TechnicalOrder_Depot_Maintenance_5_20_24.pdf

PDF 4 MB Posted

Attached to
FA853424R0003 AMENDMENT 4 Air Transportable Galley and Lavatory (ATGL) RFP
Solicitation number
FA853424R0003
Issued by

About this file

This document is a technical manual for the overhaul, repair, and maintenance of the Air Transportable Galley/Lavatory (ATGL) system, part number 8946600. The manual provides detailed instructions and illustrations for the removal, disassembly, cleaning, inspection, repair, and replacement of various ATGL components, including the galley, lavatory, toilet assembly, and electrical and plumbing systems. It covers special tools and test equipment required, as well as consumable materials. The manual also includes troubleshooting procedures, equipment tests, and an illustrated parts breakdown. This technical manual supports the federal contract opportunity FA853424R0003 for the sustainment of the ATGL units, which includes program engineering support, overhaul, repair, and material management.

View the file

Other files

File Type Posted
FA853424R0003_0004.pdf PDF
ATGL PWS 1 JULY 2024.pdf PDF
FA853424R0003_0003.pdf PDF
HistoricalData.pdf PDF
FA853424R0003_0002_.pdf PDF
L_M_25_June_2024.pdf PDF
TechnicalOrder_Refrigerator_5_20_24.pdf PDF
TechnicalOrder_Inspection_Requirements_5_20_24.pdf PDF
TechnicalOrder_Oven_5_20_24.pdf PDF
TechnicalOrder_Coffee_Maker_5_20_24.pdf PDF
TechnicalOrder_Technical_Manual_Work_Package_5_20_24.pdf PDF
FA853424R0003_0001.pdf PDF
ATGL_TEP_Attachment_5_20_24.xlsx XLSX spreadsheet
TechnicalOrder_Coffee_Maker_Rail_Assembly_5_20_24.pdf PDF
ATGL TDP_5_20_24.pdf PDF
Sections L and M_5_20_24.pdf PDF
Transportation 1653.pdf PDF
807 ATGL.pdf PDF
ATGL TEP_Attachment 2 Workbook 3.20.24.xlsx XLSX spreadsheet
Sections L and M.pdf PDF
FA853424R0003.pdf PDF
GFP Attachment.pdf PDF
ATGL QASP Final.pdf PDF
ATGL PWS 01 April.pdf PDF
CDRLS (2).pdf PDF
Packaging 158.pdf PDF
Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TO 13B4-4-3

TECHNICAL MANUAL

OVERHAUL INSTRUCTIONS WITH

ILLUSTRATED PARTS BREAKDOWN

DEPOT MAINTENANCE

AIR TRANSPORTABLE GALLEY/LAVATORY (ATGL)

PART NUMBER 8946600

Raytheon E-Systems

DAAB07-92-Z-B506

DISCLOSURE NOTICE - This information is furnished upon the condition that it will not be released to another nation without the specific authority of the Department of the Air Force of the United States, that it will be used for military purposes only, that individual or corporate rights originating in the information, whether patented or not, will be respected, that the recipient will report promptly to the United States, any known or suspected compromise, and that the information will be provided substantially the same degree of security afforded it by the Department of Defense of the United States. Also, regardless of any other markings on the document, it will not be downgraded or declassified without written approval of the originating United States agency.

DISTRIBUTION STATEMENT B - Distribution authorized to U.S. Government Agencies only (Administrative or Operational Use) (15 September 1997). Other requests for this document shall be referred to 406 SCMS/GULAC, Robins AFB, GA 31098. Questions concerning technical content shall be referred to 579 CBSS/GBLCA.

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401, et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

HANDLING AND DESTRUCTION NOTICE - Comply with distribution statement and destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Published Under Authority of the Secretary of the Air Force

15 SEPTEMBER 1997 CHANGE 3 - 9 JULY 2010

BASIC AND ALL CHANGES HAVE BEEN MERGED

TO MAKE THIS A COMPLETE PUBLICATION

NOTE: The portion of the text affected by the changes is indicated by a vertical line in the outer margin of the page. Changes to illustrations are indicated by shaded or screened areas, or by miniature pointing hands.

INSERT LATEST CHANGED PAGES. DESTROY SUPERSEDED PAGES.

LIST OF EFFECTIVE PAGES

*Zero in this column indicates an original page.

USAF

Page *Change No. No.

Page *Change No. No.

Page *Change No. No.

Dates of issue for original and changed pages are:

A Change 3

Title A - B C Blank i - iii iv S-1 - S-2 1-1 - 1-4 1-5 - 1-7 1-8 2-1 2-2 - 2-3 2-4 Blank 3-1 - 3-2 3-2A Added 3-2B Blank 3-3 - 3-5 3-6 3-7 - 3-8 3-8A - 3-8B Added 3-9 - 3-10 3-11 - 3-27 3-28 Blank 4-1 4-2 5-1 - 5-2 5-3 5-4 - 5-6 5-7 5-8 - 5-10 5-10A Added 5-10B Blank 5-11 - 5-15 5-16 - 5-17 5-18

5-19 - 5-24 6-1 6-2 6-2A Added 6-2B Blank 6-3 - 6-6 6-7 6-8 Blank 7-1 7-2 Blank 8-1 - 8-2 8-3 8-4 8-5 - 8-11 8-12 - 8-15 8-16 8-17 - 8-18 8-19 - 8-21 8-22 Blank 8-23 - 8-28 8-29 8-30 8-31 8-32 Blank 9-1 9-2 Blank 10-1 - 10-7 10-8 10-9 - 10-11 10-12 10-13 - 10-15 10-16 - 10-17 10-18 - 10-19 10-20

10-21 - 10-22 10-23 - 10-25 10-26 10-27 - 10-30 10-31 10-32 - 10-34 10-35 10-36 10-37 - 10-49 10-50 - 10-51 10-52 10-53 - 10-58 10-59 10-60 - 10-61 10-62 - 10-64 10-65 10-66 - 10-67 10-68 10-69 - 10-76 10-77 10-78 - 10-82 10-83 - 10-87 10-88 10-89 - 10-93 10-94 Blank 10-95 - 10-96 10-96A Added 10-96B Blank 10-97 - 10-99 10-100 10-100A Added 10-100B Blank 10-101 10-102 - 10-110

Original. . . . . . . . . .0 . . 15 September 1997 Change . . . . . . . . . .1 . . . . . . . 15 April 2001

Change . . . . . . . . . . 2 . . . . .15 October 2008 Change . . . . . . . . . . 3 . . . . . . . . . 9 July 2010

TOTAL NUMBER OF PAGES IN THIS PUBLICATION IS 300, CONSISTING OF THE FOLLOWING:

LIST OF EFFECTIVE PAGES – continued

*Zero in this column indicates an original page.

Change 3 B/(C blank)

Page *Change No. No.

Page *Change No. No.

Page *Change No. No.

10-110A Added 10-110B Blank 10-111 - 10-115 10-116 10-117 10-118 10-119 10-120 10-121 - 10-122 10-123 - 10-124 10-124A Added 10-124B Blank 10-125 - 10-126 10-127 10-128 - 10-129 10-130 - 10-131 10-132 - 10-154 11-1 11-2 Blank

FP-1

FP-2 Blank

FP-3

FP-4 Blank

FP-5

FP-6 Blank

FP-7

FP-8 Blank

Change 1 i

TABLE OF CONTENTS

Section Page

LIST OF ILLUSTRATIONS ........................... iii

LIST OF TABLES ........................................iv

SAFETY SUMMARY..................................S-1

1 GENERAL INFORMATION ......................... 1-1

1-1 Purpose ........................................... 1-1 1-2 Description....................................... 1-1 1-9 Leading Particulars ............................. 1-4 1-10 Electrostatic Discharge Sensitive Explanation.................................... 1-8

2 SPECIAL TOOLS AND TEST EQUIPMENT ..... 2-1

2-1 General ........................................... 2-1 2-2 Consumable Materials.......................... 2-1

3 REMOVAL AND DISASSEMBLY .................. 3-1

3-1 General ........................................... 3-1 3-2 Preparation for Component Removal ........ 3-1 3-3 Line-Replaceable Unit and Internal Component Removal......................... 3-1 3-4 Separation of ATGL from Pallet ............. 3-6 3-5 Galley Cabinet Module (Breadbox) Removal....................................... 3-6 3-6 Oven/Coffee Maker Module Removal ....................................... 3-7 3-7 Galley Countertop Removal ................. 3-10 3-8 Galley Drawer/Refuse Module Removal ........................... 3-13 3-9 Lavatory Cabinet Removal .................. 3-13 3-10 Panel Pin Removal............................ 3-13 3-11 Right Wall Removal .......................... 3-15 3-16 Left Wall Panel Removal .................... 3-22 3-17 Ceiling Panel Removal ....................... 3-26

4 CLEANING .............................................. 4-1

4-1 Air Transportable Galley/Lavatory (ATGL) Cleaning ....................................... 4-1 4-2 Toilet Assembly Cleaning ..................... 4-1 4-3 Repainting........................................ 4-1

5 INSPECTION, REPAIR, AND ....................... 5-1

REPLACEMENT

5-1 Inspection and Preventive Maintenance................................... 5-1

Section Page

5-2 Construction of ATGL Structure .............. 5-1 5-3 Damage Assessment ............................. 5-1 5-6 Inspection Techniques ........................... 5-4 5-9 Inspection Requirements ........................ 5-4 5-10 Moisture Removal .............................. 5-16 5-13 Repair of Honeycomb Panels ................. 5-17 5-19 Potted Insert Replacement ..................... 5-21

6 INSTALLATION......................................... 6-1

6-1 General ............................................ 6-1 6-2 Galley Drawer/Refuse Module Installation...................................... 6-1 6-3 Galley Countertop Installation ................. 6-1 6-4 Oven/Coffee Maker Module Installation ..... 6-2 6-5 Galley Cabinet Module (Breadbox) Installation.................................... 6-2A 6-6 Lavatory Cabinet Installation................... 6-3 6-7 Panel Pin Installation ............................ 6-3 6-8 Right Wall Installation .......................... 6-4 6-9 Right Forward Wall Installation ............... 6-4 6-10 Closeout Panel Installation...................... 6-4 6-11 Right Aft Wall Installation...................... 6-5 6-12 Left Wall Panel Installation .................... 6-6 6-13 Ceiling Panel Installation ....................... 6-6 6-14 Installation of ATGL onto Pallet .............. 6-7

7 ACCESSORIES........................................... 7-1

8 TESTING .................................................. 8-1

Section I. Operational Checkout

8-1 General ............................................ 8-1 8-2 Preparation........................................ 8-1 8-3 Oven Functional Test............................ 8-1 8-4 Coffee Maker Functional Test ................. 8-1 8-5 Refrigerator Functional Test ................... 8-4 8-6 Toilet Tank Functional Test .................... 8-4 8-7 Lavatory Functional Test ....................... 8-4 8-8 Smoke Alarm Functional Test ................. 8-4

Section II. Troubleshooting Procedures

8-9 General ............................................ 8-5 8-10 Malfunction Listing.............................. 8-5 8-11 Galley.............................................. 8-5 8-12 Lavatory.......................................... 8-10 8-13 Toilet Assembly ................................. 8-14 8-14 ATGL Control Panel Continuity Tests............................................ 8-18

Change 1 ii

TABLE OF CONTENTS - CONTINUED

Section Page

Section III. Equipment Tests

8-18 Toilet Timer Assembly Electrical Test .... 8-23 8-19 Toilet Timer Assembly Operational Test ........................................... 8-24 8-20 Motor-Pump-Filter Assembly Test ......... 8-25 8-21 Toilet Assembly Test ......................... 8-25 8-22 Liquid Level Indicator Electrical Test .............................. 8-26 8-23 Oxygen System Operational Check ........ 8-28 8-24 Water Heater Pressure Relief Valve and Thermostat Test/Adjustment.............. 8-29

9 TABLE OF LIMITS ..................................... 9-1

Section Page

10 ILLUSTRATED PARTS BREAKDOWN ........... 10-1

10-1 General ........................................... 10-1 10-2 Contents .......................................... 10-1 10-3 How to Use This Illustrated Parts Breakdown.............................. 10-1 10-4 Maintenance Parts List ......................... 10-1 10-13 Record of Time Compliance Technical Orders ............................. 10-4 10-14 Numerical Index ................................ 10-5 10-15 Abbreviations.................................... 10-5 10-16 Recommended Changes ........................ 10-5 10-17 Related Manuals................................. 10-5 Numerical Index ............................. 10-141

11 DIFFERENCE DATA SHEETS ...................... 11-1

Change 1 iii

LIST OF ILLUSTRATIONS

Number Title Page

1-1 Air Transportable Galley/Lavatory.............. 1-2 1-2 ATGL Shell Components ......................... 1-5

3-1 Air Transportable Galley/Lavatory (ATGL) ... 3-2 3-1A ATGL Drain Procedure .........................3-2A 3-2 LRU and Internal Component Removal/Installation............................. 3-3 3-3 Removal of ATGL from Pallet ................... 3-7 3-4 Galley Cabinet Module (Breadbox) Removal/Installation............................. 3-7 3-5 Oven/Coffee Maker Module Removal/Installation............................. 3-8 3-6 Galley Countertop Removal/Installation ...... 3-11 3-7 Galley Drawer/Refuse Module Removal/Installation ................ 3-12 3-8 Lavatory Cabinet Removal/Installation ....... 3-14 3-9 Right Forward Wall Removal/Installation.......................... 3-16 3-10 Right Aft Wall Removal/Installation .......... 3-18 3-11 Closeout Panel Removal/Installation .......... 3-20 3-12 Left Wall Panel Removal/Installation ......... 3-23 3-13 Ceiling Panel Removal/Installation ............ 3-24

5-1 Damage Assessment ............................... 5-2 5-2 Tap Hammer Inspection Tool .................... 5-3 5-3 Moisture Removal Technique .................. 5-17 5-4 Honeycomb Repair............................... 5-18 5-5 Drilling Head Flange from Potted Insert............................................. 5-20 5-6 Insert Replacement Using Plate ................ 5-22 5-7 Insert Replacement Using Tab ................. 5-24

8-1 Air Transportable Galley/Lavatory.............. 8-2 8-2 Timer Assembly Schematic Diagram.......... 8-23 8-3 Timer Assembly Test Setup .................... 8-24 8-4 Motor-Pump-Filter Assembly Test Setup Diagram.......................................... 8-26 8-5 Toilet Assembly Test Setup..................... 8-27 8-6 Liquid Level Indicator Functional Check..... 8-28 8-7 Oxygen System Test Setup...................... 8-30 8-8 Water Heater Pressure Relief Valve Test/Adjustment ................................ 8-31

Number Title Page

10-1 Air Transportable Galley/Lavatory .............. 10-8 10-2 ATGL Shell Assembly............................. 10-9 10-3 Ceiling Panel Assembly ......................... 10-18 10-4 Wall Panel Assembly ............................ 10-19 10-5 Galley Cabinet Module (Breadbox) Assembly........................................ 10-21 10-6 Oven/Coffee Maker Module Assembly ....... 10-23 10-7 Center Wall Panel Assembly ................... 10-27 10-8 Countertop Support Assembly.................. 10-29 10-9 Galley Refuse Module Assembly .............. 10-30 10-10 Galley Drawer Module Assembly ............. 10-32 10-11 Base Assembly.................................... 10-34 10-12 Galley Left Wall Panel Assembly.............. 10-36 10-13 Closeout Panel Assembly ....................... 10-37 10-14 Right Lavatory Wall Panel Assembly ......... 10-38 10-15 Lavatory Wall Panel Assembly................. 10-39 10-16 Vanity Panel Assembly .......................... 10-41 10-17 Vanity Panel Top Assembly .................... 10-43 10-18 Right and Left Lavatory Cabinet Assemblies ...................................... 10-44 10-19 Lavatory Divider Assembly..................... 10-47 10-20 Main Panel Assembly............................ 10-49 10-21 Line-Replaceable Unit (LRU) Assembly...... 10-50 10-22 Potable Water Tank Assembly ................. 10-55 10-23 Power Distribution Panel........................ 10-57 10-24 Toilet Assembly .................................. 10-63 10-25 Toilet Base Assembly............................ 10-68 10-26 Toilet AC Motor Assembly ..................... 10-69 10-27 Liquid Transmitter ............................... 10-71 10-28 Motor-Pump-Filter Assembly .................. 10-73 10-29 Sequential Timer Assembly..................... 10-76 10-30 Waste Drain Valve Assembly .................. 10-79 10-31 ATGL Unit Installation.......................... 10-83 10-32 Potable Water Plumbing Assembly ............ 10-84 10-33 Plumbing Drainage Installation................. 10-92 10-34 Electrical Installation ............................ 10-95 10-35 Galley/Lavatory Assembly..................... 10-102 10-36 Lavatory Door Assembly....................... 10-130 10-37 Decal Location .................................. 10-132 10-38 Toilet Enhancement ............................. 10-137 10-39 Step Enhancement ............................... 10-138 FO-1 ATGL Wiring Diagram .......................... FP-1 FO-2 Control Panel Wiring Diagram.................. FP-7 iv

LIST OF TABLES

1-1 Leading Particulars............................... 1-4

2-1 Special Tools and Test Equipment ............. 2-1 2-2 Consumable Materials ........................... 2-2

4-1 Paint Data.......................................... 4-2

5-1 Inspection and Preventive Maintenance ..................................... 5-1 5-2 Inspection Requirements......................... 5-4

8-1 ATGL Malfunction Listing ..................... 8-5 8-2 Coffee Maker Fails to Brew .................... 8-6 8-3 Coffee Maker Power Light Fails to Illuminate ..................................... 8-6 8-4 Galley Lights Fail to Operate ................... 8-7 8-5 Oven Fails to Operate............................ 8-8 8-6 Refrigerator Fails to Operate ................... 8-8 8-7 Main Power Indicator Light Fails to Illuminate ..................................... 8-9 8-8 Both Refrigerator Exhaust Cavity Cooling Fans Fail to Operate ............... 8-10

8-9 Attendant Call Light Fails to Operate.......... 8-10 8-10 Lavatory Occupied Light Fails to Operate ................................ 8-11 8-11 Oxygen System Fails to Operate ............... 8-12 8-12 Water System Fails to Operate ................. 8-12 8-13 Water Heater Fails to Operate .................. 8-12 8-14 Toilet Assembly Will Not Flush................ 8-14 8-15 Toilet Assembly Exhibits Low-Water Volume Flushing (Motor Running) ..................... 8-15 8-16 Toilet Assembly Motor Fails to Operate Properly................................ 8-15 8-17 Liquid Level Indicator Lights Do Not Illuminate ........................................ 8-16 8-18 Lavatory Lights/Exhaust Fans Fail ................................................ 8-17 8-19 ATGL Control Panel Continuity Checks ............................................ 8-18 8-20 Barometric Pressure Readings .................. 8-29

10-1 SMR Coding Chart ............................... 10-6 10-2 Record of Applicable Time Compliance Technical Orders ............................... 10-7

S-1

SAFETY SUMMARY

The following are general safety precautions and instructions that personnel must understand and apply during many phases of operation and maintenance to ensure personal safety and health and the protection of Air Force property. Portions of this summary may be repeated elsewhere in this publication for emphasis.

OBSERVE WARNING AND CAUTION STATEMENTS

WARNING and CAUTION statements have been strategically placed throughout this manual to emphasize certain steps or procedures for the protection of personnel (WARNING) or possibility of equipment and property damage (CAUTION). A WARNING or CAUTION, once provided, will apply each time the related task is performed, regardless of the number of times the step is repeated throughout the manual. Prior to starting any task, review and understand the WARNINGs and CAUTIONs included in this manual for that task.

KEEP AWAY FROM LIVE CIRCUITS

Operating personnel must observe all safety regulations at all times. Do not replace components inside the equipment with voltage supply turned on. Under certain conditions, dangerous potentials may exist when power control is in the OFF position due to charges retained by capacitors. To avoid injuries, always remove power from discharge and ground a circuit before touching it. Adhere to all lock out/tag out requirements.

DO NOT WEAR JEWELRY

Remove rings, watches, and other metallic objects which may cause shock or burn hazards. Snagged finger rings have caused many serious injuries. Remove finger rings during all periods of maintenance.

DO NOT SERVICE OR ADJUST ALONE

Do not attempt internal service or adjustment with power applied unless another person capable of rendering aid and resuscitation is present. Personnel working with or near dangerous voltage shall be trained in modern methods of resuscitation.

Information and training sources may be obtained from the director of base medical services.

USE ELECTROSTATIC DISCHARGE (ESD) PROCEDURES

Certain circuit card assemblies and their components will be damaged by seemingly undetectable electrostatic discharge. Care must be exercised during handling/repair of these items. Use electrostatic discharge (ESD) precautionary procedures.

GIVE CLEANERS/CHEMICALS SPECIAL CARE

Keep cleaners in approved safety containers and in minimum quantities. Some cleaners/chemicals may have an effect on skin, eyes, and respiratory tract. Observe manufacturer's WARNING label and current safety directives. Use only in authorized areas. Discard soiled cleaning cloths into safety cans.

S-2

USE SAFETY-APPROVED EQUIPMENT

When cleaners and primers are being applied, use approved explosion-proof lights, blowers, and other equipment. Ensure that firefighting equipment is readily available and in working order.

OBSERVE PRESSURE SYSTEM SAFETY PRECAUTIONS

Pressure system safety precautions apply to all ranges of pressure. Care must be taken during testing to ensure that all test connections are proper and tight prior to applying pressure to the test setup; all system components must be compatible with pressure applied. Use of compressed air can create an environment of propellant foreign particles. Air pressure shall be reduced to less than 30 psi and used with effective chip guarding and personal protective equipment.

WEAR PERSONAL PROTECTIVE EQUIPMENT

Wear protective clothing/equipment (gloves, apron, eye protection, etc.) approved for the materials, procedures, and tools being used. Contact supervisor for guidance. If necessary, the bioenvironmental engineer of the base safety office should be contacted for guidance.

T O 13B 4-4-3

Change 1 1-1

CHA PT E R 1

G EN ER A L IN FOR MA T ION

1-1 PU RPOS E.

The Air Transportable Galley/Lavatory (ATGL) is a self-contained galley/lavatory intended for installation in the forward end of the cargo compartment of C -5, C -130, C - 141, and C-17 aircraft. The A T GL galley provides two meals and one snack f or 160 people f or up to 15 hours.

Electr ical r eceptacles mounted on the right side of the ATGL receive power f rom the aircraft. The ATGL is mounted on a standard 88 x 108- inch pallet (HCU-6/E ) that is compatible with existing aircraft rails, rollers, and materiel handling equipment. Pe netration points are provided to allow the ATGL to be forklifted with the cover installed.

1-2 DES C R IPT ION.

The A T GL galley consists of two ovens, overhead storage compartments for 160 serving trays, two coffee brewers, three thermoelectric refrigerators, storage drawers, and two auxiliary work shelves. Each of the two lavatories contains a toilet, sink, smoke detector, ventilation fan, self-contained emergency oxygen system, emergency call button, mirror, waste receptacle, paper towel dispenser, and an assist handle.

A 39-gallon stainless steel potable water tank provides potable water for the lavatories and the coffee makers. Th e toilet assembly, which holds 71 gallons, services both lavatories. The assembly will hold approximately 60 gallons of waste and 11 gallons of chemical precharge f or f lushing the toilets. Two liquid level indicator lights installed on the servicing end of the assembly show if the system is functioning and if it needs to be serviced.

1-3 T op A rea. The top of the A T GL contains the following items (See Figur e 1-1):

a. Tie -down rails ( 1)

b. A ssist handle ( 2)

c. Potable water tank access cover (2 1)

1-4 G alley A rea. The G alley c ontains the f ollowing items:

a. Coffee makers (3 )

b. C ontrol panel ( 5)

c. Stowage compartments (4 )

d. Ovens (6 )

e. C ountertop (7)

f. Auxiliary work shelves (8)

g. R efrigerators (9)

h. Refuse door ( 10)

i. Tras h receptacle (11)

j. Galley drawers ( 12)

1-5 Right-S ide A rea. Th e right side, as v iewed when f acing forward, contains the f ollowing:

a. (D eleted)

b. Extension line support assembly (14)

c. Waste tank indicators ( 15)

d. Human waste dump valve ( 16)

e. Human waste drain hose ( 17)

f. Human waste tank r inse ( 18)

g. Ex ternal power receptacles (1 9)

h. External power cord and AT GL cover storage ( 20)

1-6 Lavatory A rea. The lavatory contains the following items:

a. La vatory door ( 23)

b. Emergency oxygen system (24)

c. Smoke detector ( 25)

d. A ssist handle ( 26)

e. A ttendant call button (27)

f. Toilet base (28)

g. Toilet flush button (29)

1-2 Change 1

Figure 1-1. Air Transportable Galley/Lavatory (Sheet 1 of 2)

Change 1 1-3

Figure 1-1. Air Transportable Galley/Lavatory (Sheet 2 of 2)

1-4 Change 1

h. Toilet paper dispenser ( 30)

i. Refuse door ( 31)

j. Light (32)

k. Mirro r (33)

l. Lavatory cabinet door ( 34)

m. Wash basin (35)

n. Paper towel dispenser ( 36)

o. Refuse door and access panel (37)

p. Paper cup dispenser ( 38)

q. La vatory occupied and lavatory emergency lights (22)

r. Potable water tank ( 39)

1-7 Left Side A rea. The left side, v iewed when facing forward, contains the f ollowing:

a. Refrigerator exhaust closeout panel ( 40)

b. Toilet access panel (4 1)

c. Foldout steps ( 42)

d. C atwalk extension (42A)

1-8 Fram ew ork. The ATGL fram ework, see figure 1-2, comprises the f ollowing wall panels and removable modular components:

a. C eiling panel ( 1)

b. L eft-side wall (2 )

c. Center wall (3 )

d. Right-side wall panel (galley left wall) (4)

e. Galley cabinet module (5) provides storage space for galley.

f. Oven/coffee maker module (6) provides space for the two coffee makers, the control panel, and two ovens.

g. C ountertop support (7) provides support for oven/ coffee maker module.

h. Galley r efuse module (8) provides space for the galley r efuse container.

i. Galley cabinet (9) provides storage drawers for the galley.

j. Lav atory cabinets (1 0) provide storage space for lavatory.

k. Lav atory divider (11) provides storage space for the potable water tank.

l. V anity panel top (17) provides support for lavatory cabinet and wash basin.

m. V anity panels ( 12) provide support for vanity panel.

n. C loseout panel ( 13) provides f ront support for left-hand lavatory toilet shroud.

o. C loseout panel ( 14) serves as wall a bove toilet cavity, r ight-hand side, as well a s f ront support for right-hand lavatory toilet shroud.

p. La vatory wall panel ( 15)

q. La vatory wall panel ( 16)

1-9 LE A DING PA R T ICU LA R S .

The leading particulars of the A T GL are listed in table 1-1.

TAB LE 1-1. LEADIN G PART ICU LARS

Overall dimensions:

Height ...................... 80 in.

Length ...................... 104.3 in.

Depth ....................... 84.5 in.

Basic weight ............... 3200 lb. (Dry)

Capacity:

Each refrigerator .......... 106 meals, 53 snacks

Potable water tank ........ 39 gal.

