This document is an Appendix E for a mezzanine to be installed at Joint Base Charleston, South Carolina as part of a Flight Line Support Facility project. The appendix establishes the minimum performance, design, fabrication, installation, and test requirements for the mezzanine. Key details include:

The mezzanine must be freestanding, pre-engineered, and capable of supporting a minimum capacity of 150 pounds per square foot. It shall have a nominal clear height of 9 feet 6 inches and a maximum deck height of 12 feet above the warehouse floor. The mezzanine shall include structural steel framing, metal roof deck and composite flooring, three sets of stairs with platforms and railings, a pallet gate, and a fire suppression system. Electrical requirements include LED lighting with motion sensors and emergency lighting. The mezzanine must meet various safety standards and be inspected and tested as described in the appendix.

View the file

Other files for this federal contract opportunity

Other files attached to FA8604 Storage Aids System/JB Charleston, South Carolina MMHS, newest first.
File Type Posted
Solicitation Amendment FA860424RB0050004 SF 30.pdf PDF
QuestionsAnswers Set 6 Charleston 12 Apr24.pdf PDF
STORAGE AIDS SYSTEM AT JOINT BASE CHARLESTON SOUTH CAROLINA FLIGHT LINE SUPPORT FACILITY CSN BCH205.zip ZIP file
Solicitation Amendment - FA860424RB0050004.pdf PDF
QuestionsAnswers Set 5 Charleston 09 Apr24.pdf PDF
QuestionsAnswers Set 4 Charleston 05 Apr24.pdf PDF
STORAGE AIDS SYSTEM AT JOINT BASE CHARLESTON SOUTH CAROLINA FLIGHT LINE SUPPORT FACILITY CSN BCH205.zip ZIP file
Solicitation Amendment FA860424RB0050003 SF 30.pdf PDF
Solicitation Amendment - FA860424RB0050003.pdf PDF
QuestionsAnswers Set 3 Charleston 04 Apr24.pdf PDF
STORAGE AIDS SYSTEM AT JOINT BASE CHARLESTON SOUTH CAROLINA FLIGHT LINE SUPPORT FACILITY CSN BCH205.zip ZIP file
Solicitation Amendment FA860424RB0050001 SF 30.pdf PDF
Solicitation Amendment FA860424RB0050002 SF 30.pdf PDF
Solicitation Amendment - FA860424RB0050002.pdf PDF
QuestionsAnswers Set 2_Charleston_01Apr24.pdf PDF
QuestionsAnswers Set 1_Charleston_28Mar24.pdf PDF
Solicitation Amendment - FA860424RB0050001.pdf PDF
Solicitation Amendment FA860424RB0050001 SF 30.pdf PDF
STORAGE AIDS SYSTEM AT JOINT BASE CHARLESTON SOUTH CAROLINA FLIGHT LINE SUPPORT FACILITY CSN BCH205 amendment 1.zip ZIP file
Drawing.pdf PDF
Appendix B- Mobile Aisle.pdf PDF
Appendix C Cantilever Rack.pdf PDF
Solicitation - FA860424RB005.pdf PDF
Appendix H- Expandable Gravity Conveyor.pdf PDF
Cover PD Attachment 1.pdf PDF
Addendums 52.212-1 and 2 Attachment 12.pdf PDF
Appendix F Pallet Rack 463L.pdf PDF
Appendix A- Pallet Rack.pdf PDF
Checklist Summary Pricing Sheet Attachment 14.pdf PDF
ACKNOWLEDGEMENT OF COMPLIANCE Attachment 13.pdf PDF
Appendix G - Rider Reach Vehicle.pdf PDF
BCH205 - Contractor Information Attachment 11.pdf PDF
Notification of Compliance with Contract Insurance Requirements Charleston Attachment 15.pdf PDF
Appendix D - Modular Cabinet Mini-Mezzanine Attachment 5.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX E

FOR A

MEZZANINE

AT

JOINT BASE CHARLESTON, SOUTH CAROLINA

FLIGHT LINE SUPPORT FACILITY

CSN: BCH205

DATE: 20 DECEMBER 2023

PREPARED BY:

Ashley Ambrose

ASHLEY AMBROSE

PROJECT ENGINEER

AFLCMC/EZPAE

Ronald Parsons

RONALD PARSONS

REVIEWER

AFLCMC/EZPAE

FA860424RB005 ATTACHMENT 6

THIS PAGE LEFT BLANK INTENTIONALLY

Joint Base Charleston - Appendix E - Page i

Table of Contents

1. SCOPE

1.1. GENERAL SCOPE

1.2. DEFINITIONS

2. APPLICABLE DOCUMENTS

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

3.2. CHARACTERISTICS

3.2.1. PERFORMANCE AND PHYSICAL CHARACTERISTICS

3.2.1.1. LOAD CAPACITY

3.2.1.2. FREESTANDING STRUCTURE

3.2.1.2.1. PRE-ENGINEERED

3.2.1.3. DEFLECTION UNDER LOAD

3.2.1.4. DIMENSION AND CLEAR HEIGHT

3.2.1.5. SEISMIC

3.2.1.6. COLUMNS

3.2.1.6.1. BASE PLATES

3.2.1.7. FRAMING

3.2.1.7.1. BEAMS

3.2.1.7.2. JOISTS

3.2.1.7.3. BRIDGING

3.2.1.7.4. DECKING

3.2.1.7.4.1. METAL ROOF DECK

3.2.1.7.4.2. COMPOSITE FLOORING

3.2.1.8. STAIRWAY SYSTEMS

3.2.1.8.1. STAIR TREADS

3.2.1.8.2. STRINGERS

3.2.1.8.3. RAILING

3.2.1.8.4. PLATFORMS

3.2.1.9. MEZZANINE RAILING

3.2.1.10. KICKPLATE

3.2.1.11. PALLET GATE

3.2.1.12. FIRE SUPPRESSION SYSTEM

3.2.1.12.1. FIRE SUPPRESSION DESIGN ANALYSIS

3.2.2. ELECTRICAL CHARACTERISTICS

3.2.2.1. LIGHTING

3.2.2.1.1. FIXTURES

3.2.2.1.2. MOTION SENSOR ON/OFF

3.2.2.1.3. EMERGENCY LIGHTING

3.2.3. SAFETY FEATURES

3.2.3.1. CAPACITY MARKINGS

3.2.3.2. NO-STEP MARKINGS

3.2.3.3. SAFETY FACTOR

Joint Base Charleston - Appendix E - Page ii

4. QUALITY CONFORMANCE

4.1. INSPECTIONS

4.2. TEST

4.3. CERTIFICATIONS

Joint Base Charleston - Appendix E - Page 1

1. SCOPE

1.1. GENERAL SCOPE

This appendix establishes the minimum performance, design, fabrication, installation, and test requirements for a mezzanine, for the 628th Logistics Readiness Squadron (LRS) in the Flight Line Support Facility (FLSF) at Joint Base

Charleston, South Carolina. The work shall be completed in accordance with this appendix, the Cover Purchase Description

(PD), and Air Force (AF) Drawing BCH205-01. This appendix covers all equipment, materials, and labor necessary to complete installation of the system.

1.2. DEFINITIONS

Beams - Structural steel supporting member which connect the columns.

Bridging - Steel channels used to provide lateral stability and prevent joists from twisting.

Column - Structural steel that supports beams and joist.

Framing - Consists of beams, joists, and bridging.

Joists - Structural steel member supporting the decking.

2. APPLICABLE DOCUMENTS

Applicable documents shall be in accordance with Section 2 of the Cover PD and the following:

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM A36/A36M Standard Specification for Structural

Steel

ASTM A366/A366M Standard Specification for Steel

Sheet, Carbon Cold-Rolled, Commercial

Quality

ASTM 446/A446M Standard Specification for Steel

Sheet, Zinc-Coated (Galvanized) by the

Hot-Dip Process, Structural (Physical)

Joint Base Charleston - Appendix E - Page 2

ASTM A500 Standard Specification for Cold-Formed

Welded and Seamless Carbon Steel

Structural Tubing in Rounds and Shapes

ASTM A570 Standard Specification for Steel, Sheet and Strip, Carbon, Hot-Rolled, Structural Quality

ASTM A611 Standard Specification for Steel, Sheet, Carbon, Cold-Rolled, Structural

(Applications for copies should be addressed to the American

Society for Testing and Materials, 1916 Race Street, Philadelphia PA 19103)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 13 Standard for the Installation of

Sprinkler Systems

NFPA 255 Standard Method of Test of Surface

Burning Characteristics of Building

Materials

(Applications for copies shall be addressed to the National Fire

Protection Association, One Batterymarch Park, P.O. Box 9101, Quincy MA 02269-9101)

UNIFIED FACILITIES CRITERIA (UFC)

UFC 3-600-01 Fire Protection Engineering for

Facilities

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

The mezzanine shall be located according to AF Drawing BCH205-

01. The mezzanine shall be used to support crated bulk items, expandable conveyor, and Type “D” pallet rack as specified in

Appendix H and A, respectively. The mezzanine system shall consist of the following components:

Joint Base Charleston - Appendix E - Page 3

A. Freestanding, structural steel mezzanine with columns, beams, joists, decking, and bridging.

B. Three sets of stairs, platforms, handrails, midrails, and kickplates.

C. One pallet gate.

D. Fire suppression system.

E. Lighting.

F. Conduit, wiring, mechanical fasteners, and all other items required to install a functional mezzanine system.

3.2. CHARACTERISTICS

3.2.1. PERFORMANCE AND PHYSICAL CHARACTERISTICS

3.2.1.1. LOAD CAPACITY

All components of the mezzanine shall be designed to support a minimum capacity of 150 pounds per square foot (uniformly distributed), a dead load capacity of 40 pounds per square foot, and a live load capacity of 110 pounds per square foot. The mezzanine shall be capable of sustaining pallet jack loads up to

2,000 pounds without permanent deflection or deformation. The mezzanine shall be capable of sustaining the concentrated loads of the fully loaded pallet rack (Appendix A – Type D) without permanent deflection or deformation. The mezzanine shall be stable and shall not exhibit any excessive sway motion.

3.2.1.2. FREESTANDING STRUCTURE

The mezzanine shall not be attached to the building except for the warehouse floor. Cross bracing between columns shall be permitted only along building wall that does not interfere with doors.

3.2.1.2.1. PRE-ENGINEERED

All components of the mezzanine shall be pre-engineered so that on-site welding is eliminated.

Joint Base Charleston - Appendix E - Page 4

3.2.1.3. DEFLECTION UNDER LOAD

No component of the mezzanine shall exhibit deflections greater than the length of the component divided by 360 (L/360) under uniformly loaded conditions.

3.2.1.4. DIMENSION AND CLEAR HEIGHT

The mezzanine shall be rectangular-shaped with the longest dimensions a nominal 89’-8” wide X 54'-8” deep. The mezzanine shall have a nominal clear height of 9 feet 6 inches underneath all components of the mezzanine. The top of the decking shall be a maximum of 12 feet above the warehouse floor.

3.2.1.5. SEISMIC

The mezzanine shall be designed to withstand seismic forces as specified in the Cover PD section 3.3.1.8.

3.2.1.6. COLUMNS

Columns shall be cold formed, structural steel tubing and shall meet or exceed the requirements of ASTM A500, Grade B, FY-46KSI.

The columns shall be pre-punched at the top to provide a secure connection to beams and joists. Columns shall be a minimum of 5 inches by 5 inches by 3/16 inch thick. Columns shall be spaced nominally as shown on AF Drawing BCH205-01 or as approved by the

Contracting Officer’s Technical Representative (COTR). The contractor shall provide a drawing showing column spacing and cross-bracing locations for the mezzanine.

3.2.1.6.1. BASE PLATES

Base plates shall be used under each column to distribute the load. The base plates shall be factory welded to the columns and pre-punched to provide a secure connection to the floor.

The base plates shall be anchored in accordance with the manufacturers recommended procedure. The base plates shall meet or exceed the requirements of ASTM A36 and shall be a minimum of

12 inches by 12 inches by 1 inch. Grout shall be used under all base plates.

3.2.1.7. FRAMING

Hot rolled structural steel members shall meet or exceed the requirements of ASTM A570. Cold-formed structural steel members shall meet or exceed the requirements of ASTM A500 or ASTM A611.

Framing shall consist of beams, joists and bridging as defined

Joint Base Charleston - Appendix E - Page 5 in 1.2. The framing shall be designed to support the full rated load and the calculated mezzanine dead load.

3.2.1.7.1. BEAMS

All beams shall be structural steel and shall be pre-punched for secure connection to the columns and joists with A325 bolts.

3.2.1.7.2. JOISTS

All joists shall be structural steel and shall be pre-punched for secure connection to the beams with A325 bolts.

3.2.1.7.3. BRIDGING

Structural steel bridging channels shall be minimum 18-gauge steel.

3.2.1.7.4. DECKING

The decking shall consist of a metal roof deck and composite flooring. The decking shall sustain the load specified in

3.2.1.1.

3.2.1.7.4.1. METAL ROOF DECK

The metal roof deck shall be galvanized or painted on both sides and consist of minimum 20-gauge, type-B roof deck meeting the requirements of ASTM A611, Grade C, or minimum 18 gauge, type-B roof deck meeting the requirements of ASTM A446, Grade A. If the roof deck is painted, the bottom of the roof deck shall be painted white and the top shall be painted the manufacturer's standard color. The roof deck shall be securely fastened to the framing with plated, self-tapping, steel screws or equivalent as approved by the Contracting Officer’s Technical Representative

(COTR).

3.2.1.7.4.2. COMPOSITE FLOORING

The composite flooring shall be ResinDek 45 or equivalent.

ResinDek flooring is a special blend of phenolic resin, wax emulsion, and wood fibers combined under heat and pressure. The flooring shall be minimum 3/4-inch thick. The flooring shall have an exterior sealant. The sealant shall be Diamond Seal 2 or equivalent. The flooring sheets shall be tongue and groove on long sides forming an integral surface. The flooring sheets shall be securely fastened to the framing with ResinDek type

Joint Base Charleston - Appendix E - Page 6 drill screws or equivalent. All exposed sides of the composite flooring shall be covered.

3.2.1.8. STAIRWAY SYSTEMS

Stairway systems shall be provided as shown on AF Drawings

BCH205-01. The stairway systems shall include stairs, structural steel stringers, railing, a platform if required by OSHA

1910.24, and all necessary hardware to install the stairway.

The stairway shall be minimum 36 inches wide. The stairway shall be designed and constructed in accordance with OSHA

1910.24. The stairway systems shall be painted safety yellow.

3.2.1.8.1. STAIR TREADS

Stairs shall be open tread type with bar grating or closed tread with diamond plate.

3.2.1.8.2. STRINGERS

Stringers shall meet or exceed the requirements of ASTM A36.

3.2.1.8.3. RAILING

Railing shall be provided on the open sides of all exposed stairways and platforms. Rails shall be designed and constructed in accordance with OSHA 1910.23 and shall be of either the 2-rail or 3-rail type. The top rail surface shall be between 30-34 inches above the stair tread surface. Railing shall be minimum 1-1/4 inch, schedule 40 steel tubing. Rail sections shall be joined together with either galvanized fittings or a pre-engineered union. Railing for the stairway shall be bolt connected or factory welded to the stringer such that it is capable of withstanding a load of at least 200 pounds applied in any direction at any point on the top rail.

3.2.1.8.4. PLATFORMS

The platform shall be the same width as the stairway and minimum

48 inches in length (measured in the direction of travel).

3.2.1.9. MEZZANINE RAILING

Railing shall be provided on the open sides of all exposed mezzanine floor. Rails shall be designed and constructed in accordance with OSHA 1910.23 and shall be the 2-rail type. The top rail surface shall be 42-inches above the mezzanine decking.

Railing shall be minimum 1-1/2 inch diameter, schedule 40 steel

Joint Base Charleston - Appendix E - Page 7 tubing. Rail sections shall be joined together with either galvanized fittings or a pre-engineered union. Railing for the mezzanine shall be bolt-connected to a structural framing beam such that it is capable of withstanding a load of at least 200 pounds applied in any direction at any point on the top rail.

Support posts shall be spaced on a maximum of 8-foot centers.

3.2.1.10. KICKPLATE

A kickplate shall be provided on all open sides of the mezzanine and platforms. The kickplate shall be minimum 4-inches high with no more than 1/4-inch clearance between the floor and the bottom of the kickplate. The kickplate shall be minimum 14-gauge steel and shall be securely fastened to the mezzanine or railings.

3.2.1.11. PALLET GATE

One pallet gate shall be provided at the location shown on AF

Drawing BCH205-01. The gate shall be used to load/unload material from the mezzanine using a standard forklift. The pallet gate shall be constructed of steel tubing matching the railing and shall provide a minimum opening of 72 inches. The pallet gate shall be the pivot type that allows the pallet gate area to be open to only one side at a time.

3.2.1.12. FIRE SUPPRESSION SYSTEM

The Contractor shall design and install a wet-pipe fire suppression system under the mezzanine in accordance with NFPA

13, UFC 3-600-01, and applicable fire codes at Joint Base

Charleston, South Carolina. All appendices of NFPA 13 will be considered to be a part of the main body of the standard; all

"shoulds" will be considered "shalls" in this project.

Sprinkler size, spacing and location shall be in accordance with

NFPA 13, Chapter 4 and designed for ordinary hazard occupancy classification as defined in NFPA 13, Section 1-7. Sprinkler heads and piping shall be located so not to be susceptible to damage or interfere with normal operations under the mezzanine.

The clear height specified in 3.2.1.4. shall be maintained. The

Contractor shall connect the fire suppression system to the existing system piping at the most economical point permitted by

NFPA 13 criteria and approved by the COTR. The Contractor shall perform a test on the existing system to determine flow and pressure characteristics and design a system compatible with the existing system. The proposed sprinkler design, with supporting hydraulic calculations, shall be submitted with the shop drawing package for review and approval by the COTR prior to initiation

Joint Base Charleston - Appendix E - Page 8 of any work on the fabrication or installation of the sprinkler system. The fire suppression design and hydraulic calculations shall be sealed by a qualified registered Professional Engineer or a R.M.E. (NICET Level IV) technician. Prior to impairing the existing system for connection of the mezzanine sprinkler system, the Contractor shall notify the Base Fire Department.

The existing fire suppression system shall not be inoperative for any time longer than that required to make the required connections.

3.2.1.12.1. FIRE SUPPRESSION DESIGN ANALYSIS

A Fire Protection Engineer must review the shop drawing design submission and certify in writing that the design is in compliance with UFC 3-600-1, paragraph 4.1. This certification letter must be submitted with the shop drawing package.

3.2.2. ELECTRICAL CHARACTERISTICS

3.2.2.1. LIGHTING

The Contractor shall provide LED lighting underneath the mezzanine with a minimum luminance level of 50 foot-candles measured at 30 inches above the floor. Lighting shall be supported by the mezzanine and tied into building power at a source within 100 feet.

3.2.2.1.1. FIXTURES

T8 LED 4-foot light fixtures and lights shall be utilized.

Lenses shall be provided for all light fixtures. Fixtures shall provide rapid start lighting. Fixtures shall not be suspended.

3.2.2.1.2. MOTION SENSOR ON/OFF

Lighting shall come on via motion sensors. Lighting shall turn off after no motion is detected for 10 minutes.

3.2.2.1.3. EMERGENCY LIGHTING

There shall be three battery back-up ballasts underneath the mezzanine for emergency lighting. They shall be positioned so that personnel can safely navigate out from under the mezzanine if building power is lost.

3.2.3. SAFETY FEATURES

Joint Base Charleston - Appendix E - Page 9

3.2.3.1. CAPACITY MARKINGS

Live load capacity metal signs or stenciled markings shall be displayed on the front and ends of the mezzanine. Text stating the capacity shall be easily readable from 5 feet away.

3.2.3.2. NO-STEP MARKINGS

Signs shall be posted on the railings indicating that the rails are not steps. Signs shall be posted on a maximum of 20-foot centers.

3.2.3.3. SAFETY FACTOR

All vertical members of the mezzanine shall have a minimum safety factor of 1.92 to 1 and all horizontal members shall have a minimum safety factor of 1.67 to 1.

4. QUALITY CONFORMANCE

4.1. INSPECTIONS

The system shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of this appendix and the

Cover Purchase Description. These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.

4.2. TEST

The following test shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.

Joint Base Charleston - Appendix E - Page 10

No. Paragraph Description

1. 3.2.1.3. The COTR shall select three joists. At the midpoint of the joists, the distance from the bottom of the joist to the floor will be measured in inches and recorded as M1. A minimum of three pallets weighing 150 pounds per square foot shall be placed over the joists. After a continuous 4 hours, the distance from the midpoint of the joist to the floor will be measured in inches and recorded as M2. The deflection shall be calculated by using the following formula:

(M1 - M2) / (Span of joist in inches) =

Deflection

If the deflection is greater than (Span of joist in inches)/360 or any permanent deformation has occurred, the mezzanine shall fail the test.

2. 3.2.1.11. The operation of the pallet gate shall be tested. If the gates fails to operate properly or requires excessive force (greater than 40 pounds) to operate, the pallet gate fails this test.

3. 3.2.2.1. The lighting under the mezzanine shall be turned on. Test the lighting with a light meter 30 inches from the floor. If the lighting is not a minimum of 50 foot-candles then the system shall fail the test.

4.3. CERTIFICATIONS

The Contractor shall provide certification that the following requirements have been met. All certifications shall be provided in accordance with the Contract Data Requirements List.

No. Paragraph Certification

1. 3.2.1.1. All components of the mezzanine shall be designed to support a minimum capacity of 150 pounds per square foot.

Joint Base Charleston - Appendix E - Page 11

2. 3.2.3.3. All vertical members of the mezzanine shall have a minimum safety factor of 1.92 to 1 and all horizontal members shall have a minimum safety factor of 1.67 to 1.

THIS AREA LEFT BLANK INTENTIONALLY

TECHNICAL PROPOSAL QUESTIONNAIRE

FOR

Joint Base Charleston – Mezzanine TPQ – Page 1 of 5

A MEZZANINE

Solicitation Number: FA8604- -R-

Project Title: Storage Aids System

Base: Joint Base Charleston SC CSN: BCH205

Appendix E, Mezzanine, 20 December 2023

The Offeror shall complete this questionnaire. All entries to this questionnaire shall be typed. The questionnaire will be used to determine the Offeror's understanding of the requirements and acceptability of the proposed equipment.

Please attach product literature/cut sheets for all equipment detailed in this questionnaire and attach any exceptions to the

Purchase Description Appendix as detailed below.

Mezzanine Manufacturer: ________________________________________

No

Paragraph Characteristics

1. 3.2.1.1. All components are designed to support a minimum of ________ psf

2. 3.2.1.2. Is the mezzanine freestanding?

YES NO

3. 3.2.1.2.1. Are all components pre-engineered so that on site welding is eliminated?

4. 3.2.1.3. All components are designed so that deflection is not greater than __________________________.

5. 3.2.1.4. The clear height underneath the mezzanine is

______ feet ______ inches.

The deck height of the mezzanine is ______ feet

______ inches high.

The longest width and depth of the mezzanine are ______ feet _____ inches by ______ feet

______ inches.

Joint Base Charleston – Mezzanine TPQ - Page 2 of 5

6. 3.2.1.6. Is a drawing provided showing column spacing and cross-bracing locations for the mezzanine?

Are the columns structural steel tubing?

7. 3.2.1.6.1. The dimensions of the base plates are ______ inches by ______ inches and are ________ inch(es) thick.

8. 3.2.1.7. What type of framing is proposed?

9. 3.2.1.7.1. Will all beams and joists be structural steel and pre-punched for connection?

Will A325 bolts be used for connection?

10. 3.2.1.7.4.1. What type of decking are you proposing?

What is the brand name of the decking?

11. 3.2.1.7.4.2. What is the thickness of the decking? _________

12. 3.2.1.8. How many sets of stairs are provided? _________

What is the width of the stairs? _______ inches

13. 3.2.1.8.1. Are stairs open tread with bar grating or closed tread with diamond plate?

Joint Base Charleston – Mezzanine TPQ - Page 3 of 5

14. 3.2.1.8.3. Are the handrails in accordance with OSHA

1910.23?

Are rail sections joined with galvanized fittings or are they a pre-engineered union?

15. 3.2.1.8.4. Are the platforms the same width as the stairs?

What is the length of the platform? ____ inches

16. 3.2.1.9. Are the mezzanine railings in accordance with

OSHA 1910.23?

17. 3.2.1.10. The kick plate is ____ inches high.

18. 3.2.1.11. Type of pallet gate provided:

Will the pallet gate provided allow the pallet gate area to be open to only one side at a time?

The pallet gate will provide an opening of

_______ inches.

19. 3.2.1.12. Will the fire sprinkler system meet all the requirements specified in this appendix?

20. 3.2.2.1. The lighting will provide a minimum illumination level of __________ foot-candles measured at 30 inches above the floor.

21. 3.2.2.1.2. Are motion sensors provided as specified?

22. 3.2.2.1.3. Is emergency lighting provided as specified?

Joint Base Charleston – Mezzanine TPQ - Page 4 of 5

23. 3.2.3.1. Are capacity markings provided?

24. 3.2.3.2. Are no-step markings provided?

25. 3.2.3.3. Vertical members have a minimum safety factor of ______ to ______.

Horizontal members have a minimum safety factor of ______ to ______.

THIS AREA LEFT BLANK INTENTIONALLY

Joint Base Charleston – Mezzanine TPQ - Page 5 of 5

EXCEPTIONS

Attach any exceptions taken to the Purchase Description

Appendix. Please outline those concerns in detail. Your exceptions will be reviewed to determine acceptability.