This document provides instructions for completing a pricing spreadsheet for a federal contract opportunity, likely related to engineering and maintenance services. Offerors are required to fill in yellow-highlighted Excel fields, including estimated annual hours for various engineering technician levels across multiple contract years, bare cost hourly rates for each technician level, overhead and profit percentages, and a bare cost estimate for a specific "Seed Project". The spreadsheet covers Year 1 through Option Year 6, with mandatory entries for Control and Chiller Tech hours. All yellow-highlighted fields will be considered firm pricing and firm overhead & profit for the contract's duration, and offerors must reference PWS Appendices I (Equipment List), O (Preventative Maintenance Task List), J, and M, as well as Section 3.3.3 and 4.2 of the Performance Work Statement when completing the pricing document.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTION FOR COMPLETING PRICING SPREADSHEET
1. Offeror shall fill in all YELLOW highlighted excel fields (NOTE: that all other fields are locked for Government Use Only)
2. Annual Hours Required Column – Estimate and enter the annual hours required for each Engineering Tech Level required to complete Operation/Inspections/Prevent Maintenance for all equipment on the Equipment List for each Lab or Lab group. NOTE: Control and Chiller Tech hours are mandatory as shown. NOTE: See PWS Appendix I (Equipment List) and Appendix O (Preventative Maintenance Task List) for calculating labor hours required.
3. Year 1 thru Option Year 6 – Estimate and enter the bare cost hourly rate for each technician level for each contract year. NOTE: All Technician bare cost hourly rate fields must be completed regardless of the estimated and entered annual hours required tab.
4. OVERHEAD and PROFIT - Estimate and enter the Overhead and Profit percentages for each CLIN. NOTE: Overhead and Profit percentage shall include all Contactor Costs that are not included in the Bare Cost hourly labor rates and the Bare Cost for the Seed Project.
NOTE: For mandatory required overhead (Salary) positions to be included in this cost see Appendix J and Section 4.2 of the PWS.
5. BARE COST ESTIMATE Seed Project – Estimate and enter the Bare Cost associated with all labor, material and equipment required to complete the Seed Project. NOTE: for information on the Seed Project see PWS Section 3.3.3, Appendix M and Task Order pricing document.
NOTE: All YELLOW highlighted fields estimated and entered by the Offeror shall be considered FIRM PRICING and FIRM OVERHEAD & PROFIT for the life of the contract.