This document is an Addendum (No. 1) to Solicitation FA875125B0001 for a Department of the Air Force Materiel Command Research Laboratory project involving electrical system modifications. The addendum provides specific technical updates, including the removal of a motor control center (MCC-i4M -1/HVSB - J6M-1) from the electric room and revisions to lighting fixture specifications.

The addendum introduces two key changes: first, modifications to the fixture schedule with updated LED lighting specifications for 2"x4" Cruze fixtures (including a new type B2 fixture), and second, requirements for a lightning protection system on the penthouse roof in accordance with specification section 26 41 00. Additionally, the document specifies that removed motor control centers should be turned over to the owner and moved to a designated storage area, with disassembly permitted if necessary for removal.

View the file

Other files

File Type Posted
FA875125B0001 Questions and Answers - 8 May 2025.docx DOCX document
Solicitation Amendment FA875125B00010006 SF 30.pdf PDF
Attachment 6 (Addendum 1 Rev 1).pdf PDF
Solicitation Amendment FA875125B00010005 SF 30.pdf PDF
Attachment 7 - Addendum 2.pdf PDF
Solicitation Amendment FA875125B00010004 SF 30.pdf PDF
FA875125B0001 Questions and Answers - 29April 2025.docx DOCX document
FA875125B0001 Questions and Answers - 28April 2025.docx DOCX document
FA875125B0001 Questions and Answers - 23April 2025.docx DOCX document
Attachment 1c - Technical Specifications_Appendix A.pdf PDF
Attachment 1a - Technical Specifications_Volume 1.pdf PDF
Attachment 1b - Technical Specifications_Volume 2.pdf PDF
Solicitation Amendment FA875125B00010003 SF 30.pdf PDF
FA875125B0001 Pre-Bid Sign In 2of2.jpg JPG image
FA875125B0001 Pre-Bid Sign In 1of2.jpg JPG image
Solicitation Amendment FA875125B00010002 SF 30.pdf PDF
Attachment 5 - Drawings- AHU C-D Bay Furniture.pdf PDF
Solicitation Amendment FA875125B00010001 SF 30.pdf PDF
Attachment 1 - Technical Specifications_Rev 1.pdf PDF
Attachment 1 - Technical Specifications.pdf PDF
Attachment 1 - Technical Specifications.pdf PDF
Attachment 4 - Wage Determination 3.14.25.pdf PDF
Attachment 2 - Drawings B3 HVAC Design.pdf PDF
Attachment 3 - SOW - Furniture.pdf PDF
Solicitation - FA875125B0001.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA875125B0001 – Attachment 6 ADDENDUM NO. 1 29 April 2025 Refer to drawings:

1. Sheet 62, drawing ED001 Existing One - Line Power Diagram – Electric Room J6-K: remove motor control center MCC-i4M -1/HVSB – J6M-1.

2. Sheet 72, drawing E-601 Details:

a. Refer to Fixture Schedule:

i. Change type B to Read: 2”x4” Cruze, ribbed frosted acrylic lens, 90% reflective matte white enamel finish, paint after fabrication, 10% to 100% dimming driver; 36.1W, LED (5570 lumens), 120-277; recessed grid ceiling; Metalux catalog number 24CZ2-55VHE-UNV-L940- CD1.

ii. Add fixture type B2: 2”x4” Cruze, ribbed frosted acrylic lens, 90% reflective matte white enamel finish, paint after fabrication, 10% to 100% dimming driver; 29.6W, LED (4559 lumens), 120-277; recessed grid ceiling; Metalux catalog number 24CZ2-45VHE-UNV-L940- CD1.

Add the following:

1. Provide all work on attached drawing ADE-1 relative to a lightning protection system on the penthouse roof.

2. Provide a lighting protection system in accordance with specification section 26 41 00 Lightning Protection System, attached.

3. All motor control centers noted to be removed should be turned over to the owner and moved to a storage area designated by the owner. If the units are required to be disassembled for removal from the mezzanine, they are not required to be assembled in the designated storage area.