made to either relax format requirements or to tailor the DID to be in consonance with the source document tailoring contained in the Performance Work Statement (PWS). Since contract data requirements are normally a by-product of some contract task, if the requirements of the DID are in conflict with the tailored application of the source document as reflected in the PWS, the latter takes precedence.

DATA DELIVERY DATES

For Soft Copies, delivery of data is to be construed as the date data is available in the contractor’s data management system and electronic notification is sent to addressees.

For Hard Copies, delivery of data is to be construed as “On Dock” dates at destination. Provision of a 3-day postage handling period from postmark at contractor's facility to “On-Dock” delivery at destination meets this requirement, unless otherwise stated in CDRL. The date of government signature at destination, if courier service is used, is to be construed as the “On Dock” date. It shall be the contractor's responsibility to ensure data delivery prior to end of business on the due date if a courier service is used in lieu of the U.S. Postal Service.

If due date falls on weekend or government holiday, data shall be due on the next scheduled government workday.

DD FORM 250 REQUIREMENTS

Block 7 of the CDRL will indicate whether inspection and acceptance of the data by DD Form 250 is required.

“Draft” copies submitted for advance approval and “Preliminary” copies submitted are exempt from the DD Form 250 requirements.

ADDITIONS TO DISTRIBUTION

If an addressee is added to distribution, or distribution quantities have been increased to an existing addressee, initial submittal to new addressee shall include the basic document and revisions as appropriate.

COMMUNICATIONS

Any correspondence related to requests for data delivery deviations, amendments, additions, or deletions shall be addressed to the Procuring Contracting Office (PCO) with an information copy to the government Data Management Officer (DMO).

For those data items where “LT” (Letter of Transmittal) is indicated in Block 7 of the CDRL, the Contractor shall utilize a Letter of Transmittal (LOT). Each copy submitted shall have a LOT attached. In addition, the contractor shall furnish one copy of each LOT (without data) to the government DMO. Change pages shall indicate updates by a bar in the margin adjacent to the change and encompassing all changed portions.

CDRL ADDRESS LIST AND DATA DISTRIBUTION LIST

The Address List provides the complete mailing address for each addressee and a mailing code.

The Data Distribution List provides information regarding quantities for shipment (normally in Blocks 14 and 15 of the CDRL) to each mailing code. Quantity of Hard deliverables and Soft deliverables will be indicated to the left and right of the “/”, respectively. See CDRL for possible additional format or delivery instructions.

DATA APPROVALS

While all data are subject to government approval, selected data will require advanced approval. The letter “A” appearing in Block 8 of the CDRL designates such data. Approval will be required on every submittal (e.g., the Preliminary, Draft, Finals that incorporate government comments, and revisions or change pages, if applicable). The approving authority shall be the PCO. Delivery of the Final data shall be submitted within 30 CD after receipt of government approval of Draft unless otherwise stated on CDRL.

CODES USED ON THE CDRL

The following codes may be used as described below.

a. Block 7: DD Form 250 requirements

CODE WHEN USED

LT Letter of Transmittal only

b. Block 8: Approval code

CODE WHEN USED

A Approval is required by government on all submittals.

N/A Approval is not required.

c. Block 10: Frequency

CODE (Limit to five characters)

DAILY Daily WEKLY Weekly BI-WE Each 2 weeks MTHLY Monthly BI-MO Each 2 months QRTLY Quarterly ANNLY Annually SEMIA Each 6 months OTIME One time ONE/R One time, & revisions R/ASR Revisions as required *ASREQ As required DFDEL Deferred delivery DFORD Deferred ordering ONE/P 1-time preliminary draft 2TIME Two separate submittals

*When ASREQ is used in items 10, 11, 12 or 13, an explanation of the requirement must be entered in item 16.

d. Blocks 12 and 13: Date of 1st and Subsequent Submissions

SDA = Government APPROVAL CDR = Critical Design Review CA = Contract Award IPR = In Process Review CO = Change Order FCA = Functional Configuration Audit SA = Supplemental Agreement PCA = Physical Configuration Audit SRR = System Requirements Review FLT = Flight Test Review SDR = System Design Review CD = Calendar Days PDR = Preliminary Design Review WD = Working Days EOC = End of Contract ATP = Authority to Proceed ILC = Initial Launch Capability DACA = Days After Contract Award

ELECTRONIC DISTRIBUTION

CDRLs shall be delivered on the contractor’s data management system(s). The contractor shall enable remote access to these systems by all SPO personnel (Air Force, Aerospace, Systems Engineering and Integration [SE&I], and Systems Engineering and Technical Assistance [SETA]) subject to applicable terms on this contract. An index of addressees to be allowed access to or to be notified of CDRL availability will be provided by government DMO via e-mail notification for contractor’s implementation. Access Lists will be updated, as required, without modification to the contract. The contractor shall use an acceptable electronic format that is compatible with existing government systems, unless a precise format is specified in the CDRL.

CDRL ADDRESS LIST

1. HQ Space & Missile Systems Center (AFSPC) LE

Launch Enterprise Systems Directorate Attn: LE Data Management Office

483 North Aviation Blvd.

Los Angeles AFB El Segundo, CA 90245-2808 SMC_LE_CMDM_all@us.af.mil

2. HQ Space & Missile Systems Center (AFSPC) SAF/SL

Attn: SAF/SL, Bldg. A5 483 North Aviation Blvd.

Los Angeles AFB El Segundo, CA 90245-2808

3. 30th Operations Group 30 OG

Attn: Data Desk 806 13th St, Room 285

Bldg. 7015

VAFB, CA 92437-5221

4. 45 OG and 5 SLS 45 OG

Attn: Data Library 15270 Samuel C. Phillips Parkway (CCAFS) Building 1645 Patrick AFB, FL 32925-2009

5. Defense Cost and Resource Center (DCARC) DCARC

201 12th Street South Suite 220 Arlington, VA 22202

(703) 601-4850

6. DCMA, TBD DCMA

7. NRO Operations Squadron NOPS

401 Discoverer Ave. Ste 32 Schriever AFB, CO 80912 NOPS_Launch@us.af.mil

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0005 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A001 Data Accession List (DAL) 4 AUTHORITY (Data Acquisition Document No.)

5 CONTRACT REFERENCE 6 REQUIRING OFFICE

DI-MGMT-81453B/T Performance Work Statement, Para 3.1.4.5 SMC/LE DMO

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT MTHLY 30 DACA 15 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

SUBMISSION

a ADDRESSEE

FINAL

N/A N/A BLK 16 Draft Reg Repro

16 REMARKS See Distribution List

1. (BLK 4):

a. Data Accession List (DAL) is cumulative.

b. The DAL listing should not include data generated by other CDRLs on contract.

c. The DAL must contain pointers (links) to the contractor’s electronic data systems file names or document location in the online database.

2. (BLK 13): Technical data must be added to the online dataset within 10 working days (WD) after release.

3. (BLK 10) DAL listing, not provided on demand via IDE or equivalent, must be provided in monthly submittal. The Government will review submission and provide feedback within 30 calendar days (CD) to the maximum extent possible.

15 TOTAL

G PREPARED BY H DATE I APPROVED BY J DATE

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0005 A TDP X TM OTHER

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A002 Software Products Database Design Description 4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE DI-IPSC-81437A Performance Work Statement, Para 3.1.4.2, 3.1.4.3, 3.1.4.4

SMC/LEE

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT ASREQ BLK 16 15 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

A N/A BLK 16 Draft Reg Repro

16 REMARKS See Distribution List

1. (BLK 4) Section 3: Contractor format is acceptable.

a. Identify any software and/or license that USG would require to access IDE from USG location. Identify any customization to COTS products that would be necessary for IDE access.

b. Provide a snapshot of hierarchy and/or structure so that the USG can navigate the IDE to review required data.

2. (BLKs 10, 12, 13):

a. IDE Draft Database Design Description (DBDD) shall be submitted 90 DACA.

b. Final IDE Database Design Description shall be submitted 30 CD after receipt of Government comments to the Draft Database Design Description.

c. Updates shall be submitted as significant revisions are made or by PCO direction.

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A003 Cost Data Summary Report (DD Form 1921)

DI-FNCL-81565C/T Performance Work Statement, Para 3.1.6 SMC/LEP

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT BLK 16 BLK 16 15 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

N/A BLK 16 BLK 16 Draft Reg Repro

16 REMARKS See Distribution List

1. (Blocks 10 – 13):

Prepare the Cost Data Summary Report (CDSR) in accordance with DI-FNCL-81565C (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81565C, is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs.

The CSDR Plan is included as a contract attachment.

Contractors shall be required to submit the Contractor Cost Data Reports (CCDRs) at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD DDCA-approved CSDR Plan.

All CCDRs shall be submitted electronically using the CSDR Submit-Review System. The required form and file type for each CCDR is specified in its Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.

Contractors shall submit CDSRs for two separate CSDR Plans: One Plan for Launch Services (by Mission) and one plan for Launch Service Support-LSS (Annually). Refer to the CSDR Plans for Special Instructions (Block 15 [Cost and Software Data Reporting/Earned Value Management Co-Plan] Remarks) on preparing the report.

Subcontractor Reporting: Prime contractors are responsible for flowing down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. This includes requiring subcontractors to electronically report directly to the DCARC using the CSDR Submit-Review System.

The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the DCARC for DDCA approval.

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A004 Functional Cost-Hour Report (DD Form 1921-1)

DI-FNCL-81566C/T Performance Work Statement, Para 3.1.6 SMC/LEP

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT BLK 16 BLK 16 15 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

16 REMARKS See Distribution List

1. (Blocks 10 – 13):

Prepare the Functional Cost Hour Report (FCHR) in accordance with DI-FNCL-81566C (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81566C, is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs.

The CSDR Plan is included as a contract attachment.

Contractors shall be required to submit the Contractor Cost Data Reports (CCDRs) at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD DDCA-approved CSDR Plan

All CCDRs shall be submitted electronically using the CSDR Submit-Review System. The required form and file type for each CCDR is specified in its Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.

Contractors shall submit FCHRs for two separate CSDR Plans: One Plan for Launch Services (by Mission) and one plan for Launch Service Support-LSS (Annually). Refer to the CSDR Plans for Special Instructions (Block 15 [Cost and Software Data Reporting/Earned Value Management Co-Plan] Remarks) on preparing the report.

Subcontractor Reporting: Prime contractors are responsible for flowing down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. This includes requiring subcontractors to electronically report directly to the DCARC using the CSDR Submit-Review System.

15 TOTAL 1

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A005 Contractor Business Data Report (DD Form 1921-3) 4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE DI-FNCL-81765/T Performance Work Statement, Para 3.1.6 SMC/LEP

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT BLK 16 BLK 16 15 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

16 REMARKS See Distribution List

Contractors shall be required to submit 1921-3 Contractor Business Data Report on an annual basis within 60 calendar days subsequent to the end of the contractor's fiscal year for the life of the contract in accordance with DI-FNCL-81765 (or most recently approved version). Only one report is required to be completed and submitted by each FPR (Forward Pricing Rate) unit (e.g., plant, site, business unit) per year, independent of the number of contracts within the FPR unit which contain this CDRL item. The Contractor Business Data Report is to be prepared by and for the business entity (e.g., plant, site, or business unit) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government. In the absence of a FPR requirement, the term “FPR unit” should be interpreted for reporting purposes as “business unit” as defined in the FAR.

Reports are to be submitted annually, as of the end of the business entity’s fiscal year. The reports are due 60 calendar days subsequent to the end of the contractor's fiscal year.

The Defense Cost and Resource Center (DCARC) is responsible for administration of this requirement. The DCARC website is located at http://cade.osd.mil/csdr.

All 1921-3 reports shall be submitted electronically using the 1921-3 & FPR Submit-Review System.

The required form and file type for each 1921-3 report is specified in its Data Item Description (DID).

Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A006 Contractor Work Breakdown Structure (CWBS) 4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE DI-MGMT-81334D/T Performance Work Statement, Para 3.1.6 SMC/LEP

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT BLK 16 BLK 16 15 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

16 REMARKS See Distribution List

1. (Blocks 10 – 13):

Prepare the CWBS in accordance with DI-MGMT-81334D (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-MGMT-81334D, is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs. The CSDR Plan is included as a contract attachment.

Contractors shall be required to submit the CWBS Dictionary at frequencies specified in the OSD DDCA-approved contract CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD DDCA-approved CSDR Plan.

The CWBS Dictionary shall be submitted electronically using the CSDR Submit-Review System.

Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or a DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested role. All DCARC Portal accounts need to be renewed at least annually.

Subcontractor Reporting. Prime contractors are responsible for flowing down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. This includes requiring subcontractors to electronically report directly to the DCARC using the CSDR Submit-Review System.

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0001 A TDP X TM OTHER

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A007

Small Business Utilization Report

4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE DI-MGMT-82041 Performance Work Statement, Para 3.1.6 SMC/LE

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT SEMIA BLK 16 15 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

16 REMARKS See Distribution List

1. (BLK 4): Contractor format is acceptable.

a. Draft reports shall be coordinated with SMC/SB at least 5 working days (WD) prior to the due dates (April 30 and October 30) to allow subsequent turn-around time for the contractor to resubmit (if applicable) after government's acceptability determination has been issued.

b. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

c. Small Business Utilization Report shall be in contractor format or as specified in the contract, and briefly describe the subcontractor(s) efforts performed.

d. The contractor shall report actual achievements relative to proposed small business utilization in performance of the contract (including subcontracting dollars/percentages relative to total contract value / total subcontracting), and the results of efforts to:

1) Expand the pool of qualified small businesses through increased competition for acquisition of components, parts (includes hardware and software), and/or to perform sustainability or support services.

2) Engage small businesses to serve as alternative sources in order to mitigate the risks of single point failures in the supply chain and increase the quality of supplies or services.

e. Under no circumstances shall technical data or computer software to be delivered under or in conjunction with this CDRL, be marked "Proprietary" (or similar Nonconforming marking(s)).

f. (BLK 9): Distribution Statement E: Distribution authorized to DoD Components only (Proprietary Information). Other requests shall be referred to SMC/SB.

2. (BLKs 12, 13): The semiannual report shall be submitted for the six months ending March 31 and the twelve months ending September 30.

a. Submittal due 30 calendar days after the close of each reporting period and within

30 calendar days of contract completion.

b. For initial submittal, a draft report is due 30 DACA for Government comment (No

Government approval required).

c. Government will review and provide feedback within 30 CD to the maximum extent possible.

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

0008 Integrated Program Management Report (IPMR) Integrated Master Schedule (IMS) 4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE DI-MGMT-81861A/T Performance Work Statement, Para 3.1.6 SMC/LEP

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT MTHLY BLK 16 15 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

16 REMARKS See Distribution List

1. (BLK 4):

a. Only the following DID sections and their sub-sections (omitting references to Formats 1-5 and

7) are applicable: 1.3, 1 5, 2.1.1, 2.1.1.2, 2 2 5, 2.3, 2.5.1, 2.6 1, 2.7, 3.6.7, and 3.7 as tailored below; excluding 6.2.1.1.6.

b. 2.1.1 Electronic Submission of Data. Add the following: The IMS shall be submitted electronically using the contractor’s schedule tool and only in a pdf file format when specifically requested by the Government.

c. 2.2.5 Native Schedule Format. Add the following: The IMS shall be created using a network capable scheduling software application of the contractor’s choice. The IMS shall be configured to allow sorting a filtering by key events and to allow filtering for various views; for example, top level summary view, mid-level summary view, critical path for each mission, and a complete detail view.

d. 2.6.1 Submission Requirements. Replace with: Format 6 shall be submitted to the procuring activity no later than 14 federal working days (WD) after contractor’s month-end close.

e. 2.6.7.1 Critical/Driving Paths. Delete all references to Driving Paths in the title and body of the requirement.

f. 3.7.1 IMS Requirements. Delete all references to the Integrated Master Plan (IMP). An IMP is not required.

g. 3.7.1.1.1 Production Contract IMS. Add the following: Production key events/milestones shall be incorporated at the summary level and networked to their associated activities within the IMS.

The interrelationships/interdependencies shall be identified with sufficient detailed activities through the use of network logic that provide a clear picture of the mission's progress from Authority to Proceed (ATP) through contract completion.

h. 3.7.1.3 IMS Content Elements. Second bullet – Replace with: The IMS shall have traceability to WBS and Performance Work Statement.

i. 3.7.1.3.4.3 Scope Planning. Add the following: Planning packages shall be detailed and planned into discrete work packages, or apportioned tasks (as appropriate) no later than one accounting period prior to the schedule start of the planning package. Planning package plans shall reflect the manner in which the work is to be performed.

j. 3.7.1.3.5.3 Duration. Add the following: Discrete/measurable activities shall be baselined in accordance with the contractor’s System Description Document. Where durations are longer than 44 working days, rationale shall be provided within the IMS.

Electronically Generated PAGE 1 OF 2 PAGES

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0001 A TDP X TM OTHER

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

16 REMARKS

k. 3.7.1.3.5.8 Driving Path. Delete.

l. 3.7.1.3.5.9 Critical Path. Add the following: Each mission’s critical path shall show clear network logic through the launch operation schedule of activities. The launch operations data shall be provided to the Government using existing contractor schedule and format on a monthly basis. At the mission level, the critical path follows the standard definition (a critical path being the longest contiguous path through the network) flow from mission ATP through launch providing a clear network of logic of all tasks along the critical path. As a mission progresses, the critical path shall also include activities that have negative float. Where critical path is not calculated based on the longest path, but based on risk and development of known delivery problems, the critical path shall explain the deviation from the standard derived critical path.

m. 3.7.1.3.5.10 Current Schedule. Add the following: Reporting thresholds shall be consistent with the most recent Defense Contract Management Agency DCMA 14 Point Assessment metrics, version 3 2.0.

n. 3.7.1.3.5.15 External Dependencies. Add the following: A network schedule for each mission shall clearly identify activities, product hand-offs and deliverables from external interfaces, from the lowest level of contract tasks/activities up to the summary level schedule activities and milestones. The determination of external significant and critical interfaces to be identified within the Integrated Master Schedule (IMS) requires agreement among the contractor(s) and Government and is documented accordingly.

o. 3.7.1.3.6 Schedule Risk Assessment (SRA). Delete.

p. 3.7.1.3.6.1 – 3.7.1.3.6.5. Delete.

q. 3.7.1.3.7.2 Required Traceability. Replace with: The WBS must be traceable for all discrete work in the IMS. Traceability may be met with a field in the IMS or via other means as long as discrete work reconciles.

r. 3.7.1.3.7.3. Item 4) Earned Value Technique (EVT), Delete; Item 6) Critical Paths and Driving Paths, Delete all references to Driving Path in the title and the requirement.

s. 3.7.1.3.9 Retention of Historic Performance. Remove “and the three-point estimates that were used before the task/activity started.”

t . 3.7.2.1 Schedule Visibility Task (SVT). Deleted.

2. (BLK 11) The Contractor’s month-end close.

3. (BLK 12) First submission of the initial draft shall be 30 DACA for Government review. Contractor shall submit updated IMS for each launch task order for Government acceptance.

4. (BLK 13) Electronic copy shall be submitted no later than (NLT) 12 federal working days after contractor’s month-end close.

5. (BLK 14) All IMS related forms must be electronically submitted to the central repository at the DCARC website at https://service.dcarc.cape.osd.mil/DCARCPortal/site/login.asox.

6. The Government will review each submission and provide feedback within 15 CD to the maximum extent possible.

Electronically Generated PAGE 2 OF 2 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0001 A TDP TM OTHER X

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A009 Mission Integration Schedule (MIS) 4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE DI-MGMT-81861A/T Performance Work Statement, Para 3.4.2.1, 3.4.2.4

SMC/LE GMIM

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT MTHLY BLK 16 15 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

16 REMARKS See Distribution List

1. (BLK 4): MIS schedule will be a subset of the IMS submitted for each NSS Launch Task Order.

DID subsection 6 is applicable in accordance with CDRL A008 approved format.

a. The MIS may be used to coordinate Mission Integration activity and SV schedule for integration purposes. The MIS may be CDRL A008 submittal that is filtered for content appropriately.

2. (BLK 11) Last day of the contractor’s monthly accounting period.

3. (BLK 12) Submittal of MIS will be provided to the Government for each Launch Task Order, with initial submitted no later than 60 calendar days (CD) after task order.

4. (BLK 13) Electronic copy shall be submitted NLT 14 federal working days after contractor’s month-end close

Electronically Generated PAGE 1 OF 1 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 P lease DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0005 A X TDP TM OTHER

D SYSTEM/ITEM E CONTRACT/PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A010 Work Management Plan Mission Integration Management Plan 4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE DI-MGMT-81911/T Performance Work Statement, Para 3.1.8.1, 3.4.2.4, 3.4.6.1, 3.8 17.8, and 3.9.2.2

SMC/LE GMIM

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT ASREQ BLK 16 15 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

16 REMARKS See Distribution List

1. (BLK 4):

a. Replace 1 with “1. Format. The plan shall be in the contractor’s format. The plan shall be printable on standard size paper (e.g., 8 ½ x 11 or A4).

b. Replace 3 with “The Mission Integration Management Plan describes the contractor’s mission integration services and process flow. The Plan shall contain the following sections:

1.0 Introduction

2.0 Integration Management

2.1 Standard Mission Integration Plan. Provide an overview of the mission integration processes/tasks, citing applicable Performance Work Statement (PWS) paragraphs for reference.

2.2 Integration Schedules. Provide the Mission Integration Schedule and associated schedules used in the Mission Integration process.

2.3 Action Items: Provide an overview of the contractor’s process and tracking system used to ensure action item closure.

3.0 Organizational Responsibilities. For the following organizations, describe the organization responsibilit ies in the Contractor’s Mission Integration process. Provide a graphical representation of the corresponding connections and Points of Contacts between the different organizations.

3.1 Government Organizations

3.1.1 Launch Vehicle Program Office (SMC/LE)

3.1.2 Space Vehicle Program Office (For USAF Missions)

3.1.3 USAF Space Wing(s)

3.2 Contractor Organizations

3.2.1 Launch Vehicle Contractor (LVC)

3.2.2 Satellite Vehicle Contractor (SVC) (For USAF Missions)

Electronically Generated PAGE 1 OF 2 PAGES

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0005 A X TDP TM OTHER

D SYSTEM/ITEM E CONTRACT/PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

16 REMARKS

4.0 Key Integration Meetings. Provide the detail description purpose/objectives and composition of the following contractor meetings:

4.1 Mission Integration Kick-off meeting (Four-party meeting to introduce the mission and integration plan)

4.2 Mission Design Review (MDR) (Preliminary design review for mission integration)

4.3 Mission Verification Review (MVDR) (Critical design review for mission integration)

4.4 Ground Operations Readiness Review (GORR) (For USAF missions) (Launch site readiness for ground operations to integrate spacecraft onto the launch vehicle)

4.5 Pre-Vehicle Ship Review (Verify readiness to ship flight hardware to the launch site)

4.6 Component and Subsystem Readiness Review (CSRR) (Assessment of mission and launch vehicle design and analysis)

4.7 Integrated Operation Readiness Review (IORR) (Review and demonstrate launch site and launch vehicle readiness for integrated ops)

4.8 Space Flight Worthiness Certification Review (SCR) (Establishes readiness of launch system to proceed into countdown operations)

4.9 Launch Readiness Review (LRR) (Final Contractor’s readiness review for launch)

4.10 Other Contractor Mission Readiness Reviews (Any other readiness reviews necessary due to the nature of the mission)

4.11 Launch System Program Level Reviews (Contractual or hardware reviews which the integration team should support)

5.0 Customer Reviews and Rehearsals. Provide description and summarization of level of support to be provided for the following meetings:

5.1 Mission Rehearsals (including academics)

5.2 Spacecraft Mission Readiness Review (MRR)

5.3 Flight Readiness Review (FRR)

5.4 Ground Operations Readiness Review (GORR)

6.0 Integration Working Groups. Provide a description of the nature and composition of the working groups below.

6.1 Management Working Group (MWG)

6.2 Ground Operations Working Group (GOWG)

6.3 Day-of-Launch Working Group (DOLWG)

6.4 Ascent Operations Working Group (AOWG)

6.5 Rehearsal Working Group (RWG)

6.6 Other Contractor Mission related working group (Any other working group necessary due to the nature of the mission)

7.0 Integration Tasks and Responsibilities

7.1 Space Vehicle Information. Provide a chronological tabular listing of data required from the Space Vehicle Contractor by the Launch Vehicle Contractor;

examples include Space Vehicle (SV) interface requirements, SV CAD/loads models, analyses results required for input to integrated analyses.

7.2 Launch Vehicle (LV) Information. Provide a chronological tabular listing of the information/reports developed during the mission integration process.

(Key products including analyses, reports, requests, schedule, and other documentation or data. May require two Couple Loads Analyses at different t imes.)

7.3 Mission Integration Control Documents. Provide the list of mission integration control documents the contractor is responsible for preparation, distribution, and maintenance of. Provide the process/plan for maintaining configuration control of these documents.

7.4 Interface Control Document (ICD) and Verification Process. Provide a description of the ICD, the Contractor’s process for development, and verification of the ICD.

Appendix A: Entry/Exit Criteria for Key Integration Meetings Appendices as needed for Definitions, Terms, Abbreviations and Acronyms”

c. Delete 5. Media Requirements.

2. (BLKs 12, 13)

a. Submit draft 90 DACA for Government review and comment.

b. Submit final 30 CD after receipt of Government comments for Government approval.

c. Submit updates to incorporate changes to the document process, as required for mission specific changes with an added task order, or upon Procurement Contracting Office (PCO) direction for Government Approval.

Electronically Generated PAGE 2 OF 2 PAGES

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information, Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503 Please DO NOT RETURN your form to either of these addresses Send completed form to the Government issuing Contracting officer for the Contract/PR No listed in Block E

A CONTRACT LINE ITEM NO B EXHIBIT C CATEGORY:

0005 A TDP X TM OTHER

D SYSTEM / ITEM E CONTRACT / PR NO F CONTRACTOR

NSSL FA8811-19-R-0002

1 DATA ITEM NO 2 TITLE OF DATA ITEM 3 SUBTITLE

A011 Program Protection Implementation Plan (PPIP) 4 AUTHORITY (Data Acquisition Document No.) 5 CONTRACT REFERENCE 6 REQUIRING OFFICE DI-ADMN-81306 Performance Work Statement, Para 3.1.15, 3.1 18, and 3.1.19 SMC/LE Chief of Security

7 DD 250 REQ 9 DIST STATEMENT

REQUIRED

10 FREQUENCY 12 DATE OF FIRST

SUBMISSION

14 DISTRIBUTION

LT ASREQ BLK 16 15 b COPIES

8 APP CODE D 11 AS OF DATE 13 DATE OF

SUBSEQUENT

16 REMARKS See Distribution List

1. (BLK 4):10.1 Content Requirements

a. 10.1.a Replace with “Description detailing how the Program Protection Implementation Plan (PPIP) aligns with the Government Program Protection Plan (PPP) methodology and the defined Program Protection schedule activities/events. Description shall also addresses implementation of Government Program Protection contractual direction (Performance Work Statement).”

b. Add “10.1.d Definitions of contractor Criticality Analysis methods to further define Government PPP Critical Components (CC) detail. CC detail must be provided down to the point where the contractor loses configuration management control of the CC internal components (e.g., COTS hardware). Criticality Analysis results should be provided as modifications/additions to Government PPP content.”

c. Add “10.1.e Definition of contractor-identified vulnerabilities and Program Protection incidents and how/when they are reported to the Government.”

d. Add “10.1.f Definition of contractor-identified vulnerabilities and Program Protection incidents and how/when they are reported to the Government. Also, describe methods to ensure accountability of all Critical Program Information (CPI) handled by the contractor.”

e. Add “10.1.g For Supply Chain Risk Management countermeasures aspects, provide a detailed set of supplier information for all CCs and components that handle CPI. A supplier can either be a Manufacturer (e.g., Original Equipment Manufacturer) or a Vendor (sells Manufacturer components). If CCs are purchased from a Vendor, the Manufacturer information must also be provided.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .