HistoricalData.pdf
PDF 94 KB Posted
- Solicitation number
- FA853424R0003
About this file
This document appears to be a historical data summary related to the refurbishment of Air Transportable Galley and Lavatory (ATGL) units. The summary provides details on the estimated levels of refurbishment required for various ATGL units, including the identification of significant repair or replacement items such as coffee makers, ovens, refrigerators, lavatory components, and other hardware. The analysis is based on technical inspections and is subject to change throughout the refurbishment process. The document also includes notes and assumptions, such as the analysis being based on prime costs without burden costs and fees, and that the estimated labor hours do not include support/management labor. This historical data appears to be provided for informational purposes only and does not reflect the government's actual requirements for a future procurement.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
***Disclaimer** The information in this attachment does not reflect the Government’s actual requirement’s and should not be viewed as any type of baseline for future orders.
Attachment 18 Historical Data
Summary of Analysis:
This ATGL estimates to be a Light level refurbishment.
Significant LRU replacement / repair items are: Both Coffee Makers, Coffee Pots and filter tray assemblys were missing.
Requires one Refrigerator OEM refurb. Circuit Breaker Panel needs refurbed / repaired. Tarp is damaged and needs replaced.
Lavatory Door Grilles need replaced and all 4 Toilet Motors need repaired.
Incorporated TCTOs: 13B4-501 – EPOS Kit Pouch; 13B4-503 – Pallet J-Bolts installation; 13B4-504: Toilet Flapper Valve Installation Remaining Itemized parts and repairs are noted below.
Notes/Assumptions:
Analysis is based on Prime Costs, which does not include burden cost and fees.
Analysis is based on findings during technical inspection and is subject change throughout the refurbishment process.
Analysis does not include all steps within the refurbishment process and may require additional hours than identified within this document.
Material Estimates are not final prices, as not all material is on PO yet and could be +/- estimated costs once on PO.
Material Estimates do not include minimum buy requirements or shipping costs.
Estimated Labor Hours reflected in this document represent refurbishment touch labor and does not include support/management labor (i.e. PMO, PP&C, ENG, QA, etc.)
Estimated repair hours per unit will vary due to damage levels.
This ATGL estimates to be a HEAVY level refurbishment due to a significant level of cannibalization and structural refurbishment / repairs.
Significant LRU replacement / repair items as highlighted below are: 1 Oven, both Coffee Makers, Coffee Pots and filter tray assys, Refrigerator Trays, and requires one Refrigerator OEM refurb. Both Power cables and Circuit Breaker Panel are also missing; Tarp is damaged and needs replaced. Lavatory Door Grilles need replaced, all 4 Toilet Motors missing, Dump Cap needs replaced (damaged), water Tank Cap missing.
Incorporated TCTOs: 13B4-501 – EPOS Kit Pouch; 13B4-503 – Pallet J-Bolts installation; 13B4-504: Toilet Flapper Valve Installation Notes/Assumptions:
Analysis is based on Prime Costs, which does not include burden cost and fees.
Analysis is based on findings during technical inspection and is subject change throughout the refurbishment process.
Analysis does not include all steps within the refurbishment process and may require additional hours than identified within this document.
Material Estimates are not final prices, as not all material is on PO yet and could be +/- estimated costs once on PO.
Material Estimates do not include minimum buy requirements or shipping costs.
Estimated Labor Hours reflected in this document represent refurbishment touch labor and does not include
This ATGL is projected to be a Light level refurbishment AF087 requires one Coffee Maker repair; One Oven repiar; one Refridgerator refurb, Left Lav. Emergency Call Switch, Tarp, one Lav Door Knob, one Lav Door slide latch and threshold, one Trashcan, a Sink Button Assy, 5 minor interior delams, and various ATGL Hardware needed.
Notes/Assumptions:
Analysis is based on Prime Costs, which does not include burden cost and fees.
Analysis is based on findings during technical inspection and is subject change throughout the refurbishment process.
Analysis does not include all steps within the refurbishment process and may require additional hours than identified within this document.
Material Estimates are not final prices, as not all material is on PO yet and could be +/- estimated costs once on PO.
Material Estimates do not include minimum buy requirements or shipping costs.
Estimated Labor Hours reflected in this document represent refurbishment touch labor and does not include
This ATGL is projected to be a Medium level refurbishment; requires two Coffee Makers and Pots; Two Oven repairs; one Refrigerator refurb, one Control Panel Repair, one ATGL Hours of Operation Meter, Left Lav. Emergency Call Switch, Tarp, one Lav Door Knob, one Lav Door slide latch and threshold, Sink Buttons, Circuit Breakers, several interior delams, and various ATGL hardware needed.
Notes/Assumptions:
Analysis is based on Prime Costs, which does not include burden cost and fees.
Analysis is based on findings during technical inspection and is subject change throughout the refurbishment process.
Analysis does not include all steps within the refurbishment process and may require additional hours than identified within this document.
Material Estimates are not final prices, as not all material is on PO yet and could be +/- estimated costs once on PO.
Material Estimates do not include minimum buy requirements or shipping costs.
Estimated Labor Hours reflected in this document represent refurbishment touch labor and does not include
This ATGL is projected to be a Medium level refurbishment; requires one Coffee Maker repair / refurb; two Refrigerator refurbs, Potable Water Tank replacement, Four Lavatory Motor / Pump replacements, Lavatory Floor delam / repair, Center Wall delam / repair, Galley Cabinet Module delam / repair, Base assembly requires prime / paint, and various ATGL hardware needed.
Notes/Assumptions:
Analysis is based on Prime Costs, which does not include burden cost and fees.
Analysis is based on findings during technical inspection and is subject change throughout the refurbishment process.
Analysis does not include all steps within the refurbishment process and may require additional hours than identified within this document.
Material Estimates are not final prices, as not all material is on PO yet and could be +/- estimated costs once on PO.
Material Estimates do not include minimum buy requirements or shipping costs.
Estimated Labor Hours reflected in this document represent refurbishment touch labor and does not include
| Summary of Analysis: |
| Notes/Assumptions: |
| Summary of Analysis: |
| Notes/Assumptions: |
| Summary of Analysis: |
| Notes/Assumptions: |
| Summary of Analysis: |
| Notes/Assumptions: |
| Summary of Analysis: |
| Notes/Assumptions: |
File details come from the government source that posted it. Updated .