VGR301- Appendix F- Support Equipment (REV1).pdf

PDF 154 KB Posted

Attached to
Storage Aid System at Grissom ARB, IN, Building 209 Federal contract opportunity
Solicitation number
FA860425RB032
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This Appendix F document details support equipment requirements for Building 209 at Grissom Air Reserve Base (ARB) in Indiana. The specification includes precise quantities and specifications for multiple types of equipment, such as 300 stack racks (200 at 48"x48"x48" and 100 at 48"x48"x36"), 10 manual pallet jacks, 6 spill containment pallets, 1 ESD workstation, 3 rolling ladders, 2 packing tables, 1 jumbo packing table, 1 mobile cart, 2 mobile workstations, 20 tri-wall containers, plastic storage bins in three sizes totaling 19,300 units, 20 column protectiors, forklift guard barriers, and bollards. Each item has specific dimensional, weight capacity, and installation requirements. The document includes a quality assurance section with a detailed inspection and testing checklist to verify that all equipment meets the specified requirements during system checkout and quality conformance tests.

View the file

Other files for this federal contract opportunity

Other files attached to Storage Aid System at Grissom ARB, IN, Building 209, newest first.
File Type Posted
Grissom MMHS RFI Response Log.xlsx XLSX spreadsheet
RFI log_FA8604-25-R-B032_Grissom ARB .xlsx XLSX spreadsheet
VGR301- Contractor Information.pdf PDF
Solicitation - FA860425RB032.pdf PDF
Appendix B- Cantilever Rack.pdf PDF
Appendix G- Removal of Existing Equipment.pdf PDF
Addendums.pdf PDF
Combo Synopsis-Solicitation (Grissom MMHS).pdf PDF
Cover Purchase Description.pdf PDF
Technical Proposal Questionnaire.pdf PDF
Appendix A- Pallet Rack.pdf PDF
Appendix C- Bin shelving.pdf PDF
VGR301-01.pdf PDF
VGR301-02.pdf PDF
Appendix D- Rider Reach.pdf PDF
Appendix E- Orderpicker.pdf PDF
Appendix F- Support Equipment .pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX F

FOR

SUPPORT EQUIPMENT

AT

GRISSOM ARB, INDIANA

BUILDINGS 209

CSN VGR301

DATE: 16 MAY 2025

REVISION 1: 2 SEPTEMBER 2025

PREPARED BY:

James Rowland

JAMES ROWLAND

PROJECT ENGINEER

AFLCMC/EZPAE

Josh Payne

JOSH PAYNE

REVIEWER

AFLCMC/EZPAE

Grissom ARB, IN - Appendix F - Page 1 of 4

1. GENERAL SCOPE

This appendix establishes the minimum performance, design, fabrication, installation, and test requirements for support equipment at Grissom ARB, Building 209. The work shall be completed in accordance with this appendix, the Cover Purchase Description (PD), and Air Force (AF) Drawing VGR301-01. This appendix covers all equipment, materials, and labor necessary to complete installation of the system.

2. APPLICABLE DOCUMENTS

Applicable documents shall be in accordance with Section 2 of the Cover PD.

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

Support equipment shall be provided as part of turn-key storage aid system.

3.2. CHARACTERISTICS

Support equipment shall conform to the following requirements.

3.2.1. CONFIGURATION REQUIREMENTS

Support equipment shall be located and configured as shown on AF Drawing VGR301- 01 or as outlined below.

3.2.2. STRUCTURE AND INSTALLATION

• Stack Racks o (300) Stack racks shall be delivered to Building 209, exact location to be determined during installation.

o (200) 48”W x 48”D x 48”H o (100) 48”W x 48”D x 36”H o Minimum load capacity of 4,000 pounds o Capable of being stacked 6 high

• Pallet Jacks o (10) Manual pallet jacks shall be delivered to Building 209.

o Minimum load capacity of 5,500 pounds o Minimum fork length of 42”

• Spill Containment Pallets o (6) Spill containment pallets shall be delivered to Building 209 o 49”L x 49”W x 11”D o Minimum load capacity of 6,000 pounds o Minimum sump capacity of 73 gallons

Grissom ARB, IN - Appendix F - Page 2 of 4

• ESD Workstations o (1) ESD workstation shall be delivered to Building 209; exact location to be determined during installation.

o 96”L x 30”W ESD top o Supported by (1) steel leg and (1) Modular Cabinet Pedestal (29-inch wide) with 5 drawers o 45”H providing a countertop height worksurface

• Rolling Ladders o (3) Rolling ladders shall be delivered to Building 209 o 7-step (70” platform) o Minimum weight capacity: 450 pounds o Minimum 20-inch deep top step o Lock-out bar prevents movement of ladder when in use

