Statement of Objectives
63 KB Posted
- Solicitation number
- FA8601-10-R-0010
About this file
Statement of Objectives (Seed Project 101888)
Text of this file
STATEMENT OF OBJECTIVES
FOR
VPP - Repair Steel Columns Facility 30055
WRIGHT-PATTERSON AIR FORCE BASE, OHIO
Project No. 10-1888 12 January 2010 1.0 GENERAL: The contractor shall provide all supervision, labor, materials, equipment, and transportation to accomplish this project in accordance with this Statement of Work, project drawings, and the requirements contained in the original documents.
1.1.
All work shall be done in a professional and craftsman-like manner.
1.2.
Field verify all dimensions.
1.3.
All materials shall be installed per manufacturer's recommendations unless specified otherwise. All materials shall be utilized within the manufacturers limitations and intended purposes.
1.4.
The Contractor shall protect against construction debris, including dust, from entering non-project areas.
1.5.
In the event of damages of any nature caused by this work due to improper protection, precaution or safety measures, such damages shall be repaired or such property shall be replaced by the Contractor at no cost to the Government. In the event the Contractor does not satisfactorily repair or replace such damage caused by the work of this contract, the Government will make the necessary corrections and the contractor shall reimburse the Government for inconveniences, labor, and materials involved.
1.6.
It shall be the responsibility of the Contractor with assistance from base personnel to locate all existing utility lines in the field before starting excavation of any kind. The Contractor shall obtain a signed AF Form 103, Base Civil Engineering Work Clearance Request prior to excavating. Contractor shall notify Government SABER Representative 72 hours in advance to schedule an on-site clearance.
1.7.
In order to prevent damage, all digging around utilities shall be done by hand.
1.8.
All required utility outages shall be approved through Government SABER Representative, with no less than 7 days advanced notice.
1.9 No Government Furnished Property (GFP) will be included in this project.
2.0. PERFORMANCE PERIOD: 60 calendar days total.
- 45 days (mobilization/submittals/close-out
- 15 days (construction) 2.1
LIQUIDATED DAMAGES: N/A
3.0 GENERAL SCOPE OF WORK:
3.1.
HAZARDOUS MATERIAL: Contractor shall be aware existing coatings may contain lead based paint.
3.2.
DEMOLITION: Contractor shall remove extensive rust and paint from lowest 8’ on all (14) structural columns. On (7) selected columns, contractor shall remove lowest 2’ of column rusted beyond repair.
3.3.
STRUCTURAL: Contractor shall replace removed steel with new structural column/plates and secure to existing structural columns.
3.4 MECHANICAL: not applicable 3.5 ELECTRICAL: Contractor shall temporarily relocate surface mounted conduit to allow for rust removal, priming, and painting of structural columns.
3.6 FINISHES: Contractor shall prime and paint all (14) columns with rust inhibiting paint on the lowest 8’ of columns.
4.0 CODES, REGULATIONS, AND PERMITS: All work shall be in accordance with the applicable codes and manufacturer's standards.
4.1.
Air Force Occupational Safety and Health Administration Standards (AFOSH).
4.2.
Applicable USAF / AFMC / Wright-Patterson Regulations.
4.3.
OSHA 1910 Standards.
4.4.
National Safety Council Data Sheets.
4.5.
The Ohio Environmental Protection Agency (EPA).
4.6.
Regional Air Pollution Control Regulation (RAPCA).
4.7.
National Electric Code (NEC).
4.8 Ohio Plumbing Code.
5.0 DRAWINGS, SPECIFICATIONS, AND SUBMITTALS:
5.1 Drawings shall be submitted by the contractor, which will indicate to the Government that the Contractor has a full and complete understanding of the construction requirements and that adequate engineering has been done to meet the project requirements. As a minimum drawings submitted shall include;
5.1.1.
Proposed scaled civil, architectural, mechanical, and electrical drawings showing design and details.
5.1.2.
As-built record drawings upon project completion.
5.1.3.
All work shall be in compliance with SABER Contract Specifications.
5.1.4.
Contractor shall submit for approval technical data for all equipment.
5.1.5.
Contractor shall submit for approval color boards, texture/pattern samples, and style /design literature or product brochures for all finish materials.
6.0. SPECIAL CONDITIONS AND/OR INSTRUCTIONS:
6.1.
The Contractor shall remove all debris and refuse from jobsite on a daily basis.
6.2.
The Contractor shall barricade and post the work area to restrict non-project related personnel traffic.
6.3.
The contractor shall conduct his work in such a manner that it would not inhibit or cease operations being conducted in and around the project area without the written approval from the contracting officer.
6.4.
Prior to welding or the use of any flame apparatus, a clearance shall be obtained from the Fire Inspector. Notification to the Fire Inspector for a clearance requires the request be made at a minimum of 24 hours in advance of the desired "hot" work. N/A 6.5.
Contractor shall be in compliance with all applicable safety and security requirements.
6.6. Changes to this contract shall be allowed only by the Contracting Officer.
12 January 2010
Other files
| File | Type | Posted |
|---|---|---|
| RFI 8 Response.docx | DOCX document | |
| RFI 7 Response.docx | DOCX document | |
| FA8601-10-R-0010-0003.pdf | ||
| RFIs Responses for SABER Contract 7May10.docx | DOCX document | |
| FA8601-10-R-0010-0003.pdf | ||
| Wage Decision OH29 Mod 6 5-07-10.docx | DOCX document | |
| RFIs Responses for the SABER Contract.doc | DOC document | |
| Wage Decision OH29 Mod 5 4-30-10.docx | DOCX document | |
| Site Visit Attendees SABER.xlsx | XLSX spreadsheet | |
| FA8601-10-R-0010-0002.doc | DOC document | |
| SABER Bridge Solicitation RFI Responses.doc | DOC document | |
| General Decision Number OH29 Mod 4 4-16-10.docx | DOCX document | |
| B55-Steel Columns Sketch.pdf | ||
| FA8601-10-R-0010-0001.doc | DOC document | |
| Addendum.doc | DOC document | |
| Addendum 1.docx | DOCX document | |
| Addendum 2.docx | DOCX document | |
| FA8601-10-R-0010 SABER Solicitation.doc | DOC document | |
| VPPSafety Health Plan Requirement.docx | DOCX document | |
| Wage Decision OH29 Mod 2.docx | DOCX document | |
| SABER WPAFB_BFS_ _Specs_2009-11-27.pdf | ||
| Section 01 33 00.pdf | ||
| SABER_BRIDGE_SOW.doc | DOC document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .