Price_Model_Revised.xlsx

XLSX spreadsheet 50 KB Posted

Attached to
Next Generation All Aluminum Pallets Federal contract opportunity
Solicitation number
FA8534-19-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document contains a price model and template for a federal contract solicitation seeking offers for the production of next generation aluminum cargo pallets.

The price model template includes pricing details across multiple contract line item numbers and option periods totaling up to nine years. Pricing is to be provided for first article production, non-recurring costs, and full rate production quantities ranging from 5,000 to 15,000 pallets per year. Unit pricing is to be broken out by aluminum content weight and price subject to adjustment versus price not subject to adjustment. Accelerated delivery and material inspection line items are also included.

The related solicitation seeks offers for the manufacturing and production of 463L Air Cargo Pallets to Mil-DTL-27443 specifications. The basic period is for first article testing with five pallets required. Option periods range from decreased initial production of 10,000 pallets in the first year to full rate production of 13,000 pallets in subsequent years. The award will utilize a tradeoff best value source selection process among technically acceptable offers considering past and present performance equally with cost/price. The contract will be a requirements-type indefinite delivery contract issued by the Air Force Materiel Command Lifecycle Management Center located at Robins Air Force Base.

Revised Price Model

View the file

Other files for this federal contract opportunity

Other files attached to Next Generation All Aluminum Pallets, newest first.
File Type Posted
RFP_Release_-_Questions_from_Industry_6Nov19.docx DOCX document
CDRL_A006_Incoming_Inspection_and_Inventory_Report.pdf PDF
SectionL.doc DOC document
FA853419R0001_______0003.pdf PDF
CargoPalletAssembly201993426.STEP STEP file
CenterPanelExtrusion201993428.STEP STEP file
FA853419R0001_______0002.pdf PDF
TieDownRingAssembly201993431.STEP STEP file
IntermediatePanelExtrusion201993427.STEP STEP file
SidePanelExtrusion201993429.STEP STEP file
Amended_Drawings_201993426.pdf PDF
HuckRivetToolNoseAssembly201993432.STEP STEP file
RFP_release_-_Questions_from_Industry.docx DOCX document
FA853419R0001_______0001.pdf PDF
ppi_tool.accdb MDB file
Eng_Data_List.pdf PDF
Next_Gen_Cargo_Pallet_Replacement_MIL_DTL_27443G.pdf PDF
Side_Panel_Extrusion_(X201993429).STEP STEP file
Cargo_Pallet_Assembly_(X201993426).STEP STEP file
Intermediate_Panel_Extrusion_(X201993427).STEP STEP file
Edge_Rail_Extrusion_(X201993430).STEP STEP file
CDRLS_A001_-_A010.pdf PDF
SOW_Next_Gen.pdf PDF
Section_M_Final.pdf PDF
Drawing_Package.pdf PDF
Section_L_Final.pdf PDF
Price_Model,_final.xlsx XLSX spreadsheet
FA853419R0001.pdf PDF
ppi_tool.accdb MDB file
Q&As_4.pdf PDF
Tie-Down_Ring_Assembly_(X201993431).STEP STEP file
Edge_Rail_Extrusion_(X201993430).STEP STEP file
Cargo_Pallet_Assembly_(X201993426).STEP STEP file
Revised_Drawings.pdf PDF
Agenda.docx DOCX document
Information_Sign_in_Sheet.pdf PDF
Revised_Section_L_Aluminum_Pallet.doc DOC document
REVISED_Price_Model.xlsx XLSX spreadsheet
REVISED_SOW_NextGenPallet.pdf PDF
QA_Mar_19_final.docx DOCX document
Draft_-_Next_Gen_Cargo_Pallet_Replacement_MIL_DTL_27443.docx DOCX document
SectionLAluminum.doc DOC document
FA853419R0001.pdf PDF
Drawings.pdf PDF
SectionMAluminum.doc DOC document
SOWNextGenPallet2018.pdf PDF
CargoPalletsCDRLS.pdf PDF
CWBSMatrix.docx DOCX document
PriceModel.xlsx XLSX spreadsheet
DraftForm1653.doc DOC document
Show all 50

Next Generation All Aluminum Pallets has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Model, 09-23-19

Company Name:Attachment G
Address:
POC:
Phone Number:
CAGE Code:
Request for Proposal No. FA8534-18-R-0004
Next Generation Pallet

BASIC PERIOD (18 months)

CLIN Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

0001First ArticleFFP6EA$ - 0
0002F/A Non Recurring CostsFFP1LO$ - 0

Total for Basic Period $ - 0

Option I (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) * PSA (See Note 1) ** PNSA (See Note 2) Unit Price Evaluated Price

1001Next Generation Cargo PalletFPE10,000
Range
FromTo
15,000EA5,000284.50$ - 0$ - 0$ - 0
5,00110,000EA5,000284.50$ - 0$ - 0$ - 0
10,000Evaluated CLIN Price$ - 0

Total for Option I $ - 0

Option II (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

2001Next Generation Cargo PalletFPE15,000
Range
FromTo
15,000EA5,000284.50$ - 0$ - 0$ - 0
5,00110,000EA5,000284.50$ - 0$ - 0$ - 0
10,00115,000EA5,000284.50$ - 0$ - 0$ - 0
15,000Evaluated CLIN Price$ - 0

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

2004 Accelerated Delivery Schedule FFP 1 EA $ - 0

2005 Inspection/Handling Exch Mtl FFP 1,000 EA $ - 0

Total for Option II $ - 0

Option III (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

3001Next Generation Cargo PalletFPE15,000
Range
FromTo
15,000EA5,000284.50$ - 0$ - 0$ - 0
5,00110,000EA5,000284.50$ - 0$ - 0$ - 0
10,00115,000EA5,000284.50$ - 0$ - 0$ - 0
15,000Evaluated CLIN Price$ - 0

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

3004 Accelerated Delivery Schedule FFP 1 EA $ - 0

3005 Inspection/Handling Exch Mtl FFP 1,000 EA $ - 0

Total for Option III $ - 0

Option IV (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

4001Next Generation Cargo PalletFPE13,000
Range
FromTo
15,000EA5,000284.50$ - 0$ - 0$ - 0
5,00110,000EA5,000284.50$ - 0$ - 0$ - 0
10,00113,000EA3,000284.50$ - 0$ - 0$ - 0
13,000Evaluated CLIN Price$ - 0

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

4004 Accelerated Delivery Schedule FFP 1 EA $ - 0

4005 Inspection/Handling Exch Mtl FFP 1,000 EA $ - 0

Total for Option IV$ - 0
Option V (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

5001Next Generation Cargo PalletFPE13,000
Range
FromTo
15,000EA5,000284.50$ - 0$ - 0$ - 0
5,00110,000EA5,000284.50$ - 0$ - 0$ - 0
10,00113,000EA3,000284.50$ - 0$ - 0$ - 0
13,000Evaluated CLIN Price$ - 0

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

5004 Accelerated Delivery Schedule FFP 1 EA $ - 0

5005 Inspection/Handling Exch Mtl FFP 1,000 EA $ - 0

Total for Option V $ - 0

Option VI (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

6001Next Generation Cargo PalletFPE13,000
Range
FromTo
15,000EA5,000284.50$ - 0$ - 0$ - 0
5,00110,000EA5,000284.50$ - 0$ - 0$ - 0
10,00113,000EA3,000284.50$ - 0$ - 0$ - 0
13,000Evaluated CLIN Price$ - 0

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

6004 Accelerated Delivery Schedule FFP 1 EA $ - 0

6005 Inspection/Handling Exch Mtl FFP 1,000 EA $ - 0

Total for Option VI $ - 0

Option VII (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

7001Next Generation Cargo PalletFPE13,000
Range
FromTo
15,000EA5,000284.50$ - 0$ - 0$ - 0
5,00110,000EA5,000284.50$ - 0$ - 0$ - 0
10,00113,000EA3,000284.50$ - 0$ - 0$ - 0
13,000Evaluated CLIN Price$ - 0

