00212_CDRL_A004_DI-NDTI-80566A.pdf

Data Item Description Rev. A PDF 237 KB Posted

Attached to
PLUG-IN UNIT, ELECTRICAL
Solicitation number
FA8517-15-Q-00212
Issued by

About this file

CONTRACT DATA REQUIREMENTS LIST A004

View the file

Other versions and copies of DI-NDTI-80566A

File Revision Posted Attached to
A17.5_90258634-02687-9025-8634_FACTORY_ACCEPTANCE_TEST-TEST_PROCEDURES_DI-NDTI-80566A_REV_12-18-2018.pdf Rev. A, Dec 18, 2018 Printed Circuit Boards (PCB) Design
Attachment_14_A00D_DI-NDTI-80566A.pdf Rev. A Amendment-1 RFP FA8119-25-R-0011 Multi-platform Sustainment Engineering Services Support
Attachment_13_A00D_DI-NDTI-80566A.pdf Rev. A Draft Solicitation FA8119-25-R-0011 Multi-platform Sustainment Engineering Services Support
CDRL_A009 DI-NDTI-80566A-T- Wheel Set Test Plan.pdf Rev. A Kohler Generator, HVAC, Wheel Set Repair
CDRL_A006 DI-NDTI-80566A-T-HVAC Test Plan.pdf Rev. A Kohler Generator, HVAC, Wheel Set Repair
CDRL_A002 DI-NDTI-80566A-T-Generator Test Plan.pdf Rev. A Kohler Generator, HVAC, Wheel Set Repair
0520-06 - TAC Repairs - DID DI-NDTI-80566A.pdf Rev. A Tapered Anechoic Chamber (TAC) Repairs
Attachment 7 DI-NDTI-80566A (Test Plan Update).pdf Rev. A BASE WIDE WI-FI AVIANO AIR BASE ITALY
CDRL A001 DI-NDTI-80566A Test Plan.pdf Rev. A Shock Testing
DINDTI80566A Test Plan Update.pdf Rev. A BASE WIDE WI-FI, AVIANO AIR BASE, ITALY
DINDTI80566A Test Plan Base Doc.pdf Rev. A BASE WIDE WI-FI, AVIANO AIR BASE, ITALY
09b. DI-NDTI-80566A (Test Plan) A002.pdf Rev. A 400 HR Diesel Engine Laboratory Testing
09b. DI-NDTI-80566A (Test Plan) A002.pdf Rev. A Diesel Engine Testing
9d DID DI-NDTI-80566A Test Plan.pdf Rev. A Procure a Cylindrical Grinder with its material components
CDRL A004 DI-NDTI-80566A test plan.pdf Rev. A Trailer Load Testing and Certification of 11-meter Expeditionary Rigid-Hull Inflatable Boat (11mEXP RIB) trailer
DI-NDTI-80566A.pdf Rev. A Radio and Equipment Upgrade
DI_NDTI_80566A.pdf Rev. A Inertial Navigation Element Remanufacture - Sole Source to Northrop Grumman
12139 CDRL A007 - Acceptance Test Procedures (ATP) - DID DI-NDTI-80566.pdf Revision not stated Flight Simulator Curved Screen
DI-NDTI-80566.pdf Revision not stated Mission Clean Power System
DI-NDTI-80566.pdf Revision not stated Robotic Welding System
Show all 20

Who attaches DI-NDTI-80566A

Other files

File Type Posted
00212_PKGRQMT_REPORT.pdf PDF
00212_TRNSPDATA_REPORT.pdf PDF
WD_SantaClara_CA.pdf PDF
00212PWS.docx DOCX document
00212_CDRL_A009_DI-MISC-81832.pdf PDF
00212_CDRL_A005_DI-NDTI-80809B.pdf PDF
00212_CDRL1_REPORT.pdf PDF
00212SOW_CAVAF_CFM_V17_8Aug2014.docx DOCX document
FA851715Q00212.pdf PDF
00212_CDRL_A001_DI-QCIC-80125B.pdf PDF
00212APCSAFE.doc DOC document
00212_CDRL_A006_DI-SAFT-81536-T.pdf PDF
00212_CDRL_A002_DI-QCIC-80126B.pdf PDF
00212_CDRL_A007_DI-MGMT-81803.pdf PDF
00212_CDRL_A008_Dl-MGMT-81804A.pdf PDF
WD_Cook_Illinois.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A004
title: Test Plan
sub:
auth: DI-NDTI-80566A
ref: PWS Para: 4.6
req_ofc: 410 SCMS/GULA
dd250: DD
appcode: A
dist: D
freq: ASREQ
asof: See Blk16
firstsub: See Blk16
subsub: See Blk16
addressee1:
draft1:
reg1:
repro1:
addressee2: Program Manager
draft2: 1
reg2: 1
repro2:
addressee3: 410 SCMS/GULA
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5: Program Engineer
draft5: 1
reg5: 1
repro5:
addressee6: 410 SCMS/GUEA
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8: Equipment Specialist
draft8: 1
reg8: 1
repro8:
addressee9: 410 SCMS/GULA
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11: PCO
draft11:
reg11: 1
repro11:
addressee12: AFSC/PZAAC
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14: ACO
draft14:
reg14: 1
repro14:
addressee15: DCMA
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 3
total_reg: 5
total_repro: 0
remarks:

Blk 4: Contractor format is acceptable:

Blks 11, 12, 13. The contractor shall submit the Acceptance Test Plan/Procedure to the Government 45 days prior to validation/verification. The Government shall have 15 days to evaluate and provide approval/disapproval. If disapproved, the Govt. shall resubmit to the contractor for correction and re-submission.

Block 14: Document submission shall be made electronically via MS Office (Power Point, Excel, or Word) 2010 format. Final submittal both via Email addresses and in Wide Area Work Flow (WAWF). Submittal in WAWF will be accepted/approved by Government personnel. When information is submitted in WAWF the contractor shall provide email notification to email addresses below:

Data delivery to PCO/ACO will be without enclosures.

Program Manager ryan.evangelo@us.af.mil

Program Engineer phong.pham@us.af.mi

Program Equip Specialist anthony.bruno@us.af.mil

PCO: AFSC/PZAAC

Franklin.Holland@robins.af.mil

group:
total_price:
prep_name: Phong Pham
line_item:
exhibit: A
xtdp: Yes
xtm: Off
othercat:
system: F-15 ESTS
ctr_no: FD2060-15-00212
contr: Northrop Grumman Corp.
remarksb:
Page2:
Reset:
2014-11-04T11:48:54-0500
PHAM.PHONG.D.1232216774
prep_date: 3 Nov 2014
app_by:
2014-11-05T16:04:15-0500
HEADLAND.PAUL.D.1246894490
app_date: 5 Nov 2014
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .