This document contains questions and answers regarding a solicitation for the manufacturing and production of item 463L Air Cargo Pallets. The solicitation will result in an indefinite delivery, requirements-type contract with an 18-month basic period and seven one-year option periods, as well as a six-month option period. The contractor will be responsible for manufacturing and delivering first article pallets for testing within 12 months of award. Production quantities will range from 5 pallets for first article testing during the basic period to a maximum of 15,000 pallets per year during later option periods. The Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base will utilize tradeoff source selection procedures to make a best value award to a single contractor.

Q&A's

View the file

Other files

File Type Posted
RFP_Release_-_Questions_from_Industry_6Nov19.docx DOCX document
MIL-DTL-27443G.pdf PDF
FA853419R0001_______0004.pdf PDF
RFP_release_-_Questions_from_Industry_15Oct19.docx DOCX document
FA853419R0001_______0003.pdf PDF
CDRL_A006_Incoming_Inspection_and_Inventory_Report.pdf PDF
SectionL.doc DOC document
Price_Model_Revised.xlsx XLSX spreadsheet
Amended_MIL-DTL-27443G.pdf PDF
CenterPanelExtrusion201993428.STEP STEP file
CargoPalletAssembly201993426.STEP STEP file
FA853419R0001_______0002.pdf PDF
EdgeRailExtrusion201993430.STEP STEP file
Amended_Drawings_201993426.pdf PDF
IntermediatePanelExtrusion201993427.STEP STEP file
TieDownRingAssembly201993431.STEP STEP file
SidePanelExtrusion201993429.STEP STEP file
HuckRivetToolNoseAssembly201993432.STEP STEP file
RFP_release_-_Questions_from_Industry.docx DOCX document
FA853419R0001_______0001.pdf PDF
ppi_tool.accdb MDB file
Transportation_DD_Form_1653.pdf PDF
Eng_Data_List.pdf PDF
Next_Gen_Cargo_Pallet_Replacement_MIL_DTL_27443G.pdf PDF
Center_Panel_Extrusion_(X201993428).STEP STEP file
Cargo_Pallet_Assembly_(X201993426).STEP STEP file
Side_Panel_Extrusion_(X201993429).STEP STEP file
Packaging_AF_Form_158.pdf PDF
Tie-Down_Ring_Assembly_(X201993431).STEP STEP file
Intermediate_Panel_Extrusion_(X201993427).STEP STEP file
Edge_Rail_Extrusion_(X201993430).STEP STEP file
SOW_Next_Gen.pdf PDF
Next_Gen_Past_Performance_Questionnaire_FINAL.docx DOCX document
Section_L_Final.pdf PDF
CDRLS_A001_-_A010.pdf PDF
Drawing_Package.pdf PDF
FA853419R0001.pdf PDF
ppi_tool.accdb MDB file
Price_Model,_final.xlsx XLSX spreadsheet
Section_M_Final.pdf PDF
Intermediate_Panel_Extrusion_(X201993427).STEP STEP file
Tie-Down_Ring_Assembly_(X201993431).STEP STEP file
Center_Panel_Extrusion_(X201993428).STEP STEP file
Edge_Rail_Extrusion_(X201993430).STEP STEP file
Q&As_4.pdf PDF
Side_Panel_Extrusion_(X201993429).STEP STEP file
Cargo_Pallet_Assembly_(X201993426).STEP STEP file
Pre-Solicitation_Conference_Questions_Final.pdf PDF
Revised_Drawings.pdf PDF
Agenda.docx DOCX document
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. (Reference RFP Questins 18, Drawing 201993426, note 8) Note 8 states; “COAT 1/2" OF RIVET SHANK WITH MIL-DTL-53022, TYPE IV EPOXY. DRIVE THE RIVET WHILE PRESERVATIVE IS WET, 66 PLACES. USE 201993432 ALTERED ITEM HUCK RIVET TOOL NOSE ASSEMBLY TO ENSURE PROPER SWAGING OF RIVET HEADS.” Drawing 201993432 has not been published on FBO. Please provide drawing or confirm that drawing is not needed.

Drawing has now been published in FBO

2. Answers to Questions 22 and 53 released on 9/23 state “legend was added.” Please provide the legend or advise where the legend was added. Did the Government intend to upload updated RFP documents? Sections L&M will be uploaded to FBO. Legend is as follows:

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

3. The Government removed the cross reference matrix in Volume I, but it is still in Section L.II.A under description of Volume I. Is it still a requirement? No, it is not a requirement.

4. Are you going to use only one manufacturer or possibly contract this out to several companies based on the numbers required? We plan on awarding to a single source.

5. In Amendment 0002 released earlier this week, there is reference to an “amended CDRL A006.” Did the Government intend to upload a revised version of CDRL A006 to FBO? Yes, uploaded with Amendment 003.