FA8574-22-R-0003_FINAL.pdf

PDF 1 MB Posted

Attached to
Pocket - J CLS Support Federal contract opportunity
Solicitation number
FA8574-22-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This Request for Proposals (RFP) solicits competitive proposals to provide lifecycle support services for the Pocket J System. Key requirements include program management, maintenance support, management of government furnished equipment, teardown and evaluation, repair, cybersecurity support, block cycle upgrades, engineering support, training, over and above work, travel, contractor furnished property, and data deliverables. The contract will have a basic period of performance with four ordering periods through June 2028. It will utilize firm fixed price, cost plus fixed fee, and cost reimbursable line items. This is a 100% competitive small business set-aside utilizing LPTA source selection procedures. Proposals are due by 31 October 2022 with award anticipated thereafter.

View the file

Other files for this federal contract opportunity

Other files attached to Pocket - J CLS Support, newest first.
File Type Posted
ATTACH09_SectionLM_12062022_Rev03.pdf PDF
FA8574-22-R-0003-0004_FINAL.pdf PDF
QA_Revision 3 FINAL 7 December 2022.xlsx XLSX spreadsheet
QA_Revision 2 FINAL 22Nov2022.xlsx XLSX spreadsheet
ATTACH11_CDRL_Deliverables_Rev02.pdf PDF
ATTACH08_PWS_PocketJ_11182022_Rev02.pdf PDF
FA8574-22-R-0003_0003_FINAL.pdf PDF
ATTACH09_SectionLM_11182022_Rev02.pdf PDF
ATTACH01_CrossReference Matrix_Rev02.docx DOCX document
ATTACH17_WageDetermination_2015-4495_Rev20.pdf PDF
ATTACH09_SectionLM_Rev01.pdf PDF
ATTACH03_CostPriceProposalSpreadsheet_Rev01.xlsx XLSX spreadsheet
ATTACH15_NonGovtAdvisorDisclosure_Rev01.docx DOCX document
ATTACH16_MaintenanceHistory_10242022.xlsx XLSX spreadsheet
ATTACH14_Transportation_Requirements.pdf PDF
ATTACH11_CDRL_Deliverables_Rev01.pdf PDF
QA_Solicitation FA8574-22-R-0003_10Nov2022.xlsx XLSX spreadsheet
FA8574-22-R-0003-0002_FINAL.pdf PDF
ATTACH08_PWS_PocketJ_Rev01.pdf PDF
ATTACH01_CrossReferenceMatrix_Rev01.docx DOCX document
FA8574-22-R-0003-0001_FINAL.pdf PDF
QA_FA8574-22-R-0003_21Sep2022.pdf PDF
ATTACH15_NonGovt_Advisor_Disclosure.docx DOCX document
ATTACH07_RE_InstructorTrainingGuide141216_v6.pdf PDF
ATTACH05_How to Post Offer on PIEE.pdf PDF
ATTACH03_Cost Price Proposal Spreadsheet_FINAL_8Aug2022 (1).xlsx XLSX spreadsheet
ATTACH14_Transportation_Requirements.pdf PDF
ATTACH13_Packaging_Requirements.pdf PDF
ATTACH10_GFPListing_FINAL.xlsx XLSX spreadsheet
ATTACH04_Instructions to Register a PIEE Account.pdf PDF
ATTACH01_CrossReference Matrix.docx DOCX document
ATTACH09_SectionLM_FINAL.pdf PDF
ATTACH08_PWS_PocketJ_08042022_Rev00.pdf PDF
ATTACH06_FE_Training_Instructor_Guide_141216_v5.pdf PDF
ATTACH02_JointVenture_TeamMember_Consent.docx DOCX document
ATTACH12_254_SecurityRequirements.pdf PDF
ATTACH11_CDRL_Deliverables.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

FA8574-22-R-0003

X

X

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 541330

8(A) SIZE STANDARD: $41.50

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

PLEASE NOTE: The use of non-government advisors to provide technical expertise and evaluation of proposals. Please see Attachment 15 of this Request for Proposal (RFP) for more details.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO: A7

3. AWARD/EFFECTIVE DATE

FA8574

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14

SCD:B

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Military and Aerospace Equipment and Military Weapons

9. (Agency Use)

Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.

