This document contains a price model and template example for a federal contract opportunity to manufacture next generation aluminum pallets. The price model outlines an 18-month basic period and nine option periods totaling up to 108 months, with quantities ranging from 5 to 15,000 pallets per period. Pricing is proposed using firm-fixed-price and fixed-price-with-economic-price-adjustment contract line item numbers for pallets and non-recurring costs. Proposed unit pricing is broken into price subject to adjustment for aluminum content and price not subject to adjustment for other costs and profit. The template provides an example total evaluated price of $300 million. The related opportunity notice seeks proposals for the manufacturing and production of 463L air cargo pallets to specification MIL-DTL-27443. The Air Force Materiel Command intends to award an indefinite-delivery requirements contract with a period of performance as described in the price model. Offerors must provide five first article test pallets within 12 months of award.
Price Model
View the file
Other files for this federal contract opportunity
Show all 50
Next Generation All Aluminum Pallets has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Model, 07-24-19
| Company Name: | Attachment G |
| Address: | |
| POC: | |
| Phone Number: | |
| CAGE Code: | |
| Request for Proposal No. FA8534-18-R-0004 | |
| Next Generation Pallet |
BASIC PERIOD (18 months)
CLIN Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
| 0001 | First Article | FFP | 6 | EA | $ - 0 |
| 0002 | F/A Non Recurring Costs | FFP | 1 | EA | $ - 0 |
Total for Basic Period $ - 0
Option I (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) * PSA (See Note 1) ** PNSA (See Note 2) Unit Price Evaluated Price
| 1001 | Next Generation Cargo Pallet | FPE | 10,000 | |||||||
| Range | ||||||||||
| From | To | |||||||||
| 1 | 5,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 5,001 | 10,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 10,000 | Evaluated CLIN Price | $ - 0 |
Total for Option I $ - 0
Option II (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
| 2001 | Next Generation Cargo Pallet | FPE | 15,000 | |||||||
| Range | ||||||||||
| From | To | |||||||||
| 1 | 5,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 5,001 | 10,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 10,001 | 15,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 15,000 | Evaluated CLIN Price | $ - 0 |
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
2004 Accelerated Delivery Schedule FFP 1 EA $ - 0
Total for Option II $ - 0
Option III (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
| 3001 | Next Generation Cargo Pallet | FPE | 15,000 | |||||||
| Range | ||||||||||
| From | To | |||||||||
| 1 | 5,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 5,001 | 10,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 10,001 | 15,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 15,000 | Evaluated CLIN Price | $ - 0 |
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
3004 Accelerated Delivery Schedule FFP 1 EA $ - 0
Total for Option III $ - 0
Option IV (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
| 4001 | Next Generation Cargo Pallet | FPE | 13,000 | |||||||
| Range | ||||||||||
| From | To | |||||||||
| 1 | 5,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 5,001 | 10,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 10,001 | 13,000 | EA | 3,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 13,000 | Evaluated CLIN Price | $ - 0 |
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
4004 Accelerated Delivery Schedule FFP 1 EA $ - 0
| Total for Option IV | $ - 0 | |
| Option V (12 months) |
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
| 5001 | Next Generation Cargo Pallet | FPE | 13,000 | |||||||
| Range | ||||||||||
| From | To | |||||||||
| 1 | 5,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 5,001 | 10,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 10,001 | 13,000 | EA | 3,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 13,000 | Evaluated CLIN Price | $ - 0 |
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
5004 Accelerated Delivery Schedule FFP 1 EA $ - 0
Total for Option V $ - 0
Option VI (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
| 6001 | Next Generation Cargo Pallet | FPE | 13,000 | |||||||
| Range | ||||||||||
| From | To | |||||||||
| 1 | 5,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 5,001 | 10,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 10,001 | 13,000 | EA | 3,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 13,000 | Evaluated CLIN Price | $ - 0 |
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
6004 Accelerated Delivery Schedule FFP 1 EA $ - 0
Total for Option VI $ - 0
Option VII (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
| 7001 | Next Generation Cargo Pallet | FPE | 13,000 | |||||||
| Range | ||||||||||
| From | To | |||||||||
| 1 | 5,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 5,001 | 10,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 10,001 | 13,000 | EA | 3,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 13,000 | Evaluated CLIN Price | $ - 0 |
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
7004 Accelerated Delivery Schedule FFP 1 EA $ - 0
Total for Option VII $ - 0
Option VIII (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
| 8001 | Next Generation Cargo Pallet | FPE | 13,000 | |||||||
| Range | ||||||||||
| From | To | |||||||||
| 1 | 5,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 5,001 | 10,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 10,001 | 13,000 | EA | 3,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 13,000 | Evaluated CLIN Price | $ - 0 |
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
8004 Accelerated Delivery Schedule FFP 1 EA $ - 0
Total for Option VIII $ - 0
Option IX (06 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
| 9001 | Next Generation Cargo Pallet | FPE | 13,000 | |||||||
| Range | ||||||||||
| From | To | |||||||||
| 1 | 5,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 5,001 | 10,000 | EA | 5,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 10,001 | 13,000 | EA | 3,000 | 284.50 | $ - 0 | $ - 0 | $ - 0 | |||
| 13,000 | Evaluated CLIN Price | $ - 0 |
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
9004 Accelerated Delivery Schedule FFP 1 EA $ - 0
| Total for Option IX | $ - 0 |
| Total Evaluated Price | $ - 0 |
| * Price Subject to Adjustment (Aluminum $ contained within unit price) |
| NOTE 1: Per FAR 16.203-4 (c)(4)(ii), when adjustments are made, they shall not include indirect cost or profit. |
| ** Price Not Subject to Adjustment |
| NOTE 2: Includes all remaining unit costs and profit not proposed under the PSA. |
TEP Example, 07-24-19 BASIC PERIOD (18 months)
CLIN Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
| 0001 | First Article | FFP | 6 | EA | $ 2,000.00 | $ 12,000.00 |
| 0002 | F/A Non Recurring Costs | FFP | 1 | EA | $ 1,000.00 | $ 1,000.00 |
Total for Basic Period $ 13,000.00
Option I (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) * PSA (See Note 1) ** PNSA (See Note 2) Unit Price Evaluated Price
| 1001 | Next Generation Cargo Pallet | FPE | 10,000 | |||||||||
| Range | ||||||||||||
| From | To | |||||||||||
| 1 | 5,000 | EA | 5,000 | 284.50 | $ 20.00 | $ 5,690.00 | $ 1,800.00 | $ 7,490.00 | $ 37,450,000.00 | |||
| 5,001 | 10,000 | EA | 5,000 | 284.50 | $ 20.00 | $ 5,690.00 | $ 1,800.00 | $ 7,490.00 | $ 37,450,000.00 | |||
| 10,000 | Evaluated CLIN Price | $ 74,900,000.00 |
Total for Option I $ 74,900,000.00
Option II (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
| 2001 | Next Generation Cargo Pallet | FPE | 15,000 | |||||||||
| Range | ||||||||||||
| From | To | |||||||||||
| 1 | 5,000 | EA | 5,000 | 284.50 | $ 21.00 | $ 5,974.50 | $ 1,900.00 | $ 7,875.00 | $ 39,375,000.00 | |||
| 5,001 | 10,000 | EA | 5,000 | 284.50 | $ 21.00 | $ 5,974.50 | $ 1,900.00 | $ 7,875.00 | $ 39,375,000.00 | |||
| 10,001 | 15,000 | EA | 5,000 | 284.50 | $ 21.00 | $ 5,974.50 | $ 1,900.00 | $ 7,875.00 | $ 39,375,000.00 | |||
| 15,000 | Evaluated CLIN Price | $ 118,125,000.00 |
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
2004 Accelerated Delivery Schedule FFP 1 EA $ 1,000.00 $ 1,000.00
Total for Option II $ 118,126,000.00
Option III (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
3001 Next Generation Cargo Pallet FPE Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
3004 Accelerated Delivery Schedule FFP Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.
Total for Option III Etc.
Option IV (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
4001 Next Generation Cargo Pallet FPE Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
4004 Accelerated Delivery Schedule FFP Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.
| Total for Option IV | Etc. | |
| Option V (12 months) |
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
5001 Next Generation Cargo Pallet FPE Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
5004 Accelerated Delivery Schedule FFP Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.
Total for Option V Etc.
Option VI (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
6001 Next Generation Cargo Pallet FPE Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
6004 Accelerated Delivery Schedule FFP Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.
Total for Option VI Etc.
Option VII (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
7001 Next Generation Cargo Pallet FPE Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
7004 Accelerated Delivery Schedule FFP Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.
Total for Option VII Etc.
Option VIII (12 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
8001 Next Generation Cargo Pallet FPE Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
8004 Accelerated Delivery Schedule FFP Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc. Etc.
Total for Option VIII Etc.
