E002_Engineering_Change_Proposal_dtd_72215.pdf
PDF 60 KB Posted
- Attached to
- 10K, 50K, & 210K Collapsible Fuel Tanks
- Solicitation number
- FA8533-16-R-0002
About this file
CDRL E002 dated 22 JUL 2015
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved
(1 Data Item) OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
F. CONTRACTORD. SYSTEM ITEM E. CONTRACT/PR NO.
FD2060-1 -
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
E00 Engineering Change Proposal
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI- -80639 SOW para 3.5.2 AFLCMC/WNZE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
SD ASREQ ASREQ b. COPIES
8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
A N/A N/A Reg Repr o
16. REMARKS AFLCMC/
WNZE 0 2 0
After the product baseline is established, the contractor shall incorporate all changes to master baseline via approved ECPs. A Notice of Revision (NOR) shall be submitted with each ECP. All ECPs shall include applicable Technical Manual changes as required. After Government approval of the ECP, the contractor shall be responsible for submitting updated Technical Manuals to reflect the changes made in the ECP.
BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors. Other requests for this document shall be referred to AFLCMC/WNZE .
BLK 14: Documents shall be provided via electronic media utilizing standard Microsoft Office applications. Both hard copies and CD-ROM or DVD shall be submitted via e-mail to:
Support Equipment & Vehicles Division
ATTN: AFLCMC/WNZE
235 Byron Street, Suite 19A Robins AFB GA 31098-1813 e-mail: @us.af.mil
Notification of submission shall be provided to the PCO via e-mail.
15. Total 2
H. DATE I. APPROVED BY J. DATEG. PREPARED BY
DD FORM 1423-1, Feb 2001 Previous editions are obsolete Page of Pages
07/22/2015
LIKOS.WILLIAM
.E.1247033170
Digitally signed by
LIKOS.WILLIAM.E.1247033170
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=LIKOS.WILLIAM.E.1247033170 Date: 2015.07.22 14:23:13 -04'00'
SPANGENBERG.NAT
ALIA.W.1287748988
Digitally signed by SPANGENBERG.NATALIA.W.1287748988 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=SPANGENBERG.NATALIA.W.1287748988 Date: 2015.07.22 15:02:22 -04'00'
File details come from the government source that posted it. Updated .