Attch 14 CDRL Sample Order 0002.docx

DOCX document 124 KB Posted

Attached to
AGILE CYBER TECHNOLOGY (ACT) Federal contract opportunity
Solicitation number
FA8750-12-R-0002
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Atch 14 - CDRL Sample Order 0002

View the file

Other files for this federal contract opportunity

Other files attached to AGILE CYBER TECHNOLOGY (ACT), newest first.
File Type Posted
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
3rd Round RFP Q A 23AUG2011.docx DOCX document
Second Round RFP Questions 19 AUG.pdf PDF
Amendment 0001.pdf PDF
RFP and DRFP Industry QandA 15 Aug 2011.docx DOCX document
RFP Cover Letter.pdf PDF
Attch 6 Cross-Reference Matrix.doc DOC document
Attch 12 DD254 Sample Order 0002.pdf PDF
Attch 1 Anticipated CDRL List.docx DOCX document
Attch 3 Umbrella DD 254.pdf PDF
Attch 8 Interested Parties List.doc DOC document
Attch 10 Sample Order 0001 Work Description.docx DOCX document
Attch 11 CDRL Sample Order 0001.docx DOCX document
Attch 15 First Order Work Description SEMP.docx DOCX document
Attch 4 Labor Category Qual.docx DOCX document
RFP FA8750-12-R-0002.pdf PDF
Attch 16 CDRL First Order.docx DOCX document
Attch 5 FFP NTE Hourly Rate Tables.xlsx XLSX spreadsheet
Attch 9 DD254 Sample Order 0001.pdf PDF
Attch 7 Identification_and_Assertion.docx DOCX document
Notice To Offerors 19 July 2011.pdf PDF
ACT Umbrella DD 254.pdf PDF
Follow-up Industry Questions.docx DOCX document
DRAFT RFP Q A 05July.docx DOCX document
Memo to Potential Offerors.pdf PDF
DRFP Cover Letter Amendment.pdf PDF
Draft RFP Cover Letter.pdf PDF
ACT DRAFT REQUEST FOR PROPOSAL —
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

CLIN 0002

B. EXHIBIT

A

C. CATEGORY

TDP TM- OTHER MISC

D. SYSTEM/ITEM

SAMPLE ORDER 0002

E. CONTRACT/PR NO.

FA8750-12-R-0002/0002

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

RESEARCH AND DEVELOPMENT (R&D) PROJECT SUMMARY

3. SUBTITLE

AFRL PROGRAM MANAGEMENT REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81612B/T

5. CONTRACT REFERENCE

PARAGRAPH 4.9.1 OF THE WORK DESCRIPTION

6. REQUIRING OFFICE

AFRL/RIGA

7. DD250 REQ

NO

9. DIST STATEMENT REQUIRED

N/A

10. FREQUENCY

SEE BLOCK 16

12. DATE OF FIRST SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16

a.ADDRESSEE
Draft
Final
Reg
Repro

16. REMARKS

REFERENCE BLOCK 4, TAILOR DI-MISC-81612B

THE CONTRACTOR SHALL UTILIZE THE AFRL PROGRAM MANAGEMENT SYSTEM, KNOWN AS JIFFY (https://jiffy.rome.af.mil) TO INPUT THE REQUIRED STATUS, SUMMARY AND FINANCIAL INFORMATION.

ESTABLISH CONTRACTOR USER ACCOUNT BY CONTACTING JIFFY HELP DESK AT 315-330-3005.

NOTIFY THE RRS JIFFY HELP DESK (email: jiffy@rl.af.mil) WITHIN TEN (10) DAYS OF AWARD WITH NAMES OF ALL CONTRACT REPORTING INDIVIDUALS (REQUIRING JIFFY USER ACCOUNTS).