Option IX (06 months)
CLIN Description CLIN Type BEQ Unit/Issue Evaluated Qty Aluminum (Lbs) $/Lb. (Aluminum) PSA PNSA Unit Price Evaluated Price
| 9001 | Next Generation Cargo Pallet | FPE | 13,000 | |||||||||
| Range | ||||||||||||
| From | To | |||||||||||
| 1 | 5,000 | EA | 5,000 | 284.50 | $ 22.00 | $ 6,259.00 | $ 2,000.00 | $ 8,259.00 | $ 41,295,000.00 | |||
| 5,001 | 10,000 | EA | 5,000 | 284.50 | $ 22.00 | $ 6,259.00 | $ 2,000.00 | $ 8,259.00 | $ 41,295,000.00 | |||
| 10,001 | 13,000 | EA | 3,000 | 284.50 | $ 22.00 | $ 6,259.00 | $ 2,000.00 | $ 8,259.00 | $ 24,777,000.00 | |||
| 13,000 | Evaluated CLIN Price | $ 107,367,000.00 |
Description CLIN Type Quantity Unit/Issue Unit Price Evaluated Price
9004 Accelerated Delivery Schedule FFP 1 EA $ 1,100.00 $ 1,100.00
| Total for Option IX | $ 107,368,100.00 |
| Total Evaluated Price | $ 300,407,100.00 |
| * Price Subject to Adjustment (Aluminum $ contained within unit price) |
| NOTE 1: Per FAR 16.203-4 (c)(4)(ii), when adjustments are made, they shall not include indirect cost or profit. |
| ** Price Not Subject to Adjustment |
| NOTE 2: Includes all remaining unit costs and profit not proposed under the PSA. |
EPA example, 07-24-19
| Example of EPA Increase | ||||||
| Step 1: PCO identifies baseline costs in the basic contract. | ||||||
| Contract Schedule | ||||||
| U/I | Price Subject to Adjustment (PSA) (Note 1) | Price Not Subject to Adjustment (PNSA) (Note 2) | Total Unit Price | |||
| Structural Product Material (Identified Below) | QTY (Pounds) | Price | Total | |||
| Aluminum | Pounds | 1000 | $ 10.00 | $ 10,000.00 | ||
| Unit Price | EA | $ 10,000.00 | $ 20,000.00 | $ 30,000.00 |
| Step 2: PCO reviews new costs in contractor's submitted proposal adjustment (PA). | ||||||
| PA submitted by Contractor | ||||||
| U/I | Contractor's Proposed Adjustment to PSA (Note 1) | Price Not Subject to Adjustment (Note 2) | Adjusted Unit Price | |||
| Structural Product Material (Identified Below) | QTY (Pounds) | Price | Total | |||
| Aluminum | Pounds | 1000 | $ 11.00 | $ 11,000.00 | ||
| Unit Price | EA | $ 11,000.00 | $ 20,000.00 | $ 31,000.00 |
| NOTE 1: Per FAR 16.203-4 (c)(4)(ii), when adjustments are made, they shall not include |
| indirect cost or profit. |
| NOTE 2: Includes all remaining unit costs and profit not proposed under the PSA. |
| Step 3: PCO determines if any adjustments are applicable. | |
| Adjustment calculation 1 | |
| A = | $ 11,000.00 |
| U = | $ 10,000.00 |
| Δ = | ($11,000 - $10,000)/$10,000 OR: |
| 10.00% |
10.00% is ≥ 5.00%; therefore, PA is considered.
| Adjustment calculation 2 | ||
| Proposed Adjusted Total Unit Price | $ 31,000.00 | |
| divided by | ||
| Initial Proposed Total Unit Price | $ 30,000.00 | |
| = | 103.33% |
| The proposed adjusted total unit price is no more than 10.00% higher than the initial proposed total |
| unit price. An EPA is applicable. |
Step 4: Contractor's submitted PA meets the requirements for a price increase. A modification to the delivery order is issued for the adjusted unit price of $31,000 shown in Step 2.
| Example of EPA Increase capped at 10% | ||||||
| Step 1: PCO identifies baseline costs in the basic contract. | ||||||
| Contract Schedule | ||||||
| U/I | Price Subject to Adjustment (Note 1) | Price Not Subject to Adjustment (Note 2) | Total Unit Price | |||
| Structural Product Material (Identified Below) | QTY (Pounds) | Price | Total | |||
| Aluminum | Pounds | 1000 | $ 10.00 | $ 10,000.00 | ||
| Unit Price | EA | $ 10,000.00 | $ 20,000.00 | $ 30,000.00 |
| Step 2: PCO reviews new costs in contractor's submitted proposal adjustment. | ||||||
| PA submitted by Contractor | ||||||
| U/I | Contractor's Proposed Adjustment to PSA (Note 1) | Price Not Subject to Adjustment (Note 2) | Adjusted Unit Price | |||
| Structural Product Material (Identified Below) | QTY (Pounds) | Price | Total | |||
| Aluminum | Pounds | 1000 | $ 15.00 | $ 15,000.00 | ||
| Unit Price | EA | $ 15,000.00 | $ 20,000.00 | $ 35,000.00 |
| NOTE 1: Per FAR 16.203-4 (c)(4)(ii), when adjustments are made, they shall not include |
| indirect cost or profit. |
| NOTE 2: Includes all remaining unit costs and profit not proposed under the PSA. |
| Step 3: PCO determines if any adjustments are applicable. | |
| Adjustment calculation 1 | |
| A = | $ 15,000.00 |
| U = | $ 10,000.00 |
| Δ = | ($15,000 - $10,000)/$10,000 OR: |
| 50.00% |
50.00% is ≥ 5.00%; therefore, PA is considered.
| Adjustment calculation 2 | ||
| Proposed Adjusted Total Unit Price | $ 35,000.00 | |
| divided by | ||
| Initial Proposed Total Unit Price | $ 30,000.00 | |
| = | 116.67% |
| The proposed adjusted total unit price is more than 10.00% higher than the initial proposed total unit |
| price. An EPA is applicable, but per FAR 52.216-4(c)(4), the increase will be capped at 10.00% higher than |
| the initial proposed total unit price. |
| Adjustment calculation 3 (capped at 10.00%) | ||
| Initial Proposed Total Unit Price | $ 30,000.00 | |
| multiplied by | 110.00% | |
| = | ||
| Adjusted Total Unit Price w/10.00% cap | $ 33,000.00 |
Step 4: Contractor's submitted PA meets the requirements for a price increase. The increase is capped at 10.00% higher than the initial proposed total unit price. A modification to the delivery order is issued for the adjusted unit price of $33,000 shown in Adjustment calculation 3.
| Example of EPA Decrease | ||||||
| Step 1: PCO identifies baseline costs in the basic contract. | ||||||
| Contract Schedule | ||||||
| U/I | Price Subject to Adjustment (Note 1) | Price Not Subject to Adjustment (Note 2) | Total Unit Price | |||
| Structural Product Material (Identified Below) | QTY (Pounds) | Price | Total | |||
| Aluminum | Pounds | 1000 | $ 10.00 | $ 10,000.00 | ||
| Unit Price | EA | $ 10,000.00 | $ 20,000.00 | $ 30,000.00 |
| Step 2: PCO reviews new costs in contractor's submitted proposal adjustment. | ||||||
| PA submitted by Contractor | ||||||
| U/I | Contractor's Proposed Adjustment to PSA (Note 1) | Price Not Subject to Adjustment (Note 2) | Adjusted Unit Price | |||
| Structural Product Material (Identified Below) | QTY (Pounds) | Price | Total | |||
| Aluminum | Pounds | 1000 | $ 9.50 | $ 9,500.00 | ||
| Unit Price | EA | $ 9,500.00 | $ 20,000.00 | $ 29,500.00 |
| NOTE 1: Per FAR 16.203-4 (c)(4)(ii), when adjustments are made, they shall not include |
| indirect cost or profit. |
| NOTE 2: Includes all remaining unit costs and profit not proposed under the PSA. |
| Step 3: PCO determines if any adjustments are applicable. | ||
| Adjustment calculation 1 | ||
| A = | $ 9,500.00 | |
| U = | $ 10,000.00 | |
| Δ = | ($9,500 - $10,000)/$10,000 OR: | |
| -5.00% | (Absolute Value = 5.00%) |
5.00% is ≥ 5.00%; therefore, PA is considered.
| Adjustment calculation 2 | ||
| Proposed Adjusted Total Unit Price | $ 29,500.00 | |
| divided by | ||
| Initial Proposed Total Unit Price | $ 30,000.00 | |
| = | 98.33% |
| The proposed adjusted total unit price is less than the initial proposed total unit price; an EPA is |
| applicable. Per FAR 52.216-4(c)(4), there is no percentage limitation on the amount of decreases that may |
| be made. |
Step 4: Contractor's submitted PA meets the requirements for a price decrease. A modification to the delivery order is issued for the adjusted unit price of $29,500 shown in Step 2.