Addendum 2.docx
DOCX document 11 KB Posted
- Solicitation number
- FA8601-10-R-0010
About this file
Addendum 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 8 Response.docx | DOCX document | |
| RFI 7 Response.docx | DOCX document | |
| FA8601-10-R-0010-0003.pdf | ||
| RFIs Responses for SABER Contract 7May10.docx | DOCX document | |
| FA8601-10-R-0010-0003.pdf | ||
| Wage Decision OH29 Mod 6 5-07-10.docx | DOCX document | |
| Wage Decision OH29 Mod 5 4-30-10.docx | DOCX document | |
| RFIs Responses for the SABER Contract.doc | DOC document | |
| Site Visit Attendees SABER.xlsx | XLSX spreadsheet | |
| FA8601-10-R-0010-0002.doc | DOC document | |
| SABER Bridge Solicitation RFI Responses.doc | DOC document | |
| General Decision Number OH29 Mod 4 4-16-10.docx | DOCX document | |
| B55-Steel Columns Sketch.pdf | ||
| FA8601-10-R-0010-0001.doc | DOC document | |
| Addendum.doc | DOC document | |
| Statement of Objectives | — | |
| VPPSafety Health Plan Requirement.docx | DOCX document | |
| Wage Decision OH29 Mod 2.docx | DOCX document | |
| Addendum 1.docx | DOCX document | |
| FA8601-10-R-0010 SABER Solicitation.doc | DOC document | |
| SABER WPAFB_BFS_ _Specs_2009-11-27.pdf | ||
| Section 01 33 00.pdf | ||
| SABER_BRIDGE_SOW.doc | DOC document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NUMBER 2
TO
DRAWINGS AND SPECIFICATIONS
FOR
SABER BRIDGE CONTRACT
WRIGHT-PATTERSON AIR FORCE BASE, OHIO
PROJECT NUMBER: 10-1001
1. The contract Drawings and Specifications are hereby amended in part as follows:
Add Paragraph 10 as follows to the Statement of Work:
10. Hold Harmless:
10.1 The contractor will be required to acknowledge that projects for which proposals are prepared may not be awarded in the current or any future fiscal year. The Government reserves the right to award or cancel any project at any time.
10.2 The contractor will conduct site visits, prepare (and revise as needed) project proposals, engage in negotiations, and perform such other acts as are necessary to prepare projects for award without any liability on the part of the government for the contractor’s costs in preparation of such proposals.
10.3 Any project design/cost estimate prepared by the contractor on a voluntary basis will be treated as proprietary information and will not be used for any purpose outside the scope of this effort.
2. This Addendum Number 2 hereby forms and is made a part of the above named project drawings and specifications.