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

7004 Accelerated Delivery Schedule FFP 1 EA $ - 0

7005 Inspection/Handling Exch Mtl FFP 1,000 EA $ - 0

Total for Option VII $ - 0

Option VIII (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

8001Next Generation Cargo PalletFPE13,000
Range
FromTo
15,000EA5,000284.50$ - 0$ - 0$ - 0
5,00110,000EA5,000284.50$ - 0$ - 0$ - 0
10,00113,000EA3,000284.50$ - 0$ - 0$ - 0
13,000Evaluated CLIN Price$ - 0

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

8004 Accelerated Delivery Schedule FFP 1 EA $ - 0

8005 Inspection/Handling Exch Mtl FFP 1,000 EA $ - 0

Total for Option VIII $ - 0

Option IX (06 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

9001Next Generation Cargo PalletFPE13,000
Range
FromTo
15,000EA5,000284.50$ - 0$ - 0$ - 0
5,00110,000EA5,000284.50$ - 0$ - 0$ - 0
10,00113,000EA3,000284.50$ - 0$ - 0$ - 0
13,000Evaluated CLIN Price$ - 0

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

9004 Accelerated Delivery Schedule FFP 1 EA $ - 0

9005 Inspection/Handling Exch Mtl FFP 500 EA $ - 0

Total for Option IX$ - 0
Total Evaluated Price$ - 0
* Price Subject to Adjustment (Aluminum $ contained within unit price)
NOTE 1: Per FAR 16.203-4 (c)(4)(ii), when adjustments are made, they shall not include indirect cost or profit.
** Price Not Subject to Adjustment
NOTE 2: Includes all remaining unit costs and profit not proposed under the PSA.

TEP Example, 09-23-19 BASIC PERIOD (18 months)

CLIN Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

0001First ArticleFFP6EA$ 2,000.00$ 12,000.00
0002F/A Non Recurring CostsFFP1LO$ 1,000.00$ 1,000.00

Total for Basic Period $ 13,000.00

Option I (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) * PSA (See Note 1) ** PNSA (See Note 2) Unit Price Evaluated Price

1001Next Generation Cargo PalletFPE10,000
Range
FromTo
15,000EA5,000284.50$ 20.00$ 5,690.00$ 1,800.00$ 7,490.00$ 37,450,000.00
5,00110,000EA5,000284.50$ 20.00$ 5,690.00$ 1,800.00$ 7,490.00$ 37,450,000.00
10,000Evaluated CLIN Price$ 74,900,000.00

Total for Option I $ 74,900,000.00

Option II (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

2001Next Generation Cargo PalletFPE15,000
Range
FromTo
15,000EA5,000284.50$ 21.00$ 5,974.50$ 1,900.00$ 7,875.00$ 39,375,000.00
5,00110,000EA5,000284.50$ 21.00$ 5,974.50$ 1,900.00$ 7,875.00$ 39,375,000.00
10,00115,000EA5,000284.50$ 21.00$ 5,974.50$ 1,900.00$ 7,875.00$ 39,375,000.00
15,000Evaluated CLIN Price$ 118,125,000.00

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

2004 Accelerated Delivery Schedule FFP 1 EA $ 1,000.00 $ 1,000.00

2005 Inspection/Handling Exch Mtl FFP 1,000 EA $ 200.00 $ 200,000.00

Total for Option II $ 118,326,000.00

Option III (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

3001 Next Generation Cargo Pallet FPE Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

3004 Accelerated Delivery Schedule FFP Etc. Etc. Etc. Etc.

3005 Inspection/Handling Exch Mtl FFP Etc. Etc. Etc. Etc.

Total for Option III Etc.

Option IV (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

4001 Next Generation Cargo Pallet FPE Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

4004 Accelerated Delivery Schedule FFP Etc. Etc. Etc. Etc.

4005 Inspection/Handling Exch Mtl FFP Etc. Etc. Etc. Etc.

Total for Option IVEtc.
Option V (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

5001 Next Generation Cargo Pallet FPE Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

5004 Accelerated Delivery Schedule FFP Etc. Etc. Etc. Etc.

5005 Inspection/Handling Exch Mtl FFP Etc. Etc. Etc. Etc.

Total for Option V Etc.

Option VI (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

6001 Next Generation Cargo Pallet FPE Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

6004 Accelerated Delivery Schedule FFP Etc. Etc. Etc. Etc.

6005 Inspection/Handling Exch Mtl FFP Etc. Etc. Etc. Etc.

Total for Option VI Etc.

Option VII (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

7001 Next Generation Cargo Pallet FPE Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

7004 Accelerated Delivery Schedule FFP Etc. Etc. Etc. Etc.

7005 Inspection/Handling Exch Mtl FFP Etc. Etc. Etc. Etc.

Total for Option VII Etc.

Option VIII (12 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

8001 Next Generation Cargo Pallet FPE Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

8004 Accelerated Delivery Schedule FFP Etc. Etc. Etc. Etc.

8005 Inspection/Handling Exch Mtl FFP Etc. Etc. Etc. Etc.

Total for Option VIII Etc.

Option IX (06 months)

CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price

9001Next Generation Cargo PalletFPE13,000
Range
FromTo
15,000EA5,000284.50$ 22.00$ 6,259.00$ 2,000.00$ 8,259.00$ 41,295,000.00
5,00110,000EA5,000284.50$ 22.00$ 6,259.00$ 2,000.00$ 8,259.00$ 41,295,000.00
10,00113,000EA3,000284.50$ 22.00$ 6,259.00$ 2,000.00$ 8,259.00$ 24,777,000.00
13,000Evaluated CLIN Price$ 107,367,000.00

Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price

9004 Accelerated Delivery Schedule FFP 1 EA $ 1,100.00 $ 1,100.00

9005 Inspection/Handling Exch Mtl FFP 500 EA $ 200.00 $ 100,000.00

Total for Option IX$ 107,468,100.00
Total Evaluated Price$ 300,707,100.00
* Price Subject to Adjustment (Aluminum $ contained within unit price)
NOTE 1: Per FAR 16.203-4 (c)(4)(ii), when adjustments are made, they shall not include indirect cost or profit.
** Price Not Subject to Adjustment
NOTE 2: Includes all remaining unit costs and profit not proposed under the PSA.

$ 300,707,100.00

EPA example, 09-23-19

Example of EPA Increase
Step 1: PCO identifies baseline costs in the basic contract.
Contract Schedule
U/IPrice Subject to Adjustment (PSA) (Note 1)Price Not Subject to Adjustment (PNSA) (Note 2)Total Unit Price
Structural Product Material (Identified Below)QTY (Pounds)PriceTotal
AluminumPounds1000$ 10.00$ 10,000.00
Unit PriceEA$ 10,000.00$ 20,000.00$ 30,000.00
Step 2: PCO reviews new costs in contractor's submitted proposal adjustment (PA).
PA submitted by Contractor
U/IContractor's Proposed Adjustment to PSA (Note 1)Price Not Subject to Adjustment (Note 2)Adjusted Unit Price
Structural Product Material (Identified Below)QTY (Pounds)PriceTotal
AluminumPounds1000$ 11.00$ 11,000.00
Unit PriceEA$ 11,000.00$ 20,000.00$ 31,000.00
NOTE 1: Per FAR 16.203-4 (c)(4)(ii), when adjustments are made, they shall not include
indirect cost or profit.
NOTE 2: Includes all remaining unit costs and profit not proposed under the PSA.
Step 3: PCO determines if any adjustments are applicable.
Adjustment calculation 1
A =$ 11,000.00
U =$ 10,000.00
Δ =($11,000 - $10,000)/$10,000 OR:
10.00%

10.00% is ≥ 5.00%; therefore, PA is considered.

Adjustment calculation 2
Proposed Adjusted Total Unit Price$ 31,000.00
divided by
Initial Proposed Total Unit Price$ 30,000.00
=103.33%
The proposed adjusted total unit price is no more than 10.00% higher than the initial proposed total
unit price. An EPA is applicable.

Step 4: Contractor's submitted PA meets the requirements for a price increase. A modification to the delivery order is issued for the adjusted unit price of $31,000 shown in Step 2.

Example of EPA Increase capped at 10%
Step 1: PCO identifies baseline costs in the basic contract.
Contract Schedule
U/IPrice Subject to Adjustment (Note 1)Price Not Subject to Adjustment (Note 2)Total Unit Price
Structural Product Material (Identified Below)QTY (Pounds)PriceTotal
AluminumPounds1000$ 10.00$ 10,000.00
Unit PriceEA$ 10,000.00$ 20,000.00$ 30,000.00
Step 2: PCO reviews new costs in contractor's submitted proposal adjustment.
PA submitted by Contractor
U/IContractor's Proposed Adjustment to PSA (Note 1)Price Not Subject to Adjustment (Note 2)Adjusted Unit Price
Structural Product Material (Identified Below)QTY (Pounds)PriceTotal
AluminumPounds1000$ 15.00$ 15,000.00
Unit PriceEA$ 15,000.00$ 20,000.00$ 35,000.00
NOTE 1: Per FAR 16.203-4 (c)(4)(ii), when adjustments are made, they shall not include
indirect cost or profit.
NOTE 2: Includes all remaining unit costs and profit not proposed under the PSA.
Step 3: PCO determines if any adjustments are applicable.
Adjustment calculation 1
A =$ 15,000.00
U =$ 10,000.00
Δ =($15,000 - $10,000)/$10,000 OR:
50.00%

50.00% is ≥ 5.00%; therefore, PA is considered.

Adjustment calculation 2
Proposed Adjusted Total Unit Price$ 35,000.00
divided by
Initial Proposed Total Unit Price$ 30,000.00
=116.67%
The proposed adjusted total unit price is more than 10.00% higher than the initial proposed total unit
price. An EPA is applicable, but per FAR 52.216-4(c)(4), the increase will be capped at 10.00% higher than
the initial proposed total unit price.
Adjustment calculation 3 (capped at 10.00%)
Initial Proposed Total Unit Price$ 30,000.00
multiplied by110.00%
=
Adjusted Total Unit Price w/10.00% cap$ 33,000.00

Step 4: Contractor's submitted PA meets the requirements for a price increase. The increase is capped at 10.00% higher than the initial proposed total unit price. A modification to the delivery order is issued for the adjusted unit price of $33,000 shown in Adjustment calculation 3.

Example of EPA Decrease
Step 1: PCO identifies baseline costs in the basic contract.
Contract Schedule
U/IPrice Subject to Adjustment (Note 1)Price Not Subject to Adjustment (Note 2)Total Unit Price
Structural Product Material (Identified Below)QTY (Pounds)PriceTotal
AluminumPounds1000$ 10.00$ 10,000.00
Unit PriceEA$ 10,000.00$ 20,000.00$ 30,000.00
Step 2: PCO reviews new costs in contractor's submitted proposal adjustment.
PA submitted by Contractor
U/IContractor's Proposed Adjustment to PSA (Note 1)Price Not Subject to Adjustment (Note 2)Adjusted Unit Price
Structural Product Material (Identified Below)QTY (Pounds)PriceTotal
AluminumPounds1000$ 9.50$ 9,500.00
Unit PriceEA$ 9,500.00$ 20,000.00$ 29,500.00
NOTE 1: Per FAR 16.203-4 (c)(4)(ii), when adjustments are made, they shall not include
indirect cost or profit.
NOTE 2: Includes all remaining unit costs and profit not proposed under the PSA.
Step 3: PCO determines if any adjustments are applicable.
Adjustment calculation 1
A =$ 9,500.00
U =$ 10,000.00
Δ =($9,500 - $10,000)/$10,000 OR:
-5.00%(Absolute Value = 5.00%)

5.00% is ≥ 5.00%; therefore, PA is considered.

Adjustment calculation 2
Proposed Adjusted Total Unit Price$ 29,500.00
divided by
Initial Proposed Total Unit Price$ 30,000.00
=98.33%
The proposed adjusted total unit price is less than the initial proposed total unit price; an EPA is
applicable. Per FAR 52.216-4(c)(4), there is no percentage limitation on the amount of decreases that may
be made.

Step 4: Contractor's submitted PA meets the requirements for a price decrease. A modification to the delivery order is issued for the adjusted unit price of $29,500 shown in Step 2.

File details come from the government source that posted it. Updated .