C
LEAN
R O
O M
GENERAL NOTES - ASBESTOS REMOVAL NOTES:
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETION OF THE ASBESTOS CONTAINING MATERIAL REMOVALS AS DEFINED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR ALL MEANS, METHODS, COORDINATION, SUPERVISION, MANAGEMENT, AND
SEQUENCING TO COMPLETE THE WORK. ADDITIONALLY, THE CONTRACTOR SHALL MAKE ALL EFFORTS TO COOPERATE AND COORDINATE WITH THE OTHER PROJECT CONTRACTORS. THE CONTRACTOR SHALL COORDINATE ALL BUILDING/ ELECTRICAL/ HVAC SHUTDOWNS AND ISOLATION WITH THE OWNER.
B. THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR ASBESTOS REMOVAL AND SHALL EMPLOY NYS DEPARTMENT OF LABOR CERTIFIED EMPLOYEES. SUFFICIENT STAFF SHALL BE PROVIDED TO COMPLETE THE ASBESTOS REMOVALS WITHIN THE SCHEDULED CONSTRUCTION PERIODS.
C. ASBESTOS MATERIAL REMOVAL AND DISPOSAL SHALL BE IN ACCORDANCE WITH THE PROCEDURES IDENTIFIED IN THE PROJECT MANUAL AND APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
CONTRACTOR, AT THEIR OWN EXPENSE, MAY OBTAIN A SITE SPECIFIC VARIANCE FROM THE NYS
DEPARTMENT OF LABOR.
D. CONTRACT DRAWINGS INDICATE THE EXTENT OF ASBESTOS REMOVAL AND ARE TO BE USED AS A
GUIDELINE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING MATERIALS
ILLUSTRATED ON THE CONTRACT DRAWINGS AND LISTED IN THE SPECIFICATIONS.
E. CONTRACTOR SHALL COORDINATE PROPOSED DECONTAMINATION UNIT LOCATIONS, STAGING AREAS, AND WORK SITE ACCESS WITH BUILDING OWNER AND/OR THEIR REPRESENTATIVE.
F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES TO THE
BUILDING, BUILDING COMPONENTS, OR SYSTEMS NOT INCLUDED IN THIS SCOPE THAT ARE
CONSEQUENTLY DAMAGED AS A RESULT OF THE CONTRACTOR'S WORK.
MATERIAL REMOVAL SCHEDULE
LEGEND MATERIAL APPROX. QUANTITY
PIPE INSULATION ABOVE CEILING SYSTEMS LF
ACM JOINT COMPOUND ON WALLS WITHIN THIS ROOM. WORK
IMPACTING MATERIALS SHALL BE CONDUCTED IN ACCORDANCE
WITH NY ICR 56 - THIS INCLUDES CONTROL SWITCH INSTALLATIONS,
CEILING GRID TRACK WORK, WIRING, ETC.
50 SF
(IMPACTED QUANTITY)1
NOTE: PIPE INSULATION IN THIS LOCATION IS APPROX. 20-25'
ABOVE THE FLOOR, REMOVALS WILL REQUIRE EXTENDABLE
LIFTS AT ACCESS AND REMOVE.
02/07/2025
390 LF
03/21/2025
H SS8x8x1/4
H SS8x8x3/8
H SS8x8x1/4
GENERAL NOTES - ASBESTOS REMOVAL NOTES:
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETION OF THE ASBESTOS CONTAINING MATERIAL REMOVALS AS DEFINED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR ALL MEANS, METHODS, COORDINATION, SUPERVISION, MANAGEMENT, AND
SEQUENCING TO COMPLETE THE WORK. ADDITIONALLY, THE CONTRACTOR SHALL MAKE ALL EFFORTS TO COOPERATE AND COORDINATE WITH THE OTHER PROJECT CONTRACTORS. THE CONTRACTOR SHALL COORDINATE ALL BUILDING/ ELECTRICAL/ HVAC SHUTDOWNS AND ISOLATION WITH THE OWNER.
B. THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR ASBESTOS REMOVAL AND SHALL EMPLOY NYS DEPARTMENT OF LABOR CERTIFIED EMPLOYEES. SUFFICIENT STAFF SHALL BE PROVIDED TO COMPLETE THE ASBESTOS REMOVALS WITHIN THE SCHEDULED CONSTRUCTION PERIODS.
C. ASBESTOS MATERIAL REMOVAL AND DISPOSAL SHALL BE IN ACCORDANCE WITH THE PROCEDURES IDENTIFIED IN THE PROJECT MANUAL AND APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
CONTRACTOR, AT THEIR OWN EXPENSE, MAY OBTAIN A SITE SPECIFIC VARIANCE FROM THE NYS
DEPARTMENT OF LABOR.
D. CONTRACT DRAWINGS INDICATE THE EXTENT OF ASBESTOS REMOVAL AND ARE TO BE USED AS A
GUIDELINE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING MATERIALS
ILLUSTRATED ON THE CONTRACT DRAWINGS AND LISTED IN THE SPECIFICATIONS.
E. CONTRACTOR SHALL COORDINATE PROPOSED DECONTAMINATION UNIT LOCATIONS, STAGING AREAS, AND WORK SITE ACCESS WITH BUILDING OWNER AND/OR THEIR REPRESENTATIVE.
F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES TO THE
BUILDING, BUILDING COMPONENTS, OR SYSTEMS NOT INCLUDED IN THIS SCOPE THAT ARE
CONSEQUENTLY DAMAGED AS A RESULT OF THE CONTRACTOR'S WORK.
MATERIAL REMOVAL SCHEDULE
LEGEND MATERIAL APPROX. QUANTITY
PIPE INSULATION ABOVE CEILING SYSTEMS LF
NOTE: PIPE INSULATION IN THIS LOCATION IS APPROX. 20-25'
ABOVE THE FLOOR, REMOVALS WILL REQUIRE EXTENDABLE
LIFTS AT ACCESS AND REMOVE.
720 LF
GENERAL NOTES - ASBESTOS REMOVAL NOTES:
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETION OF THE ASBESTOS CONTAINING MATERIAL REMOVALS AS DEFINED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR ALL MEANS, METHODS, COORDINATION, SUPERVISION, MANAGEMENT, AND
SEQUENCING TO COMPLETE THE WORK. ADDITIONALLY, THE CONTRACTOR SHALL MAKE ALL EFFORTS TO COOPERATE AND COORDINATE WITH THE OTHER PROJECT CONTRACTORS. THE CONTRACTOR SHALL COORDINATE ALL BUILDING/ ELECTRICAL/ HVAC SHUTDOWNS AND ISOLATION WITH THE OWNER.
B. THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR ASBESTOS REMOVAL AND SHALL EMPLOY NYS DEPARTMENT OF LABOR CERTIFIED EMPLOYEES. SUFFICIENT STAFF SHALL BE PROVIDED TO COMPLETE THE ASBESTOS REMOVALS WITHIN THE SCHEDULED CONSTRUCTION PERIODS.
C. ASBESTOS MATERIAL REMOVAL AND DISPOSAL SHALL BE IN ACCORDANCE WITH THE PROCEDURES IDENTIFIED IN THE PROJECT MANUAL AND APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
CONTRACTOR, AT THEIR OWN EXPENSE, MAY OBTAIN A SITE SPECIFIC VARIANCE FROM THE NYS
DEPARTMENT OF LABOR.
D. CONTRACT DRAWINGS INDICATE THE EXTENT OF ASBESTOS REMOVAL AND ARE TO BE USED AS A
GUIDELINE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING MATERIALS
ILLUSTRATED ON THE CONTRACT DRAWINGS AND LISTED IN THE SPECIFICATIONS.
E. CONTRACTOR SHALL COORDINATE PROPOSED DECONTAMINATION UNIT LOCATIONS, STAGING AREAS, AND WORK SITE ACCESS WITH BUILDING OWNER AND/OR THEIR REPRESENTATIVE.
F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES TO THE
BUILDING, BUILDING COMPONENTS, OR SYSTEMS NOT INCLUDED IN THIS SCOPE THAT ARE
CONSEQUENTLY DAMAGED AS A RESULT OF THE CONTRACTOR'S WORK.
MATERIAL REMOVAL SCHEDULE
LEGEND MATERIAL APPROX. QUANTITY
ACM FLEX DUCT CONNECTOR SF
ACM SEAL SEALANT ON AHU. CONTRACTOR SHALL DISASSEMBLE
THE ANU AND REMOVE AND DISPOSE OF ALL ACM SEALANT AT
DUCTWORK JOINTS.
SF
3 72
100 SF
120 SF
MATERIAL REMOVALS AS DEFINED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR ALL MEANS, METHODS, COORDINATION, SUPERVISION, MANAGEMENT, AND
SEQUENCING TO COMPLETE THE WORK. ADDITIONALLY, THE CONTRACTOR SHALL MAKE ALL EFFORTS TO COOPERATE AND COORDINATE WITH THE OTHER PROJECT CONTRACTORS. THE CONTRACTOR SHALL COORDINATE ALL BUILDING/ ELECTRICAL/ HVAC SHUTDOWNS AND ISOLATION WITH THE OWNER.
B. THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR ASBESTOS REMOVAL AND SHALL EMPLOY NYS DEPARTMENT OF LABOR CERTIFIED EMPLOYEES. SUFFICIENT STAFF SHALL BE PROVIDED TO COMPLETE THE ASBESTOS REMOVALS WITHIN THE SCHEDULED CONSTRUCTION PERIODS.
C. ASBESTOS MATERIAL REMOVAL AND DISPOSAL SHALL BE IN ACCORDANCE WITH THE PROCEDURES IDENTIFIED IN THE PROJECT MANUAL AND APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
CONTRACTOR, AT THEIR OWN EXPENSE, MAY OBTAIN A SITE SPECIFIC VARIANCE FROM THE NYS
DEPARTMENT OF LABOR.
D. CONTRACT DRAWINGS INDICATE THE EXTENT OF ASBESTOS REMOVAL AND ARE TO BE USED AS A
GUIDELINE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING MATERIALS
ILLUSTRATED ON THE CONTRACT DRAWINGS AND LISTED IN THE SPECIFICATIONS.
E. CONTRACTOR SHALL COORDINATE PROPOSED DECONTAMINATION UNIT LOCATIONS, STAGING AREAS, AND WORK SITE ACCESS WITH BUILDING OWNER AND/OR THEIR REPRESENTATIVE.
F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES TO THE
BUILDING, BUILDING COMPONENTS, OR SYSTEMS NOT INCLUDED IN THIS SCOPE THAT ARE
CONSEQUENTLY DAMAGED AS A RESULT OF THE CONTRACTOR'S WORK.
MATERIAL REMOVAL SCHEDULE
LEGEND MATERIAL APPROX. QUANTITY
ACM FLEX DUCT CONNECTOR SF
ACM SEAL SEALANT ON AHU. CONTRACTOR SHALL DISASSEMBLE
THE ANU AND REMOVE AND DISPOSE OF ALL ACM SEALANT AT
4 72
150 SF
120 SF
MATERIAL REMOVALS AS DEFINED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR ALL MEANS, METHODS, COORDINATION, SUPERVISION, MANAGEMENT, AND
SEQUENCING TO COMPLETE THE WORK. ADDITIONALLY, THE CONTRACTOR SHALL MAKE ALL EFFORTS TO COOPERATE AND COORDINATE WITH THE OTHER PROJECT CONTRACTORS. THE CONTRACTOR SHALL COORDINATE ALL BUILDING/ ELECTRICAL/ HVAC SHUTDOWNS AND ISOLATION WITH THE OWNER.
B. THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR ASBESTOS REMOVAL AND SHALL EMPLOY NYS DEPARTMENT OF LABOR CERTIFIED EMPLOYEES. SUFFICIENT STAFF SHALL BE PROVIDED TO COMPLETE THE ASBESTOS REMOVALS WITHIN THE SCHEDULED CONSTRUCTION PERIODS.
C. ASBESTOS MATERIAL REMOVAL AND DISPOSAL SHALL BE IN ACCORDANCE WITH THE PROCEDURES IDENTIFIED IN THE PROJECT MANUAL AND APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
CONTRACTOR, AT THEIR OWN EXPENSE, MAY OBTAIN A SITE SPECIFIC VARIANCE FROM THE NYS
DEPARTMENT OF LABOR.
D. CONTRACT DRAWINGS INDICATE THE EXTENT OF ASBESTOS REMOVAL AND ARE TO BE USED AS A
GUIDELINE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING MATERIALS
ILLUSTRATED ON THE CONTRACT DRAWINGS AND LISTED IN THE SPECIFICATIONS.
E. CONTRACTOR SHALL COORDINATE PROPOSED DECONTAMINATION UNIT LOCATIONS, STAGING AREAS, AND WORK SITE ACCESS WITH BUILDING OWNER AND/OR THEIR REPRESENTATIVE.
F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES TO THE
BUILDING, BUILDING COMPONENTS, OR SYSTEMS NOT INCLUDED IN THIS SCOPE THAT ARE
CONSEQUENTLY DAMAGED AS A RESULT OF THE CONTRACTOR'S WORK.
MATERIAL REMOVAL SCHEDULE
LEGEND MATERIAL APPROX. QUANTITY
ACM FLEX DUCT CONNECTOR SF
ACM SEAL SEALANT ON AHU. CONTRACTOR SHALL DISASSEMBLE
THE ANU AND REMOVE AND DISPOSE OF ALL ACM SEALANT AT
5 72
210 SF
200 SF
ELEVATED DRAINAGE PIPE
PU
M
P
H W
S C
W S
LAV-1
GENERAL NOTES - ASBESTOS REMOVAL NOTES:
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETION OF THE ASBESTOS CONTAINING MATERIAL REMOVALS AS DEFINED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR ALL MEANS, METHODS, COORDINATION, SUPERVISION, MANAGEMENT, AND
SEQUENCING TO COMPLETE THE WORK. ADDITIONALLY, THE CONTRACTOR SHALL MAKE ALL EFFORTS TO COOPERATE AND COORDINATE WITH THE OTHER PROJECT CONTRACTORS. THE CONTRACTOR SHALL COORDINATE ALL BUILDING/ ELECTRICAL/ HVAC SHUTDOWNS AND ISOLATION WITH THE OWNER.
B. THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR ASBESTOS REMOVAL AND SHALL EMPLOY NYS DEPARTMENT OF LABOR CERTIFIED EMPLOYEES. SUFFICIENT STAFF SHALL BE PROVIDED TO COMPLETE THE ASBESTOS REMOVALS WITHIN THE SCHEDULED CONSTRUCTION PERIODS.
C. ASBESTOS MATERIAL REMOVAL AND DISPOSAL SHALL BE IN ACCORDANCE WITH THE PROCEDURES IDENTIFIED IN THE PROJECT MANUAL AND APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
CONTRACTOR, AT THEIR OWN EXPENSE, MAY OBTAIN A SITE SPECIFIC VARIANCE FROM THE NYS
DEPARTMENT OF LABOR.
D. CONTRACT DRAWINGS INDICATE THE EXTENT OF ASBESTOS REMOVAL AND ARE TO BE USED AS A
GUIDELINE. CONTRACTOR SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING MATERIALS
ILLUSTRATED ON THE CONTRACT DRAWINGS AND LISTED IN THE SPECIFICATIONS.
E. CONTRACTOR SHALL COORDINATE PROPOSED DECONTAMINATION UNIT LOCATIONS, STAGING AREAS, AND WORK SITE ACCESS WITH BUILDING OWNER AND/OR THEIR REPRESENTATIVE.
F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES TO THE
BUILDING, BUILDING COMPONENTS, OR SYSTEMS NOT INCLUDED IN THIS SCOPE THAT ARE
CONSEQUENTLY DAMAGED AS A RESULT OF THE CONTRACTOR'S WORK.
MATERIAL REMOVAL SCHEDULE
LEGEND MATERIAL APPROX. QUANTITY
ACM FLEX DUCT CONNECTOR 100 SF
ACM SEAL SEALANT ON AHU. CONTRACTOR SHALL DISASSEMBLE
THE ANU AND REMOVE AND DISPOSE OF ALL ACM SEALANT AT
60 SF
72 6
90 SF
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETION OF THE ASBESTOS CONTAINING MATERIAL REMOVALS AS DEFINED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ALL MEANS, METHODS, COORDINATION, SUPERVISION, MANAGEMENT, AND SEQUENCING TO COMPLETE THE WORK. ADDITIONALLY, THE CONTRACTOR SHALL MAKE ALL EFFORTS TO COOPERATE AND COORDINATE WITH THE OTHER PROJECT CONTRACTORS. THE CONTRACTOR SHALL COORDINATE ALL BUILDING/ ELECTRICAL/ HVAC
SHUTDOWNS AND ISOLATION WITH THE OWNER.
B. THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR ASBESTOS REMOVAL AND SHALL EMPLOY NYS DEPARTMENT OF LABOR CERTIFIED EMPLOYEES. SUFFICIENT STAFF SHALL BE PROVIDED TO
COMPLETE THE ASBESTOS REMOVALS WITHIN THE SCHEDULED CONSTRUCTION PERIODS.
C. ASBESTOS MATERIAL REMOVAL AND DISPOSAL SHALL BE IN ACCORDANCE WITH THE PROCEDURES IDENTIFIED IN THE PROJECT MANUAL AND APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. CONTRACTOR, AT THEIR OWN EXPENSE, MAY OBTAIN A SITE SPECIFIC VARIANCE FROM THE NYS DEPARTMENT OF LABOR.
D. CONTRACT DRAWINGS INDICATE THE EXTENT OF ASBESTOS REMOVAL AND ARE TO BE USED AS A GUIDELINE.
CONTRACTOR SHALL REMOVE AND DISPOSE OF ASBESTOS CONTAINING MATERIALS ILLUSTRATED ON THE
CONTRACT DRAWINGS AND LISTED IN THE SPECIFICATIONS.
E. CONTRACTOR SHALL COORDINATE PROPOSED DECONTAMINATION UNIT LOCATIONS, STAGING AREAS, AND
WORK SITE ACCESS WITH BUILDING OWNER AND/OR THEIR REPRESENTATIVE.
F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES TO THE BUILDING, BUILDING COMPONENTS, OR SYSTEMS NOT INCLUDED IN THIS SCOPE THAT ARE CONSEQUENTLY DAMAGED AS
A RESULT OF THE CONTRACTOR'S WORK.