PRINCIPAL INVESTIGATOR (PI) OF RECORD (1.1.2.1)

FINANCIAL REPORTER (1.1.2.3)

PROGRAMMATIC/TECHNICAL STATUS REPORTER (1.1.2.4, IF NOT PI)

ORGANIZATIONAL STATUS REPORTING MONITORS (1.1.2.2)

VERIFY INFORMATION CONCURRENTLY WITH THE FIRST REPORT

SCHEDULE PAGE INTERFACE
DETAILED INDIVIDUAL TASK DESCRIPTION (1.2.2.4.2), INPUT INTO SCHEDULE EDITOR PAGE (EDIT SCHEDULE)
QUAD CHART (1.2.2.7), UPLOAD TO QUAD CHART UPLOAD PAGE

CONTINUED ON NEXT PAGE.

SEE BLOCK 16
15. TOTAL

G. PREPARED BY

DONALD R. LUBECKI

H. DATE

22 JUN 2011

I. APPROVED BY

THOMAS J. PARISI

J. DATE

22 JUN 2011

DD Form 1423-1, SEP 97 (EG) (Computer Generated)PREVIOUS EDITIONS ARE OBSOLETEPage1of11Pages

CONTRACT DATA REQUIREMENTS LIST, DD FORM 1423 CONTINUATION SHEET

CLIN 0002 FA8750-12-R-0002/0002 EXHIBIT A A001

BLOCK 16,

CONTINUED FROM PREVIOUS PAGE.

FINANCIAL DATA.

INPUT MONTHLY EXPENDITURE VALUES FOR THE ENTIRE PERFORMANCE PERIOD CONCURRENTLY WITH THE FIRST REPORT AND INCLUDE THE FOLLOWING.

REPORTED MONTH’S ACCRUED/ INCURRED EXPENDITURE (2.1), INPUT VALUE INTO THE FINANCIAL INPUT PAGE PROJECTED EXPENDITURES (2.4), INPUT PROJECTIONS FOR THE NUMBER OF MONTHS TO THE EXHAUSTION OF OBLIGATED FUNDS.

TECHNICAL STATUS.

UPLOAD REPORT AS A FILE OR INPUT NARRATIVE TO THE TECHNICAL STATUS INPUT PAGE

PROGRESS AGAINST PLANNED OBJECTIVES (3.1.1),

TECHNICAL ACCOMPLISHMENTS THIS PERIOD (3.1.2),

IMPROVEMENTS TO PROTOTYPES THIS PERIOD (3.1.3),

DELIVERABLES THIS PERIOD (3.1.5),

PUBLICATIONS THIS PERIOD (3.1.7) UPLOAD DIGITAL COPY OF PUBLICATION WITH STATUS REPORT OR AS SEPARATE UPLOAD

MEETINGS AND PRESENTATIONS THIS PERIOD (3.1.8),

ISSUES OR CONCERNS (3.1.9),

PLANNED ACTIVITIES (3.2.1), INFORMATION COVERING THE NEXT THREE (3) MONTHS.

ENTER THE FIRST REPORT WITHIN FORTY (40) DAYS AFTER CONTRACT AWARD AND MONTHLY THEREAFTER FOR THE PERIOD OF PERFORMANCE.

DO NOT INPUT DATA THAT IS CLASSIFIED TO JIFFY. SUBMIT SUCH DATA AS HARD COPY OR VIA THE SIPRNET AS COORDINATED WITH THE REQUIRING OFFICE.

INCLUDE THE FOLLOWING REPORTING DISTRIBUTION WITHIN JIFFY. (SELECT CC: CHECK BOXES)

GOVERNMENT TECHNICAL POINT OF CONTACT (REFERENCE BLOCK 6)

GOVERNMENT BUYER (SF26, BLOCK 5; DD1155, BLOCK 6)

ADMINISTRATIVE CONTRACTING POINT OF CONTACT (ACO, SF26 BLOCK 6; DD1155, BLOCK 7) (INPUT MANUALLY E-MAIL ADDRESS TO OUT-GOING E-MAIL NOTICE)

OTHER RECIPIENTS AS COORDINATED WITH THE REQUIRING OFFICE

Page2of11Pages
CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP TM- OTHER MGMT

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

FA8750-12-R-0002/0002

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

CONTRACT FUNDS STATUS REPORT (CFSR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81468

5. CONTRACT REFERENCE

PARAGRAPH 4.9.2 OF THE WORK DESCRIPTION

6. REQUIRING OFFICE

AFRL/RIGA

7. DD250 REQ

NO

9. DIST STATEMENT REQUIRED

TBD

10. FREQUENCY

SEE BLOCK 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16

a.ADDRESSEE
Draft
Final
Reg
Repro

16. REMARKS

COMPLETE CONTRACT LINE ITEM OR APPROPRIATION REPORTING IN TOTAL SHALL BE ACCOMPLISHED ON A QUARTERLY CALENDAR BASIS, AND ALSO BY SEPARATE CONTRACT LINE ITEM WHEN AN INDIVIDUAL CONTRACT LINE ITEM IS VALUED OVER $1,500,000.

UTILIZE THE JIFFY UPLOAD DOCUMENTS/REPORTS ACTIONS DROP-DOWN MENU ITEM (FINANCIAL STATUS/COST/CFSR FILE CATEGORY) TO POST CONTRACTOR FORMATTED FILES FOR AUTOMATIC DISTRIBUTION.

CONTRACTOR FORMAT IS ACCEPTABLE PROVIDING ALL THE ELEMENTS REQUIRED ARE INCLUDED AND ADDRESSED. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT OR RTF.

COMPILE AND SUBMIT BLOCK 12 INFORMATION OF DD FORM 1586, “OPEN COMMITMENTS” AND “ACCRUED EXPENDITURES” MONTHLY AS FOLLOWS: ACTUAL TO DATE (CURRENT MONTH), NEXT MONTH PROJECTION, THE FOLLOWING MONTH PROJECTION, THEN THE PROJECTION FOR EACH REMAINING FISCAL QUARTER. ALL OF THE ABOVE ARE CUMULATIVE FIGURES. ANY ADDITIONAL PROJECTIONS MAY BE ADDED BY THE CONTRACTOR SO LONG AS THE ELEMENTS ARE CLEARLY IDENTIFIED.

UTILIZE THE JIFFY "ENTER FINANCIAL INFORMATION" FEATURE TO POST MONTHLY ACCRUED VALUE FOR THE CURRENT PERIOD AND PROJECTED ACCRUED EXPENDITURES FOR THE NEXT THREE (3) MONTHS THROUGH CONTRACT COMPLETION.

THIS DATA ITEM RELATES TO THE R&D PROJECT SUMMARY (A001); DO NOT DUPLICATE REPORTING REQUIREMENTS ESTABLISHED THEREIN.

SEE BLOCK 16
15. TOTAL

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated)PREVIOUS EDITIONS ARE OBSOLETEPage3of11Pages
CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP TM- OTHER ADMN

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

FA8750-12-R-0002/0002

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

PRESENTATION MATERIAL

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81373

5. CONTRACT REFERENCE

PARGRAPH 4.9.3 OF THE WORK DESCRIPTION

6. REQUIRING OFFICE

AFRL/RIGA

7. DD250 REQ

NO

9. DIST STATEMENT REQUIRED

TBD

10. FREQUENCY

SEE BLOCK 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16

a.ADDRESSEE
Draft
Final
Reg
Repro

16. REMARKS

CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT OR RTF.

THE CONTRACTOR SHALL SUBMIT DRAFT PRESENTATION MATERIAL WITHIN THREE (3) DAYS PRIOR TO EACH PRESENTATION. UPLOAD FILE TO JIFFY USING THE "CONTRACTOR PRESENTATION/QUAD CHARTS' CATEGORY. UPLOADED FILE SIZE IS LIMITED TO 12 MEGABYTES.

COORDINATE THE NUMBER OF COPIES AND DELIVERY MEDIA REQUIRED FOR EACH PRESENTATION WITH THE REQUIRING OFFICE.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated)PREVIOUS EDITIONS ARE OBSOLETEPage4of11Pages
CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

