FA8574-22-R-0003-0001_FINAL.pdf
PDF 897 KB Posted
- Attached to
- Pocket - J CLS Support Federal contract opportunity
- Solicitation number
- FA8574-22-R-0003
About this file
This is a request for proposals for Pocket J system support services. The contractor will provide program management, GFE management, maintenance support, repair, travel, data deliverables, cybersecurity, block cycle upgrades, engineering support, training, and other services. The goal is to maximize availability and reliability of Pocket J systems while minimizing sustainment costs. This hybrid contract includes FFP, CPFF, and cost reimbursement line items over a five-year period from June 2023 through June 2028. The solicitation method is RFP utilizing FAR Part 15 procedures, with award based on LPTA. The competition is set aside for small business. The Air Force Materiel Command Life Cycle Management Center at Robins AFB is the issuing agency.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JSU
2. AMENDMENT/MODIFICATION NO.
FA8574-22-R-0003-0001
3. EFFECTIVE DATE
26 OCT 2022
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)
6. ISSUED BY CODE
POSITIONING, NAVIGATION, AND TIMING, AFLCMC/WNKF
236 MILLEDGEVILLE ST STE F30
ROBINS AFB GA 31098-1663
BUYER: Kevin F. Hinman kevin.hinman.2@us.af.mil Phone: (478) 222- 9820 Fax: (000) 000-0000 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8574
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA857422R0003
9B. DATED (SEE ITEM 11)
1-SEP-2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 30-NOV-2022 5:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PLEASE NOTE: The use of non-government advisors to provide technical expertise and evaluation of proposals. Please see Attachment 15 of this Request for Proposal (RFP) for more details.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8574-22-R-0003-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this Amendment is to extend the date of proposal responses to 30 November 2022.
END OF AMENDMENT
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 GENERAL:This Requirements type contract is in support of Pocket J System. The Contractor (independently and not as an agent of the Government) shall furnish all necessary personnel, labor, supplies and materials (except as otherwise authorized by the Contracting Officer) as required to provide Program Management, Maintenance, GFE/GFP Management, Teardown, Test, and Evaluation (TT&E), Repair, Cybersecurity, Block Cycle and Software Upgrade, Enginering Support, Training, Over and Above, Travel, Contractor Furnished Material requirements identified within the Schedule, Section B, and the Performance Work Statement (PWS). Performance shall be in accordance with all provisions and specifications as stipulated herein.
B.2 CONTRACT TYPE: This is an Indefinite Delivery Requirements type contract as contemplated at FAR
16.503. This contract utilizes a Best Estimated Quantity (BEQ) with a mix of Contract Line Item (CLINs) types, specifically Firm Fixed Price (FFP), Cost Plus Fixed Fee (CPFF), Not Separately Priced (NSP), and Cost Reimbursable No Fee (CRNF). Each CLIN indicates the type used for each particular requirement.
B.3 MINIMUM/MAXIMUM VALUE: The contractor shall furnish to the Government, if and when ordered, the items of supplies or services specified in this Schedule up to and including the “Maximum” amount of $XXXXXX.XX for all orders issued hereunder. The Government shall order at least the “Minimum” amount of 2,000,000.00 in conjunction with award of the basic contract. The quantities of supplies or services specified in this Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as “estimated” or “maximum” in the schedule, that fact shall not constitute the basis for an equitable price adjustment equitable price adjustment.
B.4 ORDERING PERIODS: In accordance with the clause in Section I of this contract, DFARS
252.216 7006 Ordering, orders may be issued hereunder for this 60 month strategy: One, Twelve (12) month base period and four (4), 12 month ordering periods. Orders issued hereunder shall utilize the CLIN representing the period in effect at the time of order award for purposes of pricing. The ordering periods associated with each CLIN series are defined as follows:
ORDERING PERIOD STRUCTURE
Base Ordering Period - 18 June 2023 to 17 June 2024 (000X) Ordering Period 1 - 18 June 2024 to 17 June 2025 (100X) Ordering Period 2 - 18 June 2025 to 17 June 2026 (200X) Ordering Period 3 - 18 June 2026 to 17 June 2027 (300X) Ordering Period 4 - 18 June 2027 to 17 June 2028 (400X)
B.5 AUTHORITY TO ISSUE ORDERS: Orders under this contract may only be issued by members of the Positioning, Navigation, and Timing (PNT) Contracting Office (WNKF).
