Appendix G- Removal of Existing Equipment.pdf

PDF 2 MB Posted

Attached to
Storage Aid System at Grissom ARB, IN, Building 209 Federal contract opportunity
Solicitation number
FA860425RB032
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This Appendix G document outlines requirements for removing existing equipment at Grissom Air Reserve Base (ARB) in Indiana, specifically in Building 209. The removal scope includes dismantling and disposing of a rack-supported mezzanine (45' x 92'), which contains 298 bin shelf units on the floor level, 156 bin shelf units on the mezzanine level, and one double-high row of bin shelving. Additional equipment to be removed includes a 6' x 6' Vertical Reciprocating Conveyor (VRC) that interfaces with the mezzanine, and approximately 113 pallet rack bays (59 bays measuring 4'D x 9'W x 10'H and 54 bays measuring 4'D x 9'W x 12'H), which will be disassembled and palletized for future use by Grissom ARB.

The document specifies that after equipment removal, all anchor bolts must be cut down to floor level and holes filled with epoxy/resin. A quality assurance section is included with a test matrix to verify proper removal of all specified equipment, requiring inspection during system checkout and quality conformance testing. The appendix is dated 16 May 2025 and was prepared by James Rowland, Project Engineer, and reviewed by Josh Payne, both from AFLCMC/EZPAE (Air Force Life Cycle Management Center).

View the file

Other files for this federal contract opportunity

Other files attached to Storage Aid System at Grissom ARB, IN, Building 209, newest first.
File Type Posted
Grissom MMHS RFI Response Log.xlsx XLSX spreadsheet
VGR301- Appendix F- Support Equipment (REV1).pdf PDF
RFI log_FA8604-25-R-B032_Grissom ARB .xlsx XLSX spreadsheet
VGR301- Contractor Information.pdf PDF
Solicitation - FA860425RB032.pdf PDF
Appendix B- Cantilever Rack.pdf PDF
Addendums.pdf PDF
Combo Synopsis-Solicitation (Grissom MMHS).pdf PDF
Cover Purchase Description.pdf PDF
Appendix D- Rider Reach.pdf PDF
Appendix E- Orderpicker.pdf PDF
Appendix F- Support Equipment .pdf PDF
Technical Proposal Questionnaire.pdf PDF
Appendix A- Pallet Rack.pdf PDF
Appendix C- Bin shelving.pdf PDF
VGR301-01.pdf PDF
VGR301-02.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX G

FOR

REMOVAL OF EXISTING EQUIPMENT

AT

GRISSOM ARB, INDIANA

BUILDING 209

CSN VGR301

DATE: 16 MAY 2025

PREPARED BY:

James Rowland

JAMES ROWLAND

PROJECT ENGINEER

AFLCMC/EZPAE

Josh Payne

JOSH PAYNE

REVIEWER

AFLCMC/EZPAE

Grissom ARB, IN - Appendix G - Page 1 of 6

1. GENERAL SCOPE

This appendix establishes the minimum performance, design, fabrication, installation, and test requirements for demolition and removal of existing equipment at Grissom ARB, Building 209. The work shall be completed in accordance with this appendix, the Cover Purchase Description (PD), and Air Force (AF) Drawing VGR301-02. This appendix covers all equipment, materials, and labor necessary to complete installation of the system.

2. APPLICABLE DOCUMENTS

Applicable documents shall be in accordance with Section 2 of the Cover PD.

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

Existing government owned racking and rack-supported mezzanine shall be removed.

3.2. CHARACTERISTICS

The demolition and removal of existing government owned equipment shall conform to the following requirements.

3.2.1. CONFIGURATION REQUIREMENTS

Existing government owned equipment to be removed as shown on AF Drawing VGR301-02. Any bolts left in floor from existing equipment shall be ground level to the floor and any holes filled in with an epoxy/resin.

3.2.2. EXISTING EQUIPMENT

• Mezzanine o ~ 45’ x 92’ mezzanine shall be dissembled and disposed of

Floor level- (298) bin shelf units (3’W x 18’D x 7’H) Mezzanine level- (156) bin shelf units (3’W x 18”D x 7’H)

(1) Double high row of bin shelving (3’W x 18’D x 14’H) o Picture of existing equipment:

Grissom ARB, IN - Appendix G - Page 2 of 6

Grissom ARB, IN - Appendix G - Page 3 of 6

Grissom ARB, IN - Appendix G - Page 4 of 6

• Vertical Reciprocating Conveyor (VRC) o ~ 6’ x 6’ VRC shall be dissembled and disposed of o Currently interfaces with rack supported mezzanine o Picture of existing equipment:

o

Grissom ARB, IN - Appendix G - Page 5 of 6

• Pallet Rack o ~ (113) Pallet rack bays shall be diassembled and palletized for future use by Grissom ARB.

o (59) bays are 4’D x 9’W x 10’H o (54) bays are 4’D x 9’W x 12’H o Pictures of existing equipment:

Grissom ARB, IN - Appendix G - Page 6 of 6

4. QUALITY ASSURANCE PROVISIONS

4.1. INSPECTION

Those areas where equipment was removed shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of this appendix and the Cover PD. These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.

4.2. TESTS

The following tests shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.

No. Description Result

1. Was the rack supported mezzanine removed as specified? ☐ Pass

☐ Fail

2. Was the VRC removed as specified? ☐ Pass

☐ Fail

3. Were the pallet rack removed and palletized as specified? ☐ Pass

☐ Fail

4. Were all anchor bolts cut down and holes filled as specified? ☐ Pass

☐ Fail

DATE: 16 MAY 2025
General scope
APPLICABLE DOCUMENTS
REQUIREMENTS
System description
Characteristics
Configuration requirements
3.2.2. EXISTING EQUIPMENT
QUALITY ASSURANCE PROVISIONS
Inspection
Tests