FA8750-12-R-0002/0002

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

TECHNICAL INFORMATION REPORT

3. SUBTITLE

CONOPS

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80652/T

5. CONTRACT REFERENCE

PARAGRAPH 4.5 OF THE WORK DESCRIPTION

6. REQUIRING OFFICE

AFRL/RIGA

7. DD250 REQ

NO

9. DIST STATEMENT REQUIRED

TBD

10. FREQUENCY

SEE BLOCK 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16

a.ADDRESSEE
Draft
Final
Reg
Repro

16. REMARKS

BLOCK 2 AND 4. REFERENCE DD FORM 1664 OR FACSIMILE, TAILORING. THE FOLLOWING PARAGRAPHS APPLY: 10.3.4 AND 10.3.5 CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT OR RTF. UPLOAD FILE TO JIFFY USING THE CENTER ACTION DROP-DOWN MENU “UPLOAD DOCUMENTS/REPORTS” ON PROJECT PAGE. NOTE THAT THE UPLOADS ARE SUBJECT TO FILE SIZE LIMITATIONS AS POSTED ON THE UPLOAD PAGE.

THE CONTRACTOR SHALL SUBMIT THIS DOCUMENT WITHIN THIRTY (30) DAYS PRIOR TO THE COMPLETION OF PARAGRAPH 4.5 THE GOVERNMENT WILL RETURN COMMENTS WITHIN FIFTEEN (15) DAYS AFTER RECEIPT OF DRAFT DOCUMENT.

SUBMIT UPDATED DOCUMENT WITHIN FIFTEEN (15) DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

PROVIDE UPDATES AND SUPPLEMENTS TO THIS DOCUMENT, AS APPROPRIATE, DURING THE PERIOD OF PERFORMANCE. INCORPORATE CHANGE BARS OR SOME OTHER METHOD TO IDENTIFY CHANGES FROM PREVIOUS VERSIONS. PERMANENT CHANGE PAGES SHALL CONFORM TO THE REQUIREMENTS, QUALITY, STYLE AND FORMAT OF THE BASIC DOCUMENTATION.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated)PREVIOUS EDITIONS ARE OBSOLETEPage5of11Pages
CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

FA8750-12-R-0002/0002

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

TECHNICAL INFORMATION REPORT

3. SUBTITLE

TRL PLAN

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80652/T

5. CONTRACT REFERENCE

PARAGRAPH 4.6 OF THE WORK DESCRIPTION

6. REQUIRING OFFICE

AFRL/RIGA

7. DD250 REQ

NO

9. DIST STATEMENT REQUIRED

TBD

10. FREQUENCY

SEE BLOCK 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16

a.ADDRESSEE
Draft
Final
Reg
Repro

16. REMARKS

BLOCK 2 AND 4. REFERENCE DD FORM 1664 OR FACSIMILE, TAILORING. THE FOLLOWING PARAGRAPHS APPLY: 10.3.4 AND 10.3.5 CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT OR RTF. UPLOAD FILE TO JIFFY USING THE CENTER ACTION DROP-DOWN MENU “UPLOAD DOCUMENTS/REPORTS” ON PROJECT PAGE. NOTE THAT THE UPLOADS ARE SUBJECT TO FILE SIZE LIMITATIONS AS POSTED ON THE UPLOAD PAGE.

THE CONTRACTOR SHALL SUBMIT THIS DOCUMENT WITHIN THIRTY (30) DAYS PRIOR TO THE COMPLETION OF PARAGRAPH 4.6 THE GOVERNMENT WILL RETURN COMMENTS WITHIN FIFTEEN (15) DAYS AFTER RECEIPT OF DRAFT DOCUMENT.

SUBMIT UPDATED DOCUMENT WITHIN FIFTEEN (15) DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

PROVIDE UPDATES AND SUPPLEMENTS TO THIS DOCUMENT, AS APPROPRIATE, DURING THE PERIOD OF PERFORMANCE. INCORPORATE CHANGE BARS OR SOME OTHER METHOD TO IDENTIFY CHANGES FROM PREVIOUS VERSIONS. PERMANENT CHANGE PAGES SHALL CONFORM TO THE REQUIREMENTS, QUALITY, STYLE AND FORMAT OF THE BASIC DOCUMENTATION.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated)PREVIOUS EDITIONS ARE OBSOLETEPage6of11Pages
CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP TM- OTHER IPSC

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

FA8750-12-R-0002/0002

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

SOFTWARE PRODUCT SPECIFICATION (SPS)

3. SUBTITLE

EXECUTABLE SOFTWARE, SOURCE FILES AND PACKAGING REQUIREMENTS

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81441A/T

5. CONTRACT REFERENCE

PARAGRAPH 4.8.1.1 OF THE WORK DESCRIPTION

6. REQUIRING OFFICE

AFRL/RIGA

7. DD250 REQ

NO

9. DIST STATEMENT REQUIRED

TBD

10. FREQUENCY

SEE BLOCK 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16

a.ADDRESSEE
Draft
Final
Reg
Repro

16. REMARKS

BLOCK 2 AND 4, REFERENCE DD FORM 1664 OR FACSIMILE. TAILORING: ONLY PARAGRAPHS 3.1, 3.2 AND 3.3 APPLY. IN THE EVENT THE SOFTWARE PRODUCED HEREIN IS NOT A COMPUTER SOFTWARE CONFIGURATION ITEM (CSCI), DISREGARD CSCI REQUIREMENTS.

CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT OR RTF.

THE CONTRACTOR SHALL SUBMIT EXECUTABLE SOFTWARE, COMMENTED SOURCE CODE FILES AND PACKAGING REQUIREMENTS AT THE COMPLETION OF CLIN 0001. COORDINATE THE DELIVERY MEDIA WITH THE REQUIRING OFFICE.

AFRL/RIGA
1
SEE BLOCK 16
15. TOTAL
1

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated)PREVIOUS EDITIONS ARE OBSOLETEPage7of11Pages
CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

FA8750-12-R-0002/0002

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

TECHNICAL INFORMATION REPORT

3. SUBTITLE

INSTALLATION USER AND MAINTENANCE MANUAL

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80652/T

5. CONTRACT REFERENCE

PARAGRAPH 4.8.1.2 OF THE WORK DESCRIPTION

6. REQUIRING OFFICE

AFRL/RIGA

7. DD250 REQ

NO

9. DIST STATEMENT REQUIRED

TBD

10. FREQUENCY

SEE BLOCK 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16

a.ADDRESSEE
Draft
Final
Reg
Repro

16. REMARKS

BLOCK 2 AND 4. REFERENCE DD FORM 1664 OR FACSIMILE, TAILORING. THE FOLLOWING PARAGRAPHS APPLY: 10.3.4 AND 10.3.5 CONTRACTOR FORMAT IS ACCEPTABLE. PREFER ELECTRONIC DELIVERY IN MICROSOFT OFFICE SUITE COMPATIBLE FORMAT OR RTF. UPLOAD FILE TO JIFFY USING THE CENTER ACTION DROP-DOWN MENU “UPLOAD DOCUMENTS/REPORTS” ON PROJECT PAGE. NOTE THAT THE UPLOADS ARE SUBJECT TO FILE SIZE LIMITATIONS AS POSTED ON THE UPLOAD PAGE.

THE CONTRACTOR SHALL SUBMIT THIS DOCUMENT WITHIN THIRTY (30) DAYS PRIOR TO THE START OF THE FINAL DEMONSTRATION.

THE GOVERNMENT WILL RETURN COMMENTS WITHIN FIFTEEN (15) DAYS AFTER RECEIPT OF DRAFT DOCUMENT.

SUBMIT UPDATED DOCUMENT WITHIN FIFTEEN (15) DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

PROVIDE UPDATES AND SUPPLEMENTS TO THIS DOCUMENT, AS APPROPRIATE, DURING THE PERIOD OF PERFORMANCE. INCORPORATE CHANGE BARS OR SOME OTHER METHOD TO IDENTIFY CHANGES FROM PREVIOUS VERSIONS. PERMANENT CHANGE PAGES SHALL CONFORM TO THE REQUIREMENTS, QUALITY, STYLE AND FORMAT OF THE BASIC DOCUMENTATION.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated)PREVIOUS EDITIONS ARE OBSOLETEPage8of11Pages
CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP TM- TMSS OTHER

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

FA8750-12-R-0002/0002

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

COMMERCIAL OFF-THE-SHELF (COTS) MANUAL AND ASSOCIATED SUPPLEMENTAL DATA

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-TMSS-80527B

5. CONTRACT REFERENCE

PARAGRAPH 4.8.1.5 OF THE WORK DESCRIPTION

6. REQUIRING OFFICE

AFRL/RIGA

7. DD250 REQ

NO

9. DIST STATEMENT REQUIRED

TBD

10. FREQUENCY

AS REQUIRED

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

N/A

a.ADDRESSEE
Draft
Final
Reg
Repro

16. REMARKS

UTILIZE MIL-PRF-32216 FOR GUIDANCE AS COORDINATED WITH THE REQUIRING OFFICE.

THE CONTRACTOR SHALL SUBMIT ORIGINAL MEDIA COTS MANUALS AND SUPPLEMENTAL DATA CONCURRENT WITH EACH DELIVERY OF ASSOCIATED SOFTWARE OR HARDWARE AS APPLICABLE.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated)PREVIOUS EDITIONS ARE OBSOLETEPage9of11Pages
CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

FA8750-12-R-0002/0002

F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

SCIENTIFIC AND TECHNICAL REPORTS

3. SUBTITLE

SCI

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80711A/T

5. CONTRACT REFERENCE

PARAGRAPH 4.9.4 OF THE WORK DESCRIPTION

6. REQUIRING OFFICE

AFRL/RIGA

7. DD250 REQ

DD

9. DIST STATEMENT REQUIRED

TBD

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

b. COPIES

8. APP CODE

A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLOCK 16

a.ADDRESSEE
Draft
Final
Reg
Repro

16. REMARKS

BLOCK 4:REFERENCE ANSI/NISO Z39.18-2005 BASED AFRL FORMAT GUIDELINES INCLUDING STANDARD FORM 298 (AVAILABLE AT https://jiffy.rome.af.mil with AFRL TECHNICAL QUALITY CHECKLIST AFRL FORM 25) BLOCK 9: DISTRIBUTION STATEMENT F: FURTHER DISSEMINATION ONLY AS DIRECTED BY AFRL/RIEE/SSO, ROME, NY 13441.

NOTE: THIS DISTRIBUTION STATEMENT IS PRELIMINARY ONLY. FINAL DISTRIBUTION STATEMENT SHALL BE DETERMINED BY THE GOVERNMENT DURING THE REVIEW PROCESS.

BLOCK 11: COMPLETION OF TECHNICAL EFFORT, SEE SECTION F CLIN0001.

BLOCKS 12, 13 & 14: WHEN DD 254 BLOCK 10.e.1 IS SELECTED, THE CONTRACTOR SHALL DELIVER ANY REPORTS TO INCLUDE REVISIONS WITH SF 298 AND THE COMPLETED, SIGNED TECHNICAL QUALITY CHECKLIST (AFRL FORM 25) WITHIN FIFTEEN (15) CALENDAR DAYS AFTER THE COMPLETION OF THE TECHNICAL EFFORT. CLASSIFIED REPORTS MUST BE SENT THROUGH PROPER CHANNELS PER INSTRUCTIONS IN THE DD254.

CLASSIFIED (ABOVE SECRET AND/OR INCLUDING SENSITIVE COMPARTMENTED INFORMATION (SCI)) FINAL REPORT ONE (1) HARDCOPY AND ONE (1) ELECTRONIC VERSION VIA DVD/CD TO AFRL/RIEE/SSO, 525 BROOKS RD, ROME, NEW YORK.

SUBMIT A NOTIFICATION OF DELIVERY TO AFRL/RIOIP VIA JIFFY OF INITIAL SUBMISSION TO AFRL/RIEE/SSO.

CONTINUED ON NEXT PAGE

AFRL/RIEE

SSO
)

15. TOTAL

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, SEP 97 (EG) (Computer Generated)PREVIOUS EDITIONS ARE OBSOLETEPage10of11Pages