Each coffee maker ........ 48 ounces in 4 minutes or less

E ach oven .................. 36 frozen dinners in 40 minutes

Power requirement ....... 115/208 Vac, 3-phase wye,4-wire, 400 Hz

Power consumption ....... 23 kW

Individual power r equirements:

Each refrigerator .......... 115/208 Vac, 3-phase, 1350W, 400 Hz

Each coffee maker ........ 115/208 Vac, 3-phase, 2760W, 400 Hz

Each oven .................. 200 Vac, 3-phase, 2350 W per cavity, 400 Hz

1-5

Figure 1-2. ATGL Shell Components (Sheet 1 of 3)

1-6

Figure 1-2. ATGL Shell Components (Sheet 2 of 3)

1-7

Figure 1-2. ATGL Shell Components (Sheet 3 of 3)

1-8 Change 1

TABLE 1-1. LEADING PARTICULARS - Continued

Toilet facilities ................. 115/208 Vac, 3-phase, 400 Hz Water pump................... 24 Vdc, 4.0 amps, 96 W Water heater .................. 120 Vac, 2400 W Electrical fan.................. 24 Vac, 67 W, 280 mA Temperatures:

Coffee maker ............... 145 oF minimum Hot water server ........... 185 oF Oven ......................... 180 - 350 oF

Refrigerator................. 38 ± 5 oF

Water heater ................ 85 ± 10 oF Weight limitations: Top of ATGL limited to 300 lb. maximum

1-10 ELECTROSTATIC DISCHARGE SENSITIVE

(ESDS) EXPLANATION.

This manual contains procedures for removing, replacing, and adjusting components that are Electrostatic Discharge Sensitive (ESDS). Paragraphs that address handling or maintenance that could damage ESDS components are identified by the ESDS symbol 1 and a CAUTION prior to the actual procedure. Each procedure is marked with **ESD** following the paragraph number and prior to the paragraph title. Consult TO 00-25-234 for instructions.

2-1

CHAPTER 2

SPECIAL TOOLS AND TEST EQUIPMENT

2-1 GENERAL.

The special tools and test equipment (or equivalents) listed in table 2-1 are required to perform the operational checks and testing of the Air Transportable Galley/Lavatory.

2-2 CONSUMABLE MATERIALS.

The consumable material listed in table 2-2 are required for maintenance of the Air Transportable Galley/Lavatory.

TABLE 2-1. SPECIAL TOOLS AND TEST EQUIPMENT

TOOL/EQUIPMENT

NO./CAGE

FIGURE

NO.

NOMENCLATURE USE AND APPLICATION

Ammeter Check amperage on motor-pump-filter 5465/32042 2-1, TO 13B8-4-1 Bushing insertion tool Maintenance of water pump, pressurematic water system MS24264R14B7P/96906 5-3, TO 13B4-4-1 Connector, receptacle, electrical (Input) Test timer assembly MS24264R14B75S/96906 5-3, TO 13B4-4-1 Connector, receptacle, electrical (Output) Test timer assembly AA271-420/75834 Conversion kit Convert manual placing tool Dial indicator Check spring-loaded endplay of the rotor shaft BR5401-400/17023 Electrical power supply, 28 Vdc Test toilet assembly, liquid level indicator 1227-6/01556 Extraction tool Remove inserts Feeler gauge Check pump assembly impeller clearance 57721-6/7L946 Flowmeter Test motor-pump-filter assembly SRE-8-115-15X15/90411 5-3 Heat blanket Remove moisture from honeycomb panels 10008/83284 5-4, TO 13B6-5-1 Heat gun Shrink tubing, Nordskog coffee maker 6041 Hot melt glue gun Local purchase M81969/14-03/77820 Insert and removal tool Remove and install inserts 3378 5-1, TO 13B6-5-1 Installation tool Switch removal and replacement, Nordskog coffee maker EAO-02-906/61706 5-1, TO 13B6-5-1 Lamp holder switch Lamp removal and replacement, Nordskog coffee maker CLSB1 Magnifying glass, 10X Inspection 24W-M/8W895 Manometer Test motor-pump-filter assembly and oxygen system AA170/75834 Manual placing tool Install inserts 4812-70/29780 or equivalent Motor, alternating current Test timer assembly M-77/89536 or equivalent Multimeter Check voltage and continuity EAO-02-905/61706 5-1, TO 13B6-5-1 Pincers Lens removal, Nordskog coffee maker 18201502/05167 Pressure gauge, 0-100 psi Test pressure relief valve 513759/7F243 Pressure gauge Test toilet assembly, liquid level indicator 8946674-10 Sink drain tool Remove lavatory sink drain B99-007 Spanner nut Valve disassembly 4FPB/03486 Tap ¼-28 Install inserts Local manufacture 5-2 Tap hammer Detect voids and delaminations in honeycomb panels 3379 Test Box Test PC board

2-2 Change 1

TABLE 2-1. SPECIAL TOOLS AND TEST EQUIPMENT - Continued

TOOL/EQUIPMENT

NO./CAGE

FIGURE

NO.

NOMENCLATURE USE AND APPLICATION

Fluke 51/52 Thermometer Measure inside temperature of refrigerator and oven

15102B/07295 Vacuum pump, rotary Test toilet assembly, liquid level indicator

513756/7F243 Water regulator Test toilet assembly, liquid level indicator

TE12A 5-26, TO 13B-4-4-1 Wrench, torque, 0-150 in.-lb. Lavatory faucet 68434-32C/15472 Wrench, water filter Remove filter housing Local purchase 5-3 Vacuum bag Remove moisture from honeycomb panels

TABLE 2-2. CONSUMABLE MATERIALS

NOMENCLATURE SPECIFICATION PART NO./CAGE

Adhesive EC1751/52152 Adhesive ATR525/9X645 Adhesive, epoxy MMM-A-134,type 1 EC1177/81348 Adhesive, contact Type 1 MMM-A-130/81348 Adhesive, silicone MIL-A-46146B ANSI 3195 Adhesive, silicone EC1927/84633 Alodine Corrosion Protective Coating (CPC) Class 3 MIL-C-5541/81349 Black silicone rubber Group 1, type 1 RTV 108/01139 Black silicone rubber MIL-R-46089C RTV 732/71984 Cleaning compound, aircraft surface Type I MIL-C-87936/81349 Cleaning compound, solvent Type II MIL-C-87937/81349 Cloth, fiberglass Type III MIL-C-9084/81349 Cloth, abrasive, 150-grit A-A-1048A P-C-451/81348 Compound, caulking ES-234 Compound, caulking 18001/90300 Compound, caulking TT-C-1796, type 2, Class 2 3008K11/58536 Compound, caulking 08505/76381 Compound, caulking, silicone-acrylic 7692T11/39428 Compound, joint 684176-10004/08589 Compound, sealing 7582T15/81346 Compound, sealing Type 1, Class 2 MIL-P-46094 Compound, sealing Class B1/2, Type IV MIL-S-81733 Deodorant, aircraft A-A-50758 SANIPAKN02031/18195 Desiccant MIL-D-3464E Detergent, general purpose Class I P-D-1747/80244 Dry cleaning solvent Type III PD680/81348 Fastener tape, loop Type B, class L MIL-F-21840/11153 Filler Type 304, SS #4 QQ-S-766 Gloves JJ-G-001396/81348 Gloves, toxicological agents protective MIL-G-12223J MIL-G-12223/81349 Heat shrink tubing FIT-221-3/92194 HeliCoil MIL-I-8846C 5401-4, size ¼-20/01556 Hot melt glue Local purchase Insulation, compound electrical (heat sink) RTV-108 Clear/08800 Isopropyl alcohol, technical TT-I-735A Loctite AA15-1 Master thread repair kit AAT-312-420/75834 AAT-312-420/75834 Nitrogen, technical Type I BB-N-411/81348