• Packing Table o (2) Packing tables shall be delivered to Building 209, exact location to be determined during installation o Nominal dimensions: 96”L x 36”W, 30-37” adjustable height o Minimum weight capacity: 500 pounds o Solid wood worksurface

• Jumbo Packing Table o (1) Jumbo packing table shall be delivered to Building 209, exact location to be determined during installation o Nominal dimensions: 144”L x 48”W, 30-37” adjustable height o Minimum weight capacity: 500 pounds o Solid wood worksurface o (4) drawers (24”L x 15”W x 16.5”H) shall be mounted to the underside of packing table (2 per side)

• Mobile Cart o (1) Mobile cart/receiving cart shall be delivered to Building 209 o Nominal dimensions: 31”L x 27”W x 44”H o Minimum weight capacity: 500 pounds o Acrylic worksurface o Non-marking caster wheels o (3) Exterior shelves nominal dimensions 25” x 10” o (3) Interior shelves nominal 27” x 7” behind locking cabinet

• Mobile Workstation o (2) Mobile workstation/bin utility carts shall be delivered to Building 209 o Nominal dimensions: 42”L x 24”W x 35”H o Minimum weight capacity: 400 pounds o Worksurface with convertible top

Grissom ARB, IN - Appendix F - Page 3 of 4 o Non-marking caster wheels o Capable of storing/transporting 36 plastic bins sized 11”L x 5.5”W x 5”H

(provided with)

• Tri-Wall Container o (20) Tri-wall containers shall be delivered to Building 209 o Nominal dimensions: 48”L x 48”W x 45”H o Mininum weight capacity: 3,500 pounds o Capable of being stacked 4 high

• Plastic Storage Bins (REV 1) o Three sizes of plastic storage bins shall be provided to interface with the bin shelving specified in Appendix C.

o All bins shall be yellow o Quantities, and dimensions, and example part number (or equivalent) as shown below:

Quantity Outer Dimension Example Part Number 14,000 11”L x 4”W x 4”H Akro-Mils AkroBin 30224 1,800 15”L x 8”W x 7”H Akro-Mils AkroBin 30240 3,500 18”L x 11”W x 10”H Akro-Mils AkroBin 30260

• Column Protectors o (20) Column protectors shall be delivered and installed around all exposed building columns (9” x 9”) as shown on AF Drawing VGR301-01 o Nominal dimensions: 26” diameter, 42”H o Heavy duty plastic capable of fully surrounding columns and shielding from vehicle impacts o Secured by hook and loop straps allow for easy install/removal

• Forklift Guard Barrier o Forklift guard barriers shall be installed in Building 209 to facilitate the storage of bulk and oversized loads. Exact location and configuration of guard barriers to be determined at time of installation o (10) 10’ sections of rail shall be provided, with no shared rail posts between sections.

o Rails capable of being removed for temporary access o Posts shall be 42”H o Minimum 5,000 pound impact rating at 4mph

• Bollards o Minimum 5”W by 5”D x 42”H and 3/16” tick steel with a welded base plate.

The top of each bollard shall be enclosed/covered o Anchored in accordance with the manufacturer’s installation procedures

Grissom ARB, IN - Appendix F - Page 4 of 4

4. QUALITY ASSURANCE PROVISIONS

4.1. INSPECTION

The support equipment shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of this appendix and the Cover PD. These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.

4.2. TESTS

The following tests shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.

No. Description Result

1. Stack racks delivered as specified

☐ Pass ☐ Fail

2. Pallet jacks delivered as specified ☐ Pass ☐ Fail

3. Spill containment pallets delivered as specified ☐ Pass ☐ Fail

4. ESD workstations delivered as specified ☐ Pass ☐ Fail

5. Rolling ladders delivered as specified ☐ Pass ☐ Fail

6. Packing table delivered as specified ☐ Pass ☐ Fail

7. Jumbo packing table delivered as specified ☐ Pass ☐ Fail

8. Mobile cart delivered as specified ☐ Pass ☐ Fail

9. Mobile workstation delivered as specified ☐ Pass ☐ Fail

10. Tri-wall containers delivered as specified ☐ Pass ☐ Fail

11. Plastic storage bins delivered as specified ☐ Pass ☐ Fail

12. Column protectors installed as specified ☐ Pass ☐ Fail

13. Forklift guard barrier installed as specified ☐ Pass ☐ Fail

14. Bollards installed as specified ☐ Pass ☐ Fail

DATE: 16 MAY 2025
REVISION 1: 2 SEPTEMBER 2025
General scope
APPLICABLE DOCUMENTS
REQUIREMENTS
System description
Characteristics
Configuration requirements
3.2.2. STRUCTURE AND INSTALLATION
QUALITY ASSURANCE PROVISIONS
Inspection
Tests