CLIN 0002 A FA8750-12-R-0002/0002 A009 CONT’D

REPORT SHALL BE IN ONE EDITABLE TEXT FORMAT (MS WORD) FILE, WITH THE COMPLETED SF 298 EMBEDDED IN THE REPORT. THE GOVERNMENT WILL TAKE NO MORE THAN THIRTY (30) CALENDAR DAYS TO REVIEW, EDIT AND RETURN TO THE CONTRACTOR FOR CORRECTIONS IF NEEDED. UPON NOTIFICATION AND THE RECEIPT OF THE WRITTEN GOVERNMENT COMMENTS, AND IF APPLICABLE ORCON REQUIREMENTS, THE CONTRACTOR SHALL TAKE NO MORE THAN FIFTEEN (15) DAYS TO INCORPORATE ALL REQUIRED CHANGES AND RESUBMIT THE FINAL REPORT (MS WORD WITH EMBEDDED SF 298) AND COMPLETED, SIGNED CHECKLIST AND ANNOTATED CHANGE PAGES TO AFRL/RIEE/SSO FOR VERIFICATION OF CORRECTIONS AND PROPER MARKINGS.

SUBMIT A NOTIFICATION OF DELIVERY TO AFRL/RIOIP VIA JIFFY OF THE RESUBMISSION TO AFRL/RIEE/SSO.

FOR REPORT THAT DO NOT REQUIRE SCI AND/OR ABOVE SECRET MARKINGS AFTER INITIAL REVIEW BY AFRL/RIEE/SSO, THE FOLLOWING SHALL APPLY:

UPON RECEIPT OF THE WRITTEN GOVERNMENT COMMENTS, THE CONTRACTOR SHALL TAKE NO MORE THAN FIFTEEN (15) DAYS TO INCORPORATE ALL REQUIRED CHANGES AND RESUBMIT THE FINAL REPORT (MS WORD WITH EMBEDDED SF298) AND COMPLETED, SIGNED CHECKLIST AND ANNOTATED CHANGE PAGES TO AFRL/RIEE/SSO FOR VERIFICATION OF CORRECTIONS AND PROPER MARKINGS.

SUBMIT ONLY A NOTIFICATION TO AFRL/RIOIP VIA JIFFY OF THE RESUBMISSION TO AFRL/RIEE/SSO.

ACCEPTANCE CRITERIA SHALL BE IN ACCORDANCE WITH THE ANSI BASED AFRL FORMAT GUIDELINES AND THE AFRL QUALITY TECHNICAL REPORT (TR) CHECKLIST. REPRODUCTION AND DISTRIBUTION OF THIS DOCUMENT IS THE RESPONSIBILITY OF AFRL/RIEE/SSO. SUBMISSION OF THE FINAL UPDATED REPORT SATISFIES THE REQUIREMENT AT DFARS 252.235-7011.

NOTE: THE CONTRACTOR SHALL NOT DELIVER ANY TECHNICAL DATA WITH RESTRICTIVE MARKINGS UNLESS THE TECHNICAL DATA ARE LISTED ON AN ATTACHMENT TO THIS CONTRACT ENTITLED “IDENTIFICATION AND ASSERTION OF RESTRICTIONS ON THE GOVERNMENT’S USE, RELEASE OR DISCLOSURE OF TECHNICAL DATA OR COMPUTER SOFTWARE.” UNLESS WAIVED BY THE AFRL TECHNICAL DIRECTOR, IF THE FINAL REPORT CONTAINS DATA THAT IS DELIVERED WITH LESS-THAN-UNLIMITED RIGHTS (e.g. LIMITED RIGHTS, GOVERNMENT PURPOSE RIGHTS, SPECIFICALLY NEGOTIATED LICENSE RIGHTS), THE DATA WITH LESS-THAN-UNLIMITED RIGHTS SHALL BE DELIVERED IN AN APPROPRIATELY MARKED (PER DFARS 252.227-7013) APPENDIX TO THE FINAL REPORT. THE FINAL REPORT WITHOUT THE APPENDIX SHALL BE CONSIDERED TO BE DELIVERED WITH UNLIMITED RIGHTS. THE REQUIREMENT FOR A SEPARATE APPENDIX IS MANDATORY AND CAN ONLY BE WAIVED WITH WRITTEN APPROPRIATE AFRL TECHNICAL DIRECTOR APPROVAL VIA THE PROCURING CONTRACTING OFFICER (PCO).

PAGE ___11___ OF __11_____ PAGES

File details come from the government source that posted it. Updated .