MATERIAL REMOVAL SCHEDULE
LEGEND MATERIAL APPROX. QUANTITY
PIPE INSULATION ABOVE CEILING SYSTEMS 175 LF
ACM FLEX DUCT CONNECTOR 150 SF
ACM SEAL SEALANT ON AHU. CONTRACTOR SHALL DISASSEMBLE
THE ANU AND REMOVE AND DISPOSE OF ALL ACM SEALANT AT
100 SF
7 72
C O A
08 4 EXP I RATON DATE 08/31/2027
LE
A N
R O O M
C O A
A N
R O O M
C O A
A N
R O O M
Server
Server
C O A
U P
U P
CO
A
08 4 EXP I RATON DATE 08/31/ 2027
D O W N
J6-J
J6-K
CO
A
E
V A
TE
D
D R
A
IN
A G
E P
IP
E
E
LE
V A
TE
D
D R
A
IN
A G
E P
IP
E
ELEVATED DRAINAGE PIPE
P U
M P
H W
S
C W
S
LA
V -1
CO
A
A N
R O
M
CO
084 EXP I RATON DATE 08/31/2027
Δ
C O A
S S 8x8x1/4
H S S 8x8x3/8
H S S 8x8x1/4
C O A
F
AHU-C-2
C O A
A N
R O O M
C O A
A N
R O O M
C O A
S 8x8x1/4
H S S 8x8x3/8
H S S 8x8x1/4
C O A
W N
CO
A
W N
CO
A
C O A
08 4 EXP I RATON DATE 08/31/2027
A N
R O O M
C O A
A N
R O O M
C O A
A N
R O O M
C O A
A N
R O O M
C O A
S 8x8x1/4
H S S 8x8x3/8
H S S 8x8x1/4
C O A
5A
-3 P
A -3
P
0A
-3 P
0A
-3 P
5A
-3 P
5A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
5A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
A
-2 P
A
-2 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
A -3
P
0A
-3 P
POWER TRANSFORMER, PT-2
1500 KVA, 13.2 KV X 208/120V
OUTSIDE J6-i
4-#4/0 & 1-#4/0 G. (15KV)
IN 4" C.
FROM SERVICE ENTRANCE
SWITCHING CENTER (SESC),
FEEDER BAY 2 (FB-2).
SEE DRAWING E-7 FOR
CONTINUATION
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
A -3
P
LVSB-J6M-1
J6-K
4-500 KCM & 1-500 KCM G.
IN EACH OF 11-4" C.
3-500 KCM & 1-250 KCM G.
IN EACH OF 6-4" C.
500 KVA TRNSFRMR
T-HVSBJ6M1
208V X 480/277V J6-K
0A
-3 P
30A-3P
250A-3P
200A-3P
175A-3P
400A-3P
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-4" C.
HVSB-J6M-1/LVSB-J6M-1
J6-K
3-500 KCM & 1-#3 G.
IN 4" C.
LVP-TP-1/
HVSB-J6M-1
TACTICAL
PAD
300 KVA TRNSFRMR
T-TP1
480V X 120/208V
TACTICAL PAD
4-400 KCM & 1-#2/0 G.
IN EACH OF 3-31
2" C.
UNIT HEATER
3-#10 & 1-#10 G.
IN 2" C.
3-250 KCM & 1-#4 G.
IN 3" C.
3-#4/0 & 1-#4 G.
IN 21
2" C.
MCC-J6M-1/
HVSB-J6M-1
J6-J
MCC-i7-1/
HVSB-J6M-1
i7-B
MCC-i5M-1/
HVSB-J6M-1
MEZZANINE
ABOVE i5-H
MCC-i4M-1/
HVSB-J6M-1
MEZZANINE
ABOVE i4-A
MCC-G4M-1/
HVSB-J6M-1
MEZZANINE
ABOVE G4-B
MCC-F4M-1/
HVSB-J6M-1
MEZZANINE
ABOVE F4-C
3-#4/0 (AL)
IN 2" C.
3-#4/0 & 1-#4 G.
IN 2" C.
3-#2/0 (AL)
IN 2" C.
400A-3P 50A-3P
HVP-K4-1/
HVSB-J6M-1
K4-A
75 KVA TRNSFRMR
T-3 480V X 120/208V K4-A
4-600 KCM & 1-#3 G.
IN 4" C.
3-#2
IN 11
4" C.
LVP-K4-1/
HVP-K4-1
K4-A
200A-3P
200A-3P
200A-3P
200A-3P
LVDP-K5-1/
LVSB-J6M-1
K5-E
5-#3/0 & 1-#6 G.
IN 21
2" C.
LVP-K5-1/
LVDP-K5-1
K5-E
5-#3/0 & 1-#6 G.
IN 21
2" C.
5-600 KCM & 1-#1/0 G.
IN EACH OF 2-4" C.
LVP-K5-2/
LVDP-K5-1
K5-E
LVP-K5-3/
LVDP-K5-1
K5-E
LVP-K5-4/
LVDP-K5-1
K5-E
LVDP-J6M-4/
LVSB-J6M-1
MEZZANINE
ABOVE J6-C
LVDP-VB-3/
LVSB-J6M-1
0A
-3 P
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-4" C.
4-500 KCM
IN EACH OF 2-3" C.
0A
-3 P
100A-3P
100A-3P
100A-3P
LVDP-J5M-1/
LVSB-J6M-1
MEZZANINE
ABOVE J5-J
4-500 KCM & 1-#2 G.
IN 31
2" C.
LVP-J5-1/
LVDP-J5M-1
J5-J
LVP-J5-2/
LVDP-J5M-1
J5-K
LVP-J6-11/
LVDP-J5M-1
J6-C 4-#2 & 1-#8 G.
IN 11
2" C.
4-#2
IN 11
4" C.
100A-3P
100A-3P
100A-3P
100A-3P
100A-3P
100A-3P
100A-3P
LVDP-J6-1/
LVSB-J6M-1
J6-C
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-4" C.
4-500 KCM
IN EACH OF 2-3" C.
LVP-J5-13/
LVDP-J6-1
J5-H
LVP-J5-15/
LVDP-J6-1
J5-H
60A-3P
LVP-J5-3/
LVDP-J6-1
J5-H LVP-J5-3A/
LVP-J5-3
J5-J
4-#4 W/G.
MC CABLE
LVP-J5-10/
LVDP-J6-1
LVP-J5-4/
LVDP-J6-1
J5-E
80A-3P
LVP-J5-5/
LVDP-J6-1
J5-F LVP-J5-5A/
LVP-J5-5
J5-J
4-#2 W/G.
MC CABLE
LVP-J5-16/
LVDP-VB-3
60A-3P
LVP-J5-6/
LVDP-J6-1
J5-K
60A-3P
LVP-J5-6A/
LVP-J5-6
J5-J
LVP-J5-8/
LVDP-J6-1
LVP-J5-6B/
LVP-J5-6
J5-J
LVP-J5-9/
LVDP-J6-1
4-#4 W/G.
MC CABLE
80A-3P
LVP-J5-7/
LVDP-J6-1
J5-L LVP-J5-7A/
LVP-J5-7
J5-J
4-#2 W/G.
MC CABLE
LVP-J5-12/
LVDP-VB-3
4-#2
IN 11
4" C.
LVP-J5-11/
LVDP-J6-1
J5-H
LVP-J5-14/
LVDP-J6-1
J5-H 4-#3 & 1-#8 G.
IN 11
4" C.
LVP-J5-13/
LVDP-VB-3
LVP-J5-15/
LVDP-VB-3
LVP-J5-11/
LVDP-VB-3
LVP-J5-14/
LVDP-VB-3
LVP-J5-18/
LVDP-J5M-2
J5-M
4-#3/0
IN 2" C.
LVP-J5-18/
LVDP-K5-1
0A
-3 P
200A-3P
LVDP-J5M-2/
LVSB-J6M-1
MEZZANINE
ABOVE J5-L
LVDP-K5-1/
LVSB-J6M-1
4-350 KCM
IN EACH OF 2-3" C.4-350 KCM & 1-#1 G.
IN EACH OF 2-3" C.
0A
-3 P
225A-3P
125A-3P
125A-3P
LVDP-J6M-1/
LVSB-J6M-1
MEZZANINE
ABOVE J6-B
J6-H
UPS #3
J6-H
LVP-J6-3/
LVDP-J6M-1
J6-H
J6-H
UPS #2
J6-H
LVP-J6-2/
LVDP-J6M-1
J6-H
J6-H
UPS #1
J6-H
LVP-J6-1/
LVDP-J6M-1
J6-H
4-#1/0 & 1-#4 G.
IN 2" C.
4-#1/0 & 1-#4 G.
IN 2" C.
4-#1/0 & 1-#4 G.
IN 2" C.
4-#1/0 & 1-#4 G.
IN 2" C.
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-4" C.
125A-3P
PDI POWER
ENCLOSURE
i6-A
4-#4/0 & 1-#4 G.
IN 21
2" C.
200A-3P
200A-3P
200A-3P
200A-3P
100A-3P
100A-3P
100A-3P
LVDP-J6M-2/
LVSB-J6M-1
MEZZANINE
ABOVE J6-B
100A-3P
100A-3P
0A
-3 P
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-4" C.
UNKNOWN
DESTINATION
LVP-J6-10/
LVDP-J6M-2
J6-C
LVP-J6-9/
LVDP-J6M-2
J6-C
LVP-J6-8/
LVDP-J6M-2
J6-C
LVP-J6-7/
LVDP-J6M-2
J6-i
LVP-J6-6/
LVDP-J6M-2
J6-H
LVP-J6-5/
LVDP-J6M-2
J6-G
LVP-J6-4/
LVDP-J6M-2
J6-A
LVP-J5-17/
LVDP-J6M-2
J5-B
4-#4/0 & 1-#4 G.
IN 2" C.
4-#4/0 & 1-#2 G.
IN 21
2" C.
4-#2 & 1-#6 G.
IN 11
4" C.
2-#10 & 1-#10 G. IN 1" C.
TO J-5 FIRE
ALARM PANEL
LVDP-J6M-3/
LVSB-J6M-1
MEZZANINE
ABOVE J6-C
LVDP-VB-1/
LVSB-J6M-1
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-31
2" C.
0A
-3 P
60A-3P
LVDP-J5M-3/
LVSB-J6M-1
MEZZANINE
ABOVE J5-M
LVDP-VB-2/
LVSB-J6M-1
LVP-J5-19/
LVDP-J5M-3
J5-M
4-#6
IN 1" C.
LVP-J5-19/
LVDP-VB-2
4-500 KCM & 1-#2 G.
IN 31
2" C.
3-500 KCM & 1-#1/0 G.
IN 4" C.
0A
-3 P
LVDP-H7-1/
LVSB-J6M-1
H7-F
200A-3P
200A-3P
200A-3P
200A-3P
200A-3P
LVP-H7-1/
LVDP-H7-1
H7-F
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-31
2" C.
3-500 KCM & 1-#4/0 N.
IN EACH OF 3-4" C.
4-#3/0 & 1-#6 G.
IN 2" C.
LVP-H7-2/
LVDP-H7-1
H7-D 100A-3P
LVP-H7-3/
LVDP-H7-1
H7-E
100A
CONTACTOR
LVP-H7-3A/
LVP-H7-3
H7-E
4-#2 & 1-#4 G.
IN 2" C.
H7-E
50A-3P
LVP-H7-4/
LVDP-H7-1
H7-C
100A
CONTACTOR
LVP-H7-4A/
LVP-H7-4
H7-C
4-#2 & 1-#6 G.
IN 11
2" C.
H7-C
A
-3 P
4"X4" WIREWAY
4-#2 & 1-#4 G.
IN 11
2" C.
4"X4" WIREWAY
4-#2 & 1-#6 G.
IN 11
2" C.
50A-3P
LVP-H7-5/
LVDP-H7-1
H7-A
400 Hz
FREQUENCY
GENERATOR
H7-A
4"X4" WIREWAY
LVP-H7-5B/
LVP-H7-5
H7-C
LVP-H7-5A/
LVP-H7-5
H7-D
4-#1/0 (AL)
IN 2" C. LVP-H7-6/
LVDP-H7-1
H7-A
4-#2 & 1-#6 G.
IN 2" C.
4-#2 & 1-#6 G.
IN 11
2" C.
4-#4
IN 2" C.
0A
-3 P
125A-3P
LVP-J4-1/
LVSB-J6M-1
J4-C LVP-J4-1A/
LVP-J4-1
J4-AA
4-#2 & 1-#6 G.
IN 11
2" C.
4-500 KCM & 1-#3/0 G.
IN EACH OF 3-31
2" C.
"POWER PANEL &
BUS-DUCT, E-BAY"
3-500 KCM & 1-#1/0 N.
IN EACH OF 3-4" C.
3-500 KCM & 1-#1/0 N.
IN 4" C.
200A-3P
200A-3P
200A-3P
200A-3P
LVDP-H7-2/
LVSB-J6M-1
H7-K
0A
-3 P
200A-3P
200A-3P
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-31
2" C.
3-500 KCM & 1-#4/0 N.
IN EACH OF 3-4" C.
3-#1/0
LVP-H8-6/
LVDP-H7-2
H8-A
4-#3/0 & 1-#6 G.
IN 2" C.
LVP-G8-1/
LVDP-H7-2
G8-A
4-#3/0
IN 21
2" C.
LVP-H7-8/
LVDP-H7-2
H7-K
4-#3/0
IN 2" C.
LVP-H7-7/
LVDP-H7-2
H7-A
4-#6
IN 11
4" C.
3-#1/0
IN 2" C.
350A-3P
400A-3P
200A-3P
LVDP-i7-1/
LVSB-J6M-1
i7-C
400A-3P
18"X10" WIREWAY
4-500 KCM & 1-#1/0 G.
IN 36"X8" WIREWAY
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-31
2" C.
60A-3P
LVP-CORR.H-1/
LVDP-i7-1
CORRIDOR H
0A
-3 P
100A-3P
LVP-CORR.6-1/
LVDP-i7-1
CORRIDOR 6
60A-3P
LVP-CORR.5-3/
LVP-CORR.H-1
CORRIDOR 5
LVP-CORR.4-1/
LVP-CORR.H-1
CORRIDOR 4
4-#4 & 1-#8 G.
IN 11
4" C.
LVP-F6-1/
LVP-CORR.6-1
F6
4-250 KCM & 1-#2 G.
IN EACH OF 2-3" C.
4-350 KCM (AL) & 1-#2 G.
IN 4" C.
4-#3 & 1-#8 G.
IN 11
4" C.
LVP-CORR.F-1/
LVDP-i7-1
CORRIDOR F
4-250 KCM (AL) & 1-#2 G.
IN 21
2" C.
4-250 KCM (AL) & 1-#2 G.
IN 3" C.
4-#2/0 (AL) & 1-#6 G.
IN 2" C.
LVP-F8-4/
LVDP-i7-1
F8-K
4-250 KCM & 1-#2 G.
IN EACH OF 2-31
2" C.
4-750 KCM (AL) & 1-#2 G.
IN 5" C.
PANEL
RP-2A
4-#4/0 & 1-#2 G.
IN 21
2" C.
100A-3P
100A-3P
100A-3P
100A-3P
LVDP-H4-1/
LVSB-J6M-1
H4-G
0A
-3 P
100A-3P
100A-3P
100A-3P
400A i7-C DS-LVDP-H4-1
4-500 KCM & 1-#2 G.
IN 4" C.
4-500 KCM & 1-#2 G.
IN 31
2" C.
4-500 KCM & 1-#2 G.
IN 3" C.
LVP-H4-1/
LVDP-H4-1
H4-A
LVP-H4-2/
LVDP-H4-1
H4-A
LVP-H4-3/
LVDP-H4-1
H4-A
LVP-H4-4/
LVDP-H4-1
H4-A
LVP-H4-5/
LVDP-H4-1
H4-A
4-#2 & 1-#6 G.
IN 11
2" C.
4-#2 & 1-#8 G.
IN 11
2" C.
LVP-H4-7/
LVDP-H4-1
H4-C
4-#2 & 1-#6 G.
IN 11
2" C.
45 KVA TRNSFRMR
208V X 120/208V
LVP-H4-6/
LVDP-H4-1
H4-D
3-#1/0, 1-#2 N. & 1-#1/0 G.
IN 11
2" C.
H4-G
45 KVA TRNSFRMR
208V X 120/208V H4-G
3-#1/0 & 1-#1/0 G.
IN 11
2" C.
3-#2 & 1-#6 G.
IN 11
2" C.LVP-J5-20/
LVSB-J6M-1
J5-O
LVP-J5M-2/
LVSB-J6M-1-1
MEZZANINE
ABOVE J5-B
LVP-CORR.4-2/
LVSB-J6M-1
4-#2/0
IN 21
2" C.
4-#2/0 & 1-#6 G.
IN 2" C.
4-#2/0
IN 21
2" C.
"LIGHTING
PANEL
E-BAY"4-#1/0 & 1-#6 G.
IN 2" C.
4-#1/0 IN 2" C.
4-500 KCM & 1-#2 G.
IN 31
2" C.
6"X6" WIREWAY
3-500 KCM & 1-250 KCM N.
IN 31
2" C.
100A-3P
LVP-H7-9/
LVDP-H7-2
H7-F
0A
-3 P
LVP-H7-12/
LVP-H7-9
H7-i
4-#6
IN 11
2" C.
150A
H8-D
100A
H8-D
200A
H8-D
LVP-H8-2/
LVSB-J6M-1
H8-B
LVP-H8-3/
LVSB-J6M-1
H8-B
4-#1/0
IN 2" C.
LVP-H8-1/
LVSB-J6M-1
H8-A
4-#3/0 & 1-#4 G.
IN 21
2" C.
UNKNOWN
DESTINATION
4-#1/0
IN 2" C.
4-#1/0
IN 2" C.
LVP-H8-4/
LVSB-J6M-1
H8-B
0A
-3 P
100A-3P
100A-3P
125A-3P
LVDP-H4-2/
LVSB-J6M-1
H4-A
4-500 KCM & 1-#1/0 G. IN EACH OF 2-4" C. 4-500 KCM
IN EACH OF 2-4" C.
FILTER
CIRCUIT
LVP-H4-8/
LVDP-H4-2
H4-A
LVP-H4-9/
LVDP-H4-2
H4-A
4-#2 & 1-#6 G.
IN 11
2" C.
4-#4 & 1-#8 G.
IN 11
4" C.
0A
-3 P
50A-2P
125A-3P
125A-3P
LVDP-i6-1/
LVSB-J6M-1
i6-A
125A-3P
4-500 KCM & 1-#2 G.
IN 31
2" C.
50A i7-B
LVP-i6-1D/ LVDP-i6-1 i6-A
16 KVA
UPS
i7-B
LVP-i6-1C/ LVDP-i6-1 i6-A
3-#8 & 1-#10 G.
IN 34" C.
3-#8 & 1-#10 G.
IN 34" C.
LVP-i6-1B/ LVDP-i6-1 i6-A
LVP-i6-1A/ LVDP-i6-1 i6-A
4-#2 & 1-#6 G.
IN 2" C.
2-#2, 2-#4 & 1-#6 G.
IN 2" C.
4-#2 & 1-#6 G.
IN 2" C.
0A
-3 P
100A-3P
100A-3P
100A-3P
LVP-i5-2/
LVSB-J6M-1
i5-B
4-500 KCM & 1-#2 G. IN 3" C.
4-#3/0 & 1-#6 G.
IN 2" C.
LVP-i5-2C/ LVP-i5-2 i5-C
LVP-i5-2A/ LVP-i5-2 i5-E
4-#2 & 1-#6 G.
IN 11
2" C.
LVP-H7-10/
LVSB-J6M-1
H7-F
LVP-i5-2B/ LVP-i5-2 i5-D
LVP-H7-11/
LVSB-J6M-1
H7-F
4-500 KCM & 1-#2 G.
IN 31
2" C.
4-500 KCM
IN 4" C.
4-#4/0
IN 2" C.
0A
-3 P
30A-2P
100A-1P
100A-1P
LVP-i7-2/
LVSB-J6M-1
i7-C4-#2/0 & 1-#4 G.
IN 2" C.
100A-1P
"RANGE"
4-#10 & 1-#10 G.
IN 34" C.
LTCP 10
(A/C CONTROLS)
LTCP 4, 5A, 5B, 6 & 7
(A/C CONTROLS)
LTCP 3 & 8
(A/C CONTROLS)
2-#2 & 1-#2 G.
IN 1" C.
LVP-i5-1/
LVSB-J6M-1
i5-A
4-500 KCM & 1-#2 G. IN 31
2" C.
4-#3/0 & 1-#6 G.
IN 2" C.
4-500 KCM & 1-#2 G. IN 31
2" C. 4-750 KCM (AL)
& 1-#2 G.
IN 4" C.
LVP-G5-2/
LVSB-J6M-1
G5-F
LVP-G5-1/
LVSB-J6M-1
G5-F
LVP-F5-2/
LVSB-J6M-1
F5-D
LVP-H5-3/
LVSB-J6M-1
H5-A
4-#4/0 & 1-#4 G.
IN 21
2" C.
4-500 KCM
& 1-#2 G.
IN 31
2" C.
4-#1 & 1-#6 G.
IN 2" C.
4-500 KCM
& 1-#2 G.
IN 31
2" C.
4-500 KCM
& 1-#2 G.
IN 31
2" C.
4-#2/0 & 1-#8 G.
IN 2" C.
4-#3/0 & 1-#8 G.
IN 2" C.
S P
A R
E
4-350 KCM & 1-#4 G. IN 3" C.
"COMPUTER
ROOM POWER
ROOM 2217"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
27 27
25 25
23 23
22 22
18 18
17 17
15 15
14 14
13 13
12 12
11 11 11
9 9
99 9
8 8
7 7
6.1
5 5
4 4
2 2 2
2 2 2 2
1 1
28.1
28.2
28.3
28.4
28.5
28.6
28.6
28.4
28.4
28.4.1
28.4.1
28.3
28.2
28.1 28.1 28.1 28.1
27.1
27.2
27.3
27.4
27.1
27.2
27.3
27.4
25.1
25.1
25.2
25.3
25.2
25.3
24.1
24.2
24.3
24.4
24.5
24.6
24.7
24.7
24.7.1 24.7.1
24.6
24.6
24.5 24.5
24.5
24.5.1 24.5.1
24.4 24.4
24.4
24.4.2
24.4.1
24.3 24.3
24.3
24.3.1
24.2
24.2 24.2
24.1 24.123.1
22.1
22.2
22.3
22.4
22.4
22.3 22.3
22.2 22.2
22.1 22.1 21.1
21.2
21.3
21.4
21.5
21.6
21.7
21.8
21.9
21.7
21.7
21.6
21.6
21.5
21.5
21.4
21.4
21.3
21.3
21.2 21.2
21.2
21.3
21.1 21.1
21.1
17.1
16.1
16.2
16.3
16.4
16.5
16.5
16.4
16.3
16.3
16.2 16.2
16.2
16.2.1 16.2.1
16.1 16.1
16.1
16.1
16.1.1 16.1.1
15.1 15.1
14.2
14.3
14.4
14.5
14.6
14.6
14.5
14.4
14.4
14.3
14.3
14.2
14.2
14.1
13.1
13.2
13.3 13.3
13.3
13.3.1
13.3.2
13.3.1
13.2
13.2
13.2.1 13.2.1
13.2
13.1
13.1
12.1
12.2
12.3
12.4
12.5
12.6
12.7 12.7
12.6
12.6
12.5
12.5
12.4 12.4
12.4
12.3 12.3
12.3
12.2 12.2
12.2
12.1 12.1
8.1
8.2
8.3
8.1
8.2
8.3
7.1
7.2
7.3
7.4
7.4
7.4
7.4
7.3
7.2
7.1
6.2
6.3 6.3
6.2
6.2
6.1
5.1
5.1
4.1
4.2
4.3
4.4
4.4
4.3
4.2
4.1
28.6
16.3.1 16.3.1
21.8
23.1 24.1
LVP-i4-1/
LVSB-J6M-1
i4-B
4-#3/0 & 1-#6 G.
IN 2" C.
LVP-H6-1/
LVDP-i7-1
H6-A
4-#3/0 & 1-#6 G.
IN 2" C.
13.2
E-MON
POWER
METER
J6-K
LVP-F8-3/
LVDP-H7-2
F8-A
14.6
14.7
14.1
14.1.1 14.1.1
LVP-H8-5/
LVSB-J6M-1
H8-B
200A-3P 14.1
LVP-H8M-1/
LVDP-H7-2
MEZZAINE
ABOVE H8-A
14.5
14.7
14.1
3-#2/0 (AL)
IN 2" C.
CO
A
N
C
LE
A N
R O
O M
LVP-i7-1
MCC-i7-1/HVSB-J6M-1 J6-K 28.2
J6-K 2
LVP-H5-3/LVSB-J6M-1
LVP-i5-1/LVSB-J6M-1 J6-K 3
LVP-CORR.4-1/LVP-CORR.H-1
J6-K 13.3.1
W8x48 CO A
V A
TE
D
D R
A
IN
A G
E P
IP
E
E
LE
V A
TE
D
D R
A
IN
A G
E P
IP
E
ELEVATED DRAINAGE PIPE
P
U M
P
H W
S
C W
S
LA
V -1
C
LE
A N
R O
O M
Server
Server
CO
A
MCC-G4M-1/HVSB-J6M-1
J6-K 28.1
J6-K 28.2
MCC-F4M-1/HVSB-J6M-1
J6-K 28.1
U P
U P
UP
U P
CO
A
D O
W N
U P
J6-K 28
T-HVSBJ6M1
LVSB-J6M-1
MCC-i4M-1/HVSB-J6M-1
(@ MEZZANINE)
MCC-i5M-1/HVSB-J6M-1
(@ MEZZANINE)
J6-K 28.1
HVSB-J6M-1/LVSB-J6M-1
J6-K 28
MCC-J6M-1/HVSB-J6M-1
J6-K 28.3
CO
A
5A
-3 P
A -3
P
0A
-3 P
0A
-3 P
5A
-3 P
5A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
5A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
A
-2 P
A
-2 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
A -3
P
0A
-3 P
POWER TRANSFORMER, PT-2
1500 KVA, 13.2 KV X 208/120V
OUTSIDE J6-i
4-#4/0 & 1-#4/0 G. (15KV)
IN 4" C.
FROM SERVICE ENTRANCE
SWITCHING CENTER (SESC),
FEEDER BAY 2 (FB-2).
SEE DRAWING E-7 FOR
CONTINUATION
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
0A
-3 P
A -3
P
LVSB-J6M-1
J6-K
4-500 KCM & 1-500 KCM G.
IN EACH OF 11-4" C.
3-500 KCM & 1-250 KCM G.
IN EACH OF 6-4" C.
500 KVA TRNSFRMR
T-HVSBJ6M1
208V X 480/277V J6-K
0A
-3 P
30A-3P
250A-3P
200A-3P
175A-3P
400A-3P
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-4" C.
HVSB-J6M-1/LVSB-J6M-1
J6-K
3-500 KCM & 1-#3 G.
IN 4" C.
LVP-TP-1/
HVSB-J6M-1
TACTICAL
PAD
300 KVA TRNSFRMR
T-TP1
480V X 120/208V
TACTICAL PAD
4-400 KCM & 1-#2/0 G.
IN EACH OF 3-31
2" C.
UNIT HEATER
3-#10 & 1-#10 G.
IN 2" C.
3-250 KCM & 1-#4 G.
IN 3" C.
3-#4/0 & 1-#4 G.
IN 21
2" C.
MCC-J6M-1/
HVSB-J6M-1
J6-J
MCC-i7-1/
HVSB-J6M-1
i7-B
MCC-i4M-1/
HVSB-J6M-1
MEZZANINE
ABOVE i4-A
MCC-F4M-1/
HVSB-J6M-1
MEZZANINE
ABOVE F4-C
3-#4/0 (AL)
IN 2" C.
3-#4/0 & 1-#4 G.
IN 2" C.
400A-3P 50A-3P
HVP-K4-1/
HVSB-J6M-1
K4-A
75 KVA TRNSFRMR
T-3 480V X 120/208V K4-A
4-600 KCM & 1-#3 G.
IN 4" C.
3-#2
IN 11
4" C.
LVP-K4-1/
HVP-K4-1
K4-A
200A-3P
200A-3P
200A-3P
200A-3P
LVDP-K5-1/
LVSB-J6M-1
K5-E
5-#3/0 & 1-#6 G.
IN 21
2" C.
LVP-K5-1/
LVDP-K5-1
K5-E
5-#3/0 & 1-#6 G.
IN 21
2" C.
5-600 KCM & 1-#1/0 G.
IN EACH OF 2-4" C.
LVP-K5-2/
LVDP-K5-1
K5-E
LVP-K5-3/
LVDP-K5-1
K5-E
LVP-K5-4/
LVDP-K5-1
K5-E
LVDP-J6M-4/
LVSB-J6M-1
MEZZANINE
ABOVE J6-C
LVDP-VB-3/
LVSB-J6M-1
0A
-3 P
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-4" C.
4-500 KCM
IN EACH OF 2-3" C.
0A
-3 P
100A-3P
100A-3P
100A-3P
LVDP-J5M-1/
LVSB-J6M-1
MEZZANINE
ABOVE J5-J
4-500 KCM & 1-#2 G.
IN 31
2" C.
LVP-J5-1/
LVDP-J5M-1
J5-J
LVP-J5-2/
LVDP-J5M-1
J5-K
LVP-J6-11/
LVDP-J5M-1
J6-C 4-#2 & 1-#8 G.
IN 11
2" C.
4-#2
IN 11
4" C.
100A-3P
100A-3P
100A-3P
100A-3P
100A-3P
100A-3P
100A-3P
LVDP-J6-1/
LVSB-J6M-1
J6-C
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-4" C.
4-500 KCM
IN EACH OF 2-3" C.
LVP-J5-13/
LVDP-J6-1
J5-H
LVP-J5-15/
LVDP-J6-1
J5-H
60A-3P
LVP-J5-3/
LVDP-J6-1
J5-H LVP-J5-3A/
LVP-J5-3
J5-J
4-#4 W/G.
MC CABLE
LVP-J5-10/
LVDP-J6-1
LVP-J5-4/
LVDP-J6-1
J5-E
80A-3P
LVP-J5-5/
LVDP-J6-1
J5-F LVP-J5-5A/
LVP-J5-5
J5-J
4-#2 W/G.
MC CABLE
LVP-J5-16/
LVDP-VB-3
60A-3P
LVP-J5-6/
LVDP-J6-1
J5-K
60A-3P
LVP-J5-6A/
LVP-J5-6
J5-J
LVP-J5-8/
LVDP-J6-1
LVP-J5-6B/
LVP-J5-6
J5-J
LVP-J5-9/
LVDP-J6-1
4-#4 W/G.
MC CABLE
80A-3P
LVP-J5-7/
LVDP-J6-1
J5-L LVP-J5-7A/
LVP-J5-7
J5-J
4-#2 W/G.
MC CABLE
LVP-J5-12/
LVDP-VB-3
4-#2
IN 11
4" C.
LVP-J5-11/
LVDP-J6-1
J5-H
LVP-J5-14/
LVDP-J6-1
J5-H 4-#3 & 1-#8 G.
IN 11
4" C.
LVP-J5-13/
LVDP-VB-3
LVP-J5-15/
LVDP-VB-3
LVP-J5-11/
LVDP-VB-3
LVP-J5-14/
LVDP-VB-3
LVP-J5-18/
LVDP-J5M-2
J5-M
4-#3/0
IN 2" C.
LVP-J5-18/
LVDP-K5-1
0A
-3 P
200A-3P
LVDP-J5M-2/
LVSB-J6M-1
MEZZANINE
ABOVE J5-L
LVDP-K5-1/
LVSB-J6M-1
4-350 KCM
IN EACH OF 2-3" C.4-350 KCM & 1-#1 G.
IN EACH OF 2-3" C.
0A
-3 P
225A-3P
125A-3P
125A-3P
LVDP-J6M-1/
LVSB-J6M-1
MEZZANINE
ABOVE J6-B
J6-H
UPS #3
J6-H
LVP-J6-3/
LVDP-J6M-1
J6-H
J6-H
UPS #2
J6-H
LVP-J6-2/
LVDP-J6M-1
J6-H
J6-H
UPS #1
J6-H
LVP-J6-1/
LVDP-J6M-1
J6-H
4-#1/0 & 1-#4 G.
IN 2" C.
4-#1/0 & 1-#4 G.
IN 2" C.
4-#1/0 & 1-#4 G.
IN 2" C.
4-#1/0 & 1-#4 G.
IN 2" C.
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-4" C.
125A-3P
PDI POWER
ENCLOSURE
i6-A
4-#4/0 & 1-#4 G.
IN 21
2" C.
200A-3P
200A-3P
200A-3P
200A-3P
100A-3P
100A-3P
100A-3P
LVDP-J6M-2/
LVSB-J6M-1
MEZZANINE
ABOVE J6-B
100A-3P
100A-3P
0A
-3 P
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-4" C.
UNKNOWN
DESTINATION
LVP-J6-10/
LVDP-J6M-2
J6-C
LVP-J6-9/
LVDP-J6M-2
J6-C
LVP-J6-8/
LVDP-J6M-2
J6-C
LVP-J6-7/
LVDP-J6M-2
J6-i
LVP-J6-6/
LVDP-J6M-2
J6-H
LVP-J6-5/
LVDP-J6M-2
J6-G
LVP-J6-4/
LVDP-J6M-2
J6-A
LVP-J5-17/
LVDP-J6M-2
J5-B
4-#4/0 & 1-#4 G.
IN 2" C.
4-#4/0 & 1-#2 G.
IN 21
2" C.
4-#2 & 1-#6 G.
IN 11
4" C.
2-#10 & 1-#10 G. IN 1" C.
TO J-5 FIRE
ALARM PANEL
LVDP-J6M-3/
LVSB-J6M-1
MEZZANINE
ABOVE J6-C
LVDP-VB-1/
LVSB-J6M-1
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-31
2" C.
0A
-3 P
60A-3P
LVDP-J5M-3/
LVSB-J6M-1
MEZZANINE
ABOVE J5-M
LVDP-VB-2/
LVSB-J6M-1
LVP-J5-19/
LVDP-J5M-3
J5-M
4-#6
IN 1" C.
LVP-J5-19/
LVDP-VB-2
4-500 KCM & 1-#2 G.
IN 31
2" C.
3-500 KCM & 1-#1/0 G.
IN 4" C.
0A
-3 P
LVDP-H7-1/
LVSB-J6M-1
H7-F
200A-3P
200A-3P
200A-3P
200A-3P
200A-3P
LVP-H7-1/
LVDP-H7-1
H7-F
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-31
2" C.
3-500 KCM & 1-#4/0 N.
IN EACH OF 3-4" C.
4-#3/0 & 1-#6 G.
IN 2" C.
LVP-H7-2/
LVDP-H7-1
H7-D 100A-3P
LVP-H7-3/
LVDP-H7-1
H7-E
100A
CONTACTOR
LVP-H7-3A/
LVP-H7-3
H7-E
4-#2 & 1-#4 G.
IN 2" C.
H7-E
50A-3P
LVP-H7-4/
LVDP-H7-1
H7-C
100A
CONTACTOR
LVP-H7-4A/
LVP-H7-4
H7-C
4-#2 & 1-#6 G.
IN 11
2" C.
H7-C
A
-3 P
4"X4" WIREWAY
4-#2 & 1-#4 G.
IN 11
2" C.
4"X4" WIREWAY
4-#2 & 1-#6 G.
IN 11
2" C.
50A-3P
LVP-H7-5/
LVDP-H7-1
H7-A
400 Hz
FREQUENCY
GENERATOR
H7-A
4"X4" WIREWAY
LVP-H7-5B/
LVP-H7-5
H7-C
LVP-H7-5A/
LVP-H7-5
H7-D
4-#1/0 (AL)
IN 2" C. LVP-H7-6/
LVDP-H7-1
H7-A
4-#2 & 1-#6 G.
IN 2" C.
4-#2 & 1-#6 G.
IN 11
2" C.
4-#4
IN 2" C.
0A
-3 P
125A-3P
LVP-J4-1/
LVSB-J6M-1
J4-C LVP-J4-1A/
LVP-J4-1
J4-AA
4-#2 & 1-#6 G.
IN 11
2" C.
4-500 KCM & 1-#3/0 G.
IN EACH OF 3-31
2" C.
"POWER PANEL &
BUS-DUCT, E-BAY"
3-500 KCM & 1-#1/0 N.
IN EACH OF 3-4" C.
3-500 KCM & 1-#1/0 N.
IN 4" C.
200A-3P
200A-3P
200A-3P
200A-3P
LVDP-H7-2/
LVSB-J6M-1
H7-K
0A
-3 P
200A-3P
200A-3P
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-31
2" C.
3-500 KCM & 1-#4/0 N.
IN EACH OF 3-4" C.
3-#1/0
LVP-H8-6/
LVDP-H7-2
H8-A
4-#3/0 & 1-#6 G.
IN 2" C.
LVP-G8-1/
LVDP-H7-2
G8-A
4-#3/0
IN 21
2" C.
LVP-H7-8/
LVDP-H7-2
H7-K
4-#3/0
IN 2" C.
LVP-H7-7/
LVDP-H7-2
H7-A
4-#6
IN 11
4" C.
3-#1/0
IN 2" C.
350A-3P
400A-3P
200A-3P
LVDP-i7-1/
LVSB-J6M-1
i7-C
400A-3P
18"X10" WIREWAY
4-500 KCM & 1-#1/0 G.
IN 36"X8" WIREWAY
4-500 KCM & 1-#1/0 G.
IN EACH OF 2-31
2" C.
60A-3P
LVP-CORR.H-1/
LVDP-i7-1
CORRIDOR H
0A
-3 P
100A-3P
LVP-CORR.6-1/
LVDP-i7-1
CORRIDOR 6
60A-3P
LVP-CORR.5-3/
LVP-CORR.H-1
CORRIDOR 5
LVP-CORR.4-1/
LVP-CORR.H-1
CORRIDOR 4
4-#4 & 1-#8 G.
IN 11
4" C.
LVP-F6-1/
LVP-CORR.6-1
F6
4-250 KCM & 1-#2 G.
IN EACH OF 2-3" C.
4-350 KCM (AL) & 1-#2 G.
IN 4" C.
4-#3 & 1-#8 G.
IN 11
4" C.
LVP-CORR.F-1/
LVDP-i7-1
CORRIDOR F
4-250 KCM (AL) & 1-#2 G.
IN 21
2" C.
4-250 KCM (AL) & 1-#2 G.
IN 3" C.
4-#2/0 (AL) & 1-#6 G.
IN 2" C.
LVP-F8-4/
LVDP-i7-1
F8-K
4-250 KCM & 1-#2 G.
IN EACH OF 2-31
2" C.
4-750 KCM (AL) & 1-#2 G.
IN 5" C.
PANEL
RP-2A
4-#4/0 & 1-#2 G.
IN 21
2" C.
100A-3P
100A-3P
100A-3P
100A-3P
LVDP-H4-1/
LVSB-J6M-1
H4-G
0A
-3 P
100A-3P
100A-3P
100A-3P
400A i7-C DS-LVDP-H4-1
4-500 KCM & 1-#2 G.
IN 4" C.
4-500 KCM & 1-#2 G.
IN 31
2" C.
4-500 KCM & 1-#2 G.
IN 3" C.
LVP-H4-1/
LVDP-H4-1
H4-A
LVP-H4-2/
LVDP-H4-1
H4-A
LVP-H4-3/
LVDP-H4-1
H4-A
LVP-H4-4/
LVDP-H4-1
H4-A
LVP-H4-5/
LVDP-H4-1
H4-A
4-#2 & 1-#6 G.
IN 11
2" C.
4-#2 & 1-#8 G.
IN 11
2" C.
LVP-H4-7/
LVDP-H4-1
H4-C
4-#2 & 1-#6 G.
IN 11
2" C.
45 KVA TRNSFRMR
208V X 120/208V
LVP-H4-6/
LVDP-H4-1
H4-D
3-#1/0, 1-#2 N. & 1-#1/0 G.
IN 11
2" C.
H4-G
45 KVA TRNSFRMR
208V X 120/208V H4-G
3-#1/0 & 1-#1/0 G.
IN 11
2" C.
3-#2 & 1-#6 G.
IN 11
2" C.LVP-J5-20/
LVSB-J6M-1
J5-O
LVP-J5M-2/
LVSB-J6M-1-1
MEZZANINE
ABOVE J5-B
LVP-CORR.4-2/
LVSB-J6M-1
4-#2/0
IN 21
2" C.
4-#2/0 & 1-#6 G.
IN 2" C.
4-#2/0
IN 21
2" C.
"LIGHTING
PANEL
E-BAY"4-#1/0 & 1-#6 G.
IN 2" C.
4-#1/0 IN 2" C.
4-500 KCM & 1-#2 G.
IN 31
2" C.
6"X6" WIREWAY
3-500 KCM & 1-250 KCM N.
IN 31
2" C.
100A-3P
LVP-H7-9/
LVDP-H7-2
H7-F
0A
-3 P
LVP-H7-12/
LVP-H7-9
H7-i
4-#6
IN 11
2" C.
150A
H8-D
100A
H8-D
200A
H8-D
LVP-H8-2/
LVSB-J6M-1
H8-B
LVP-H8-3/
LVSB-J6M-1
H8-B
4-#1/0
IN 2" C.
LVP-H8-1/
LVSB-J6M-1
H8-A
4-#3/0 & 1-#4 G.
IN 21
2" C.
UNKNOWN
DESTINATION
4-#1/0
IN 2" C.
4-#1/0
IN 2" C.
LVP-H8-4/
LVSB-J6M-1
H8-B
0A
-3 P
100A-3P
100A-3P
125A-3P
LVDP-H4-2/
LVSB-J6M-1
H4-A
4-500 KCM & 1-#1/0 G. IN EACH OF 2-4" C. 4-500 KCM
IN EACH OF 2-4" C.
FILTER
CIRCUIT
LVP-H4-8/
LVDP-H4-2
H4-A
LVP-H4-9/
LVDP-H4-2
H4-A
4-#2 & 1-#6 G.
IN 11
2" C.
4-#4 & 1-#8 G.
IN 11
4" C.
0A
-3 P
50A-2P
125A-3P
125A-3P
LVDP-i6-1/
LVSB-J6M-1
i6-A
125A-3P
4-500 KCM & 1-#2 G.
IN 31
2" C.
50A i7-B
LVP-i6-1D/ LVDP-i6-1 i6-A
16 KVA
UPS
i7-B
LVP-i6-1C/ LVDP-i6-1 i6-A
3-#8 & 1-#10 G.
IN 34" C.
3-#8 & 1-#10 G.
IN 34" C.
LVP-i6-1B/ LVDP-i6-1 i6-A
LVP-i6-1A/ LVDP-i6-1 i6-A
4-#2 & 1-#6 G.
IN 2" C.
2-#2, 2-#4 & 1-#6 G.
IN 2" C.
4-#2 & 1-#6 G.
IN 2" C.
0A
-3 P
100A-3P
100A-3P
100A-3P
LVP-i5-2/
LVSB-J6M-1
i5-B
4-500 KCM & 1-#2 G. IN 3" C.
4-#3/0 & 1-#6 G.
IN 2" C.
LVP-i5-2C/ LVP-i5-2 i5-C
LVP-i5-2A/ LVP-i5-2 i5-E
4-#2 & 1-#6 G.
IN 11
2" C.
LVP-H7-10/
LVSB-J6M-1
H7-F
LVP-i5-2B/ LVP-i5-2 i5-D
LVP-H7-11/
LVSB-J6M-1
H7-F
4-500 KCM & 1-#2 G.
IN 31
2" C.
4-500 KCM
IN 4" C.
4-#4/0
IN 2" C.
0A
-3 P
30A-2P
100A-1P
100A-1P
LVP-i7-2/
LVSB-J6M-1
i7-C4-#2/0 & 1-#4 G.
IN 2" C.
100A-1P
"RANGE"
4-#10 & 1-#10 G.
IN 34" C.
LTCP 10
(A/C CONTROLS)
LTCP 4, 5A, 5B, 6 & 7
(A/C CONTROLS)
LTCP 3 & 8
(A/C CONTROLS)
2-#2 & 1-#2 G.
IN 1" C.
LVP-i5-1/
LVSB-J6M-1
i5-A
4-500 KCM & 1-#2 G. IN 31
2" C.
4-#3/0 & 1-#6 G.
IN 2" C.
4-500 KCM & 1-#2 G. IN 31
2" C. 4-750 KCM (AL)
& 1-#2 G.
IN 4" C.
LVP-G5-2/
LVSB-J6M-1
G5-F
LVP-G5-1/
LVSB-J6M-1
G5-F
LVP-F5-2/
LVSB-J6M-1
F5-D
LVP-H5-3/
LVSB-J6M-1
H5-A
4-#4/0 & 1-#4 G.
IN 21
2" C.
4-500 KCM
& 1-#2 G.
IN 31
2" C.
4-#1 & 1-#6 G.
IN 2" C.
4-500 KCM
& 1-#2 G.
IN 31
2" C.
4-500 KCM
& 1-#2 G.
IN 31
2" C.
4-#2/0 & 1-#8 G.
IN 2" C.
4-#3/0 & 1-#8 G.
IN 2" C.
S P
A R
E
4-350 KCM & 1-#4 G. IN 3" C.
"COMPUTER
ROOM POWER
ROOM 2217"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
27 27
25 25
23 23
22 22
18 18
17 17
15 15
14 14
13 13
12 12
11 11 11
9 9
99 9
8 8
7 7
6.1
5 5
4 4
2 2 2
2 2 2 2
1 1
28.1
28.2
28.3
28.4
28.5
28.6
28.6
28.4
28.4
28.4.1
28.4.1
28.3
28.2
28.1 28.1
27.1
27.2
27.3
27.4
27.1
27.2
27.3
27.4
25.1
25.1
25.2
25.3
25.2
25.3
24.1
24.2
24.3
24.4
24.5
24.6
24.7
24.7
24.7.1 24.7.1
24.6
24.6
24.5 24.5
24.5
24.5.1 24.5.1
24.4 24.4
24.4
24.4.2
24.4.1
24.3 24.3
24.3
24.3.1
24.2
24.2 24.2
24.1 24.123.1
22.1
22.2
22.3
22.4
22.4
22.3 22.3
22.2 22.2
22.1 22.1 21.1
21.2
21.3
21.4
21.5
21.6
21.7
21.8
21.9
21.7
21.7
21.6
21.6
21.5
21.5
21.4
21.4
21.3
21.3
21.2 21.2
21.2
21.3
21.1 21.1
21.1
17.1
16.1
16.2
16.3
16.4
16.5
16.5
16.4
16.3
16.3
16.2 16.2
16.2
16.2.1 16.2.1
16.1 16.1
16.1
16.1
16.1.1 16.1.1
15.1 15.1
14.2
14.3
14.4
14.5
14.6
14.6
14.5
14.4
14.4
14.3
14.3
14.2
14.2
14.1
13.1
13.2
13.3 13.3
13.3
13.3.1
13.3.2
13.3.1
13.2
13.2
13.2.1 13.2.1
13.2
13.1
13.1
12.1
12.2
12.3
12.4
12.5
12.6
12.7 12.7
12.6
12.6
12.5
12.5
12.4 12.4
12.4
12.3 12.3
12.3
12.2 12.2
12.2
12.1 12.1
8.1
8.2
8.3
8.1
8.2
8.3
7.1
7.2
7.3
7.4
7.4
7.4
7.4
7.3
7.2
7.1
6.2
6.3 6.3
6.2
6.2
6.1
5.1
5.1
4.1
4.2
4.3
4.4
4.4
4.3
4.2
4.1
28.6
16.3.1 16.3.1
21.8
23.1 24.1
LVP-i4-1/
LVSB-J6M-1
i4-B
4-#3/0 & 1-#6 G.