B.6 PLACE OF PERFORMANCE: Place of performance of orders issued hereunder shall be stipulated within the individual delivery/task orders.
B.7 ACRN, Purchase Request, PR Line Item and Period of Performance to be cited on each order issued hereunder.
B.8 Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
B.9 In accordance with the OSD AT&L memorandum dated 10 November 2011, any incurred proposal preparation expenses are to be treated as indirect costs and direct charge billings against the resultant task/delivery order are unallowable.
B.10 PAA: Packaging IAW attached AFMC 158
B.11 CDRLs: Attachment 11 of this RFP contains the DD1423 CDRLs for the base year only. The CDRLs for the subsequent Ordering Periods have not been developed. These CDRLs will not change in the subsequent Ordering Periods but their Line Items were not included in this RFP. These CDRLs with their cooresponding Line Items will be Amended into the RFP as soon as they are provided.
Program Management
Basic Performance Period Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Program Management Program Management IAW Paragraph 4.3 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Maintenance Support
Basic Performance Period Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R425 Maintenance Support Maintenance Support Services IAW para. 4.5 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
GFP/GFE Management
Basic Performance Period Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 GFE/GFP Management Consumable/Expendable, Contractor Repair, and MILSTRIP Repair Management of Government Furnished Equipment/Property IAW PWS Para 4.4 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
GFP/GFE Management
Basic Performance Period
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Teardown, Test, and Evaluation (TT&E)
Basic Performance Period Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Teardown, Test and Evaluation (TT&E) Teardown, Test, and Evaluation IAW para. 4.7.1 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of
Teardown, Test, and Evaluation (TT&E)
Basic Performance Period IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Repair
Basic Performance Period Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
20 EA
R408 Repair Repair IAW para. 4.7 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 20 EA *12 Months
Proposed Period of Performance
IAW PWS 20 EA
Cybersecurity
Basic Performance Period Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
Cybersecurity
Basic Performance Period
12 MO
R408 Cybersecurity Cybersecurity Support IAW Paragraph 6.0 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Block Cycle Upgrade
Basic Performance Period Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Block Cycle Upgrade Block Cycle Upgrade IAW para. 8.1. of PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Block Cycle Upgrade
Basic Performance Period Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Engineering Support Services
Basic Performance Period Item No.
Cost Plus Fixed Fee Best Estimated Qty
U/I Unit Price
1 LO
R408 Engineering Support Services Engineering Support Services IAW para. 4.6 of PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Training
Basic Performance Period Item No.
Firm Fixed Price
Training
Basic Performance Period Best Estimated Qty
U/I Unit Price
5 EA
R408 Training Training Requirements as outlined IAW PWS para. 9.0 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 5 EA *12 Months
Proposed Period of Performance
IAW PWS 5 EA
Over and Above
Basic Performance Period Item No.
Cost Plus Fixed Fee Best Estimated Qty
U/I Unit Price
1 LO
R408 Over and Above Over and Above IAW PWS para. 4.8 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Over and Above
Basic Performance Period Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Travel
Basic Performance Period Item No.
Cost Reimbursement - No Fee Best Estimated Qty
U/I Unit Price
1 LO
TRAV
TRAVEL
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER IAW PWS para. 4.9 dated 04 August 2022 TRAVEL IN SUPPORT OF CLINs 0002, 0004, 0005, 0007, 0008, and 0010. TRAVEL REIMBURSED IAW FAR 31.2 and JTR Priority: R ROUTINE Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Contractor Furnished Property
Basic Performance Period Item No.
Cost Reimbursable No Fee Best Estimated Qty
U/I Unit Price
1 LO
R408 Contractor Furnished Property Contractor Furnished Property IAW PWS para. 4.4.1 dated 04 August 2022
Contractor Furnished Property
Basic Performance Period
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
DATA
Basic Performance Period Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA
Provide requested Data IAW the PWS dated 04 August 2022 and applicable DD1423s listed in Attachment 11
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of
+ IAW1423 1 LO *12 Months
Proposed Period of Performance
+ IAW1423 1 LO
Program Management
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Program Management Program Management IAW Paragraph 4.3 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Maintenance Support
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R425
Maintenance Support
Maintenance Support Maintenance Support Services IAW para. 4.5 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Government Furnished Property
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 GFE/GFP Management Consumable/Expendable, Contractor Repair, and MILSTRIP Repair Management of Government Furnished Equipment/Property IAW PWS Para 4.4 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none
Government Furnished Property
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Teardown, Test, and Evaluation (TT&E)
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Teardown, Test and Evaluation (TT&E) Teardown, Test, and Evaluation IAW para. 4.7.1 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of
Repair
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
20 EA
R408 Repair Repair IAW para. 4.7 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 20 EA *12 Months
Proposed Period of Performance
IAW PWS 20 EA
Cybersecurity
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Cybersecurity Cybersecurity Support IAW Paragraph 6.0 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Cybersecurity
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Block Cycle Upgrade
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Block Cycle Upgrade Block Cycle Upgrade IAW para. 8.1. of PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of
Engineering Support Services
Item No.
Cost Plus Fixed Fee Best Estimated Qty
U/I Unit Price
1 LO
R408 Engineering Support Services Engineering Support Services IAW para. 4.6 of PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Training
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Total Price
5 EA
R408 Training Training Requirements as outlined IAW PWS para. 9.0 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Training
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 5 EA *12 Months
Proposed Period of Performance
IAW PWS 5 EA
Over and Above
Item No.
Cost Plus Fixed Fee Best Estimated Qty
U/I Unit Price
1 LO
R408 Over and Above Over and Above IAW PWS para. 4.8 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Travel
Item No.
Travel
Cost Reimbursement - No Fee Best Estimated Qty
U/I Unit Price
1 LO
TRAV
TRAVEL
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER IAW PWS para. 4.9 dated 04 August 2022 TRAVEL IN SUPPORT OF CLINs 1002, 1004, 1005, 1007, 1008, and 1010. TRAVEL REIMBURSED IAW FAR 31.2 and JTR Priority: R ROUTINE Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Contractor Furnished Property
Item No.
Cost Reimbursable No Fee Best Estimated Qty
U/I Unit Price
1 LO
R408 Contractor Furnished Property Contractor Furnished Property IAW PWS para. 4.4.1 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed
Contractor Furnished Property
IAW PWS 1 LO
DATA
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA
Provide requested Data IAW the PWS dated 04 August 2022and applicable DD1423s listed in Attachment 11
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
+ IAW1423 1 LO *12 Months
Proposed Period of Performance
+ IAW1423 1 LO
Program Management
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
Program Management
12 MO
R408 Program Management Program Management IAW Paragraph 4.3 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Maintenance Support
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R425 Maintenance Support Maintenance Support Services IAW para. 4.5 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Maintenance Support
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Government Furnished Property
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 GFE/GFP Management Consumable/Expendable, Contractor Repair, and MILSTRIP Repair Management of Government Furnished Equipment/Property IAW PWS Para 4.4 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of
Teardown, Test, and Evaluation (TT&E)
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Teardown, Test and Evaluation (TT&E) Teardown, Test, and Evaluation IAW para. 4.7.1 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Repair
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
20 EA
R408 Repair Repair IAW para. 4.7 of the PWS dated 04 August 2022
Repair
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 20 EA *12 Months
Proposed Period of Performance
IAW PWS 20 EA
Cybersecurity
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Cybersecurity Cybersecurity Support IAW Paragraph 6.0 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of
IAW PWS 12 MO *12 Months
Cybersecurity
Proposed Period of Performance
IAW PWS 12 MO
Block Cycle Upgrade
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Block Cycle Upgrade Block Cycle Upgrade IAW para. 8.1. of PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Engineering Support Services
Item No.
Cost Plus Fixed Fee Best Estimated Qty
U/I Unit Price
1 LO
R408 Engineering Support Services Engineering Support Services IAW para. 4.6 of PWS dated 04 August 2022
Engineering Support Services
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Training
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
5 EA
R408 Training Training Requirements as outlined IAW PWS para. 9.0 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of
IAW PWS 5 EA *12 Months
Training
Proposed Period of Performance
IAW PWS 5 EA
Over and Above
Item No.
Cost Plus Fixed Fee Best Estimated Qty
U/I Unit Price
1 LO
R408 Over and Above Over and Above IAW PWS para. 4.8 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Travel
Item No.
Cost Reimbursement - No Fee Best Estimated Qty
U/I Unit Price
1 LO
TRAV
TRAVEL
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER IAW PWS para. 4.9 dated 04 August 2022
Travel
TRAVEL IN SUPPORT OF CLINs 2002, 2004, 2005, 2007, 2008, and 2010. TRAVEL REIMBURSED IAW FAR 31.2 and JTR Priority: R ROUTINE Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Contractor Furnished Property
Item No.
