Attachment_4_Transmittal_Letter.pdf

PDF 17 KB Posted

Attached to
10K, 50K, & 210K Collapsible Fuel Tanks
Solicitation number
FA8533-16-R-0002
Issued by

About this file

Attachment 4 Transmittal Letter

View the file

Other files

File Type Posted
FAX_NOTICE.pdf PDF
Questions_and_Answers_dtd_03_FEB_16.pdf PDF
Rev_Att_1_MIL32233B_dtd_02FEB2016.pdf PDF
FA853316R0002_______0003.pdf PDF
Questions_and_Answers_dtd_27_JAN_16.pdf PDF
Questions_and_Answers_dtd_19_JAN_16.pdf PDF
Questions_and_Answers_dtd_11_JAN_16.pdf PDF
E004_Request_for_Variance_dtd_72215.pdf PDF
FA853316R0002_______0002.pdf PDF
E001_Product_Base_Line_Index_dtd__3Dec14.pdf PDF
E003_Notice_of_Revision_dtd_22july2015.pdf PDF
E002_Engineering_Change_Proposal_dtd_72215.pdf PDF
B001_Technical_Report-Study_Services_dtd_3Dec14.pdf PDF
Initial_Provisioning_Performance_Spec_(IPPS).pdf PDF
SOW_dtd_21Jul2015.pdf PDF
FA853316R0002_______0001.pdf PDF
210K_EDL_5430015114293.pdf PDF
Attachment_1_FACTS_Sheet.pdf PDF
Attachment_6_Excel_Price_Model_.xlsx XLSX spreadsheet
Attachment_3_Questionnaire_Tracking_Record.pdf PDF
FA853316R0002.pdf PDF
10K__EDL_5430015112125.pdf PDF
Attachment_2_Questionnaire.pdf PDF
MIL-PRF-32233B_ _Attachment_I.pdf PDF
B003_FATest_Inspection_Report.pdf PDF
A001_Conference_Agenda.pdf PDF
50K_EDL_5430015178580.pdf PDF
Attachment_5_Client_Authorization_Ltr.pdf PDF
D002_Engineering_Data_for_Provisioning.pdf PDF
E004_Request_for_Deviation.pdf PDF
E002_Engineering_Change_Proposal.pdf PDF
B002_FATest_Procedures.pdf PDF
IUIDs.pdf PDF
D001_Logistics_Product_Data.pdf PDF
A002_Conference_Minutes.pdf PDF
E003_Notice_of_Revision.pdf PDF
Packaging_Requirements.pdf PDF
C001_TMCR.pdf PDF
E001_Product_Base_Line_Index.pdf PDF
E005_Safety_Assessment_Report.pdf PDF
General_Engineering_Notes.pdf PDF
SOW_dtd_19_Dec_14.pdf PDF
A003_Contractor's_Monthly_Status_Report.pdf PDF
B001_Technical_Report-Study_Services.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

REQUEST FOR PROPOSAL (RFP) FA8533-16-R-0002

ATTACHMENT 4

Transmittal Letter To Be Completed By Offeror and included with Performance Questionnaire

MEMORANDUM FOR: [OFFEROR’S POC]

FROM: [OFFEROR’S ADDRESS AND POINT OF CONTACT]

SUBJECT: Past/Present Performance Questionnaire for Contract(s) .

1. We are currently responding to a Request for Proposal (RFP) from the Department of the Air Force (AF), Robins Air Force Base (RAFB) for the procurement of the 10,000, 50,000, and 210,000 Collapsible Fuel Tank program.

This RFP is being conducted as a best value type of acquisition and specifically requires that we, as an offeror, do the following:

The offeror shall send out -- and track the completion of -- the Present/Past Performance Questionnaire to each of the offeror’s teaming contractors’ and/or joint venture partners’ Points of Contact (POCs). The responsibility to send out and track the completion of the Past/Present Performance Questionnaires rests solely with the offeror - i.e., it shall not be delegated to any teaming contractors, and/or joint venture partners. The completed Past/Present Performance Questionnaire shall be submitted directly to the Government not later than [OFFEROR FILL-IN RFP CLOSING DATE]. Each of the offeror’s POCs shall fax or e-mail its completed Past/Present Performance Questionnaire directly to:

AFLCMC/WNKABB

Support Equipment and Vehicles Division Major Programs Contracting Office Attn: Desura Gates or Salena Arrington Robins AFB GA 31098-1813

Desura.Gates.1@us.af.mil or Salena.Arrington@us.af.mil

The telefax numbers are (478) 222-1854. Please have your POCs call Desura Gates at (478) 222- 1908 or Salena Arrington at (478) 222-1755 before telefaxing their response.

If sending electronically, the following applies:

Exchanges of source selection information between government and questionnaire respondents will be controlled by the Contracting Officer. Email may be used to transmit such information if the email can be sent and encrypted, and must include “Source Selection Information – See FAR 2.101 and 3.104” in the subject line of the email. In order to facilitate the sending and receiving of encrypted emails, a questionnaire respondent must use MS Outlook email configured to support encryption, or, a different email product that is S/MIME compatible and configured to support encryption. If you intend to submit your completed questionnaire via an encrypted email, you will need to contact the Buyer/Contracting Officer indicated below, prior to that first submittal, in order to exchange certificates used for encryption. To insure the process is working correctly, send a test encrypted message first (without including any source selection information). Email to: (insert email address). If a computer system cannot support encryption technology, the questionnaire respondent shall send the Government points of contact referenced above correspondence stating that he/she accepts the risk of sending and receiving unencrypted electronic mail.

When submitting correspondence via email, the Government will not accept correspondence that have utilized file compression utilities or file compression software, such as but not limited to “.zip” files or format.

FOR OFFICIAL USE ONLY

2. We have identified subject contract(s): __________________ as relevant to this acquisition and you as our POC.

As such, please take a few moments of your time to fill out the attached questionnaire and send it directly back to RAFB. The information contained in the completed Past/Present Performance Questionnaires is considered sensitive and cannot be released to us, the offeror. If you have any questions about the acquisition or the attached questionnaire, your questions must be directed back to the Government’s points of contact identified above. Thank you for your timely assistance.

Sincerely, [OFFEROR’S POINT OF CONTACT]

1 [2?] ATCH

Past/Present Performance Questionnaire [Client Authorization Letter(s), if applicable]

File details come from the government source that posted it. Updated .