IN 2" C.
LVP-H6-1/
LVDP-i7-1
H6-A
4-#3/0 & 1-#6 G.
IN 2" C.
13.2
E-MON
POWER
METER
J6-K
LVP-F8-3/
LVDP-H7-2
F8-A
14.6
14.7
14.1
14.1.1 14.1.1
LVP-H8-5/
LVSB-J6M-1
H8-B
200A-3P 14.1
LVP-H8M-1/
LVDP-H7-2
MEZZAINE
ABOVE H8-A
14.5
14.7
14.1
3-#2/0 (AL)
IN 2" C.
T-LVPPENTHOUSEC
15 KVA TRNSFRMR
480V X 120/208V
4-#6 & 1-#10 G.
IN 1" C.
30A-3P
3-#10 & 1-#10 G.
IN 3/4" C.
4-#2/0 & 1-#6 G.
IN 2 1/2" C.
HVP-PC-1/HVSB-J6M-1
PENTHOUSE C
LVP-PC-1/
HVP-PC-1
PENTHOUSE C
150A-3P
PROVIDE GE TYPE
SFHA CIRCUIT BREAKER
WITH HARDWARE KIT
CO
A
N
C
LE
A N
R O
O M
LVP-i7-1
MCC-i7-1/HVSB-J6M-1 MCC-i7-1/HVSB-J6M-1
J6-K 28.2
J6-K 2
LVP-H5-3/LVSB-J6M-1
LVP-i5-1/LVSB-J6M-1 J6-K 3
LVP-CORR.4-1/LVP-CORR.H-1
J6-K 13.3.1
W8x48
CO
A
V A
TE
D
D R
A
IN
A G
E P
IP
E
E
LE
V A
TE
D
D R
A
IN
A G
E P
IP
E
ELEVATED DRAINAGE PIPE
P U
M P
H W
S
C W
S
LA
V -1
C
LE
A N
R O
O M
Server
Server
CO
A
D O
W N
U P
J6-K 28
T-HVSBJ6M1
LVSB-J6M-1HVSB-J6M-1/LVSB-J6M-1
J6-K 28
MCC-J6M-1/HVSB-J6M-1
J6-K 28.3
CO
A
DANGER!
A
| 3970-00 Cover sheet |
| 3970-01-07 ACM |
| Sheets and Views |
| 1122009001-Rome Research Site-Asbestos-AR101 (ID 3179422)-AR101 - MD203 |
| Sheets and Views |
| 1122009001-Rome Research Site-Asbestos-AR102 (ID 3217006)-AR102 - MD402 |
| Sheets and Views |
| 1122009001-Rome Research Site-Asbestos-AR103 (ID 3179487)-AR103 - MD402 |
| Sheets and Views |
| 1122009001-Rome Research Site-Asbestos-AR104 (ID 3179531)-AR100 - MD403 |
| Sheets and Views |
| 1122009001-Rome Research Site-Asbestos-AR105 (ID 3179567)-AR104 - MD404 |
| Sheets and Views |
| 1122009001-Rome Research Site-Asbestos-AR106 (ID 3179570)-AR105 - MD405 |
| Sheets and Views |
| 1122009001-Rome Research Site-Asbestos-AR100 (ID 3179330)-AR100 - MD202 |
| 3970-08-12 24033C Strucutral |
| 3970-13 A-001 |
| Sheets and Views |
| 3970 A-001-A-001 |
| 3970-14 A-101 |
| Sheets and Views |
| 3970 RCP, FURN-A-101 |
| 3970-15 A-102 |
| Sheets and Views |
| 3970 RCP, FURN-A-102 |
| 3970-16 A-103 |
| Sheets and Views |
| 3970 RCP, FURN-A-103 |
| 3970-17 A-104 |
| Sheets and Views |
| 3970 RCP, FURN-A-104 |
| 3970-18 A-201 |
| Sheets and Views |
| 3970 Upper Level-A-201 |
| 3970-19 A-202 |
| Sheets and Views |
| 3970 Upper Level-A-202 |
| 3970-20 A-203 |
| Sheets and Views |
| 3970 Upper Level-A-203 |
| 3970-21 A-301 |
| Sheets and Views |
| 3970 Roof-A-301 |
| 3970-22 A-302 |
| Sheets and Views |
| 3970 Roof-A-302 |
| 3970-23 A-303 |
| Sheets and Views |
| 3970 Roof-A-303 |
| 3970-24 FP-101 |
| Sheets and Views |
| 3970 FP101 Floor Plan-FP101 |
| 3970-25 FP-102 |
| Sheets and Views |
| 3970 FP102 Upper Level-FP102 |
| 3970-26 FP-401 |
| Sheets and Views |
| 3970 FP401 Penthouse-FP401 |
| 3970-27 ME101 |
| 3970-28 MD001 |
| Sheets and Views |
| 3970 C 001 CHW-Schematics-MD001 |
| 3970-29 MD002 |
| Sheets and Views |
| 3970 C 002 Steam Schematic-MD002 |
| 3970-30 MD003 |
| Sheets and Views |
| 3970 C 003 HW Schematic-MD003 |
| 3970-31 MD101 |
| Sheets and Views |
| MD101 |
| 3970-32 MD102 |
| Sheets and Views |
| MD102 |
| 3970-33 MD103 |
| Sheets and Views |
| 3970 C 100 D BAY Floor Plans-MD103 |
| 3970-34 MD104 |
| Sheets and Views |
| 3970 C 100 Roof Plans-MD104 |
| 3970-35 MD105 |
| Sheets and Views |
| 3970 C 100 Roof Plans-MD105 |
| 3970-36 MD106 |
| Sheets and Views |
| 3970 C 100 Roof Plans-MD106 |
| 3970-37 MD201 |
| Sheets and Views |
| 3970 C 100 B Bay Floor Plans-MD201 |
| 3970-38 MD202 |
| Sheets and Views |
| 3970 C 100 C Bay Floor Plans-MD202 |
| 3970-39 MD203 |
| Sheets and Views |
| 3970 C 100 C Bay Floor Plans-MD203 |
| 3970-40 MD204 |
| Sheets and Views |
| 3970 C 100 D BAY Floor Plans-MD204 |
| 3970-41 MD401 |
| Sheets and Views |
| 3970 C 400 Upper Level-MD401 |
| 3970-42 MD402 |
| Sheets and Views |
| 3970 C 400 Upper Level-MD402 |
| 3970-43 MD403 |
| Sheets and Views |
| 3970 C 400 Upper Level-MD403 |
| 3970-44 MD404 |
| Sheets and Views |
| 3970 C 400 Upper Level-MD404 |
| 3970-45 MD405 |
| Sheets and Views |
| 3970 C 400 Upper Level-MD405 |
| 3970-46 M-001 |
| Sheets and Views |
| 3970 C 001 CHW-Schematics-M-001 |
| 3970-47 M-002 |
| Sheets and Views |
| 3970 C 002 Steam Schematic-M-002 |
| 3970-48 M-003 |
| Sheets and Views |
| 3970 C 003 HW Schematic-M-003 |
| 3970-49 M-004 |
| Sheets and Views |
| 3970 C 004 AHU CONTROLS Schematic-M-004 |
| 3970-50 M-101 |
| Sheets and Views |
| 3970 C 100 C Bay Floor Plans-M-101 |
| 3970-51 M-102 |
| Sheets and Views |
| 3970 C 100 C Bay Floor Plans-M-102 |
| 3970-52 M-103 |
| Sheets and Views |
| 3970 C 100 Roof Plans-M-103 |
| 3970-53 M-201 |
| Sheets and Views |
| 3970 C 100 C Bay Floor Plans-M-201 |
| 3970-54 M-202 |
| Sheets and Views |
| 3970 C 100 C Bay Floor Plans-M-202 |
| 3970-55 M-203 |
| Sheets and Views |
| 3970 C 100 D BAY Floor Plans-M-203 |
| 3970-56 M-401 |
| Sheets and Views |
| 3970 C 400 Penthouse-M-401 |
| 3970-57 M-402 |
| Sheets and Views |
| 3970 C 400 Penthouse-M-402 |
| 3970-58 M-403 |
| Sheets and Views |
| 3970 C 400 Upper Level-M-403 |
| 3970-59 M-601 |
| Sheets and Views |
| 3970 C 600 Det Schd-M-601 |
| 3970-60 M-602 |
| Sheets and Views |
| 3970 C 600 Det Schd-M-602 |
| 3970-61 M-603 |
| Sheets and Views |
| 3970 C 600 Det Schd-M-603 |
| 3970-62 ED001 |
| 3970-63 ED101 |
| 3970-64 ED102 |
| 3970-65 ED401 |
| 3970-66 ED402 |
| 3970-67 E001 |
| 3970-68 E101 |
| 3970-69 E102 |
| 3970-70 E401 |
| 3970-71 E-501 |
| 3970-72 E-601 |
File details come from the government source that posted it. Updated .