Questions Answers 7.24.12.pdf

PDF 290 KB Posted

Attached to
Museum Space Shuttle Exhibit Federal contract opportunity
Solicitation number
FA8601-12-R-0032
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Museum Space Shuttle Exhibit, newest first.
File Type Posted
Questions Answers 7.25.12.pdf PDF
Questions Answers 719.12.pdf PDF
Questions Answers 7.17.12.pdf PDF
Questions Answers 7.12.12.pdf PDF
Revised Solicitation 7.12.pdf PDF
Questions Answers 7.11.12.pdf PDF
Questions Answers 7.10.12.pdf PDF
Questions Answers 7.9.12.pdf PDF
Additional Dimensions.pdf PDF
CCT Layout with Stairs.pdf PDF
Revised Solicitation Form 6.27.pdf PDF
Revised Solicitation 6.20.pdf PDF
Attachment_E-_Shuttle dimensions.pdf PDF
Revised Solicitation 6.20.pdf PDF
Solicitation Document FA8601-12-R-0032.pdf PDF
CDRL 0003.pdf PDF
Attachment A - CCT.pdf PDF
Additional Instructions to Offerors.pdf PDF
Statement of Work.pdf PDF
CDRL 0002.pdf PDF
Attachment B - Exhibit Concept.pdf PDF
CDRL 0001.pdf PDF
Attachment D - Learning Node.pdf PDF
Attachment C - Exhibit Concept Side View.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S Air Force

FA8601-12-R-0032

QUESTION: Section 2.4.1 of the SOW requires that the STEM Learning Mode seats at least 60 adults, where attachment D shows a maximum of 60 seats. Can you please clarify if 60 seats are a minimum, a maximum, or perhaps simply an estimate?

RESPONSE: The STEM learning node should be sized to seat 60 average adults. The structure, sized this way, could accommodate more than 60 smaller people (children for example), or somewhat fewer than 60 larger adults—but the key for sizing is a target of 60 average adults.

QUESTION: Section 2.4.2 of the SOW requires that the contractor provide two 87" SMART boards. Attachment D shows two "Outside Interactives". It would appear as though these both describe the same items. Can you please confirm or clarify.

RESPONSE: They are not the same items. The outside interactive are separate from the contents of the STEM Learning Node, and will be procured separately and installed outside the structure.

QUESTION: Can you please clarify who will be responsible to bring power to the Exhibit from the building supply.

RESPONSE: The Museum, in cooperation with USAF Civil Engineering, will bring power to the exhibit from the building supply.

QUESTION: Page 10 of 39 of the solicitation states that 'Technical proposals will be rated as acceptable or unacceptable with no further rating', and page 11 continues to state ' Award will be made to the offeror with an acceptable technical rating who offers the lowest price...' [Lowest Price Technically Acceptable (LPTA)], however the response to question 1 of the questions/answers dated 11-Jul-12 states that 'Technical and Price are Equal'. Can you please clarify that award will be made to the LPTA offer.

RESPONSE: The award will be made on “Best Value” to the Government. Page 10 of 39 of the solicitation document lists Technical and Price are equal factors.

QUESTION: Item 3.1 of the SOW requires that a project completion schedule is submitted with the proposal. Can you please clarify if this is to be included in Volume I or Volume II of the proposal?

RESPONSE: Please include the project completion schedule in Volume I of the proposal.