31-OCT-2022 5:00PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

X

7. ISSUED BY CODE

POSITIONING, NAVIGATION, AND TIMING, AFLCMC/WNKF

236 MILLEDGEVILLE ST STE F30

ROBINS AFB GA 31098-1663

BUYER: Kevin F. Hinman kevin.hinman.2@us.af.mil Phone: (478) 222- 9820 Fax: (000) 000-0000

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

JSU

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

DATE AND LOCAL TIME 31 OCT 2022 5:00 PM

SOLICITATION NUMBER FA857422R0003

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Kevin F Hinman

POSITIONING, NAVIGATION, AND TIMING, AFLCMC/WNKF

236 MILLEDGEVILLE ST STE F30

ROBINS AFB GA 31098-1663

FA8574-22-R-0003

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 GENERAL:This Requirements type contract is in support of Pocket J System. The Contractor (independently and not as an agent of the Government) shall furnish all necessary personnel, labor, supplies and materials (except as otherwise authorized by the Contracting Officer) as required to provide Program Management, Maintenance, GFE/GFP Management, Teardown, Test, and Evaluation (TT&E), Repair, Cybersecurity, Block Cycle and Software Upgrade, Enginering Support, Training, Over and Above, Travel, Contractor Furnished Material requirements identified within the Schedule, Section B, and the Performance Work Statement (PWS). Performance shall be in accordance with all provisions and specifications as stipulated herein.

B.2 CONTRACT TYPE: This is an Indefinite Delivery Requirements type contract as contemplated at FAR 16.503. This contract utilizes a Best Estimated Quantity (BEQ) with a mix of Contract Line Item (CLINs) types, specifically Firm Fixed Price (FFP), Cost Plus Fixed Fee (CPFF), Not Separately Priced (NSP), and Cost Reimbursable No Fee (CRNF). Each CLIN indicates the type used for each particular requirement.

B.3 MINIMUM/MAXIMUM VALUE: The contractor shall furnish to the Government, if and when ordered, the items of supplies or services specified in this Schedule up to and including the “Maximum” amount of $XXXXXX.XX for all orders issued hereunder. The Government shall order at least the “Minimum” amount of 2,000,000.00 in conjunction with award of the basic contract. The quantities of supplies or services specified in this Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as “estimated” or “maximum” in the schedule, that fact shall not constitute the basis for an equitable price adjustment equitable price adjustment.

B.4 ORDERING PERIODS: In accordance with the clause in Section I of this contract, DFARS

252.216 7006 Ordering, orders may be issued hereunder for this 60 month strategy: One, Twelve (12) month base period and four (4), 12 month ordering periods. Orders issued hereunder shall utilize the CLIN representing the period in effect at the time of order award for purposes of pricing. The ordering periods associated with each CLIN series are defined as follows:

ORDERING PERIOD STRUCTURE

Base Ordering Period - 18 June 2023 to 17 June 2024 (000X) Ordering Period 1 - 18 June 2024 to 17 June 2025 (100X) Ordering Period 2 - 18 June 2025 to 17 June 2026 (200X) Ordering Period 3 - 18 June 2026 to 17 June 2027 (300X) Ordering Period 4 - 18 June 2027 to 17 June 2028 (400X)

B.5 AUTHORITY TO ISSUE ORDERS: Orders under this contract may only be issued by members of the Positioning, Navigation, and Timing (PNT) Contracting Office (WNKF).

B.6 PLACE OF PERFORMANCE: Place of performance of orders issued hereunder shall be stipulated within the individual delivery/task orders.

B.7 ACRN, Purchase Request, PR Line Item and Period of Performance to be cited on each order issued hereunder.

B.8 Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

B.9 In accordance with the OSD AT&L memorandum dated 10 November 2011, any incurred proposal preparation expenses are to be treated as indirect costs and direct charge billings against the resultant task/delivery order are unallowable.

