Attachment 2 Price List.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- FA860125R0010
About this file
The file is a Price List attachment for a federal contract opportunity for CE Facility Maintenance & Repair Support for Laboratories and Intelligence. The solicitation (FA860125R0010) is a 100% Small Business Set-Aside with a $47 million size standard, seeking a Firm Fixed Price contract for commercial items with 5 one-year ordering periods and a potential 6-month service extension. The pricing template includes detailed labor categories such as Engineering Techs, Control Techs, and Chiller Techs, with annual hours specified for various positions across multiple contract line items (CLINs), including inspection/PM/operation, component replacement, labor, materials/equipment, and seed project costs.
The contract is issued by the Department of the Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base. Site visits are scheduled for September 24-25, 2025, with interested vendors required to email site visit registration details to andrew.silvers@us.af.mil by September 16. The government will award to the responsible offeror who submits a proposal that conforms to requirements, receives an "Acceptable" technical capability rating, and offers the lowest total evaluated price. During any potential government shutdown, contractors can contact TSgt Jennifer Jensen and Rick Leach for questions.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Option Year 6 | |||||
| Lab's | Position | Annual Hours Required | Bare Cost Hourly Rate | Bare Cost Hourly Rate | Bare Cost Hourly Rate | Bare Cost Hourly Rate | Bare Cost Hourly Rate | Bare Cost Hourly Rate | Total Bare Cost | Lab Total Bare Cost |
| 3 AND 5 | $0.00 | |||||||||
| Engineering Tech 2 | $0.00 | |||||||||
| Engineering Tech 3 | $0.00 | |||||||||
| Engineering Tech 4 | $0.00 | |||||||||
| Engineering Tech 5 | $0.00 | |||||||||
| Engineering Tech 6 | $0.00 | |||||||||
| Control Tech (Tech 6) | 2080 | $0.00 | ||||||||
| Chiller Tech (Tech 6) | 2080 | $0.00 | ||||||||
| 4 | $0.00 | |||||||||
| Engineering Tech 2 | $0.00 | |||||||||
| Engineering Tech 3 | $0.00 | |||||||||
| Engineering Tech 4 | $0.00 | |||||||||
| Engineering Tech 5 | $0.00 | |||||||||
| Engineering Tech 6 | $0.00 | |||||||||
| 6 AND 10 | $0.00 | |||||||||
| Engineering Tech 2 | $0.00 | |||||||||
| Engineering Tech 3 | $0.00 | |||||||||
| Engineering Tech 4 | $0.00 | |||||||||
| Engineering Tech 5 | $0.00 | |||||||||
| Engineering Tech 6 | $0.00 | |||||||||
| Chiller Tech (Tech 6) | 2080 | $0.00 | ||||||||
| 7 | $0.00 | |||||||||
| Engineering Tech 2 | $0.00 | |||||||||
| Engineering Tech 3 | $0.00 | |||||||||
| Engineering Tech 4 | $0.00 | |||||||||
| Engineering Tech 5 | $0.00 | |||||||||
| Engineering Tech 6 | $0.00 | |||||||||
| Control Tech (Tech 6) | 2080 | $0.00 | ||||||||
| Chiller Tech (Tech 6) | 2080 | $0.00 | ||||||||
| 8 | $0.00 | |||||||||
| Engineering Tech 2 | $0.00 | |||||||||
| Engineering Tech 3 | $0.00 | |||||||||
| Engineering Tech 4 | $0.00 | |||||||||
| Engineering Tech 5 | $0.00 | |||||||||
| Engineering Tech 6 | $0.00 | |||||||||
| Control Tech (Tech 6) | 2080 | $0.00 | ||||||||
| Chiller Tech (Tech 6) | 4160 | $0.00 | ||||||||
| 9 | $0.00 | |||||||||
| Engineering Tech 2 | $0.00 | |||||||||
| Engineering Tech 3 | $0.00 | |||||||||
| Engineering Tech 4 | $0.00 | |||||||||
| Engineering Tech 5 | $0.00 | |||||||||
| Engineering Tech 6 | $0.00 | |||||||||
| Control Tech (Tech 6) | 0 | $0.00 | ||||||||
| Chiller Tech (Tech 6) | 2080 | $0.00 | ||||||||
| Contract Bare Cost (Inspection/PM/Operation) | $0.00 | |||||||||
| OVERHEAD Contract Bare Cost (Inspection/PM/Operation) | 0% | $0.00 | ||||||||
| PROFIT Contract Bare Cost (Inspection/PM/Operation) | 0% | $0.00 | ||||||||
| CLIN 1 | TOTAL Contract Cost (Inspection/PM/Operation) | $0.00 | ||||||||
| OFFERR BARE COST ESTIMATE Labor Only for Component Replacement (Based on 160,744 Total Labor Hours) | ||||||||||
| OVERHEAD Contract Bare Cost (Component Replacement) | 0% | $0.00 | ||||||||
| PROFIT Contract Bare Cost (Component Replacement) | 0% | $0.00 | ||||||||
| CLIN 2 | TOTAL Contract Cost for Labor (Component Replacement) | $0.00 | ||||||||
| OFFEROR BARE COST ESTIMATE Material/Equipment for Component Replacement and Inspection/PM/Operation | ||||||||||
| OVERHEAD Contract Bare Cost (Component Replacement and Inspection/PM/Operation) | 0% | $0.00 | ||||||||
| PROFIT Contract Bare Cost (Component Replacement and Inspection/PM/Operation) | 0% | $0.00 | ||||||||
| CLIN 3 | TOTAL Contract Cost for Material/Equipment (Component Replacement and Inspection/PM/Operation) | $0.00 | ||||||||
| BARE COST ESTIMATE Seed Project | ||||||||||
| OVERHEAD Contract Bare Cost (Seed Project) | 0% | $0.00 | ||||||||
| PROFIT Contract Bare Cost (Seed Project) | 0% | $0.00 | ||||||||
| CLIN 4 | TOTAL Contract Cost for Seed Project | $0.00 | ||||||||
| OFFEROR BARE COST ESTIMATE Labor Only for Overtime Hours (Based on 6,203.25 Total Labor Hours) | ||||||||||
| OVERHEAD Contract Bare Cost (Overtime Hours) | 0% | $0.00 | ||||||||
| PROFIT Contract Bare Cost (Component Replacement) | 0% | $0.00 | ||||||||
| CLIN 5 | TOTAL Contract Cost for Labor (Overtime Hours) | $0.00 |
TOTAL CONTRACT BID PRICE $0.00
File details come from the government source that posted it. Updated .