Appendix G- Removal of Existing Equipment.pdf
PDF 2 MB Posted
- Attached to
- Storage Aid System at Grissom ARB, IN, Building 209 Federal contract opportunity
- Solicitation number
- FA860425RB032
About this file
This Appendix G document outlines requirements for removing existing equipment at Grissom Air Reserve Base (ARB) in Indiana, specifically in Building 209. The removal scope includes dismantling and disposing of a rack-supported mezzanine (45' x 92'), which contains 298 bin shelf units on the floor level, 156 bin shelf units on the mezzanine level, and one double-high row of bin shelving. Additional equipment to be removed includes a 6' x 6' Vertical Reciprocating Conveyor (VRC) that interfaces with the mezzanine, and approximately 113 pallet rack bays (59 bays measuring 4'D x 9'W x 10'H and 54 bays measuring 4'D x 9'W x 12'H), which will be disassembled and palletized for future use by Grissom ARB.
The document specifies that after equipment removal, all anchor bolts must be cut down to floor level and holes filled with epoxy/resin. A quality assurance section is included with a test matrix to verify proper removal of all specified equipment, requiring inspection during system checkout and quality conformance testing. The appendix is dated 16 May 2025 and was prepared by James Rowland, Project Engineer, and reviewed by Josh Payne, both from AFLCMC/EZPAE (Air Force Life Cycle Management Center).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Grissom MMHS RFI Response Log.xlsx | XLSX spreadsheet | |
| VGR301- Appendix F- Support Equipment (REV1).pdf | ||
| RFI log_FA8604-25-R-B032_Grissom ARB .xlsx | XLSX spreadsheet | |
| VGR301- Contractor Information.pdf | ||
| Solicitation - FA860425RB032.pdf | ||
| Appendix B- Cantilever Rack.pdf | ||
| Addendums.pdf | ||
| Combo Synopsis-Solicitation (Grissom MMHS).pdf | ||
| Cover Purchase Description.pdf | ||
| Appendix D- Rider Reach.pdf | ||
| Appendix E- Orderpicker.pdf | ||
| Appendix F- Support Equipment .pdf | ||
| Technical Proposal Questionnaire.pdf | ||
| Appendix A- Pallet Rack.pdf | ||
| Appendix C- Bin shelving.pdf | ||
| VGR301-01.pdf | ||
| VGR301-02.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX G
FOR
REMOVAL OF EXISTING EQUIPMENT
AT
GRISSOM ARB, INDIANA
BUILDING 209
CSN VGR301
DATE: 16 MAY 2025
PREPARED BY:
James Rowland
JAMES ROWLAND
PROJECT ENGINEER
AFLCMC/EZPAE
Josh Payne
JOSH PAYNE
REVIEWER
AFLCMC/EZPAE
Grissom ARB, IN - Appendix G - Page 1 of 6
1. GENERAL SCOPE
This appendix establishes the minimum performance, design, fabrication, installation, and test requirements for demolition and removal of existing equipment at Grissom ARB, Building 209. The work shall be completed in accordance with this appendix, the Cover Purchase Description (PD), and Air Force (AF) Drawing VGR301-02. This appendix covers all equipment, materials, and labor necessary to complete installation of the system.
2. APPLICABLE DOCUMENTS
Applicable documents shall be in accordance with Section 2 of the Cover PD.
3. REQUIREMENTS
3.1. SYSTEM DESCRIPTION
Existing government owned racking and rack-supported mezzanine shall be removed.
3.2. CHARACTERISTICS
The demolition and removal of existing government owned equipment shall conform to the following requirements.
3.2.1. CONFIGURATION REQUIREMENTS
Existing government owned equipment to be removed as shown on AF Drawing VGR301-02. Any bolts left in floor from existing equipment shall be ground level to the floor and any holes filled in with an epoxy/resin.
3.2.2. EXISTING EQUIPMENT
• Mezzanine o ~ 45’ x 92’ mezzanine shall be dissembled and disposed of
Floor level- (298) bin shelf units (3’W x 18’D x 7’H) Mezzanine level- (156) bin shelf units (3’W x 18”D x 7’H)
(1) Double high row of bin shelving (3’W x 18’D x 14’H) o Picture of existing equipment:
Grissom ARB, IN - Appendix G - Page 2 of 6
Grissom ARB, IN - Appendix G - Page 3 of 6
Grissom ARB, IN - Appendix G - Page 4 of 6
• Vertical Reciprocating Conveyor (VRC) o ~ 6’ x 6’ VRC shall be dissembled and disposed of o Currently interfaces with rack supported mezzanine o Picture of existing equipment:
o
Grissom ARB, IN - Appendix G - Page 5 of 6
• Pallet Rack o ~ (113) Pallet rack bays shall be diassembled and palletized for future use by Grissom ARB.
o (59) bays are 4’D x 9’W x 10’H o (54) bays are 4’D x 9’W x 12’H o Pictures of existing equipment:
Grissom ARB, IN - Appendix G - Page 6 of 6
4. QUALITY ASSURANCE PROVISIONS
4.1. INSPECTION
Those areas where equipment was removed shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of this appendix and the Cover PD. These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.
4.2. TESTS
The following tests shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.
No. Description Result
1. Was the rack supported mezzanine removed as specified? ☐ Pass
☐ Fail
2. Was the VRC removed as specified? ☐ Pass
☐ Fail
3. Were the pallet rack removed and palletized as specified? ☐ Pass
☐ Fail
4. Were all anchor bolts cut down and holes filled as specified? ☐ Pass
☐ Fail
| DATE: 16 MAY 2025 |
| General scope |
| APPLICABLE DOCUMENTS |
| REQUIREMENTS |
| System description |
| Characteristics |
| Configuration requirements |
| 3.2.2. EXISTING EQUIPMENT |
| QUALITY ASSURANCE PROVISIONS |
| Inspection |
| Tests |