Attch 15 First Order Work Description SEMP.docx

DOCX document 23 KB Posted

Attached to
AGILE CYBER TECHNOLOGY (ACT) Federal contract opportunity
Solicitation number
FA8750-12-R-0002
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Atch 15 - First Order Work Description SEMP

View the file

Other files for this federal contract opportunity

Other files attached to AGILE CYBER TECHNOLOGY (ACT), newest first.
File Type Posted
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
3rd Round RFP Q A 23AUG2011.docx DOCX document
Second Round RFP Questions 19 AUG.pdf PDF
Amendment 0001.pdf PDF
RFP and DRFP Industry QandA 15 Aug 2011.docx DOCX document
RFP Cover Letter.pdf PDF
Attch 6 Cross-Reference Matrix.doc DOC document
Attch 14 CDRL Sample Order 0002.docx DOCX document
Attch 12 DD254 Sample Order 0002.pdf PDF
Attch 1 Anticipated CDRL List.docx DOCX document
Attch 3 Umbrella DD 254.pdf PDF
Attch 8 Interested Parties List.doc DOC document
Attch 10 Sample Order 0001 Work Description.docx DOCX document
Attch 11 CDRL Sample Order 0001.docx DOCX document
Attch 4 Labor Category Qual.docx DOCX document
RFP FA8750-12-R-0002.pdf PDF
Attch 16 CDRL First Order.docx DOCX document
Attch 5 FFP NTE Hourly Rate Tables.xlsx XLSX spreadsheet
Attch 9 DD254 Sample Order 0001.pdf PDF
Attch 7 Identification_and_Assertion.docx DOCX document
Notice To Offerors 19 July 2011.pdf PDF
ACT Umbrella DD 254.pdf PDF
Follow-up Industry Questions.docx DOCX document
DRAFT RFP Q A 05July.docx DOCX document
Memo to Potential Offerors.pdf PDF
DRFP Cover Letter Amendment.pdf PDF
Draft RFP Cover Letter.pdf PDF
ACT DRAFT REQUEST FOR PROPOSAL —
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Order 0001

AIR FORCE RESEARCH LABORATORY

ROME RESEARCH SITE

ROME, NEW YORK

ORDER No. 0001

WORK DESCRIPTION

FOR

SYSTEM ENGINEERING MANAGEMENT PLAN

12 JUL 2011

(Contract Number FA8750-12-R-0002/ Order 0001)

4.0 TECHNICAL REQUIREMENTS.

4.1 The contractor shall accomplish the following:

4.1.1 Develop a System Engineering Management Plan (SEMP) describing the proposed efforts for planning, controlling and conducting activities under ACT. (See CDRL, A001)

4.1.1.1 Provide the following content in the introductory section of the SEMP:

· Cover/title page.

· Document history.

· Table of contents.

· An executive summary of the document’s content.

4.1.1.2 Provide a systems engineering section that conveys a description of the contractor’s system engineering process as it will be applied to system design and test requirements during the ACT effort.

4.1.1.2.1 Address the following criteria within the systems engineering section defined in 4.1.1.2:

· Organization of the Contractor development team, along with their physical location and facilities needs.

· Technical environments for the Project and how they will be managed. This section will also discuss the interaction with the pre-production and production environments.

· Description of the evaluation and decision-making process to be used by the Contractor when resolving technical questions.

4.1.1.2.2 Define a system engineering methodology within the systems engineering section defined in 4.1.1.2 that addresses the following:

· Configuration Management: Include a description of how Project configuration items (e.g. source code) will be managed.

· Requirements Verification and Validation: Include a description of how the Use Cases will be clarified and expanded, requirements validated, and updated requirements reviewed and approved by the government.

· The Architecture and Design Process including how issues will be discussed and resolved.

· The software development methodology (for iterative builds and incremental releases).

· The hardware development methodology (for iterative builds and incremental releases).

· The build management process used to create and manage builds.

· The testing process to be used by the Contractor.

4.1.1.2.3 Where sections in the SEMP require information to be conveyed that was previously provided as part of the performers overall ACT proposal, reference the section and page number of the ACT proposal to keep redundancies between documents to a minimum.