Change 1 2-3/(2-4 blank)

TABLE 2-2. CONSUMABLE MATERIALS - Continued

NOMENCLATURE SPECIFICATION PART NO./CAGE

Paint, exterior MIL-C-85285/81349 Petrolatum, technical Type V VV-P-236/81348 Plumbers putty Local purchase Primer, epoxy MIL-P-53022/81349 Primer, wash MIL-C-8507 Rag, wiping A-A-2522 197406/4N020 Resin EA 956/33564 Rubber sheet ASTM-0-2000 50G-E-00001/67048 Safety wire QQ-N-281, Class A MS20995NC32/96906 Scotch Brite® Local purchase Sealant 95G883-001 Solder QQ-S-571 QQ-S-571/81348 Spatula 7035/60042 Tape, double-sided, 2-in. 3M9472 Tape, masking UU-T-106C UU-T-106/81348 Tape, masking MIL-T-21595 232 3/4-in./26066 Tape, Teflon® 8000-326/51671 Tape, antiseize MIL-T-27730 P5205-2R/81755 Tie wraps PLTIM-CP/06383 Tubing, heat shrink FIT-221-3/92194 Tubing, plastic Local purchase Vinegar, white distilled Type 2A 00754/73137 Vinyl LONCOIN II#187/0RD07 Weather strip SNCPSA00620500/39428

Change 1 3-1

CHAPTER 3

REMOVAL AND DISASSEMBLY

3-1 GENERAL.

NOTE

When shims are removed, they will be measured and retained for installation.

Shims may be used as required.

This chapter contains removal and disassembly procedures for the following components on the galley side of the Air Transportable Galley/Lavatory (ATGL): cabinet module, oven/coffee maker module, countertop, refuse module, and drawer module. The removable component on the lavatory side is the lavatory cabinet. The procedures for removing these assemblies presuppose that the ATGL walls remain installed. The ATGL is made up of the following: roof, center wall, left-side wall, lavatory wall, and right-side wall panels, see figure 3-1. If roof or walls require removal, refer to paragraphs 3-5 through 3-17.

3-2 PREPARATION FOR COMPONENT

REMOVAL.

a. Check AFTO Form 244/245 for open discrepancies.

b. Ensure the ATGL is grounded.

c. Apply electrical power to the ATGL.

d. Close circuit breakers per TO 13B4-4-1.

The plumbing system cannot be purged with compressed air due to check valves installed in the system. The air pressure build-up could cause damage to the check valves and system hoses.

e. Drain water from ATGL as follows: See figure 3-1A.

(1) Extend potable system drain hose (1) to a location outside the aircraft.

(2) Open potable system drain hose valve (2).

(3) On control panel, close WATER PUMP circuit breaker.

(4) Remove, drain, and reinstall coffee makers in accordance with TO 13B6-5-1.

(5) Check potable tank sight gauge; when empty open WATER PUMP circuit breaker.

(6) Close tank valve (3).

(7) Disconnect faucet quick disconnect (4) and allow remaining water to drain.

(8) Connect faucet quick disconnect (4).

(9) Open tank valve (3).

(10) Close potable system drain hose valve (2).

(11) Stow potable system drain hose (1).

f. Remove electrical power from the ATGL.

Cap and seal all electrical wire ends connectors with suitable protective covering to prevent moisture saturation.

Failure to do so will result in damage to the ATGL.

g. Install danger tags on external power connectors.

3-3 LINE-REPLACEABLE UNIT AND INTERNAL

COMPONENT REMOVAL. See figure 3-2.

NOTE

The components listed below should be removed as required to facilitate other maintenance.

Remove the following Line-Replaceable Units (LRUs) and internal components per instructions in TO 13B4-4-1:

a. Galley lights (1), ballast, and adel clamps

b. Control panel (2) (contains terminal board one)

c. Ovens and screens (3)

d. **ESD** DC power supply (4)

e. Refrigerators (5)

3-2 Change 1

Figure 3-1. Air Transportable Galley/Lavatory (ATGL)

Change 1 3-2A/(3-2B blank)

Figure 3-1A. ATGL Drain Procedure

f. Coffee makers and screens (6)

g. Terminal boards two through seven (7, 8, 9, 10, 11, 11A)

h. Potable water tank (12)

i. Lavatory occupied light (13)

j. Water filter (14)

k. Water pump (15)

l. Water strainer (16)

m. K-1 relay (17)

n. Water heater (18)

o. Ball valves (19), four each o1. Flow switch (19A)

p. Toilet tank (20)

q. Refrigerator cavity exhaust fans (21), two each

r. Oxygen system/exhaust fan cover (22)

s. Oxygen deployment container assembly (23)

Change 1 3-3

Figure 3-2. LRU and Internal Component Removal/Installation (Sheet 1 of 4)

Change 1 3-4

Figure 3-2. LRU and Internal Component Removal/Installation (Sheet 2 of 4)

Change 1 3-5

Figure 3-2. LRU and Internal Component Removal/Installation (Sheet 3 of 4)

3-6

Figure 3-2. LRU and Internal Component Removal/Installation (Sheet 4 of 4)

t. Lavatory exhaust fans (24)

u. Smoke detector (25)

v. Toilet seat and shroud (26)

w. Lavatory sink and components (27)

x. Attendant call button (28)

y. Toilet flush handle (29)

z. Lavatory lights (30)

3-4 SEPARATION OF ATGL FROM PALLET. See figure 3-3.

NOTE

Ensure HCU-6/E (463L) is supported by suitable supports (4x4’s or equilvalent).

a. Remove velcro (1, figure 10-31) from perimeter of ATGL base.

b. Remove nuts (1 and 2, figure 3-3) and washer (3) from 18 hook (J) bolts (4). Remove hook bolts.

c. Using forklift, lift ATGL from HCU-6/E (463L) pallet.

3-5 GALLEY CABINET MODULE (BREADBOX)

REMOVAL. See figure 3-4.

a. Remove electrical power from ATGL.

b. Remove the following LRUs and removable components:

(1) Left and right galley lights and wiring harness, adel clamps (four each), and ballast

(2) Screens

(3) Coffee makers (two)

(4) Control panel

(5) Ovens (two)

Change 1 3-7

Figure 3-3. Removal of ATGL from Pallet

c. Remove twelve screws (2) and twelve washers

(3) from three angles (4) in each oven cavity.

Remove angles.

d. Remove six screws (11), six washers (10), six washers (9), and six nuts (8).

e. Remove four screws (13), four washers (12), four washers (6), and four nuts (7).

f. Remove sealant.

NOTE

Edge caps may need to be trimmed or removed to facilitate removal of galley cabinet module (breadbox).

g. Remove cabinet module from ATGL.

3-6 OVEN/COFFEE MAKER MODULE REMOVAL.

See figure 3-5.

a. Remove galley cabinet module per paragraph 3- 5.

b. Remove three refrigerators.

c. Remove coffee maker rails and water supply lines per TO 13B4-4-1.

c1. Slide drawer (7) to full extension of rails (8).

c2. Depress retaining tabs (9) at front of drawer rails

(8) and remove drawer. Remove rails (9A) attached to module, as required, by removing six screws (9B).

Figure 3-4. Galley Cabinet Module (Breadbox) Removal/Installation

Change 1 3-8

Figure 3-5. Oven/Coffee Maker Module Removal/Installation (Sheet 1 of 3)

Change 1 3-8A

Figure 3-5. Oven/Coffee Maker Module Removal/Installation (Sheet 2 of 3)

Change 1 3-8B c3. Loosen clamps (11) securing hose (11A) and hose (11B) to drain tubes on sump tray assembly (14A). Remove hoses.

c4. Remove drain strainer (14B) from sump tray assembly (14A).

d. Remove eight screws (10) securing sump support tray (14) and sump tray assembly (14A) to support angle assembly (12G).

e. Remove sump support tray (14) and sump support tray assembly (14A).

f. If required, loosen clamp (11C) securing hose (11A) to elbow (12) and remove hose. Loosen clamp (11D) and remove hose (11B) from tee (12D).

g. If required, loosen clamps (12A and 12C) and remove hose (12B) from elbow (12) and tee (12D). Loosen clamp (12E) and remove tee (12D) from hose (12F).

Change 1 3-9

Figure 3-5. Oven/Coffee Maker Module Removal/Installation (Sheet 3 of 3)

Change 1 3-10

h. Remove J1 and J2 external power connectors (19) in left oven cavity.

i. Remove screws from adel clamps (20) securing wiring to back wall of oven, coffee maker, and control panel cavities.

j. Place wiring through opening into lower cavities below countertop.

k. Remove terminal board 4 (TB4) per TO 13B4-4-

1. Route wires and terminal board into #2 refrigerator cavity.

l. Remove nut (2, figure 3-5), washer (4), washers (3, two each), and screw (5).

m. Remove four nuts (24), four washers (23), four screws (21), and four washers (22) from rear wall of both lavatory cabinets.

n. (Deleted)

o. (Deleted)

p. Remove 12 screws (15) and 12 washers (16) from floor of the oven cavities and the floor of the drawer and control panel cavities, and remove 12 washers (17) and 12 nuts (18) beneath counter.

q. Remove sealant from edges of oven/coffee maker module.

NOTE

Because of its bulk, two personnel are required to lift the oven/coffee maker module.

r. Carefully lift oven/coffee maker module from

ATGL.

3-7 GALLEY COUNTERTOP REMOVAL. See figure 3-6.

a. Remove oven/coffee maker module per paragraph 3-6.

b. Remove workshelves (12) and workshelf channels

(11) by performing the following steps.

NOTE

On units 1 through 50 there is an extra structural angle (29) on each side.

(1) Remove two screws (3), two lockwashers (4), and two flatwashers (5) securing block

(6) to block (7).

(2) Slide workshelf (12) out of channel.

(3) Remove three screws (8), three lockwashers (9), and three flatwashers (10) securing block (7) to channel (11). Remove block (7) from channel.

(4) Remove four screws (13), four lockwashers (14), and four flatwashers (15) from each channel (11) and remove channels.

c. In refrigerator cavities remove rivets (31) from eight angles (29) securing countertop (1) to drawer and refuse modules (16 and 2).

d. In refrigerator cavities remove 12 rivets (33) from four bonding angles (32) at upper side edge of drawer and refuse modules (16 and 2).

e. Remove screws (25), washers (26), washers (27), and nuts (28) from six angles (22).

Support aft end of angle (21) to prevent damage to forward screw when removing countertop.

NOTE

The washer (18) and nut (17) protruding beneath the countertop cannot be removed due to inaccessibility of the screw head.

f. In #1 and #3 refrigerator cavities remove ten screws (20) and ten washers (19) from two angles

(21) supporting the ends of the countertop.

g. At rear upper left corner of #1 refrigerator cavity remove rivets (33) from bonding angles (32) and remove angles.

h. Remove sealant.

NOTE

Because of the countertop's bulk, two people are required to lift and move it from the ATGL.

i. Remove galley countertop from ATGL.

3-11

Figure 3-6. Galley Countertop Removal/Installation

3-12

Figure 3-7. Galley Drawer/Refuse Module Removal/Installation

3-13

3-8 GALLEY DRAWER/REFUSE MODULE

REMOVAL. See figure 3-7.

The countertop must be removed prior to removing the galley drawer or refuse module. Failure to adhere to caution will cause damage to the module.

NOTE

The following steps can be used for removal of either the galley drawer module or the refuse module.

a. Remove countertop per paragraph 3-7.

NOTE

For galley drawer module removal, omit step b.

b. Remove refuse container (2) from refuse module.

c. Behind module (1 or 8) remove 12 rivets (5) from two deflectors (6) supporting deflector channels (7).

d. Remove rivets (4 and 10) from angles (3 and 9) from each side of the module bases.

NOTE

Due to the bulk of the galley drawer and refuse modules, two personnel are required to remove them from the ATGL.

e. Remove module from ATGL.

3-9 LAVATORY CABINET REMOVAL. See figure 3-8.

NOTE

The following procedure will be used to remove cabinet in either the left- or right-hand lavatory.

a. Remove electrical power from ATGL.

b. Remove paper towel dispenser (1, figure 3-8).

c. Remove six screws (16) and six washers (15) from false shelf (14) in lavatory cabinet.

Remove false shelf (14).

d. Disconnect ground wire (5) on wall of lavatory cabinet.

NOTE

After removal of screws, oxygen cover must be supported to facilitate removing adel clamps and terminal board.

e. Remove ten screws, (3) and ten washers (4) from oxygen component cover (2). Remove cover.

f. Remove knobs (8) and cover (9) and tag and remove wires from terminal board 5 or 6 (6) per TO 13B4-4-1. Remove terminal board (6, figure 3-8).

g. Remove adel clamps (7).

h. Remove raceway covers (17).

i. Remove wires from raceway receptacle as required to facilitate removal of cabinet (18).

j. Remove two screws (10), two washers (11), two washers (12), and two nuts (13).

k. Remove sealant between stainless steel counter and lavatory cabinet.

l. Remove lavatory cabinet (18).

3-10 PANEL PIN REMOVAL.

NOTE

• When drilling panel pins, do not drill hole deeper than 1-15/32 inch.

• Panel pins are not visible, and paint must be removed to locate them. See wall removal procedures for sanding locations.

a. Drill out panel pins with a 21/64 drill bit.

Epoxy adhesive is toxic to eyes, skin, and respiratory tract. Eye and skin protection is required. Unless waived by local bioenvironmental engineer, use only in a well ventilated area.

b. Fill holes by panel pin removal in individual wall and attaching walls with adhesive (EC1177, see Table 2-2).

3-14

Figure 3-8. Lavatory Cabinet Removal/Installation

3-15

Isopropyl alcohol is flammable and moderately toxic to eyes, skin and respiratory tract. Use only in a well ventilated area. Wear rubber gloves, protective clothing and goggles. Keep away from heat and open flames.

c. Clean residual epoxy adhesive from work area with isopropyl alcohol (TT-I-735A, refer to Table 2-2).

d. Allow epoxy adhesive to cure for 12 hours.

3-11 RIGHT WALL REMOVAL. See figure 3-9.

NOTE

The walls are identified by looking forward from the lavatory side. The right wall is on the right side and the left wall is on the left.

3-12 General. The right wall consists of three parts.

The forward panel, the closeout panel, and the aft panel.

3-13 Right Forward Wall Removal. See figure 3-9.

a. Remove electrical power from the ATGL.

b. Separate ATGL from HCU-6/E (463L) per paragraph 3-4.

c. Remove #1 oven and #1 refrigerator per paragraphs 3-2 and 3-3.

d. Remove external power electrical connectors (5) inside #1 oven cavity.

e. Remove sealant from around edge cap (27) joining ceiling panel (1) and right wall panels (23, 24, and 26).

f. Remove rivets (28) securing edge cap (27) to the ceiling (1) and right wall panels (23, 24, and 26).

g. Remove sealant from around edge caps (18) joining closeout panel (24), and forward panel

(23) and lavatory right panel (26).

h. Remove rivets (19) securing edge caps (18);

remove edge caps.

i. Remove rivets (21) from refrigerator exhaust closeout panel (22) and deflectors (20). Support angle (8) will separate from ATGL when rivets

(21) are removed.

j. Remove five screws (6) and five washers (7) from angle (9) supporting left galley countertop.

k. Remove rivets (4) from two bonding angles (3) in upper left corner of #1 refrigerator cavity.

l. Remove two lower screws (2C) and two washers (2B) from three angles (2A).

m. Remove 20 screws (11 and 14), 20 washers (12 and 15), and 20 nuts (13 and 16) from doubler

(10) and angle (17) securing bottom of panel to ATGL; remove doubler.

NOTE

Panel pins joining wall panels are located 1 to 6 inches from each end and approximately 8 inches apart. In order to locate panel pins, sand a strip approximately 1-inch wide along panel edge.

n. After sanding top edge of panel, locate and remove six panel pins (2) per paragraph 3-10.

o. After sanding upper-left edge of panel, locate and remove four panel pins (25).

p. Remove galley left wall panel (23).

required. Unless waived by local bioenvironmental engineer, use only in a well-ventilated area.

q. Fill holes from panel pin removal with adhesive (EC1177, refer to Table 2-2).

3-16

Figure 3-9. Right Forward Wall Removal/Installation (Sheet 1 of 2)

3-17

Figure 3-9. Right Forward Wall Removal/Installation (Sheet 2 of 2)

3-18

Figure 3-10. Right Aft Wall Removal/Installation

3-19 respiratory tract. Use only in a well ventilated area. Wear rubber gloves, protective clothing and goggles. Keep away from heat and open flames.

r. Clean residual epoxy adhesive from work area using isopropyl alcohol (TT-I-735A, refer to Table 2-2).

s. Allow epoxy adhesive to cure for 12 hours.

3-14 Right Aft Wall Removal. See figure 3-10.

a. Remove electrical power from ATGL.

b. Separate ATGL from H6U-6/E (463L) pallet per paragraph 3-4.

c. Remove sealant from around edge cap (27, figure 3-9) joining ceiling panel and lavatory right wall panels.

d. Remove rivets (28) securing edge cap (27) to ceiling (1), and lavatory right wall panels (26) and remove edge cap.

e. Remove ten screws (7 and 10, figure 3-10), ten washers (8 and 11), and ten nuts (9 and 12) from doubler (6) and angle (13) securing bottom of panel to ATGL; remove doubler.

f. Remove sealant from around edge caps (4) joining lavatory right wall (2) with closeout panel

(1) and lavatory wall (15).

g. Remove rivets (5) from edge caps (4) and remove edge caps.

NOTE

Panel pins joining wall panels are located 1 to 6 inches from each end and approxi-mately 8 inches apart. In order to locate panel pins, sand a strip approximately 1-inch wide along panel edge.

h. After sanding top edge of wall panel (2), remove three panel pins (14) from top edge per paragraph 3-10.

i. After sanding aft edge of wall, remove nine panel pins (3) from edge.

j. After sanding right edge of lavatory wall, remove nine panel pins (16) from edge.

k. Remove wall.

NOTE

Epoxy adhesive is toxic to eyes, skin, and respiratory tract. Eye and skin protection is required. Unless waived by local bioenvironmental engineer, use only in a well-ventilated area.

l. Fill holes from panel pin removal with adhesive (EC1177, refer to table 2-2).

respiratory tract. Use only in a well ventilated area. Wear rubber gloves, protective clothing and goggles. Keep away from heat and open flames.

m. Clean residual epoxy adhesive from work area with isopropyl alcohol (TT-I-735A, refer to Table 2-2).

n. Allow epoxy adhesive to cure for 12 hours.

3-15 Closeout Panel Removal. See figure 3-11.

a. Remove electrical power from ATGL.

b. Remove #1 oven and #1 refrigerator per paragraphs 3-2 and 3-3, and close-out panel per

TO 13B4-4-1.

3-20

Figure 3-11. Closeout Panel Removal/Installation (Sheet 1 of 2)

3-21

Figure 3-11. Closeout Panel Removal/Installation (Sheet 2 of 2)

3-22

NOTE

Lavatory right wall panel must be removed before the closeout panel can be removed.

c. Remove lavatory right wall per paragraph 3-14.

d. Remove smoke detector (11, figure 3-11) and remove two screws (2), two washers (3) and bracket (1).

e. Remove six screws (5) from handhold handle (6) in right lavatory and remove handle.

f. Remove right lavatory toilet shroud (6A) per TO 13B4-4-1.

g. Remove toilet shroud support angles per the fol-lowing steps.

(1) Remove four screws (12, figure 3-11), four washers (13), and four nuts (15) attaching mounting plates (14) to side angles (20).

Remove side angles (20).

(2) Remove four screws (16), four washers (17), and four nuts (18) attaching mounting plates (14) to front shroud support angles

(21) and aft shroud support angle (19).

Remove mounting plates (14).

(3) Remove four screws (24) and four washers

(25) securing two forward support angles

(21) to closeout panel (4). Remove support angles.

(4) Remove four screws (22) and four washers

(23) from aft shroud support angle (19).

Remove angle.

h. Remove seven horizontal rivets (8) that join angle

(7) to closeout panel (4).

i. Remove five rivets (9) from angle (10) joining vanity panel and closeout panel.

NOTE

• Panel pins joining wall panels are located 1 to 6 inches from each end and approximately 8 inches apart. In order to locate panel pins, sand a strip along panel edge.

• Panel pins securing closeout panel to center wall are located inside the #1 oven, #1…