Cost Reimbursable No Fee Best Estimated Qty
U/I Unit Price
1 LO
R408 Contractor Furnished Property Contractor Furnished Property IAW PWS para. 4.4.1 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
DATA
DATA
Not Separately Priced Best Estimated Qty
U/I Unit Price
1 LO NSP
DATA
DATA
Provide requested Data IAW the PWS dated 04 August 2022 and applicable DD1423s listed in Attachment 11
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
+ IAW1423 1 LO *12 Months
Proposed Period of Performance
+ IAW1423 1 LO
Program Management
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Program Management Program Management IAW Paragraph 4.3 of the PWS dated 04 August 2022
Program Management
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Maintenance Support
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R425 Maintenance Support Maintenance Support Services IAW para. 4.5 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required
Maintenance Support
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Government Furnished Property
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 GFE/GFP Management Consumable/Expendable, Contractor Repair, and MILSTRIP Repair Management of Government Furnished Equipment/Property IAW PWS Para 4.4 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Tearown, Test, and Evaluation (TT&E)
Item No.
Tearown, Test, and Evaluation (TT&E)
Best Estimated Qty
U/I Unit Price
12 MO
R408 Teardown, Test and Evaluation (TT&E) Teardown, Test, and Evaluation IAW para. 4.7.1 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Repair
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
20 EA
R408 Repair Repair IAW para. 4.7 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Repair
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 20 EA *12 Months
Proposed Period of Performance
IAW PWS 20 EA
Cybersecurity
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Cybersecurity Cybersecurity Support IAW Paragraph 6.0 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of
Block Cycle Upgrade
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Block Cycle Upgrade Block Cycle Upgrade IAW para. 8.1. of PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Engineering Support Services
Item No.
Cost Plus Fixed Fee Best Estimated Qty
U/I Unit Price
1 LO
R408 Engineering Support Services Engineering Support Services IAW para. 4.6 of PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Engineering Support Services
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Training
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
5 EA
R408 Training Training Requirements as outlined IAW PWS para. 9.0 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 5 EA *12 Months
Proposed Period of Performance
IAW PWS 5 EA
Over and Above
Over and Above
Cost Plus Fixed Fee Best Estimated Qty
U/I Unit Price
1 LO
R408 Over and Above Over and Above IAW PWS para. 4.8 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Travel
Item No.
Cost Reimbursement - No Fee Best Estimated Qty
U/I Unit Price
1 LO
TRAV
TRAVEL
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER IAW PWS para. 4.9 dated 04 August 2022 TRAVEL IN SUPPORT OF CLINs 3002, 3004, 3005, 3007, 3008, and 3010. TRAVEL REIMBURSED IAW FAR 31.2 and JTR Priority: R ROUTINE Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed
Travel
IAW PWS 1 LO
Contractor Furnished Property
Item No.
Cost Reimbursable No Fee Best Estimated Qty
U/I Unit Price
1 LO
R408 Contractor Furnished Property Contractor Furnished Property IAW PWS para. 4.4.1 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
DATA
Item No.
Not Separately Priced Best Estimated Qty
U/I Unit Price
1 LO NSP
DATA
DATA
Provide requested Data IAW the PWS dated 04 August 2022 and applicable DD1423s listed in Attachment 11
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
+ IAW1423 1 LO *12 Months
Proposed Period of Performance
+ IAW1423 1 LO
Program Management
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Program Management Program Management IAW Paragraph 4.3 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none
Program Management
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Maintenance Support
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R425 Maintenance Support Maintenance Support Services IAW para. 4.5 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Government Furnished Property
Item No.
Government Furnished Property
Best Estimated Qty
U/I Unit Price
12 MO
R408 GFE/GFP Management Consumable/Expendable, Contractor Repair, and MILSTRIP Repair Management of Government Furnished Equipment/Property IAW PWS Para 4.4 dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Teardown, Test, and Evaluation (TT&E)
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
12 MO
R408 Teardown, Test and Evaluation (TT&E) Teardown, Test, and Evaluation IAW para. 4.7.1 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination
Teardown, Test, and Evaluation (TT&E)
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Required Period of Performance
IAW PWS 12 MO *12 Months
Proposed Period of Performance
IAW PWS 12 MO
Repair
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
20 EA
R408 Repair Repair IAW para. 4.7 of the PWS dated 04 August 2022 Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .