QuestionsAnswers Set 6 Charleston 12 Apr24.pdf

PDF 141 KB Posted

Attached to
FA8604 Storage Aids System/JB Charleston, South Carolina MMHS Federal contract opportunity
Solicitation number
FA860424RB005
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This document consists of a set of questions and answers related to a federal contract opportunity for a Storage Aids System at Joint Base Charleston in South Carolina. The solicitation number is FA8604-24-R-B005, and the contract is 100% set aside for small businesses. The NAICS code is 333922 with a size standard of 500 employees.

The key details are: the electrical and sprinkler system requirements are the responsibility of the successful bidder; the Rider Reach Vehicle requires an onboard battery charger that meets the weight requirements, and a freestanding 110V plug-in unit is not allowed; the bid submission deadline has been extended to April 26, 2024. The acquisition is subject to the Limitations on Subcontracting clause, requiring at least 50% of the contract value to be performed by the prime contractor. The contract completion is required within 300 days of award, and the evaluation will be based on the Lowest Price Technically Acceptable method.

View the file

Other files for this federal contract opportunity

Other files attached to FA8604 Storage Aids System/JB Charleston, South Carolina MMHS, newest first.
File Type Posted
Solicitation Amendment FA860424RB0050004 SF 30.pdf PDF
STORAGE AIDS SYSTEM AT JOINT BASE CHARLESTON SOUTH CAROLINA FLIGHT LINE SUPPORT FACILITY CSN BCH205.zip ZIP file
Solicitation Amendment - FA860424RB0050004.pdf PDF
QuestionsAnswers Set 5 Charleston 09 Apr24.pdf PDF
QuestionsAnswers Set 4 Charleston 05 Apr24.pdf PDF
STORAGE AIDS SYSTEM AT JOINT BASE CHARLESTON SOUTH CAROLINA FLIGHT LINE SUPPORT FACILITY CSN BCH205.zip ZIP file
Solicitation Amendment FA860424RB0050003 SF 30.pdf PDF
Solicitation Amendment - FA860424RB0050003.pdf PDF
QuestionsAnswers Set 3 Charleston 04 Apr24.pdf PDF
STORAGE AIDS SYSTEM AT JOINT BASE CHARLESTON SOUTH CAROLINA FLIGHT LINE SUPPORT FACILITY CSN BCH205.zip ZIP file
Solicitation Amendment FA860424RB0050001 SF 30.pdf PDF
Solicitation Amendment - FA860424RB0050002.pdf PDF
Solicitation Amendment FA860424RB0050002 SF 30.pdf PDF
QuestionsAnswers Set 2_Charleston_01Apr24.pdf PDF
QuestionsAnswers Set 1_Charleston_28Mar24.pdf PDF
Solicitation Amendment FA860424RB0050001 SF 30.pdf PDF
STORAGE AIDS SYSTEM AT JOINT BASE CHARLESTON SOUTH CAROLINA FLIGHT LINE SUPPORT FACILITY CSN BCH205 amendment 1.zip ZIP file
Solicitation Amendment - FA860424RB0050001.pdf PDF
Cover PD Attachment 1.pdf PDF
Addendums 52.212-1 and 2 Attachment 12.pdf PDF
Appendix F Pallet Rack 463L.pdf PDF
Appendix A- Pallet Rack.pdf PDF
Checklist Summary Pricing Sheet Attachment 14.pdf PDF
ACKNOWLEDGEMENT OF COMPLIANCE Attachment 13.pdf PDF
Appendix H- Expandable Gravity Conveyor.pdf PDF
Drawing.pdf PDF
Appendix B- Mobile Aisle.pdf PDF
Appendix E- Mezzanine.pdf PDF
Appendix C Cantilever Rack.pdf PDF
Solicitation - FA860424RB005.pdf PDF
Appendix G - Rider Reach Vehicle.pdf PDF
BCH205 - Contractor Information Attachment 11.pdf PDF
Notification of Compliance with Contract Insurance Requirements Charleston Attachment 15.pdf PDF
Appendix D - Modular Cabinet Mini-Mezzanine Attachment 5.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8604‐24‐R‐B005

JB Charleston, SC Questions/Answers Set 6 Date 12 April 2024

Questions/Answers:

Question:

1.We have been in contact with the electrical sub-contractor who is providing the electrical materials for the Building 79 project. He has advised that the lighting requirements below the mezzanine are included in his SOW including all materials and labor. Please advise.

Answer: The electrical requirements are the responsibility of the successful bidder of this contract.

2. Given that the electrical work is included in the GC’s package, please reconfirm that the sprinkler system requirements are still part of our SOW.

Answer: The sprinkler requirements are the responsibility of the successful bidder of this contract.

3. Rider Reach Vehicle: We have not been able to find a battery manufacturer that can provide a battery with onboard charger that meets the weight requirements of the reach truck. Can we supply a freestanding 110V, plug-in unit instead

Answer: No, a freestanding 110V plug-in unit is not allowed. The requirement stands as written. Please review Appendix G section 3.3.2. for information regarding the battery.

4. We are experiencing delays in receiving quotations from several of our key suppliers due to several of the specific requirements for this project in conjunction with vacations. Respectfully requesting a bid extension to April 26, 20124.

Answer: Bid extension to April 26

File details come from the government source that posted it. Updated .