Addendum.doc

DOC document 55 KB Posted

Attached to
Simplified Acquisition Base Engineering Requirements
Solicitation number
FA8601-10-R-0010
Issued by

About this file

Addendum 1 for Project 10-1888

View the file

Other files

File Type Posted
RFI 7 Response.docx DOCX document
RFI 8 Response.docx DOCX document
FA8601-10-R-0010-0003.pdf PDF
Wage Decision OH29 Mod 6 5-07-10.docx DOCX document
RFIs Responses for SABER Contract 7May10.docx DOCX document
FA8601-10-R-0010-0003.pdf PDF
FA8601-10-R-0010-0002.doc DOC document
RFIs Responses for the SABER Contract.doc DOC document
Wage Decision OH29 Mod 5 4-30-10.docx DOCX document
Site Visit Attendees SABER.xlsx XLSX spreadsheet
SABER Bridge Solicitation RFI Responses.doc DOC document
General Decision Number OH29 Mod 4 4-16-10.docx DOCX document
FA8601-10-R-0010-0001.doc DOC document
B55-Steel Columns Sketch.pdf PDF
SABER_BRIDGE_SOW.doc DOC document
Addendum 1.docx DOCX document
Addendum 2.docx DOCX document
FA8601-10-R-0010 SABER Solicitation.doc DOC document
Statement of Objectives —
VPPSafety Health Plan Requirement.docx DOCX document
Wage Decision OH29 Mod 2.docx DOCX document
SABER WPAFB_BFS_ _Specs_2009-11-27.pdf PDF
Section 01 33 00.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NUMBER 01

FOR

VPP - Repair Steel Columns Facility 30055

WRIGHT-PATTERSON AIR FORCE BASE, OHIO

Project No. 10-1888 1.

The contract statement of objective documents are hereby amended as follows:

2.

Inserted a floor plan of facility 30055. This drawing shows the location of all (14) structural columns covered in this project, as well as the location of the (7) columns identified for structural repair.

3. This Addendum Number 01 hereby forms and is made a part of the above named project documents.

21 April 2010 Attachment:

B55 – Columns Sketch