B.10 PAA: Packaging IAW attached AFMC 158

B.11 CDRLs: Attachment 11 of this RFP contains the DD1423 CDRLs for the base year only. The CDRLs for the subsequent Ordering Periods have not been developed. These CDRLs will not change in the subsequent Ordering Periods but their Line Items were not included in this RFP. These CDRLs with their cooresponding Line Items will be Amended into the RFP as soon as they are provided.

Program Management

Basic Performance Period Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Program Management Program Management IAW Paragraph 4.3 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Maintenance Support

Basic Performance Period Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R425 Maintenance Support Maintenance Support Services IAW para. 4.5 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

GFP/GFE Management

Basic Performance Period Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 GFE/GFP Management Consumable/Expendable, Contractor Repair, and MILSTRIP Repair Management of Government Furnished Equipment/Property IAW PWS Para 4.4 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

GFP/GFE Management

Basic Performance Period

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Teardown, Test, and Evaluation (TT&E)

Basic Performance Period Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Teardown, Test and Evaluation (TT&E) Teardown, Test, and Evaluation IAW para. 4.7.1 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of

Teardown, Test, and Evaluation (TT&E)

Basic Performance Period IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Repair

Basic Performance Period Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

20 EA

R408 Repair Repair IAW para. 4.7 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 20 EA *12 Months

Proposed Period of Performance

IAW PWS 20 EA

Cybersecurity

Basic Performance Period Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

Cybersecurity

Basic Performance Period

12 MO

R408 Cybersecurity Cybersecurity Support IAW Paragraph 6.0 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Block Cycle Upgrade

Basic Performance Period Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Block Cycle Upgrade Block Cycle Upgrade IAW para. 8.1. of PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Block Cycle Upgrade

Basic Performance Period Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Engineering Support Services

Basic Performance Period Item No.

Cost Plus Fixed Fee Best Estimated Qty

U/I Unit Price

1 LO

R408 Engineering Support Services Engineering Support Services IAW para. 4.6 of PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of

IAW PWS 1 LO

Training

Basic Performance Period Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

5 EA

R408 Training Training Requirements as outlined IAW PWS para. 9.0 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 5 EA *12 Months

Proposed Period of Performance

IAW PWS 5 EA

Over and Above

Basic Performance Period Item No.

Cost Plus Fixed Fee Best Estimated Qty

U/I Unit Price

1 LO

R408 Over and Above Over and Above IAW PWS para. 4.8 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required

Over and Above

Basic Performance Period Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Travel

Basic Performance Period Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Unit Price

1 LO

TRAV

TRAVEL

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER IAW PWS para. 4.9 dated 04 August 2022 TRAVEL IN SUPPORT OF CLINs 0002, 0004, 0005, 0007, 0008, and 0010. TRAVEL REIMBURSED IAW FAR 31.2 and JTR Priority: R ROUTINE Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Contractor Furnished Property

Basic Performance Period Item No.

Cost Reimbursable No Fee Best Estimated Qty

1 LO

Contractor Furnished Property

Basic Performance Period R408 Contractor Furnished Property Contractor Furnished Property IAW PWS para. 4.4.1 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

DATA

Basic Performance Period Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

DATA

Provide requested Data IAW the PWS dated 04 August 2022 and applicable DD1423s listed in Attachment 11

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO *12 Months

Proposed Period of Performance

+ IAW1423 1 LO

Program Management

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Program Management Program Management IAW Paragraph 4.3 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of

Maintenance Support

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R425 Maintenance Support Maintenance Support Services IAW para. 4.5 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Government Furnished Property

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 GFE/GFP Management Consumable/Expendable, Contractor Repair, and MILSTRIP Repair Management of Government Furnished Equipment/Property IAW PWS Para 4.4 dated 04 August 2022

Government Furnished Property

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Teardown, Test, and Evaluation (TT&E)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Teardown, Test and Evaluation (TT&E) Teardown, Test, and Evaluation IAW para. 4.7.1 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Teardown, Test, and Evaluation (TT&E)

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Repair

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

20 EA

R408 Repair Repair IAW para. 4.7 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 20 EA *12 Months

Proposed Period of

IAW PWS 20 EA

Cybersecurity

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Cybersecurity Cybersecurity Support IAW Paragraph 6.0 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Block Cycle Upgrade

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Block Cycle Upgrade Block Cycle Upgrade IAW para. 8.1. of PWS dated 04 August 2022

Block Cycle Upgrade

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Engineering Support Services

Item No.

Cost Plus Fixed Fee Best Estimated Qty

U/I Unit Price

1 LO

R408 Engineering Support Services Engineering Support Services IAW para. 4.6 of PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of

IAW PWS 1 LO *12 Months

Engineering Support Services

Proposed Period of Performance

IAW PWS 1 LO

Training

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Total Price

5 EA

R408 Training Training Requirements as outlined IAW PWS para. 9.0 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 5 EA *12 Months

Proposed Period of Performance

IAW PWS 5 EA

Over and Above

Item No.

Cost Plus Fixed Fee Best Estimated Qty

U/I Unit Price

1 LO

R408

Over and Above

Over and Above Over and Above IAW PWS para. 4.8 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Travel

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Unit Price

1 LO

TRAV

TRAVEL

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER IAW PWS para. 4.9 dated 04 August 2022 TRAVEL IN SUPPORT OF CLINs 1002, 1004, 1005, 1007, 1008, and 1010. TRAVEL REIMBURSED IAW FAR 31.2 and JTR Priority: R ROUTINE Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of

Contractor Furnished Property

Item No.

Cost Reimbursable No Fee Best Estimated Qty

U/I Unit Price

1 LO

R408 Contractor Furnished Property Contractor Furnished Property IAW PWS para. 4.4.1 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

DATA

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

DATA

Provide requested Data IAW the PWS dated 04 August 2022and applicable DD1423s listed in Attachment 11

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO *12 Months

Proposed Period of Performance

+ IAW1423 1 LO

Program Management

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Program Management Program Management IAW Paragraph 4.3 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required

Program Management

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Maintenance Support

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R425 Maintenance Support Maintenance Support Services IAW para. 4.5 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Government Furnished Property

Item No.

Firm Fixed Price

Government Furnished Property

Best Estimated Qty

U/I Unit Price

12 MO

R408 GFE/GFP Management Consumable/Expendable, Contractor Repair, and MILSTRIP Repair Management of Government Furnished Equipment/Property IAW PWS Para 4.4 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Teardown, Test, and Evaluation (TT&E)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Teardown, Test and Evaluation (TT&E) Teardown, Test, and Evaluation IAW para. 4.7.1 of the PWS dated 04 August 2022

Teardown, Test, and Evaluation (TT&E)

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Repair

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

20 EA

R408 Repair Repair IAW para. 4.7 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required

Repair

IAW PWS 20 EA *12 Months

Proposed Period of Performance

IAW PWS 20 EA

Cybersecurity

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Cybersecurity Cybersecurity Support IAW Paragraph 6.0 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of

Block Cycle Upgrade

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Block Cycle Upgrade Block Cycle Upgrade IAW para. 8.1. of PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Engineering Support Services

Item No.

Cost Plus Fixed Fee Best Estimated Qty

U/I Unit Price

1 LO

R408 Engineering Support Services Engineering Support Services IAW para. 4.6 of PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required

Engineering Support Services

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Training

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

5 EA

R408 Training Training Requirements as outlined IAW PWS para. 9.0 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 5 EA *12 Months

Proposed Period of

IAW PWS 5 EA

Over and Above

Item No.

Cost Plus Fixed Fee Best Estimated Qty

U/I Unit Price

1 LO

R408 Over and Above Over and Above IAW PWS para. 4.8 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Travel

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Unit Price

1 LO

TRAV

TRAVEL

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER IAW PWS para. 4.9 dated 04 August 2022 TRAVEL IN SUPPORT OF CLINs 2002, 2004, 2005, 2007, 2008, and 2010. TRAVEL REIMBURSED IAW FAR 31.2 and JTR Priority: R ROUTINE Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required

Travel

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Contractor Furnished Property

Item No.

Cost Reimbursable No Fee Best Estimated Qty

U/I Unit Price

1 LO

R408 Contractor Furnished Property Contractor Furnished Property IAW PWS para. 4.4.1 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

DATA

Item No.

Not Separately Priced Best Estimated

DATA

1 LO NSP

DATA

DATA

Provide requested Data IAW the PWS dated 04 August 2022 and applicable DD1423s listed in Attachment 11

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO *12 Months

Proposed Period of Performance

+ IAW1423 1 LO

Program Management

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Program Management Program Management IAW Paragraph 4.3 of the PWS dated 04 August 2022

Program Management

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Maintenance Support

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R425 Maintenance Support Maintenance Support Services IAW para. 4.5 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None

Maintenance Support

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Government Furnished Property

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 GFE/GFP Management Consumable/Expendable, Contractor Repair, and MILSTRIP Repair Management of Government Furnished Equipment/Property IAW PWS Para 4.4 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of

Tearown, Test, and Evaluation (TT&E)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Teardown, Test and Evaluation (TT&E) Teardown, Test, and Evaluation IAW para. 4.7.1 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Repair

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

20 EA

R408 Repair Repair IAW para. 4.7 of the PWS dated 04 August 2022

Repair

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 20 EA *12 Months

Proposed Period of Performance

IAW PWS 20 EA

Cybersecurity

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Cybersecurity Cybersecurity Support IAW Paragraph 6.0 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None

Cybersecurity

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Block Cycle Upgrade

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Block Cycle Upgrade Block Cycle Upgrade IAW para. 8.1. of PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Engineering Support Services

Item No.

Cost Plus Fixed Fee

Engineering Support Services

Best Estimated Qty

U/I Unit Price

1 LO

R408 Engineering Support Services Engineering Support Services IAW para. 4.6 of PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Training

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

5 EA

R408 Training Training Requirements as outlined IAW PWS para. 9.0 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Training

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 5 EA *12 Months

Proposed Period of Performance

IAW PWS 5 EA

Over and Above

Item No.

Cost Plus Fixed Fee Best Estimated Qty

U/I Unit Price

1 LO

R408 Over and Above Over and Above IAW PWS para. 4.8 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of

Travel

Item No.

Cost Reimbursement - No Fee Best Estimated Qty

U/I Unit Price

1 LO

TRAV

TRAVEL

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER IAW PWS para. 4.9 dated 04 August 2022 TRAVEL IN SUPPORT OF CLINs 3002, 3004, 3005, 3007, 3008, and 3010. TRAVEL REIMBURSED IAW FAR 31.2 and JTR Priority: R ROUTINE Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Contractor Furnished Property

Item No.

Cost Reimbursable No Fee Best Estimated Qty

U/I Unit Price

1 LO

R408 Contractor Furnished Property Contractor Furnished Property IAW PWS para. 4.4.1 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required

Contractor Furnished Property

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

DATA

Item No.

Not Separately Priced Best Estimated Qty

U/I Unit Price

1 LO NSP

DATA

DATA

Provide requested Data IAW the PWS dated 04 August 2022 and applicable DD1423s listed in Attachment 11

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO *12 Months

Proposed Period of

+ IAW1423 1 LO

Program Management

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Program Management Program Management IAW Paragraph 4.3 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Maintenance Support

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R425 Maintenance Support Maintenance Support Services IAW para. 4.5 of the PWS dated 04 August 2022

Maintenance Support

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Government Furnished Property

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 GFE/GFP Management Consumable/Expendable, Contractor Repair, and MILSTRIP Repair Management of Government Furnished Equipment/Property IAW PWS Para 4.4 dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None

Government Furnished Property

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Teardown, Test, and Evaluation (TT&E)

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

12 MO

R408 Teardown, Test and Evaluation (TT&E) Teardown, Test, and Evaluation IAW para. 4.7.1 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of

Repair

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

20 EA

R408 Repair Repair IAW para. 4.7 of the PWS dated 04 August 2022 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .