Attachment_6_Evaluation_Criteria_3_May_19.pdf

PDF 873 KB Posted

Attached to
National Security Space Launch (NSSL) Phase 2 Launch Service Procurement (LSP) Request for Proposal (RFP) Federal contract opportunity
Solicitation number
FA8811-19-R-0002
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

This request for proposal outlines requirements for launch services to support national security space missions from fiscal year 2020 through 2024. The Space and Missile Systems Center will award two contracts to provide launch services delivering multiple national security space payloads to required orbits. Offerors must propose technical approaches for a variety of low earth orbit, Molniya, geosynchronous earth orbit, and polar missions. Proposals will be evaluated on factors such as technical merit, past performance, pricing, and risk mitigation approaches. Pricing requirements include basic launch services, acceleration services, mission unique services, government property use, launch surveillance services, early integration studies, and special studies. The solicitation does not specify set-asides but encourages responses from small disadvantaged businesses. Proposals are due as specified in the request for proposal documentation.

Evaluation Criteria

View the file

Other files for this federal contract opportunity

Other files attached to National Security Space Launch (NSSL) Phase 2 Launch Service Procurement (LSP) Request for Proposal (RFP), newest first.
File Type Posted
1 NSSL Phase 2 Model Contract 20 December 2019.pdf PDF
0 FA8811-19-R-0002 0002 Phase 2 LSP Amendment 2.pdf PDF
4B Attachment 2 DD254 SAP and SCI Addenda 20 December 2019.pdf PDF
6 Attachment 6 Evaluation Criteria 20 December 2019.pdf PDF
2 Exhibit A CDRLs 20 December 2019.pdf PDF
4A Attachment 2 DD254 20 December 2019.pdf PDF
3 Attachment 1 PWS 20 December 2019.pdf PDF
5 Attachment 5 Instructions to Offerors 20 December 2019.pdf PDF
Attachment_8_Pricing_Tables_23_July_2019.xlsx XLSX spreadsheet
Attachment_1_PWS_23_July_2019.pdf PDF
Attachment_5_Instructions_to_Offerors_23_July_2019.pdf PDF
Phase_2_Amendment_1_SF30_and_Summary_of_Changes.pdf PDF
Exhibit_A_CDRLs_23_July_2019.pdf PDF
NSSL_Phase_2_LSP_Model_Contract_28_June_2019.pdf PDF
Attachment_1_PWS_3_May_19.pdf PDF
Attachment_3A_Small_Business_Subcontracting_Plan_Cover_3_May_19.pdf PDF
Attachment_10B_Award_Fee_Plan_3_May_19.pdf PDF
Attachment_13A_NRO_Phase_2_Requirements_Description_and_CDRLs_3_May19.pdf PDF
Attachment_4_Acceptance_Criteria_3_May_19.pdf PDF
Attachment_11_OCI_Plan_Cover_3_May_19.pdf PDF
Attachment_13_NRO_Phase_2_DD254_3_May_2019.pdf PDF
Attachment_10A_Cumulative_Mission_Success_Incentive_Plan_3_May_19.pdf PDF
NSSL_Phase_2_Model_Contract_3_May_19.pdf PDF
Attachment_8_Pricing_Tables_3_May_19.xlsx XLSX spreadsheet
Exhibit_A_CDRLs_3_May_19.pdf PDF
Attachment_5_Instructions_to_Offerors_3_May_19.pdf PDF
Attachment_2_DD254_3_May_19.pdf PDF
Attachment_9_Payment_Plan_3_May_19.pdf PDF
Attachment_7_Government_Property_Cover_3_May_19.pdf PDF
Attachment_3B_Small_Business_Participation_Commitment_3_May_19.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Evaluation Criteria FA8811-19-R-0002

National Security Space Launch (NSSL)

Phase 2 Launch Service Procurement

FA8811-19-R-0002

Attachment 6

Evaluation Criteria

3 May 2019

1 RESPONSIBILITY DETERMINATION

The Procuring Contracting Officer (PCO) will make a responsibility determination in accordance with (IAW) Federal Acquisition Regulation (FAR) 9.104-1 after the evaluation of proposals to determine whether an Offeror is eligible for contract award. The PCO will also consider the Space and Missile Systems Center (SMC) Commander’s input on progress towards certification of the Offeror’s proposed launch system, among other standards listed in the FAR 9.104-1, to successfully launch National Security Space (NSS) missions.

In accordance with Section 1612 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2018 (P.L. 115-91) and SMC Instruction (SMCI) 64-101, the PCO will not award a contract to a contractor included on the Air Force Space Contractor Responsibility Watch List (CRWL) without the approval of the SMC Commander.

2 BASIS FOR CONTRACT AWARD

This is a best value tradeoff source selection conducted IAW FAR subpart 15.3, Source Selection, as supplemented by the Defense FAR Supplement (DFARS), the Air Force FAR Supplement (AFFARS), and Department of Defense (DoD) Source Selection Procedures dated 31 March 2016. The Government will select for award the two Offerors that, when combined, represent the overall best value to the Government. Of these two Offerors, the one who provides the overall best value to the Government will be awarded the requirements contract for “Requirement 1.” The other Offeror will be awarded the requirements contract for “Requirement 2.”

The “Requirement 1” or “Requirement 2” launch service distributions are described in Table 1 in 52.212-4 (z) Ordering, in the model contract.

The Offerors will need to be deemed responsible IAW FAR subpart 9.1, as supplemented by DFARS and AFFARS, and proposals must conform to the solicitation's requirements to be eligible for award. While the Government will strive for maximum objectivity in its evaluations, the source selection process, by its nature, is subjective, and, therefore, professional judgment is implicit throughout the entire process.

2.1 EVALUATION METHODOLOGY

The following evaluation Factors and Subfactors will be used to evaluate each proposal.

3 NUMBER OF CONTRACTS TO BE AWARDED

The Government will award two contracts for the NSSL Phase 2 Launch Service Procurement for “Requirement 1” and “Requirement 2.” The “Requirement 1” or “Requirement 2” launch service distributions will be as described in Table 1 in 52.212-4 (z) Ordering, in the model contract.

4 GENERAL INSTRUCTIONS

The Government will evaluate, IAW this attachment, information the Offeror provides IAW Attachment 5, Instructions to Offerors (ITO), with the exception of the executive summary.

Proposals must conform to this Request for Proposal (RFP). Any submitted proposal that does not adhere to the requirements in this RFP may be eliminated from the competition and ineligible for award.

4.1 DISCUSSIONS

The Government anticipates entering into discussions after it makes a competitive range determination of the most highly rated proposals based on the ratings of each proposal against all evaluation criteria (see FAR 15.306(c)). Offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) shall be requested for evaluation from all Offerors who remain in the competitive range. The Government reserves the right to record audio telecommunications with the Offerors during the source selection. Any proposal updates shall be evaluated according to the evaluation criteria specified here.

4.2 SOLICITATION REQUIREMENTS

Offerors are required to meet or exceed all solicitation requirements, such as terms and conditions, small business subcontracting plan, organizational conflict of interest analysis results, representations and certifications, and technical requirements, in addition to those identified as Factors or Subfactors. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being ineligible for award. The Government reserves the right to cross-reference between volumes and sections of volumes to support proposal evaluation.

5 COMPETITIVE RANGE

In accordance with FAR 15.306, an Offeror may be eliminated from the competitive range at any time during discussions if the Offeror is no longer considered to be among the most highly rated.

This elimination can occur whether or not all material aspects of the proposal have been discussed, or whether or not the Offeror has been afforded an opportunity to submit a proposal revision.

6 EVALUATION OF FACTOR 1: TECHNICAL

6.1 EVALUATION OF TECHNICAL SUBFACTORS

Each Technical Subfactor will receive a combined Technical/Risk rating. The combined technical/risk ratings include consideration of the significant strengths, strengths, weaknesses, significant weaknesses, and deficiencies. The combined Technical/Risk evaluation utilizes the combined Technical/Risk ratings listed in Table 6.2-1 and the risk descriptions set forth in Table 6.2-2.

The Government will assign a combined Technical/Risk rating, as described in Table 6.2-1 below, for all Factor 1 Subfactors, as identified in Table 2.1-1. The Government may assign strengths, significant strengths, and/or deficiencies to the Offeror’s proposal. Strengths, significant strengths, deficiencies, weakness, and significant weakness are defined as follows:

A “strength” is an aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

A "significant strength" is an aspect of an Offeror's proposal that has merit or exceeds specified performance or capability requirements in a way that will be very advantageous to the Government during contract performance.

A “deficiency” is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

A “weakness” is a flaw in the proposal that increases the risk of unsuccessful contract performance.

A “significant weakness” is a flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

To be eligible for award, Offerors must receive combined Technical/Risk ratings of Marginal, Acceptable, Good, or Outstanding for all Subfactors.

6.2 RATINGS

Each Technical Subfactor, as identified in Table 2.1-1, will receive one of the combined Technical/Risk ratings described in Table 6.2-1 below:

6.4.1.1 Category B LEO

6.4.1.1.1 LEO Concept of Operations (CONOPS)

The Government will evaluate whether, and the extent to which, the Offeror’s proposed Launch Operations CONOPS is technically sound.

6.4.1.2 Category B Molniya

6.4.1.2.1 Molniya Mission Profile

The Government will evaluate whether, and the extent to which, the Offeror’s proposed Molniya mission profile is technically sound.

6.4.2 CATEGORY A/B SYSTEM READINESS

The Government will evaluate the Offeror’s Payload Envelope Category A/B system development, Non-Recurring Design Validation (NRDV) completion and certification activities to support Phase 2 ILC dates. If the Offeror is proposing one system that will meet both Category A/B and Category C requirements, the Government will still evaluate its readiness in each Category separately. The System Readiness will be based on the proposed launch system(s). Secondary launch systems will not be considered a viable risk mitigation strategy for the proposed launch system readiness. When the Government requests updated Launch System Maturity Assessment Process (LSMAP) reports after proposal submission, the additional reports will be evaluated based on the Offeror’s Payload Envelope Category A/B system development, NRDV completion and certification activities to support Phase 2 ILC dates as well as Offeror’s progress against planned NRDV activities.

6.4.2.1 Category A/B System Technical Assessment

The Government will consider the LSMAP Technical assessment and evaluate whether, and the extent to which, the Offeror’s plans to complete NRDV for its Category A/B system are technically sound.

6.4.2.2 Category A/B System Eastern Range Schedule Assessment

The Government will consider the LSMAP schedule assessments and evaluate whether, and the extent to which, the Offeror’s plans to complete NRDV activities to meet the following Initial Launch Capability (ILC) requirements are technically sound:

1. A mission with an Initial Launch Capability (ILC) of 1 April 2022 from Cape Canaveral Air Force Station (AFS) or Kennedy Space Center; and

2. A mission requiring vertical integration with an ILC of 1 July 2022 from Cape Canaveral AFS or Kennedy Space Center.

6.4.2.3 Category A/B System Western Range Schedule Assessment

The Government will consider the LSMAP schedule assessment and evaluate whether, and the extent to which, the Offeror’s plan to complete NRDV activities to meet the ILC requirements for a mission with an ILC of 1 August 2025 from Vandenberg AFB is technically sound.

6.5 SUBFACTOR 3: CATEGORY C

6.5.1 CATEGORY C SAMPLE MISSIONS

6.5.1.1 Category C GEO 2

6.5.1.1.1 GEO 2 Mission Profile

The Government will evaluate whether, and the extent to which, the Offeror’s proposed approach for the GEO 2 mission profile is technically sound.

6.5.1.1.2 GEO 2 Mission Support Equipment (MSE) Accommodations

The Government will evaluate whether, and the extent to which, the Offeror’s proposed approach to providing GEO 2 MSE Accommodations is technically sound.

6.5.1.2 Category C Polar 2

6.5.1.2.1 Polar 2 Mission Profile

The Government will evaluate whether, and the extent to which, the Offeror’s proposed Polar 2 mission profile is technically sound.

6.5.1.2.2 Polar 2 Spot Cooling

The Government will evaluate whether, and the extent to which, the Offeror’s proposed Polar 2 spot cooling approach is technically sound.

6.5.1.2.3 Polar 2 A-Frame Mechanical Interfaces

The Government will evaluate whether, and the extent to which, the Offeror’s proposed approach to interface with A-Frame mechanisms is technically sound.

6.5.2 CATEGORY C SYSTEM READINESS

The Government will evaluate the Offeror’s Payload Envelope Category C system development, NRDV completion, and certification activities to support Phase 2 ILC dates. If the Offeror is proposing one system that will meet or exceed both Category A/B and Category C reference orbit requirements, the Government will still evaluate its readiness in each Category separately.

When the Government requests updated LSMAP reports after proposal submission, the additional reports will be evaluated based on the Offeror’s Payload Envelope Category C system development, NRDV completion, and certification activities to support Phase 2 ILC dates as well as Offeror’s progress against planned NRDV activities.

6.5.2.1 Category C System Technical Assessment

The Government will consider the LSMAP Technical assessment and evaluate whether, and the extent to which, the Offeror’s plan to complete NRDV for its Category C system are technically sound.

6.5.2.2 Category C System Eastern Range Schedule Assessment

The Government will consider the LSMAP schedule assessment and evaluate whether, and the extent to which, the Offeror’s plan to complete NRDV activities for a mission with an ILC of 1 January 2026 from Cape Canaveral AFS or Kennedy Space Center is technically sound.

6.5.2.3 Category C System Western Range Schedule Assessment

The Government will consider the LSMAP schedule assessment and evaluate whether, and the extent to which, the Offeror’s plan to complete NRDV activities for a mission with an ILC of 1 September 2025 from Vandenberg AFB is technically sound.

6.6 SUBFACTOR 4: SYSTEM RISKS AND MITIGATIONS

The Government will evaluate how the technical risks may affect the ability of the launch system to meet requirements. The Government will evaluate the effectiveness of identified mitigation plans and associated uncertainties. Secondary launch systems will not be considered a viable risk mitigation strategy for the proposed launch system.

7 EVALUATION OF FACTOR 2: PAST PERFORMANCE

7.1 PAST PERFORMANCE

The Offeror’s past performance efforts will be evaluated for recency, relevancy, and quality.

The combined past performance evaluation results in one Past Performance Rating IAW Table 7-

2. Offerors must receive a past performance rating of Acceptable to be eligible for award.

7.2 EVALUATION PROCESS

The past performance evaluation considers the Offeror’s demonstrated recent and relevant record of performance. In conducting the past performance evaluation, the Government will obtain Past Performance information from the Past Performance Information Retrieval System (PPIRS) and the Federal Awardee Performance and Integrity Information System (FAPIIS). Additionally, the Government reserves the right to obtain past performance information from the following:

Electronic Subcontract Reporting System (eSRS), or other databases; the Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers, Fee Determining Officials, and commercial sources.

7.3 RECENCY EVALUATION

Recent efforts must be ongoing or must have been performed during the past 5 years from the date of proposal submission. Past performance information that does not meet this definition will not be evaluated. In the overall past performance evaluation, more recent past performance information will be more impactful than less recent past performance information.

5. Quick Reaction and Anomaly Resolution and Special Studies composite hourly rates as needed

6. Early Integration Studies (EIS) by complexity (standard, complex, or simple/reflight) as needed

9.1 REASONABLENESS

The Offeror’s proposal will be assessed for reasonableness, where reasonableness is an assessment of whether the price is too high. In accordance with FAR 31.201-3(a) the price is reasonable, if, in its nature and amount, does not exceed that amount which would be paid by a prudent person in the conduct of competitive business. Reasonableness of an Offeror’s proposed price will be evaluated using one or more analysis techniques, as identified in FAR 15.404-1. In accordance with FAR 15.403-1(b) and 15.403-3(a), data other than certified cost or pricing data may be required to support a determination of price reasonableness. A determination of unreasonableness will render the proposal unawardable. In addition, proposals that have been assessed to be technically unacceptable are ineligible for award, and as a result, a reasonableness determination will not be made for technically unacceptable, unawardable proposals. If, after receipt of proposals, the PCO determines that there is insufficient data available to determine price reasonableness, the Offeror shall be required to submit additional data other than certified cost or pricing data.

9.2 UNBALANCED PRICING

The Government will evaluate the Offeror’s proposed prices for unbalanced pricing IAW FAR 15.404-1(g). Unbalanced pricing exists when, despite an acceptable Total Evaluated Price (TEP), the price of one or more price inputs in the pricing tables is significantly over or understated as indicated by the application of cost or price analysis techniques. An offer may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government.

9.3 RESERVED

9.4 TOTAL EVALUATED PRICE

For source selection evaluation purposes and as an input for the best value tradeoff decision process, the TEP will be determined using the weighted sum of the following items over the PoP:

a) The Basic Launch Service Price for each fiscal year, identified by reference orbit and mass-to-orbit, plus,

b) The Acceleration price applied twice per year for fiscal years 2-5, plus,

c) For each fiscal year, for each mission, the associated Mission Unique Services, plus,

d) The total Rental Equivalency for Government Property Use amount, plus,

e) The annual LSS price by order year, plus,

f) The annual non-NSS Fleet Surveillance price by order year based on the single mission price multiplied by 5 non-NSS missions, plus

g) The dollarized value for Quick Reaction, and Anomaly Resolution, and Special Studies based upon multiplying 100,000 hours by the proposed composite rate, plus,

h) For specific “next year” non-NRO missions, EIS, based upon corresponding complexity of the EIS (standard, complex, or simple/reflight).

i) Specific Study Components priced individually for all order years.

TEP will be calculated using the weighted sum of items a through i above. This is further detailed in the notional pricing table in the Bidder’s library. The weightings included in the notional pricing table are examples only. The Government will apply different weightings during the source selection that are representative of the expected requirements in the ordering period. These weightings will be generated prior to the receipt of proposals.

The Government provided Attachment 8, NSSL Phase 2 Pricing Tables will not automatically calculate the TEP from the inputs entered by the Offeror. The Government will provide the Offeror’s TEP at time of Competitive Range Determination as well at request for Final Proposal Revisions.

Note that Government acceptance of proposed TEP does not mean the Offeror’s proposed prices are reasonable and not unbalanced. The reasonableness and unbalanced pricing is a different evaluation, which involves the evaluation of every price in the NSSL Phase 2 Attachment 8 Pricing Tables.

File details come from the government source that posted it. Updated .